This type of contract is used by a
Client or Self Builder entering into an
agreement with a company or a
contractor to supply and install
equipment
Where Supply & Erect
Contract Needed?
The contract can be used for a wide variety
of supplies such as
CCTV system
Kitchen
Swimming pool
Sanitary Room
Furniture
Escalator
Advantages of Supply &
Erect Contract
Since most of the contractors are an
expert on their relevant field the errors
will be minimized
Client may get large discount for bigger
projects
Supplied & Installed by professionals
Disadvantages of Supply &
Erect Contract
Change of mind about products is not
possible for client
If the product is an imported item,
shipping charges & taxes could cost a
fortune for client
If there’s any repair needed in the future
client probably have to go back to the
same contractor
General Terms & Conditions
Included in the Supply & Erect
Contract
 general obligations of supplier and client
 work at client premises
 contract price and payment
 completion, testing and defects
 insurance and liability
 termination
 intellectual property
 disputes
Client’s Responsibility in
this Contract
 The Client shall be responsible for acquiring and
providing legal and physical possession of the Site
and access
 The Client shall acquire and pay for all permits,
approvals and licenses from all local, state or national
government authorities
 The Client shall be responsible for the continued
operation of the Facilities after Completion
 Accurate &timely payments as per the agreement
Contractor’s Responsibilities
in this Contract
Accurate time management for supply
& installation
Provide insurance for the labours
Examine all the items before installing
Keeps a perfect documentation to avoid
any dispute with client
Questions &
Clarifications?
Thank you.

More Related Content

What's hot

What's hot (17)

RISK MANAGEMENT IN CONSTRUCTION PROJECTS AS PER INDIAN SCENARIO
RISK MANAGEMENT IN CONSTRUCTION PROJECTS AS PER INDIAN SCENARIORISK MANAGEMENT IN CONSTRUCTION PROJECTS AS PER INDIAN SCENARIO
RISK MANAGEMENT IN CONSTRUCTION PROJECTS AS PER INDIAN SCENARIO
 
Hydropower engineering -Hydraulics
Hydropower engineering -HydraulicsHydropower engineering -Hydraulics
Hydropower engineering -Hydraulics
 
IRRIGATION METHODS, SOIL-WATER-PLANT RELATIONSHIPS
IRRIGATION METHODS, SOIL-WATER-PLANT RELATIONSHIPSIRRIGATION METHODS, SOIL-WATER-PLANT RELATIONSHIPS
IRRIGATION METHODS, SOIL-WATER-PLANT RELATIONSHIPS
 
Canal
CanalCanal
Canal
 
Lift irrigation
Lift irrigationLift irrigation
Lift irrigation
 
Mahan 03 oct 2013
Mahan 03 oct 2013Mahan 03 oct 2013
Mahan 03 oct 2013
 
LAND DRAINAGE- CLASSIFICATIONS, STEADY AND UNSTEADY STATE EQUATIONS
LAND DRAINAGE- CLASSIFICATIONS, STEADY AND UNSTEADY STATE EQUATIONSLAND DRAINAGE- CLASSIFICATIONS, STEADY AND UNSTEADY STATE EQUATIONS
LAND DRAINAGE- CLASSIFICATIONS, STEADY AND UNSTEADY STATE EQUATIONS
 
Methods of Irrigation
Methods of IrrigationMethods of Irrigation
Methods of Irrigation
 
FEASIBILITY STUDY OF TILA NADI HYDROPOWER PROJECT, JUMLA
FEASIBILITY STUDY OF TILA NADI HYDROPOWER PROJECT, JUMLAFEASIBILITY STUDY OF TILA NADI HYDROPOWER PROJECT, JUMLA
FEASIBILITY STUDY OF TILA NADI HYDROPOWER PROJECT, JUMLA
 
Chapter 3.pdf
Chapter 3.pdfChapter 3.pdf
Chapter 3.pdf
 
Irrigation canals
Irrigation canalsIrrigation canals
Irrigation canals
 
Canal structures
Canal structuresCanal structures
Canal structures
 
Canal headworks
Canal headworksCanal headworks
Canal headworks
 
Weirs and flumes with broad
Weirs and flumes  with broad Weirs and flumes  with broad
Weirs and flumes with broad
 
Epc contractor
Epc contractorEpc contractor
Epc contractor
 
Epc Vs Epcm
Epc Vs EpcmEpc Vs Epcm
Epc Vs Epcm
 
water distribution system & warabandi by Denish Jangid unit 2 Water Resources...
water distribution system & warabandi by Denish Jangid unit 2 Water Resources...water distribution system & warabandi by Denish Jangid unit 2 Water Resources...
water distribution system & warabandi by Denish Jangid unit 2 Water Resources...
 

