Garment Production System
 In simple a ‘garment production system’ is a way how
fabric is being converted into garment in a
manufacturing system.
 The choice of best apparel production system depend on
the Product, The Policies of the Company and the
capacities of manpower.
 There are basically three Production systems:
I. Progressive Bundle System
II. Unit Production System
III.Modular Production System
1. Progressive Bundle System
(PBS)
 Also Called Material Handling System.
 As name implies the bundle of garment parts move from
operation to operation.
 Traditional Production system.
 Widely used by apparel manufacturers for several
decades and still today.
 80% apparel manufacturers use the Bundle system
(PBS).
PBS Workflow
 Bundles consist of garment parts needed to complete a
specific operation (e.g an operation bundle for pocket
setting might include shirt fronts and pockets to b stitched
together.
 Some firms operate with a standard bundle size, while other
vary bundle sizes acc. to size of pieces in bundle and
operation to b completed.
 Bundles are assembled in the cutting room, where cut parts
are matched up with corresponding parts and bundle
tickets.
 Workers (labour) transport and move Bundles of cut parts
to sewing room via trollies.
 Operator scheduled to complete the operation and perform
same operation on all pieces in the bundle, retie the bundle,
remove Bundle ticket and move bundle for next operation.
Progressive Bundle System
Advantages of PBS
 Labor of all levels ie unskilled, skilled, semi skilled labors
are involved. Small simple operations.
 Quantity of each operation is checked during every
single operation thus quality is good.
 Due to bundle system, less chance of mixing up of
parts…thus less confusion.
 Bundle tracking is possible, so identifying and solving
problems become easy.
 Effective production control system and Quality control
system.
Dis-advantages of PBS
 Time Consuming due to assembling, moving and un-
tieing of bundles.
 More labor…More labor cost.
 Needs efficient supervisor.
 Labor absentiees can effect production due to
incompletion of contracts.
 Variety of styles and less quantity is not effective in this
system.
 Proper planning is required for each style, each batch.
 Improper planning causes labour turnover, poor quality,
less production, etc.
2. Unit Production System (UPS)
 A Unit Production System is a type of layout that uses an
overhead transporter system to move garment
components from work station to work station for
assembly.
 In UPS, there are hangers. One hanger have multiple
clips containing all parts of the single garment.
 All parts for the single garment are advanced through
stitching line together by means of hanging carrier that
moves along an overhead conveyor.
 Hanging carrier can be moved manually by the operator
using button after completion of single operation or By
computerized system that move the conveyor after a
specific fed throughput time.
UPS Workflow
 Load all the pieces of single garment in a product
carrier.
 The product carrier with the pieces will be routed
through the different operation steps.
 At every machine/operation the patented chain will
position the product ideally.
 Completed the product arrives to an unloading
station. The empty product carrier returns to the
loading station.
Unit Production System
Advantages of UPS
 Bundle Handling completely eliminated.
 The time involved in the pick-up and disposal is
reduced to minimum.
 Output is automatically recorded, eliminates the
operator to register the work.
 The computerized system automatically balance
the work between stations.
 Improved lead times-less work in process.
 Improved space utilization (more machines can be
adjusted)
Advantages of UPS (Cont.)
 Increased Productivity.
 Throughput time can be drastically
reduced.
 Indirect labor costs are reduced (by
elimination of bundle handling and
requiring fewer supervisors)
 Improved production and quality.
Dis-advantages of UPS
 Unit Production system requires high
investment.
 Proper planning is required to be effective.
 Highly expensive-buying equipment and
cost of installing.
 Specialized training for the system.
3. Modular Production System
 A Modular Production System is a contained,
manageable work unit that includes an empowered work
team, equipment and work to be executed.
 The number of teams in a plant varies with the size and
needs of the firm and product line.
 Usually there are 4-15 labors in one team depending
upon the type of garment to be stitched and skills of
labor.
 Teams may be used to perform all the operations (whole
garment production) or certain portion of assembly
operations.
 Team is responsible fro maintaining a smooth work flow,
meeting production goals, quality level.
Modular Production System
 Team members develop an interdependency to
improve the process and accomplish their goals.
 A worker in a team can perform Multiple functions
depending upon his skills (Multi-skills).
Modular Production System
Advantages of MPS
1) High Flexibility.
2) Fast throughput times.
3) Low wastages.
4) Reduced absenteeism.
5) Empowered employees.
6) Improved Quality.
Dis-advantages of MPS
 A high capital investment in equipment.
 High investment in initial training.
 No compatibility between team members can
cause problems thus loss in production…
 Dependency on the Team for whole Production.
Thanks
For
Bearing…

