SlideShare a Scribd company logo
1 of 33
API Preparatory Class
Lesson 7
External Pressure Calculations
(a) Rules for the design of shells and tubes under external
pressure given in this Division are limited to cylindrical
shells, with or without stiffening rings, tubes, and
spherical shells…..
(b) The symbols defined below are used in the procedures
of this paragraph:
A = factor determined from Fig. G in Subpart 3 of Section
II, Part D and used to enter the applicable material chart
in Subpart 3 of Section II, Part D……
B = factor determined from the applicable material chart
in Subpart 3 of Section II, Part D for maximum design
metal temperature, psi .
UG – 28 Thickness of Shells and Tubes
Under External Pressure
Page 24 Section VIII
Do = outside diameter of cylindrical shell course or tube,
in.
E = Not on exam.
L = total length, in. (mm), of a tube between tubesheets,
or design length of a vessel section between lines of
support (see Fig. UG-28.1). A line of support is:
(1) a circumferential line on a head…. Not on exam!
(2) a stiffening ring……. Not on exam!
(3) a jacket closure ……. Not on exam!
(4) a cone-to-cylinder Not on exam!
P = external design pressure, psi
UG – 28
Pa = calculated value of maximum allowable external
working pressure for the assumed value of t, psi
Ro = outside radius of spherical shell, in.
t = minimum required thickness of cylindrical shell or
tube, or spherical shell, in.
ts = nominal thickness of cylindrical shell or tube, in.
Beginning with UG-28(c) there are step by step
instructions for working these problems. We will go
through these steps one at a time.
UG – 28
(c) Cylindrical Shells and Tubes. The required minimum
thickness of a cylindrical shell or tube under external
pressure, either seamless or with longitudinal butt joints,
shall be…….
1. Cylinders having Do /t values > or = 10:
Step 1 Assume a value for t and determine the ratios
L/Do and Do /t.
* You do not assume a value for thickness (t) on the exam, it
will be given in the stated problem for the external pressure
shell or tube calculation. As will the (Do) Diameter Outside
and the (L) Length in other words all that is needed to solve
the problem will be provided.
Looking at an example, we can start learning this process.
UG – 28
1. Cylinders having Do /t values > or = 10:
Step 1 Assume a value for t and determine the ratios
L/Do and Do /t.
Example: The cylinder has corroded to a wall thickness of
0.530”, its length is 120” and the outside diameter is 10”. It
operates at 500 oF
So then;
Temperature = 500 oF
t = 0.530”
L = 120”
Do = 10”
Calculate Do/t = 10/.530 = 18.8 call it 19 (no need to be exact)
Now we do L/Do = 120/10 = 12
UG – 28
Step 2 Enter Fig. G in Subpart 3 of Section II, Part at the
value of L/Do determined in Step 1. For values of L/Do
greater than 50, enter the chart at a value of L/Do = 50.
For values of L/Do less than 0.05, enter the chart at a
value of L/Do = 0.05.
In our example problem we must go up the left side of
the Fig. G until we reach the value of L/Do of 12.
• Using the chart we have the following;
UG – 28
Step 3 Move horizontally to the line for the value Do /t
determined in Step 1.... Which in our case was 19, but
we will round this to 20 since these problems are not
meant to be extremely precise. So now we have.
UG – 28
Step 3. Continued.
From this point of intersection move vertically downward to
determine the value of factor A.
Which gives us the following;
UG – 28
Step 4
Using the value of A calculated in Step 3, enter the
applicable material chart in Subpart 3 of Section II, Part D
for the material under consideration. Move vertically to an
intersection with the material/temperature line for the design
temperature see UG-20). Interpolation may be made
between lines for intermediate temperatures. In cases
where the value of A falls to the right of the end of the
material /temperature line, assume an intersection with the
horizontal projection of the upper end of the
material/temperature line.
To use the next figure we enter at the bottom at the value
Factor A = .0028 and then up to our temperature of 500 oF.
UG – 28
Factor A = .0028 and then up to our temperature of 500 oF.
Factor B is 12,000. Plug it into the formula below and we
have our External Pressure allowable, Pa Which will be;
UG – 28
)
t
D
3(
4B
=
Pa
o
psi
800
60
000
,
48
20
x
3
12,000
x
4
=
Pa 