Similar to SSupply and erect contract

Service contrat ppt / BSB
Service contrat ppt / BSBService contrat ppt / BSB
Service contrat ppt / BSBNur Assyahiddah
 
Episode 28 : Project Management Contract
Episode 28 : Project Management ContractEpisode 28 : Project Management Contract
Episode 28 : Project Management ContractSAJJAD KHUDHUR ABBAS
 
CONTRACTS AND ITS TYPES
CONTRACTS AND ITS TYPESCONTRACTS AND ITS TYPES
CONTRACTS AND ITS TYPESPundlik Rathod
 
Contracts and their types
Contracts and their typesContracts and their types
Contracts and their typesTouqeer1
 
2.12 procurement management 1
2.12  procurement management 12.12  procurement management 1
2.12 procurement management 1reddvise
 
Project procuremenet contract in ethiopia
Project procuremenet contract in ethiopiaProject procuremenet contract in ethiopia
Project procuremenet contract in ethiopiaGuta Mengesha
 
Guarantee mechanism for material supplied with guarantee certificates
Guarantee mechanism for material supplied with guarantee certificatesGuarantee mechanism for material supplied with guarantee certificates
Guarantee mechanism for material supplied with guarantee certificatesMECandPMV
 
Solar PPA Presentation
Solar PPA PresentationSolar PPA Presentation
Solar PPA Presentationmatt_UCI
 
Solar PPA Presentation
Solar PPA PresentationSolar PPA Presentation
Solar PPA Presentationmatt_UCI
 
types of contracts
 types of contracts types of contracts
types of contractsKEVINMISTRY8
 
Project insurance claims
Project insurance claimsProject insurance claims
Project insurance claimsgoyalvimal
 
W E Gen Srvc Agreement
W E Gen Srvc AgreementW E Gen Srvc Agreement
W E Gen Srvc AgreementJustin Testa
 
Risk Management For Contractors
Risk Management For ContractorsRisk Management For Contractors
Risk Management For Contractorsdawnpogue
 

Similar to SSupply and erect contract (20)

Contract- Vijay Suryawanshi
Contract- Vijay SuryawanshiContract- Vijay Suryawanshi
Contract- Vijay Suryawanshi
 
Project contracts
Project contractsProject contracts
Project contracts
 
Service contrat ppt / BSB
Service contrat ppt / BSBService contrat ppt / BSB
Service contrat ppt / BSB
 
Refrigeration Maintenance - ACR Today_ Croydon
Refrigeration Maintenance - ACR Today_ CroydonRefrigeration Maintenance - ACR Today_ Croydon
Refrigeration Maintenance - ACR Today_ Croydon
 
Episode 28 : Project Management Contract
Episode 28 : Project Management ContractEpisode 28 : Project Management Contract
Episode 28 : Project Management Contract
 
Surat warranty
Surat warrantySurat warranty
Surat warranty
 
CONTRACTS AND ITS TYPES
CONTRACTS AND ITS TYPESCONTRACTS AND ITS TYPES
CONTRACTS AND ITS TYPES
 
Contracts and their types
Contracts and their typesContracts and their types
Contracts and their types
 
2.12 procurement management 1
2.12  procurement management 12.12  procurement management 1
2.12 procurement management 1
 
Project procuremenet contract in ethiopia
Project procuremenet contract in ethiopiaProject procuremenet contract in ethiopia
Project procuremenet contract in ethiopia
 
Guarantee mechanism for material supplied with guarantee certificates
Guarantee mechanism for material supplied with guarantee certificatesGuarantee mechanism for material supplied with guarantee certificates
Guarantee mechanism for material supplied with guarantee certificates
 
Project contracting
Project contracting Project contracting
Project contracting
 
Solar PPA Presentation
Solar PPA PresentationSolar PPA Presentation
Solar PPA Presentation
 