More Related Content

Similar to garmentsproductionsystems-130306045808-phpapp02.pdf

Assignment: Comparative Study on Various Types of Garment Production System.
Assignment: Comparative Study on Various  Types of Garment Production System.Assignment: Comparative Study on Various  Types of Garment Production System.
Assignment: Comparative Study on Various Types of Garment Production System.Proshanto Saha
 
Garments production system
Garments production systemGarments production system
Garments production systemPacific Cotton
 
PRODUCTION PLANNING AND CONTROL
PRODUCTION PLANNING AND CONTROLPRODUCTION PLANNING AND CONTROL
PRODUCTION PLANNING AND CONTROLDisha Pawar
 
Capacity planning in garment industry22 (3 files merged)
Capacity planning in garment industry22 (3 files merged)Capacity planning in garment industry22 (3 files merged)
Capacity planning in garment industry22 (3 files merged)Ankur Shukla
 
garment production system
garment production systemgarment production system
garment production systemoshan devinda
 
ch 1 Intro to production.ppt
ch 1 Intro to production.pptch 1 Intro to production.ppt
ch 1 Intro to production.pptbhavikachablani3
 
Traditional bundle vs singlepcs system
Traditional bundle vs singlepcs systemTraditional bundle vs singlepcs system
Traditional bundle vs singlepcs systemTUSHAR IQBAL
 
Traditional bundle vs single pcs system
Traditional bundle vs single pcs systemTraditional bundle vs single pcs system
Traditional bundle vs single pcs systemArtin Thomsan
 

Similar to garmentsproductionsystems-130306045808-phpapp02.pdf (20)

Assignment: Comparative Study on Various Types of Garment Production System.
Assignment: Comparative Study on Various  Types of Garment Production System.Assignment: Comparative Study on Various  Types of Garment Production System.
Assignment: Comparative Study on Various Types of Garment Production System.
 
Garments production system
Garments production systemGarments production system
Garments production system
 
Garment production
Garment productionGarment production
Garment production
 
Garment production systems
Garment production systemsGarment production systems
Garment production systems
 
PRODUCTION PLANNING AND CONTROL
PRODUCTION PLANNING AND CONTROLPRODUCTION PLANNING AND CONTROL
PRODUCTION PLANNING AND CONTROL
 
Modular garments production system
Modular garments production systemModular garments production system
Modular garments production system
 
Advance apparel manufacturing technology
Advance apparel manufacturing technologyAdvance apparel manufacturing technology
Advance apparel manufacturing technology
 
Capacity planning in garment industry22 (3 files merged)
Capacity planning in garment industry22 (3 files merged)Capacity planning in garment industry22 (3 files merged)
Capacity planning in garment industry22 (3 files merged)
 
Garment production
Garment productionGarment production
Garment production
 
garment production system
garment production systemgarment production system
garment production system
 
Garment production system
Garment production systemGarment production system
Garment production system
 
IE Qu & Ans
IE Qu & AnsIE Qu & Ans
IE Qu & Ans
 
Download
DownloadDownload
Download
 
ch 1 Intro to production.ppt
ch 1 Intro to production.pptch 1 Intro to production.ppt
ch 1 Intro to production.ppt
 
Chapter 6 mfg systems
Chapter 6    mfg systemsChapter 6    mfg systems
Chapter 6 mfg systems
 
Sewing line setting
Sewing line settingSewing line setting
Sewing line setting
 
Traditional bundle vs singlepcs system
Traditional bundle vs singlepcs systemTraditional bundle vs singlepcs system
Traditional bundle vs singlepcs system
 
Traditional bundle vs single pcs system
Traditional bundle vs single pcs systemTraditional bundle vs single pcs system
Traditional bundle vs single pcs system
 
LECTURE 1.pdf
LECTURE 1.pdfLECTURE 1.pdf
LECTURE 1.pdf
 
Production systems
Production systemsProduction systems
Production systems
 

Recently uploaded

Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx959SahilShah
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxPoojaBan
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineeringmalavadedarshan25
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLDeelipZope
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...srsj9000
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfAsst.prof M.Gokilavani
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girlsssuser7cb4ff
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerAnamika Sarkar
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfAsst.prof M.Gokilavani
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 

Recently uploaded (20)