All that work just to find Factor B is and plug it into the
simple formula below.
UG – 28
)
t
D
3(
4B
=
Pa
o
As regards the final answers to these problems, because of
the difficulty of being precise with the Fig. G there will always
be some difference from one person to the next in the
determination of Factor A. This is allowed for on the exam by
listing choices of answers that are in a range of +/- 5%. In our
previous problem the answer was 800 psi, on the exam the
correct choice would have been offered as 760 to 840 psi, i.e.
Answer Range: 760 – 840 psi
To Summarize UG-28
External calculations depart significantly from internal
calculations simply because under external pressure the
vessel is being crushed. Internal pressure wants to tear the
vessel apart.
Because of the crushing or buckling load, the Length the
Outside Diameter and the Thickness of the vessel are
important. External pressure problems are based on the
thickness of the shell to the outside diameter ratios. There
are two types of external pressure calculations, the type we
will use is when the O.D to (Do) thickness ratio (t) is greater
than 10 and the other type, not on the test, is when it is less
than 10.
To Summarize UG-28
In order to solve these types of problems two charts will be
required. The first chart Fig. G is used to find a value called
Factor A and then Factor A is used to find a Factor B in the
second material specific chart. The value of Factor B found
is the number needed to solve the problem using the
formula given in paragraph UG-28 (c)(1) step 6. As stated in
the API 510 Body of Knowledge, these charts will be
provided in the exam body, IF an external calculation is
given on the examination.
One more problem. Find the allowed external pressure on
an existing vessel of a known thickness with a Do/t ratio >
10.
UG-28
Problem: A vessel is operating under an external pressure,
the operating temperature is 500° F. The outside diameter of
the vessel is 40 inches. Its length is 70 inches. The vessel’s
wall is 1.25 inches thick and is of SA-515-70 plate. Its
specified min. yield is 38,000 psi. What is the maximum
external pressure allowed?
Givens:
Temp = 500° F
t = 1.25
L = 70 inches
D0 = 40 inches
UG – 28
From UG-28 (c)Cylindrical Shells and Tubes. The
required minimum thickness of a shell or a tube under
external pressure, either seamless or with longitudinal
butt joints, shall be determined by the following
procedure.
(1) Cylinders having a
Testing to see if this paragraph applies:
10
values
t
Do
³
UG – 28
Step 1 Our value of Do is 40 inches and L is 70 inches. We
will use these to determine the ratio of:
32
=
1.25
40
=
t
Do
1.75
=
40
70
=
o
D
L
Step 2 Enter the Factor A chart at the value of 1.75
determined above.
Step 3 Then move across horizontally to the curve Do/t =
32. Then down from this point to find the value of Factor A
which is .0045
UG – 28
Step 4. Using our value of Factor A calculated in Step 3,
enter the Factor B (CS-2) chart on the bottom. Then
vertically to the material temperature line given in the stated
problem (in our case 500 o F).
UG – 28
Step 5 Then across to find the value of Factor B. We find
that Factor B is approximately 13000.
Step 6 Using this value of Factor B, calculate the value of
the maximum allowable external pressure Pa using the
following formula:
)
t
D
3(
4B
=
Pa
o
psi
541.66
=
96
52,000
=
3(32)
4x13,000
=
Pa
Answer Range: 514 – 568 psi
Class Quiz
UG-28
A vessel under external pressure has been found to a
thickness of 1.123 ". The vessel is 8'-2" long and operates at
a temperature of 300 oF. The vessel’s outside diameter is 54
inches. It is made of a material with a minimum yield of
30,000 psi. Presently the external working pressure is 350
psi. May this vessel continue to operate in accordance with
the Code? Show all work and quote code paragraphs used.
(1) Cylinders having:
UG – 28
10
values
t
Do
³
Testing to see if this paragraph applies:
48.08
=
1.123
54
=
t
Do
Step 1 Our value of Do is 54 inches and L is 98 inches.
We will use these to determine the ratio of:
1.81
=
54
98
=
o
D
L
Step 2 Enter the Factor A chart at the value of 1.8
determined above.
UG – 28
Step 3. Then move across horizontally to the curve at
approximately Do/t = 48. Then down from this point to
find the value of Factor A which is approximately .0022
Step 4 Using our value of Factor A calculated in Step 3,
enter the Factor B (CS-2) chart on the bottom, then
vertically up to the material temperature line given in the
stated problem (in our case 300 o F).
Step 5 Next step is across to find the value of Factor B. We
find that Factor B is approximately 15000. Note due to
the variance in the reading of the charts answers and
values may vary, but should be within a 5% range of the
solution.
UG – 28
Step 6 Using this value of Factor B, calculate the value of
the maximum allowable external pressure Pa using the
following formula:
UG – 28
)
t
D
3(
4B
=
Pa
o
psi
416.66
=
144
60,000
=
3(48)
4x15,000
=
Pa
Answer Range: 395 - 437 psi
Later….

