SlideShare a Scribd company logo
1 of 6
Consultant
Sudarmono Sasmono
•Major : Electrical Power Engineering
•List of Competence :
– Power system planning and power system economic
– Friendly environment power plant
– Risk Analysis, Risk Engineering and Decision Making on Electrical Power System
– Energy and Electricity Policy
•IEEE Power and Energy Society (Member No 92352179)
•Indonesian Society of Engineer and Technician (Member No 001.15.0045255)
Selected Working Experiences
• Power System Study (Only last 3 years)
PROJECT NAME LOCATION CLIENT POSITION JOB DESCRIPTION IN PROJECT DATE
Feasibility Study of
Development Independent
Power Producer in Northern
Sumatera Region
Medan, North
Sumatera
PT Pertamina Electrical Engineer
Power and Energy Demand
Supply Analysis
2014 (6 months)Power System Study (Load Flow
Analysis and Short Circuit
Analysis) when IPP connected to
Sumatera Interconection
System
Feasibility Study of
Hydropower Plant (HPP)
Kalaena 2 x 26,50 MW -
Electrical Aspects
South Sulawesi
PT Sumber
Rahmat Pertiwi
Power System
Planning Expert
Power and Energy Demand
Supply Analysis
2014 (2 months)
Power System Study (Load Flow
Analysis, Short Circuit Analysis
and Stability) when HPP Kalaena
connected to Sulselrabar
Electrical System
Feasibility Study of
Hydropower Plant (HPP) Salu
Uro 2 x 47,50 MW - Electrical
Aspects
South Sulawesi
PT Tirta Energi
Cemerlang
Power System
Planning Expert
Power and Energy Demand
Supply Analysis
2014 (2 months)
Power System Study (Load Flow
Analysis, Short Circuit Analysis
and Stability) when HPP Salu
Uro connected to Sulselrabar
Electrical System
Selected Working Experiences (2)
PROJECT NAME LOCATION CLIENT POSITION JOB DESCRIPTION IN PROJECT DATE
Feasibility Study of
Hydropower Plant (HPP) Air
Putih 3 x 7 MW - Electrical
Aspects
Bengkulu
PT Bangun
Tirta Lestari
Power System
Planning Expert
Power and Energy Demand
Supply Analysis
2014 (2 months)Power System Study (Load
Flow Analysis, Short Circuit
Analysis and Stability) when
HPP Air Putih connected to
Sulselrabar Electrical System
Feasibility Study of Nuclear
Power Plant in Bangka - Non
Site Aspects
Bangka
PT PLN
(Persero)
Transmission Planning
Junior Expert
Energy Analysis
2012 - 2013
Spatial Demand Forecasting
Generation Expansion Planning
Transmission Expansion
Planning (Including
Transmission Route and Power
System Analysis)
• Power System Study (Only last 3 years)
Selected Working Experiences (3)
PROJECT NAME LOCATION CLIENT POSITION JOB DESCRIPTION IN PROJECT DATE
Academic studies on Inventory
and Evaluation of Process
Diversion Status PT PLN
Tarakan to PT PLN (Persero)
Tarakan,
North
Kalimantan
Local
Government
of Tarakan
City
Team Leader
Data collection on technical
conditions, financial and other
conditions of PT PLN Tarakan
2014 ( 3 months)
Data analysis as basic to make
recommendation for Diversion
Status PT PLN Tarakan to PT PLN
(Persero)
Electricity Supply and Demand
Analysis in Halmahera
Halmahera,
North Maluku
PT Star Energy
Geothermal
Halmahera
Power System
Planning Expert
Data collection on any variables
which are have correlation on
electricity demand
2014 ( 3 months)
Data analysis as basic to make
recommendation for
development Geothermal
Power Plant base on Electricity
Supply Demand Balance
Market Assessment of
Wholesale Fuel for Mining
Companies in Kalimantan
East
Kalimantan,
South
Kalimantan
and Central
Kalimantan
Exxon Mobil
Asia Pasific
Pte Ltd
Researcher
Survey on distribution line of
wholesale fuel for mining
companies expecially coal
mining companies in Kalimantan
2014 (6 months)
Data analysis as basic to make
recommendation strategy on
wholesale fuel marketing
• Energy and Electricity Policy/Decision Making (Only last 3 years)
Selected Working Experiences (4)
PROJECT NAME LOCATION CLIENT POSITION JOB DESCRIPTION IN PROJECT DATE
Strategic Assessment Of
Opportunities in Oil & Gas
Industry For Temporary Power
And Operation & Maintenance
Cilacap,
Indramayu,
and Jambi
PT Sewatama Researcher
Survey on Oil and Gas Facility
such as Refinery, Depot and
others
2014 ( 3 months)Data analysis as basic to make
recommendation on marketing
strategy for temporary power in
Oil and Gas Industry
Study on Patterns and
Mechanism to improved power
plant efficiency through Cost
Benefit Analysis in the
Framework of Implementation
of Performance Based
Regulatory (PBR) for the
Control of Electricity Subsidy
Indonesia
Ministry of
Energy and
Mineral
Resources
Electrical Power
Engineering Expert
Survey on any type of power
plant which are operating in
Indonesia
2014 (5 months)Data analysis as basic to make
recommendation on
mechanism to improved power
plant efficiency
The preparation of the
Regional Electricity General
Plan on West Bangka Regency
West Bangka
West Bangka
Office for
Energy and
Mineral
Resources
Team Leader
Survey on any secondary data
of electricity demand and
supply in West Bangka. Also,
survey on visible primary
energy on West Bangka
2012 (2 months)
Data analysis as basic to make
recommendation on Electricity
plan in West Bangka
• Energy and Electricity Policy/Decision Making (Only last 3 years)
Selected Working Experiences (4)
PROJECT NAME LOCATION CLIENT POSITION JOB DESCRIPTION IN PROJECT DATE
Strategic Assessment Of
Opportunities in Oil & Gas
Industry For Temporary Power
And Operation & Maintenance
Cilacap,
Indramayu,
and Jambi
PT Sewatama Researcher
Survey on Oil and Gas Facility
such as Refinery, Depot and
others
2014 ( 3 months)Data analysis as basic to make
recommendation on marketing
strategy for temporary power in
Oil and Gas Industry
Study on Patterns and
Mechanism to improved power
plant efficiency through Cost
Benefit Analysis in the
Framework of Implementation
of Performance Based
Regulatory (PBR) for the
Control of Electricity Subsidy
Indonesia
Ministry of
Energy and
Mineral
Resources
Electrical Power
Engineering Expert
Survey on any type of power
plant which are operating in
Indonesia
2014 (5 months)Data analysis as basic to make
recommendation on
mechanism to improved power
plant efficiency
The preparation of the
Regional Electricity General
Plan on West Bangka Regency
West Bangka
West Bangka
Office for
Energy and
Mineral
Resources
Team Leader
Survey on any secondary data
of electricity demand and
supply in West Bangka. Also,
survey on visible primary
energy on West Bangka
2012 (2 months)
Data analysis as basic to make
recommendation on Electricity
plan in West Bangka
• Energy and Electricity Policy/Decision Making (Only last 3 years)

