SlideShare a Scribd company logo
1 of 3
AREAS OF EXPERIANCES
Electrical Engineering
KNOWLEDGE
MS Office
Internet
PERSONAL SKILLS
Love to travel
Good Communicational skills
Target oriented
PERSONAL DETAILS
Address: Raghunath Enclave, Plot
No.-06, Flat No.-04, VIP Area.
IRC Village, Nayapalli,
Bhubaneswar, Odisha-751015.
Mob- 9437802141, 9040218500
E -mohapatra.mahesh@gmail.com
Father’s Name: Late Gopinath
Mohapatra
DOB: 19/02/1953
Nationality: Indian
Passport: Yes
DECLARATION
I do hereby declare that all the
information furnished here are true
to the best of my knowledge.
Date:
Place: Bhubaneswar
Signature
MaheshChandra Mohapatra
Electrical Engineer
OBJECTIVE
To proudly associate with your esteemed organization where my
knowledge and ideas would be of value and my professional
growth would be encouraged.
QUALIFICATION
 Master of Engineering in Water Resource
Development from IIT Roorkee in 1990.
 BSc. Engineering in Electrical from REC Rourkela
presently NIT, Sambalpur University in 1978.
 BSc. From Utkal University in 1973.
 1st BSc. From Utkal University in 1971.
 Pre University from Utkal University in 1970.
 HSCE from Board of Secondary Education Odisha in
1969.
TOTAL WORK EXPERIENCE (35 YEARS)
Organization: NESCO Utility
Designation: General Manager (Construction)
Period: April 2011 to till date (4 Years 8 Months)
Project Details: CAPEX Programme Govt. of Odisha.
Highlights:
For improving the quality of supply of electricity in urban
& rural areas utilizing Govt. fund by constructing new
substations, replacement of old transmission lines and
transformers etc. to improve performance of the distribution
companies on the basis of annual reduction of AT & C loss.
Job Responsibilities:
 Preparation of Details Project Report.
 Coordination with Government in Energy Dept., Gridco
Ltd and other agencies.
 Approval of drawings.
 Approval for procurement of materials.
 Monitoring the execution work of 33/11 KV new S/s,
renovation of S/s by installing PTR, VCB,CT & PT, new
& up-rating of 33 KV & 11 KV lines, implementation of
HVDS S/s & replacement of bare LT conductor with AB
Cable.
 Energy Audit.
Organization: North-eastern Electrical Supply Company Limited.
Total Period : (32 Years)
Designation: General Manager (Electrical), Corporate Office, NESCO, Balasore
Period: December 2010 to February 2011 (3 Months)
Job Responsibilities:
 Monitoring operation and maintenance work of distribution system under NESCO
including testing, purchase, procurement and commissioning of power
transformer, switchgear equipments etc.
 Dealing with intra state ABT mechanism and load restriction protocol and
interaction with the transmission licensee and SLDC in order to maintain
GRIDCO discipline.
Designation: President (Grievance Redressal Forum) Jajpur Road
Period: April 2007 to December 2010 (3 Years 8 Months)
Job Responsibilities:
 Redressal of consumer grievances relating to deficiency of services and erroneous
billing.
Designation: Manager (Keonjhar) & AGM (MRT) Corporate Office Balasore
Period: March 2002 to April 2007 (5 Years)
Job Responsibilities:
 Monitoring of billing and revenue collection activities.
 Management of distribution network system.
 Construction and maintenance of 33 KV, 11 KV over head lines and sub-station
and installation of power transformers.
 Initiation to maximize industrialization for high revenue.
 Testing and commissioning of 33 KV & 11 KV metering units & metering
cubicles (CTPT HT & LT trivector meter, along with studying load survey of high
value consumers.
 Monitoring of Automatic Meter reading instrumentation and RMRs.
 Monitoring of Energy Auditing of 33 KV & 11 KV feeders as well as distribution
transformer.
Designation: Executive Engineer, MRT Balasore
Period: June 2001 to March 2002 (9 Months)
Job Responsibilities:
 Metering of HT/LT systems, testing and commissioning of meters and metering
equipments.
 Surveillance activities relating to theft of energy and Energy Audit.
Designation: Asst. Engineer/SDO, Balasore/Kuliana, Baripada
Period: December 1996 to June 2001 (4 Years 6 Months)
Job Responsibilities:
 Operation and maintenance of 33 KV, 11 KV, LT over head lines, distribution
network and revenue activities.
Designation: Asst. Electrical Inspector, Balasore, Govt. of Odisha
Period: July 1994 to December 1996 (2 Years 6 Months)
Job Responsibilities:
 Statutory inspection of medium voltage electrical installation.
Designation: Asst. Engineer (Estimator), Bhubaneswar, Govt. of Odisha
Period: December 1990 to July 1994 (3 Years 6 Months)
Job Responsibilities:
 Preparation of details estimates of Hydro Electric Power Projects
 Approval of drawings.
 Higher Education: M.E. Degree- Water Resource Development from
Roorkee (Period-July-1989 to November 1990)
Designation: GED Asst. Engineer Cuttack
Period: September 1986 to July 1989 (3 Years)
Job Responsibilities:
 Estimation and implementation of internal electrification works of Govt. offices &
departmental building.
Designation: JE/Asst. Engineer- Transformer repairing work shop, Bhubaneswar
Period: December 1979 to August 1986 (6 Years 8 Months)
Job Responsibilities:
 Supervision of repairing and testing of burnt power and distribution transformers.

