2. Overview
Audit of 2002 revealed 76 PQ Unsatisfactory
in th OPS Department.
Corrective Action Plan was developed and
accepted by ICAO.
Our Objective:
From 32.74% EI Achieving min 60 % EI
How can we achieve that?
- More knowledgeable now what is required.
- More staff working in the Ops Department,
teamwork, support from the contracted staff
- Qualitative evaluation and processing of the
processes that Ops takes care of!
- Filing eFOD regulary
5. Progress - Documentation
PHASE 1
How? By developing new
operations manuals in
relation to the fields as
below, that contains all the
documented procedures
required by these PQ-s :
PHASE 2
• Ops Manual – General
• Ops Manual – Flight operation
• Ops-Manual – Cabin Safety
• Ops Manual Dangerous Goods
• Ops Manual – Ramp Inspection
This way we complete phase 1: Documentation!
6. When?
Accomplishment 2
DGI Manua
Ready draft final
version for quality
check.
15 December 2023
Accomplishment 3
FOI Manual
Ready draft final
version for quality
check
15 February 2023
Accomplishment 1
CSI Manual
Ready draft final
version for quality
check.
30 October 2023
Accomplishment 4
RIM Manual
Ready draft final
version for quality
check
31 October 2023
7. PQ Nature !
ORG 15
LEG 7
DTL 2
CSI MANUAL 4
DGI MANUAL 10
FOI MANUAL 36
RIM MANUAL 2
8. Implementation!
How
● How? By developing a complete oversight plan that matches our needs
during 2024.
● New concept will be introduced : RECERTIFICATION AUDIT.
● Recertification audit will be performed in certified air operators regarding
all of those requirements that come from a CE-6 PQ (requirements from the
initial issue of an AOC)
● Duration: 5 days for each operator!
.
9. Implementation deadlines!
Jan-24 Oversight Cabin Crew Mbyllen 4 CAP
Feb-24 Oversight Dangerous Goods
Mar-24 Oversight Dangerous Goods
Apr-24 Oversight Dangerous Goods
May-24 Oversight Dangerous Goods
Jun-24
Jul-24
Aug-24
Sep-24
Oct-24
Nov-24 Reserved Month Final check of CAP-s
Dec-24 ICVM Success!
Filing
Efod
in
the
system
(Annex
6
and
18)
Nxjerrim
Annexin
18
dhe,
ose
amendojme
UM
197
DGR
Mbyllen 10 CAP
Oversight Flight Operation
Mbyllen 36 CAP
SAFA-
Mbyllen
2
CAP
VAZHDON
TRAINING
THROUGH
THE
YEAR-
Mbyllen
2
CAP
10. Distribution of competence
Head of Ops
XH.M
Flight Ops
Inspector
V.L
Cabin Safety
Inspector
L.B
Ground ops
inspector
GJ.LL
Dangerous
Goods
Inspector
XH.M
11. 30 September
Submission of RIM
Manual for quality
check
30 October
CSI Manual for quality
check
15 December
Submission of DGI
Manual for quality check
January 2024
Oversight related to
Cbin shall be
completed
15 February
2024
Submission of FOI
Manual for quality
check
Finalize Oversight plan of 2023
Start of Efod,
Annex 6, 18
ROADMAP TO SUCCESS
12. February-June
2024
Oversight related to
Dangerous Goods
shall be completed
30 June-30
October
Oversight related to FOI
shall be completed
November
2024
Final Review of our
status
December
2024
ICVM Finalization
Finalize eFOD
ROADMAP TO SUCCESS