More Related Content

Similar to Sudarmono Sasmono

Wind Resource Engineer - Professional Profile
Wind Resource Engineer - Professional ProfileWind Resource Engineer - Professional Profile
Wind Resource Engineer - Professional Profile
Deeshith Jain
 
CV Haris Hakim - Electrical Engineer-1
CV Haris Hakim - Electrical Engineer-1CV Haris Hakim - Electrical Engineer-1
CV Haris Hakim - Electrical Engineer-1
Haris Hakim
 
ori PAUSON CV ING ed.
ori PAUSON CV ING ed.ori PAUSON CV ING ed.
ori PAUSON CV ING ed.
Selorm Pauson
 
Aryadipta Jena_Experience as an Analyst in Energy-1
Aryadipta Jena_Experience as an Analyst in Energy-1Aryadipta Jena_Experience as an Analyst in Energy-1
Aryadipta Jena_Experience as an Analyst in Energy-1
Arya Jena
 
Nathan's Resume - Sept 2016
Nathan's Resume - Sept 2016Nathan's Resume - Sept 2016
Nathan's Resume - Sept 2016
Nathan Sender
 

Similar to Sudarmono Sasmono (20)

CV_Rachmad Arif
CV_Rachmad ArifCV_Rachmad Arif
CV_Rachmad Arif
 
salient_features_of_aicte _at_npti_nagpur.ppt
salient_features_of_aicte _at_npti_nagpur.pptsalient_features_of_aicte _at_npti_nagpur.ppt
salient_features_of_aicte _at_npti_nagpur.ppt
 
Salient features of_aicte _at_npti_nagpur
Salient features of_aicte _at_npti_nagpurSalient features of_aicte _at_npti_nagpur
Salient features of_aicte _at_npti_nagpur
 