More Related Content

Viewers also liked

Unidad 1 actividad1c_guion_tecnico
Unidad 1 actividad1c_guion_tecnicoUnidad 1 actividad1c_guion_tecnico
Unidad 1 actividad1c_guion_tecnicoIEJuliusSieber
 
Cu dernilllo ddddd
Cu dernilllo dddddCu dernilllo ddddd
Cu dernilllo dddddXavi David
 
Practica1 fontanet ramon
Practica1 fontanet ramonPractica1 fontanet ramon
Practica1 fontanet ramondarnali
 
1994 Afstudeerverslag IPO
1994 Afstudeerverslag IPO1994 Afstudeerverslag IPO
1994 Afstudeerverslag IPOGuido Leenders
 
Al Ansari Exchange Certificate
Al Ansari Exchange CertificateAl Ansari Exchange Certificate
Al Ansari Exchange CertificateMd Nidhal
 
conceptos basicos
conceptos basicosconceptos basicos
conceptos basicosWalter Zea
 
Fan studies 4 cases: EXO – L, Red Army Fanclub (RAFC), Zoomer – X and Nudie J...
Fan studies 4 cases: EXO – L, Red Army Fanclub (RAFC), Zoomer – X and Nudie J...Fan studies 4 cases: EXO – L, Red Army Fanclub (RAFC), Zoomer – X and Nudie J...
Fan studies 4 cases: EXO – L, Red Army Fanclub (RAFC), Zoomer – X and Nudie J...Dee Nildum
 
2 4 capitalismo socialismos e imperialismo
2 4 capitalismo socialismos e imperialismo2 4 capitalismo socialismos e imperialismo
2 4 capitalismo socialismos e imperialismoGinio
 
程序人生的四个象限和两条主线
程序人生的四个象限和两条主线程序人生的四个象限和两条主线
程序人生的四个象限和两条主线jingping yi
 

Viewers also liked (15)

Unidad 1 actividad1c_guion_tecnico
Unidad 1 actividad1c_guion_tecnicoUnidad 1 actividad1c_guion_tecnico
Unidad 1 actividad1c_guion_tecnico
 
اخبار14
اخبار14اخبار14
اخبار14
 
Derechos
DerechosDerechos
Derechos
 
9290 Biznes Plan
9290 Biznes Plan9290 Biznes Plan
9290 Biznes Plan
 
Kpi
KpiKpi
Kpi
 
Cu dernilllo ddddd
Cu dernilllo dddddCu dernilllo ddddd
Cu dernilllo ddddd
 
Practica1 fontanet ramon
Practica1 fontanet ramonPractica1 fontanet ramon
Practica1 fontanet ramon
 
9434 Zadanie 3
9434 Zadanie 39434 Zadanie 3
9434 Zadanie 3
 
1994 Afstudeerverslag IPO
1994 Afstudeerverslag IPO1994 Afstudeerverslag IPO
1994 Afstudeerverslag IPO
 
Al Ansari Exchange Certificate
Al Ansari Exchange CertificateAl Ansari Exchange Certificate
Al Ansari Exchange Certificate
 
conceptos basicos
conceptos basicosconceptos basicos
conceptos basicos
 
Fan studies 4 cases: EXO – L, Red Army Fanclub (RAFC), Zoomer – X and Nudie J...
Fan studies 4 cases: EXO – L, Red Army Fanclub (RAFC), Zoomer – X and Nudie J...Fan studies 4 cases: EXO – L, Red Army Fanclub (RAFC), Zoomer – X and Nudie J...
Fan studies 4 cases: EXO – L, Red Army Fanclub (RAFC), Zoomer – X and Nudie J...
 