Application of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptxApplication of Residue Theorem to evaluate real integrations.pptx
Application of Residue Theorem to evaluate real integrations.pptx
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptx
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineering
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCL
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girls
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube ExchangerStudy on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
Study on Air-Water & Water-Water Heat Exchange in a Finned Tube Exchanger
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 

garmentsproductionsystems-130306045808-phpapp02.pdf

  • 2. Garment Production System  In simple a ‘garment production system’ is a way how fabric is being converted into garment in a manufacturing system.  The choice of best apparel production system depend on the Product, The Policies of the Company and the capacities of manpower.  There are basically three Production systems: I. Progressive Bundle System II. Unit Production System III.Modular Production System
  • 3. 1. Progressive Bundle System (PBS)  Also Called Material Handling System.  As name implies the bundle of garment parts move from operation to operation.  Traditional Production system.  Widely used by apparel manufacturers for several decades and still today.  80% apparel manufacturers use the Bundle system (PBS).
  • 4. PBS Workflow  Bundles consist of garment parts needed to complete a specific operation (e.g an operation bundle for pocket setting might include shirt fronts and pockets to b stitched together.  Some firms operate with a standard bundle size, while other vary bundle sizes acc. to size of pieces in bundle and operation to b completed.  Bundles are assembled in the cutting room, where cut parts are matched up with corresponding parts and bundle tickets.  Workers (labour) transport and move Bundles of cut parts to sewing room via trollies.  Operator scheduled to complete the operation and perform same operation on all pieces in the bundle, retie the bundle, remove Bundle ticket and move bundle for next operation.
  • 6. Advantages of PBS  Labor of all levels ie unskilled, skilled, semi skilled labors are involved. Small simple operations.  Quantity of each operation is checked during every single operation thus quality is good.  Due to bundle system, less chance of mixing up of parts…thus less confusion.  Bundle tracking is possible, so identifying and solving problems become easy.  Effective production control system and Quality control system.
  • 7. Dis-advantages of PBS  Time Consuming due to assembling, moving and un- tieing of bundles.  More labor…More labor cost.  Needs efficient supervisor.  Labor absentiees can effect production due to incompletion of contracts.  Variety of styles and less quantity is not effective in this system.  Proper planning is required for each style, each batch.  Improper planning causes labour turnover, poor quality, less production, etc.
  • 8. 2. Unit Production System (UPS)  A Unit Production System is a type of layout that uses an overhead transporter system to move garment components from work station to work station for assembly.  In UPS, there are hangers. One hanger have multiple clips containing all parts of the single garment.  All parts for the single garment are advanced through stitching line together by means of hanging carrier that moves along an overhead conveyor.  Hanging carrier can be moved manually by the operator using button after completion of single operation or By computerized system that move the conveyor after a specific fed throughput time.
  • 9. UPS Workflow  Load all the pieces of single garment in a product carrier.  The product carrier with the pieces will be routed through the different operation steps.  At every machine/operation the patented chain will position the product ideally.  Completed the product arrives to an unloading station. The empty product carrier returns to the loading station.
  • 11. Advantages of UPS  Bundle Handling completely eliminated.  The time involved in the pick-up and disposal is reduced to minimum.  Output is automatically recorded, eliminates the operator to register the work.  The computerized system automatically balance the work between stations.  Improved lead times-less work in process.  Improved space utilization (more machines can be adjusted)
  • 12. Advantages of UPS (Cont.)  Increased Productivity.  Throughput time can be drastically reduced.  Indirect labor costs are reduced (by elimination of bundle handling and requiring fewer supervisors)  Improved production and quality.
  • 13. Dis-advantages of UPS  Unit Production system requires high investment.  Proper planning is required to be effective.  Highly expensive-buying equipment and cost of installing.  Specialized training for the system.
  • 14. 3. Modular Production System  A Modular Production System is a contained, manageable work unit that includes an empowered work team, equipment and work to be executed.  The number of teams in a plant varies with the size and needs of the firm and product line.  Usually there are 4-15 labors in one team depending upon the type of garment to be stitched and skills of labor.  Teams may be used to perform all the operations (whole garment production) or certain portion of assembly operations.  Team is responsible fro maintaining a smooth work flow, meeting production goals, quality level.
  • 15. Modular Production System  Team members develop an interdependency to improve the process and accomplish their goals.  A worker in a team can perform Multiple functions depending upon his skills (Multi-skills).
  • 17. Advantages of MPS 1) High Flexibility. 2) Fast throughput times. 3) Low wastages. 4) Reduced absenteeism. 5) Empowered employees. 6) Improved Quality.
  • 18. Dis-advantages of MPS  A high capital investment in equipment.  High investment in initial training.  No compatibility between team members can cause problems thus loss in production…  Dependency on the Team for whole Production.