Hi_1.pptx
Hi_1.pptxHi_1.pptx
Hi_1.pptx
 
salient_features_of_aicte _at_npti_nagpur.ppt
salient_features_of_aicte _at_npti_nagpur.pptsalient_features_of_aicte _at_npti_nagpur.ppt
salient_features_of_aicte _at_npti_nagpur.ppt
 
G K M Jafar_UAE
G K M Jafar_UAEG K M Jafar_UAE
G K M Jafar_UAE
 
Wind Resource Engineer - Professional Profile
Wind Resource Engineer - Professional ProfileWind Resource Engineer - Professional Profile
Wind Resource Engineer - Professional Profile
 
Resume (2)
Resume (2)Resume (2)
Resume (2)
 
Resume-Smita
Resume-SmitaResume-Smita
Resume-Smita
 
Anibal_Carias_CV(1)
Anibal_Carias_CV(1)Anibal_Carias_CV(1)
Anibal_Carias_CV(1)
 
Resume sumanchatterjee
Resume sumanchatterjeeResume sumanchatterjee
Resume sumanchatterjee
 
MASP-QA-CV-2016-A
MASP-QA-CV-2016-AMASP-QA-CV-2016-A
MASP-QA-CV-2016-A
 
CV Haris Hakim - Electrical Engineer-1
CV Haris Hakim - Electrical Engineer-1CV Haris Hakim - Electrical Engineer-1
CV Haris Hakim - Electrical Engineer-1
 
ori PAUSON CV ING ed.
ori PAUSON CV ING ed.ori PAUSON CV ING ed.
ori PAUSON CV ING ed.
 
Aryadipta Jena_Experience as an Analyst in Energy-1
Aryadipta Jena_Experience as an Analyst in Energy-1Aryadipta Jena_Experience as an Analyst in Energy-1
Aryadipta Jena_Experience as an Analyst in Energy-1
 
010210PES.pptx
010210PES.pptx010210PES.pptx
010210PES.pptx
 
010210PES.pptx
010210PES.pptx010210PES.pptx
010210PES.pptx
 
Ramesh_Resume
Ramesh_ResumeRamesh_Resume
Ramesh_Resume
 
Nathan's Resume - Sept 2016
Nathan's Resume - Sept 2016Nathan's Resume - Sept 2016
Nathan's Resume - Sept 2016
 
