Garment Production
Systems
1. Definition
2. Objectives of production system
3. Factors garment production systems
4. How Production systems are named
5. Principles of choosing a production system
6. Popular Garments Production
A garment production system is a way how
fabric is being converted into garment in a
manufacturing system
The objectives of garment production systems
1. Examine the features of different kinds of garment production systems
2. Compare and contrast the different production systems
3. Assess and critically relate the merits and demerits of utilization of
different production systems in various circumstances
i. Company affordability
ii. Equipment that directly involved with workflow
iii. Items of finished products
iv. Machine or floor layout
v. Management philosophy
vi. Materials handling system
vii. Personnel training
viii. Production processes
How Production systems are named?
1. Number of machines used in layout
2. Total number of operators involved
3. Number of pieces moving in a line during making a
garment.
Some popular Garment Production Systems
1. Make Through System/ Individual Production system
2. Progressive Bundle System / Batch System
3. Section or Process System - Group System
4. Modular Production System
5. One Piece Flow System
6. UPS -Unit Production system
7. Piece Rate Production System
8. Straight-line or 'Synchro' System
Make Through System/ Individual Production system
 It is traditional method of production whereby one operator assembles
the entire garment, example tailoring
 The tailor even makes pattern (use ready-made pattern), cuts fabric and
does finishing of the garment
 The system requires a highly skilled and versatile person
 Suitable to produce a large varieties of garment with small quantities
Progressive Bundle System / Batch System
 Also called material handling system
 Garment parts are moved from one operation to another sequentially and in bundle form
 Each operator receives a bundle, does his work, reties the bundle and passes it to the next
operator
 Machines and operations are organized into sections according to basic functions,
which produce subcomponents
 Within each section, works are balanced according to the time required for each sub-function
 The amount of machinery for each operation is determined by the output required
 This system is the most widely used system in the garment industry today
Application
It is used in shirt factories,
jeans factories, jacket
factories, etc.
Progressive Bundle System / Batch System
Advantages:
- The line is easier to balance and control.
- Uniform quality can be ensured by in-process control.
- Semi-skilled labour requires less training time and cost.
- Individual performances can be monitored by incentives.
Disadvantages:
- High investment on machine cost.
- Short run production is not adaptable.
- High level of WIP extends throughput time.
- Complicated management skill is required
Section or Process System - Group System
 This is a development of the making through system and similar to the
Progressive Bundle System
 The operations are divided in sub-section
º Pre-assembling (the preparation of small parts)
º Front making
º Back making
º Main assembly (closing, setting collars and sleeves, etc)
º Lining making
º Setting linings
º Finishing operations (buttonholes, blind-stitching, etc)
Section or Process System - Group System
Advantages
 The labor of all levels, ie, semi skilled, skilled, trainee can be used in this system
 This system is very efficient for producing a variety of styles in reasonable
quantities.
 Automation and specialization can be done.
 Absenteeism and machine breakdown problems will not cause serious problems.
Disadvantage
 Quality of the garment can be deteriorated due to operators used from all level
 Group of people involved in each section which increases the inventory cost.
 As this is not a bundling system, there are more chances to mix up of lost,
shade variation, sizes, so quality and production will be affected.
Modular Production System
 sewing operators work as a team
 Neither they sew complete garment nor do they sew only single operation
 Multi skilled operators form a group and each of the team members do multiple
operations.
 Team is fully responsible for quality and production and team performance is
evaluated
Modular Production System
Advantages
- Lower level of WIP and floor space.
-Fast throughput time enables quick
response and prompt delivery.
-Quality becomes a team responsibility and
monitored at source.
-Peer pressure encourages a team spirit
and discourages absenteeism.
- The system is highly flexible with style
changes
Applications
- Fashioned garments with quick response.
-Orders with low volume and frequent
changes.
- Company with mutual trust between
management and
operators
Disadvantages
- Training time and cost is increased
- specialized equipment is poorly utilized
-Operators cannot develop the rhythm and
pace of high performance
-Individual effort is difficult to recognized
within the group
One Piece Flow System
This system works best with the components of a single piece instead of
bundle/ multiple pieces
Sewing machine can be laid in straight line/modular line
Operator receive one piece from back and move one piece to his next
Benefits of One-piece-Flow system are less through put time, Less WIP in the
line.
UPS -Unit Production system
 The unit of production is a single garment and not bundles
 The garment components are automatically transported from workstation
to work station according to a pre-determined sequence.
 The work stations are so constructed that the components are presented
as close as possible to the operator's left hand in order to reduce the
amount of movement required to grasp and position and component to be
sewn.
Disadvantages
 Unit production system requires high
investments.
 The payback period of the investment
takes long time.
 Proper planning is required to be
effective
 Quick Response Sewing System.
UPS -Unit Production system
Advantages
 Bundle handling completely
eliminated.
 The time involved in the pick-up and
disposal is reduced to minimum.
 Output is automatically recorded,
eliminates the operator to register the
work.
 The computerized systems
automatically balance the work
between stations.
 Up to 40 styles can be produced
simultaneously on one system.
18
Piece Rate Production System
Piece rate system also one of the most popular production system
in small and unorganized factories. Though people called it piece
rate system, actually it is not a production system. Whatever
Production system is used as mentioned above, when operators
are paid according their works (how many pieces produced), is
named as piece rate system.
Workers are paid on the basis of output produced by him; time is not
considerable
Wages = No. of unit produced x Rate per unit
19
Straight-line or 'Synchro' System
 This system is based
synchronized flow of work
on a
through
each stage of producing a garment
 Time-synchronization is the
most
important factor of this system
 If a operator SAM is 1.5 minute then
all other operators SAM should be
same
 Unbalancing of layout can cause
bottleneck
20
The End