More Related Content

What's hot

4 Machine design material selection
4 Machine design material selection4 Machine design material selection
4 Machine design material selectionDr.R. SELVAM
 
Process piping fundamentals, codes and standards module 1
Process piping fundamentals, codes and standards    module 1Process piping fundamentals, codes and standards    module 1
Process piping fundamentals, codes and standards module 1BHARAT BELLAD
 
Comparison of Various Pressure Vessel Codes
Comparison of Various Pressure Vessel CodesComparison of Various Pressure Vessel Codes
Comparison of Various Pressure Vessel CodesStatic Equipment Design
 
ASME Section VIII Div 1. design training
ASME Section VIII Div 1.  design trainingASME Section VIII Div 1.  design training
ASME Section VIII Div 1. design trainingSam Jose
 
design of pressure vessel (thick and thin cylinders) may 2020
design of pressure vessel (thick and thin cylinders) may 2020design of pressure vessel (thick and thin cylinders) may 2020
design of pressure vessel (thick and thin cylinders) may 2020Gaurav Mistry
 
Design by Analysis - A general guideline for pressure vessel
Design by Analysis - A general guideline for pressure vesselDesign by Analysis - A general guideline for pressure vessel
Design by Analysis - A general guideline for pressure vesselAnalyzeForSafety
 
Static and Fatigue Analysis of Pressure Vessel as per ASME Codes
Static and Fatigue Analysis of Pressure Vessel as per ASME CodesStatic and Fatigue Analysis of Pressure Vessel as per ASME Codes
Static and Fatigue Analysis of Pressure Vessel as per ASME CodesUtsav Patel
 
Fabrication of storage buffer vessel
Fabrication of storage buffer vesselFabrication of storage buffer vessel
Fabrication of storage buffer vesselNishant Rao Boddeda
 
Codes and standards by madhur mahajan
Codes and standards by madhur mahajanCodes and standards by madhur mahajan
Codes and standards by madhur mahajanMadhur Mahajan
 
How to write a Welding Procedure Specification (ISO 15614-1
How to write a Welding Procedure Specification (ISO 15614-1How to write a Welding Procedure Specification (ISO 15614-1
How to write a Welding Procedure Specification (ISO 15614-1Tiago Pereira
 
Asme sec viii div 1 s
Asme sec viii div 1 sAsme sec viii div 1 s
Asme sec viii div 1 sJithu John
 

What's hot (20)

sheet metal UNIGRAPHICS
 sheet metal UNIGRAPHICS sheet metal UNIGRAPHICS
sheet metal UNIGRAPHICS
 
4 Machine design material selection
4 Machine design material selection4 Machine design material selection
4 Machine design material selection
 
Process piping fundamentals, codes and standards module 1
Process piping fundamentals, codes and standards    module 1Process piping fundamentals, codes and standards    module 1
Process piping fundamentals, codes and standards module 1
 
Comparison of Various Pressure Vessel Codes
Comparison of Various Pressure Vessel CodesComparison of Various Pressure Vessel Codes
Comparison of Various Pressure Vessel Codes
 