A Guide to the Consumer Rights Act 2015
A Guide to the Consumer Rights Act 2015A Guide to the Consumer Rights Act 2015
A Guide to the Consumer Rights Act 2015
 
Contract
Contract Contract
Contract
 
Solar PPA Presentation
Solar PPA PresentationSolar PPA Presentation
Solar PPA Presentation
 
types of contracts
 types of contracts types of contracts
types of contracts
 
Project insurance claims
Project insurance claimsProject insurance claims
Project insurance claims
 
W E Gen Srvc Agreement
W E Gen Srvc AgreementW E Gen Srvc Agreement
W E Gen Srvc Agreement
 
Risk Management For Contractors
Risk Management For ContractorsRisk Management For Contractors
Risk Management For Contractors
 

Recently uploaded

A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityMorshed Ahmed Rahath
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Arindam Chakraborty, Ph.D., P.E. (CA, TX)
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptDineshKumar4165
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayEpec Engineered Technologies
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptxJIT KUMAR GUPTA
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.Kamal Acharya
 
Unit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfUnit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfRagavanV2
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXssuser89054b
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaOmar Fathy
 
22-prompt engineering noted slide shown.pdf
22-prompt engineering noted slide shown.pdf22-prompt engineering noted slide shown.pdf
22-prompt engineering noted slide shown.pdf203318pmpc
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfJiananWang21
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfKamal Acharya
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startQuintin Balsdon
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 

Recently uploaded (20)

A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Standard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power PlayStandard vs Custom Battery Packs - Decoding the Power Play
Standard vs Custom Battery Packs - Decoding the Power Play
 
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
COST-EFFETIVE  and Energy Efficient BUILDINGS ptxCOST-EFFETIVE  and Energy Efficient BUILDINGS ptx
COST-EFFETIVE and Energy Efficient BUILDINGS ptx
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
Unit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdfUnit 2- Effective stress & Permeability.pdf
Unit 2- Effective stress & Permeability.pdf
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
Introduction to Serverless with AWS Lambda
Introduction to Serverless with AWS LambdaIntroduction to Serverless with AWS Lambda
Introduction to Serverless with AWS Lambda
 
22-prompt engineering noted slide shown.pdf
22-prompt engineering noted slide shown.pdf22-prompt engineering noted slide shown.pdf
22-prompt engineering noted slide shown.pdf
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
data_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdfdata_management_and _data_science_cheat_sheet.pdf
data_management_and _data_science_cheat_sheet.pdf
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort ServiceCall Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
Call Girls in Netaji Nagar, Delhi 💯 Call Us 🔝9953056974 🔝 Escort Service
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
 

SSupply and erect contract

  • 1. Supply and Erect Contract Presented by T.Thananchayan & A.S.M.Muneeb
  • 2. Supply & Erect Contract This type of contract is used by a Client or Self Builder entering into an agreement with a company or a contractor to supply and install equipment
  • 3. Where Supply & Erect Contract Needed? The contract can be used for a wide variety of supplies such as CCTV system Kitchen Swimming pool Sanitary Room Furniture Escalator
  • 4.
  • 5.
  • 6. Advantages of Supply & Erect Contract Since most of the contractors are an expert on their relevant field the errors will be minimized Client may get large discount for bigger projects Supplied & Installed by professionals
  • 7. Disadvantages of Supply & Erect Contract Change of mind about products is not possible for client If the product is an imported item, shipping charges & taxes could cost a fortune for client If there’s any repair needed in the future client probably have to go back to the same contractor
  • 8. General Terms & Conditions Included in the Supply & Erect Contract  general obligations of supplier and client  work at client premises  contract price and payment  completion, testing and defects  insurance and liability  termination  intellectual property  disputes
  • 9. Client’s Responsibility in this Contract  The Client shall be responsible for acquiring and providing legal and physical possession of the Site and access  The Client shall acquire and pay for all permits, approvals and licenses from all local, state or national government authorities  The Client shall be responsible for the continued operation of the Facilities after Completion  Accurate &timely payments as per the agreement
  • 10. Contractor’s Responsibilities in this Contract Accurate time management for supply & installation Provide insurance for the labours Examine all the items before installing Keeps a perfect documentation to avoid any dispute with client