2 4 capitalismo socialismos e imperialismo
2 4 capitalismo socialismos e imperialismo2 4 capitalismo socialismos e imperialismo
2 4 capitalismo socialismos e imperialismo
 
Evolution Of HSPA
Evolution Of HSPAEvolution Of HSPA
Evolution Of HSPA
 
程序人生的四个象限和两条主线
程序人生的四个象限和两条主线程序人生的四个象限和两条主线
程序人生的四个象限和两条主线
 

Similar to Resume (2) (20)

Cv of B.K.Moharathy 15
Cv of B.K.Moharathy 15Cv of B.K.Moharathy 15
Cv of B.K.Moharathy 15
 
Engr Adnan C.V
Engr Adnan C.VEngr Adnan C.V
Engr Adnan C.V
 
RESUME_for_Subramaniyan
RESUME_for_SubramaniyanRESUME_for_Subramaniyan
RESUME_for_Subramaniyan
 
S[1].K.Gupta[2]
S[1].K.Gupta[2]S[1].K.Gupta[2]
S[1].K.Gupta[2]
 
S[1].K.Gupta[2]
S[1].K.Gupta[2]S[1].K.Gupta[2]
S[1].K.Gupta[2]
 
S[1].K.Gupta[2]
S[1].K.Gupta[2]S[1].K.Gupta[2]
S[1].K.Gupta[2]
 
danish resume
danish resumedanish resume
danish resume
 
Electrical Engineer (1) (1)
Electrical Engineer (1) (1)Electrical Engineer (1) (1)
Electrical Engineer (1) (1)
 
Faizan cv (1)
Faizan cv (1)Faizan cv (1)
Faizan cv (1)
 
Faizan cv (1)
Faizan cv (1)Faizan cv (1)
Faizan cv (1)
 
Sahu_CV
Sahu_CVSahu_CV
Sahu_CV
 
CV ( Muzamil)
CV ( Muzamil)  CV ( Muzamil)
CV ( Muzamil)
 
Copy of BhaskarSarkar_AECOM
Copy of BhaskarSarkar_AECOMCopy of BhaskarSarkar_AECOM
Copy of BhaskarSarkar_AECOM
 
CURRICULAM VITAE
CURRICULAM  VITAECURRICULAM  VITAE
CURRICULAM VITAE
 
LOHGESH2
LOHGESH2LOHGESH2
LOHGESH2
 
Shaik Akbar Pasha_Resume
Shaik Akbar Pasha_ResumeShaik Akbar Pasha_Resume
Shaik Akbar Pasha_Resume
 
RAMURESUME
RAMURESUMERAMURESUME
RAMURESUME
 
anindya maity-cv
anindya maity-cvanindya maity-cv
anindya maity-cv
 
CV of Sukumar Chakraborty
CV of Sukumar ChakrabortyCV of Sukumar Chakraborty
CV of Sukumar Chakraborty
 
CV Eko Fuji SM
CV Eko Fuji SMCV Eko Fuji SM
CV Eko Fuji SM
 

Resume (2)