Anshul_Resume
Anshul_Resume Anshul_Resume
Anshul_Resume
 

Sudarmono Sasmono

  • 1. Consultant Sudarmono Sasmono •Major : Electrical Power Engineering •List of Competence : – Power system planning and power system economic – Friendly environment power plant – Risk Analysis, Risk Engineering and Decision Making on Electrical Power System – Energy and Electricity Policy •IEEE Power and Energy Society (Member No 92352179) •Indonesian Society of Engineer and Technician (Member No 001.15.0045255)
  • 2. Selected Working Experiences • Power System Study (Only last 3 years) PROJECT NAME LOCATION CLIENT POSITION JOB DESCRIPTION IN PROJECT DATE Feasibility Study of Development Independent Power Producer in Northern Sumatera Region Medan, North Sumatera PT Pertamina Electrical Engineer Power and Energy Demand Supply Analysis 2014 (6 months)Power System Study (Load Flow Analysis and Short Circuit Analysis) when IPP connected to Sumatera Interconection System Feasibility Study of Hydropower Plant (HPP) Kalaena 2 x 26,50 MW - Electrical Aspects South Sulawesi PT Sumber Rahmat Pertiwi Power System Planning Expert Power and Energy Demand Supply Analysis 2014 (2 months) Power System Study (Load Flow Analysis, Short Circuit Analysis and Stability) when HPP Kalaena connected to Sulselrabar Electrical System Feasibility Study of Hydropower Plant (HPP) Salu Uro 2 x 47,50 MW - Electrical Aspects South Sulawesi PT Tirta Energi Cemerlang Power System Planning Expert Power and Energy Demand Supply Analysis 2014 (2 months) Power System Study (Load Flow Analysis, Short Circuit Analysis and Stability) when HPP Salu Uro connected to Sulselrabar Electrical System
  • 3. Selected Working Experiences (2) PROJECT NAME LOCATION CLIENT POSITION JOB DESCRIPTION IN PROJECT DATE Feasibility Study of Hydropower Plant (HPP) Air Putih 3 x 7 MW - Electrical Aspects Bengkulu PT Bangun Tirta Lestari Power System Planning Expert Power and Energy Demand Supply Analysis 2014 (2 months)Power System Study (Load Flow Analysis, Short Circuit Analysis and Stability) when HPP Air Putih connected to Sulselrabar Electrical System Feasibility Study of Nuclear Power Plant in Bangka - Non Site Aspects Bangka PT PLN (Persero) Transmission Planning Junior Expert Energy Analysis 2012 - 2013 Spatial Demand Forecasting Generation Expansion Planning Transmission Expansion Planning (Including Transmission Route and Power System Analysis) • Power System Study (Only last 3 years)
  • 4. Selected Working Experiences (3) PROJECT NAME LOCATION CLIENT POSITION JOB DESCRIPTION IN PROJECT DATE Academic studies on Inventory and Evaluation of Process Diversion Status PT PLN Tarakan to PT PLN (Persero) Tarakan, North Kalimantan Local Government of Tarakan City Team Leader Data collection on technical conditions, financial and other conditions of PT PLN Tarakan 2014 ( 3 months) Data analysis as basic to make recommendation for Diversion Status PT PLN Tarakan to PT PLN (Persero) Electricity Supply and Demand Analysis in Halmahera Halmahera, North Maluku PT Star Energy Geothermal Halmahera Power System Planning Expert Data collection on any variables which are have correlation on electricity demand 2014 ( 3 months) Data analysis as basic to make recommendation for development Geothermal Power Plant base on Electricity Supply Demand Balance Market Assessment of Wholesale Fuel for Mining Companies in Kalimantan East Kalimantan, South Kalimantan and Central Kalimantan Exxon Mobil Asia Pasific Pte Ltd Researcher Survey on distribution line of wholesale fuel for mining companies expecially coal mining companies in Kalimantan 2014 (6 months) Data analysis as basic to make recommendation strategy on wholesale fuel marketing • Energy and Electricity Policy/Decision Making (Only last 3 years)
  • 5. Selected Working Experiences (4) PROJECT NAME LOCATION CLIENT POSITION JOB DESCRIPTION IN PROJECT DATE Strategic Assessment Of Opportunities in Oil & Gas Industry For Temporary Power And Operation & Maintenance Cilacap, Indramayu, and Jambi PT Sewatama Researcher Survey on Oil and Gas Facility such as Refinery, Depot and others 2014 ( 3 months)Data analysis as basic to make recommendation on marketing strategy for temporary power in Oil and Gas Industry Study on Patterns and Mechanism to improved power plant efficiency through Cost Benefit Analysis in the Framework of Implementation of Performance Based Regulatory (PBR) for the Control of Electricity Subsidy Indonesia Ministry of Energy and Mineral Resources Electrical Power Engineering Expert Survey on any type of power plant which are operating in Indonesia 2014 (5 months)Data analysis as basic to make recommendation on mechanism to improved power plant efficiency The preparation of the Regional Electricity General Plan on West Bangka Regency West Bangka West Bangka Office for Energy and Mineral Resources Team Leader Survey on any secondary data of electricity demand and supply in West Bangka. Also, survey on visible primary energy on West Bangka 2012 (2 months) Data analysis as basic to make recommendation on Electricity plan in West Bangka • Energy and Electricity Policy/Decision Making (Only last 3 years)
  • 6. Selected Working Experiences (4) PROJECT NAME LOCATION CLIENT POSITION JOB DESCRIPTION IN PROJECT DATE Strategic Assessment Of Opportunities in Oil & Gas Industry For Temporary Power And Operation & Maintenance Cilacap, Indramayu, and Jambi PT Sewatama Researcher Survey on Oil and Gas Facility such as Refinery, Depot and others 2014 ( 3 months)Data analysis as basic to make recommendation on marketing strategy for temporary power in Oil and Gas Industry Study on Patterns and Mechanism to improved power plant efficiency through Cost Benefit Analysis in the Framework of Implementation of Performance Based Regulatory (PBR) for the Control of Electricity Subsidy Indonesia Ministry of Energy and Mineral Resources Electrical Power Engineering Expert Survey on any type of power plant which are operating in Indonesia 2014 (5 months)Data analysis as basic to make recommendation on mechanism to improved power plant efficiency The preparation of the Regional Electricity General Plan on West Bangka Regency West Bangka West Bangka Office for Energy and Mineral Resources Team Leader Survey on any secondary data of electricity demand and supply in West Bangka. Also, survey on visible primary energy on West Bangka 2012 (2 months) Data analysis as basic to make recommendation on Electricity plan in West Bangka • Energy and Electricity Policy/Decision Making (Only last 3 years)