ASME Section VIII Div 1. design training
ASME Section VIII Div 1.  design trainingASME Section VIII Div 1.  design training
ASME Section VIII Div 1. design training
 
Pressure vessels
Pressure vesselsPressure vessels
Pressure vessels
 
design of pressure vessel (thick and thin cylinders) may 2020
design of pressure vessel (thick and thin cylinders) may 2020design of pressure vessel (thick and thin cylinders) may 2020
design of pressure vessel (thick and thin cylinders) may 2020
 
Design by Analysis - A general guideline for pressure vessel
Design by Analysis - A general guideline for pressure vesselDesign by Analysis - A general guideline for pressure vessel
Design by Analysis - A general guideline for pressure vessel
 
Thin Cylinders
Thin Cylinders Thin Cylinders
Thin Cylinders
 
Pipe Support & EJ Field Examples & Case Studies
Pipe Support & EJ Field Examples & Case StudiesPipe Support & EJ Field Examples & Case Studies
Pipe Support & EJ Field Examples & Case Studies
 
Base ring analysis
Base ring analysisBase ring analysis
Base ring analysis
 
Static and Fatigue Analysis of Pressure Vessel as per ASME Codes
Static and Fatigue Analysis of Pressure Vessel as per ASME CodesStatic and Fatigue Analysis of Pressure Vessel as per ASME Codes
Static and Fatigue Analysis of Pressure Vessel as per ASME Codes
 
Tensile test
Tensile testTensile test
Tensile test
 
Fabrication of storage buffer vessel
Fabrication of storage buffer vesselFabrication of storage buffer vessel
Fabrication of storage buffer vessel
 
Asme sec viii div 1 icb
Asme sec viii div 1 icbAsme sec viii div 1 icb
Asme sec viii div 1 icb
 
Design of Composite Pressure Vessel
Design of Composite Pressure VesselDesign of Composite Pressure Vessel
Design of Composite Pressure Vessel
 
Codes and standards by madhur mahajan
Codes and standards by madhur mahajanCodes and standards by madhur mahajan
Codes and standards by madhur mahajan
 
How to write a Welding Procedure Specification (ISO 15614-1
How to write a Welding Procedure Specification (ISO 15614-1How to write a Welding Procedure Specification (ISO 15614-1
How to write a Welding Procedure Specification (ISO 15614-1
 
Asme sec viii div 1 s
Asme sec viii div 1 sAsme sec viii div 1 s
Asme sec viii div 1 s
 
Cast iron
Cast ironCast iron
Cast iron
 

Similar to EXTERNAL PRESSURE CALC.ppt

IRJET- Study of Heat Transfer Coefficient in Natural and Forced Convection by...
IRJET- Study of Heat Transfer Coefficient in Natural and Forced Convection by...IRJET- Study of Heat Transfer Coefficient in Natural and Forced Convection by...
IRJET- Study of Heat Transfer Coefficient in Natural and Forced Convection by...IRJET Journal
 
Isentropic Blow-Down Process and Discharge Coefficient
Isentropic Blow-Down Process and Discharge CoefficientIsentropic Blow-Down Process and Discharge Coefficient
Isentropic Blow-Down Process and Discharge CoefficientSteven Cooke
 
Heat exchanger 3-STHE manual calculation
Heat exchanger 3-STHE manual calculationHeat exchanger 3-STHE manual calculation
Heat exchanger 3-STHE manual calculationAkshay Sarita
 
Cfd Simulation and Experimentalverification of Air Flow through Heated Pipe
Cfd Simulation and Experimentalverification of Air Flow through Heated PipeCfd Simulation and Experimentalverification of Air Flow through Heated Pipe
Cfd Simulation and Experimentalverification of Air Flow through Heated PipeIOSR Journals
 
Numerical Investigation of Forced Convection cooling of Electrical enclosure ...
Numerical Investigation of Forced Convection cooling of Electrical enclosure ...Numerical Investigation of Forced Convection cooling of Electrical enclosure ...
Numerical Investigation of Forced Convection cooling of Electrical enclosure ...IJERA Editor
 