More Related Content

Similar to garmentproductionsystems.pptx

PRODUCTION PLANNING AND CONTROL
PRODUCTION PLANNING AND CONTROLPRODUCTION PLANNING AND CONTROL
PRODUCTION PLANNING AND CONTROLDisha Pawar
 
Garments production system
Garments production systemGarments production system
Garments production systemPacific Cotton
 
garments production system
garments production systemgarments production system
garments production systemMD Siyam Hossain
 
Capacity planning in garment industry22 (3 files merged)
Capacity planning in garment industry22 (3 files merged)Capacity planning in garment industry22 (3 files merged)
Capacity planning in garment industry22 (3 files merged)Ankur Shukla
 
garment production system
garment production systemgarment production system
garment production systemoshan devinda
 
ch 1 Intro to production.ppt
ch 1 Intro to production.pptch 1 Intro to production.ppt
ch 1 Intro to production.pptbhavikachablani3
 
introduction to operation management
introduction to operation managementintroduction to operation management
introduction to operation managementSanjay Thakur
 
Automation in Manufacturing (Unit-4) by Varun Pratap Singh.pdf
Automation in Manufacturing (Unit-4) by Varun Pratap Singh.pdfAutomation in Manufacturing (Unit-4) by Varun Pratap Singh.pdf
Automation in Manufacturing (Unit-4) by Varun Pratap Singh.pdfVarun Pratap Singh
 
production & material management
production & material managementproduction & material management
production & material managementBhaveshThakur11
 

Similar to garmentproductionsystems.pptx (20)

Modular garments production system
Modular garments production systemModular garments production system
Modular garments production system
 
Garment production system
Garment production systemGarment production system
Garment production system
 
GMP CH 1.pptx
GMP CH 1.pptxGMP CH 1.pptx
GMP CH 1.pptx
 
PRODUCTION PLANNING AND CONTROL
PRODUCTION PLANNING AND CONTROLPRODUCTION PLANNING AND CONTROL
PRODUCTION PLANNING AND CONTROL
 
Garments production system
Garments production systemGarments production system
Garments production system
 
garments production system
garments production systemgarments production system
garments production system
 
Capacity planning in garment industry22 (3 files merged)
Capacity planning in garment industry22 (3 files merged)Capacity planning in garment industry22 (3 files merged)
Capacity planning in garment industry22 (3 files merged)
 
