2. Project Management Tools in
Event Management
• Kanban Boards
• Asana
• RCA
• Slack
• Jira like Escalations
• CBR and BCR
• Opportunity Cost
• Standard Variation
• Schedule Management Plan
• Scope of Work
• Triangle in project management scope time and cost correlation
• Statement of Work
• Role of the CCB
5. • Great for project management, planning,
assigning etc.
• Creating escalations in events that are
hosted online, unique ticket number.
• Can be linked to asana and slack.
Jira and Escalations
6. CBR and BCR
• The benefit-cost ratio (BCR) is a profitability
indicator.
• Used in cost-benefit analysis to determine the
viability of cash flows generated from an asset or
project.
• The BCR compares the present value of all
benefits generated from.
• A project/asset to the present value of all costs.
• Cost to benefit ratio.
7. Opportunity Cost
Opportunity costs represent the potential
benefits an individual, investor, or business
misses out on when choosing one
alternative over another.
9. SOW
• What is scope of work and why is
statement of work so important?
Role of the CCB
• What is the Change Control Board?
• In an event who would have that role?
• How important is it to have the CCB?
SOW and CCB