  • 1. AREAS OF EXPERIANCES Electrical Engineering KNOWLEDGE MS Office Internet PERSONAL SKILLS Love to travel Good Communicational skills Target oriented PERSONAL DETAILS Address: Raghunath Enclave, Plot No.-06, Flat No.-04, VIP Area. IRC Village, Nayapalli, Bhubaneswar, Odisha-751015. Mob- 9437802141, 9040218500 E -mohapatra.mahesh@gmail.com Father’s Name: Late Gopinath Mohapatra DOB: 19/02/1953 Nationality: Indian Passport: Yes DECLARATION I do hereby declare that all the information furnished here are true to the best of my knowledge. Date: Place: Bhubaneswar Signature MaheshChandra Mohapatra Electrical Engineer OBJECTIVE To proudly associate with your esteemed organization where my knowledge and ideas would be of value and my professional growth would be encouraged. QUALIFICATION  Master of Engineering in Water Resource Development from IIT Roorkee in 1990.  BSc. Engineering in Electrical from REC Rourkela presently NIT, Sambalpur University in 1978.  BSc. From Utkal University in 1973.  1st BSc. From Utkal University in 1971.  Pre University from Utkal University in 1970.  HSCE from Board of Secondary Education Odisha in 1969. TOTAL WORK EXPERIENCE (35 YEARS) Organization: NESCO Utility Designation: General Manager (Construction) Period: April 2011 to till date (4 Years 8 Months) Project Details: CAPEX Programme Govt. of Odisha. Highlights: For improving the quality of supply of electricity in urban & rural areas utilizing Govt. fund by constructing new substations, replacement of old transmission lines and transformers etc. to improve performance of the distribution companies on the basis of annual reduction of AT & C loss. Job Responsibilities:  Preparation of Details Project Report.  Coordination with Government in Energy Dept., Gridco Ltd and other agencies.  Approval of drawings.  Approval for procurement of materials.  Monitoring the execution work of 33/11 KV new S/s, renovation of S/s by installing PTR, VCB,CT & PT, new & up-rating of 33 KV & 11 KV lines, implementation of HVDS S/s & replacement of bare LT conductor with AB Cable.  Energy Audit.
  • 2. Organization: North-eastern Electrical Supply Company Limited. Total Period : (32 Years) Designation: General Manager (Electrical), Corporate Office, NESCO, Balasore Period: December 2010 to February 2011 (3 Months) Job Responsibilities:  Monitoring operation and maintenance work of distribution system under NESCO including testing, purchase, procurement and commissioning of power transformer, switchgear equipments etc.  Dealing with intra state ABT mechanism and load restriction protocol and interaction with the transmission licensee and SLDC in order to maintain GRIDCO discipline. Designation: President (Grievance Redressal Forum) Jajpur Road Period: April 2007 to December 2010 (3 Years 8 Months) Job Responsibilities:  Redressal of consumer grievances relating to deficiency of services and erroneous billing. Designation: Manager (Keonjhar) & AGM (MRT) Corporate Office Balasore Period: March 2002 to April 2007 (5 Years) Job Responsibilities:  Monitoring of billing and revenue collection activities.  Management of distribution network system.  Construction and maintenance of 33 KV, 11 KV over head lines and sub-station and installation of power transformers.  Initiation to maximize industrialization for high revenue.  Testing and commissioning of 33 KV & 11 KV metering units & metering cubicles (CTPT HT & LT trivector meter, along with studying load survey of high value consumers.  Monitoring of Automatic Meter reading instrumentation and RMRs.  Monitoring of Energy Auditing of 33 KV & 11 KV feeders as well as distribution transformer. Designation: Executive Engineer, MRT Balasore Period: June 2001 to March 2002 (9 Months) Job Responsibilities:  Metering of HT/LT systems, testing and commissioning of meters and metering equipments.  Surveillance activities relating to theft of energy and Energy Audit.
  • 3. Designation: Asst. Engineer/SDO, Balasore/Kuliana, Baripada Period: December 1996 to June 2001 (4 Years 6 Months) Job Responsibilities:  Operation and maintenance of 33 KV, 11 KV, LT over head lines, distribution network and revenue activities. Designation: Asst. Electrical Inspector, Balasore, Govt. of Odisha Period: July 1994 to December 1996 (2 Years 6 Months) Job Responsibilities:  Statutory inspection of medium voltage electrical installation. Designation: Asst. Engineer (Estimator), Bhubaneswar, Govt. of Odisha Period: December 1990 to July 1994 (3 Years 6 Months) Job Responsibilities:  Preparation of details estimates of Hydro Electric Power Projects  Approval of drawings.  Higher Education: M.E. Degree- Water Resource Development from Roorkee (Period-July-1989 to November 1990) Designation: GED Asst. Engineer Cuttack Period: September 1986 to July 1989 (3 Years) Job Responsibilities:  Estimation and implementation of internal electrification works of Govt. offices & departmental building. Designation: JE/Asst. Engineer- Transformer repairing work shop, Bhubaneswar Period: December 1979 to August 1986 (6 Years 8 Months) Job Responsibilities:  Supervision of repairing and testing of burnt power and distribution transformers.