Garment production
Garment productionGarment production
Garment production
 
Garment production
Garment productionGarment production
Garment production
 
garment production system
garment production systemgarment production system
garment production system
 
ch 1 Intro to production.ppt
ch 1 Intro to production.pptch 1 Intro to production.ppt
ch 1 Intro to production.ppt
 
IE Qu & Ans
IE Qu & AnsIE Qu & Ans
IE Qu & Ans
 
Sewing line setting
Sewing line settingSewing line setting
Sewing line setting
 
Advance apparel manufacturing technology
Advance apparel manufacturing technologyAdvance apparel manufacturing technology
Advance apparel manufacturing technology
 
Manufacturing systems
Manufacturing systems Manufacturing systems
Manufacturing systems
 
introduction to operation management
introduction to operation managementintroduction to operation management
introduction to operation management
 
Automation in Manufacturing (Unit-4) by Varun Pratap Singh.pdf
Automation in Manufacturing (Unit-4) by Varun Pratap Singh.pdfAutomation in Manufacturing (Unit-4) by Varun Pratap Singh.pdf
Automation in Manufacturing (Unit-4) by Varun Pratap Singh.pdf
 
production & material management
production & material managementproduction & material management
production & material management
 
Production systems
Production systemsProduction systems
Production systems
 
final Production
 final Production  final Production
final Production
 

Recently uploaded

Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝soniya singh
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfAsst.prof M.Gokilavani
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.eptoze12
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxPoojaBan
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfAsst.prof M.Gokilavani
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort servicejennyeacort
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AIabhishek36461
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCall Girls in Nagpur High Profile
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learningmisbanausheenparvam
 

Recently uploaded (20)

Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
 
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdfCCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
CCS355 Neural Network & Deep Learning UNIT III notes and Question bank .pdf
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
VICTOR MAESTRE RAMIREZ - Planetary Defender on NASA's Double Asteroid Redirec...
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptx
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Serviceyoung call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
young call girls in Rajiv Chowk🔝 9953056974 🔝 Delhi escort Service
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort serviceGurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
Gurgaon ✡️9711147426✨Call In girls Gurgaon Sector 51 escort service
 
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
Past, Present and Future of Generative AI
Past, Present and Future of Generative AIPast, Present and Future of Generative AI
Past, Present and Future of Generative AI
 
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service NashikCollege Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
College Call Girls Nashik Nehal 7001305949 Independent Escort Service Nashik
 
chaitra-1.pptx fake news detection using machine learning
chaitra-1.pptx  fake news detection using machine learningchaitra-1.pptx  fake news detection using machine learning
chaitra-1.pptx fake news detection using machine learning
 

garmentproductionsystems.pptx

  • 2. 1. Definition 2. Objectives of production system 3. Factors garment production systems 4. How Production systems are named 5. Principles of choosing a production system 6. Popular Garments Production
  • 3. A garment production system is a way how fabric is being converted into garment in a manufacturing system
  • 4. The objectives of garment production systems 1. Examine the features of different kinds of garment production systems 2. Compare and contrast the different production systems 3. Assess and critically relate the merits and demerits of utilization of different production systems in various circumstances
  • 5. i. Company affordability ii. Equipment that directly involved with workflow iii. Items of finished products iv. Machine or floor layout v. Management philosophy vi. Materials handling system vii. Personnel training viii. Production processes
  • 6. How Production systems are named? 1. Number of machines used in layout 2. Total number of operators involved 3. Number of pieces moving in a line during making a garment.
  • 7.
  • 8. Some popular Garment Production Systems 1. Make Through System/ Individual Production system 2. Progressive Bundle System / Batch System 3. Section or Process System - Group System 4. Modular Production System 5. One Piece Flow System 6. UPS -Unit Production system 7. Piece Rate Production System 8. Straight-line or 'Synchro' System
  • 9. Make Through System/ Individual Production system  It is traditional method of production whereby one operator assembles the entire garment, example tailoring  The tailor even makes pattern (use ready-made pattern), cuts fabric and does finishing of the garment  The system requires a highly skilled and versatile person  Suitable to produce a large varieties of garment with small quantities
  • 10. Progressive Bundle System / Batch System  Also called material handling system  Garment parts are moved from one operation to another sequentially and in bundle form  Each operator receives a bundle, does his work, reties the bundle and passes it to the next operator  Machines and operations are organized into sections according to basic functions, which produce subcomponents  Within each section, works are balanced according to the time required for each sub-function  The amount of machinery for each operation is determined by the output required  This system is the most widely used system in the garment industry today Application It is used in shirt factories, jeans factories, jacket factories, etc.
  • 11. Progressive Bundle System / Batch System Advantages: - The line is easier to balance and control. - Uniform quality can be ensured by in-process control. - Semi-skilled labour requires less training time and cost. - Individual performances can be monitored by incentives. Disadvantages: - High investment on machine cost. - Short run production is not adaptable. - High level of WIP extends throughput time. - Complicated management skill is required
  • 12. Section or Process System - Group System  This is a development of the making through system and similar to the Progressive Bundle System  The operations are divided in sub-section º Pre-assembling (the preparation of small parts) º Front making º Back making º Main assembly (closing, setting collars and sleeves, etc) º Lining making º Setting linings º Finishing operations (buttonholes, blind-stitching, etc)
  • 13. Section or Process System - Group System Advantages  The labor of all levels, ie, semi skilled, skilled, trainee can be used in this system  This system is very efficient for producing a variety of styles in reasonable quantities.  Automation and specialization can be done.  Absenteeism and machine breakdown problems will not cause serious problems. Disadvantage  Quality of the garment can be deteriorated due to operators used from all level  Group of people involved in each section which increases the inventory cost.  As this is not a bundling system, there are more chances to mix up of lost, shade variation, sizes, so quality and production will be affected.
  • 14. Modular Production System  sewing operators work as a team  Neither they sew complete garment nor do they sew only single operation  Multi skilled operators form a group and each of the team members do multiple operations.  Team is fully responsible for quality and production and team performance is evaluated
  • 15. Modular Production System Advantages - Lower level of WIP and floor space. -Fast throughput time enables quick response and prompt delivery. -Quality becomes a team responsibility and monitored at source. -Peer pressure encourages a team spirit and discourages absenteeism. - The system is highly flexible with style changes Applications - Fashioned garments with quick response. -Orders with low volume and frequent changes. - Company with mutual trust between management and operators Disadvantages - Training time and cost is increased - specialized equipment is poorly utilized -Operators cannot develop the rhythm and pace of high performance -Individual effort is difficult to recognized within the group
  • 16. One Piece Flow System This system works best with the components of a single piece instead of bundle/ multiple pieces Sewing machine can be laid in straight line/modular line Operator receive one piece from back and move one piece to his next Benefits of One-piece-Flow system are less through put time, Less WIP in the line.
  • 17. UPS -Unit Production system  The unit of production is a single garment and not bundles  The garment components are automatically transported from workstation to work station according to a pre-determined sequence.  The work stations are so constructed that the components are presented as close as possible to the operator's left hand in order to reduce the amount of movement required to grasp and position and component to be sewn.
  • 18. Disadvantages  Unit production system requires high investments.  The payback period of the investment takes long time.  Proper planning is required to be effective  Quick Response Sewing System. UPS -Unit Production system Advantages  Bundle handling completely eliminated.  The time involved in the pick-up and disposal is reduced to minimum.  Output is automatically recorded, eliminates the operator to register the work.  The computerized systems automatically balance the work between stations.  Up to 40 styles can be produced simultaneously on one system. 18
  • 19. Piece Rate Production System Piece rate system also one of the most popular production system in small and unorganized factories. Though people called it piece rate system, actually it is not a production system. Whatever Production system is used as mentioned above, when operators are paid according their works (how many pieces produced), is named as piece rate system. Workers are paid on the basis of output produced by him; time is not considerable Wages = No. of unit produced x Rate per unit 19
  • 20. Straight-line or 'Synchro' System  This system is based synchronized flow of work on a through each stage of producing a garment  Time-synchronization is the most important factor of this system  If a operator SAM is 1.5 minute then all other operators SAM should be same  Unbalancing of layout can cause bottleneck 20