WorksheetPhysics I Thermal Expansion WorksheetClassUP1 LabNames.docx
WorksheetPhysics I Thermal Expansion WorksheetClassUP1 LabNames.docxWorksheetPhysics I Thermal Expansion WorksheetClassUP1 LabNames.docx
WorksheetPhysics I Thermal Expansion WorksheetClassUP1 LabNames.docxdunnramage
 
Tagliatela College of EngineeringEASC1112 – Methods of Engineeri.docx
Tagliatela College of EngineeringEASC1112 – Methods of Engineeri.docxTagliatela College of EngineeringEASC1112 – Methods of Engineeri.docx
Tagliatela College of EngineeringEASC1112 – Methods of Engineeri.docxssuserf9c51d
 
Coiled tubing calculations.pdf
Coiled tubing calculations.pdfCoiled tubing calculations.pdf
Coiled tubing calculations.pdfJesusCubillas1
 
FABRICATION OF EXPERIMENTAL SETUP TO EVALUATE CONVECTIVE HEAT TRANSFER COEFFI...
FABRICATION OF EXPERIMENTAL SETUP TO EVALUATE CONVECTIVE HEAT TRANSFER COEFFI...FABRICATION OF EXPERIMENTAL SETUP TO EVALUATE CONVECTIVE HEAT TRANSFER COEFFI...
FABRICATION OF EXPERIMENTAL SETUP TO EVALUATE CONVECTIVE HEAT TRANSFER COEFFI...Bishal Bhandari
 
Experimental Investigation of Natural Convection Heat Transfer Enhancement fr...
Experimental Investigation of Natural Convection Heat Transfer Enhancement fr...Experimental Investigation of Natural Convection Heat Transfer Enhancement fr...
Experimental Investigation of Natural Convection Heat Transfer Enhancement fr...IRJET Journal
 
IIt Jee advanced-2014 Solved Paper by Prabhat Gaurav
IIt Jee advanced-2014 Solved Paper by Prabhat GauravIIt Jee advanced-2014 Solved Paper by Prabhat Gaurav
IIt Jee advanced-2014 Solved Paper by Prabhat GauravSahil Gaurav
 

Similar to EXTERNAL PRESSURE CALC.ppt (20)

AMR.622-623.147
AMR.622-623.147AMR.622-623.147
AMR.622-623.147
 
Thermal stesses
Thermal stessesThermal stesses
Thermal stesses
 
IRJET- Study of Heat Transfer Coefficient in Natural and Forced Convection by...
IRJET- Study of Heat Transfer Coefficient in Natural and Forced Convection by...IRJET- Study of Heat Transfer Coefficient in Natural and Forced Convection by...
IRJET- Study of Heat Transfer Coefficient in Natural and Forced Convection by...
 
Isentropic Blow-Down Process and Discharge Coefficient
Isentropic Blow-Down Process and Discharge CoefficientIsentropic Blow-Down Process and Discharge Coefficient
Isentropic Blow-Down Process and Discharge Coefficient
 
Heat exchanger 3-STHE manual calculation
Heat exchanger 3-STHE manual calculationHeat exchanger 3-STHE manual calculation
Heat exchanger 3-STHE manual calculation
 
Cfd Simulation and Experimentalverification of Air Flow through Heated Pipe
Cfd Simulation and Experimentalverification of Air Flow through Heated PipeCfd Simulation and Experimentalverification of Air Flow through Heated Pipe
Cfd Simulation and Experimentalverification of Air Flow through Heated Pipe
 
Numerical Investigation of Forced Convection cooling of Electrical enclosure ...
Numerical Investigation of Forced Convection cooling of Electrical enclosure ...Numerical Investigation of Forced Convection cooling of Electrical enclosure ...
Numerical Investigation of Forced Convection cooling of Electrical enclosure ...
 
IJERA
IJERAIJERA
IJERA
 
WorksheetPhysics I Thermal Expansion WorksheetClassUP1 LabNames.docx
WorksheetPhysics I Thermal Expansion WorksheetClassUP1 LabNames.docxWorksheetPhysics I Thermal Expansion WorksheetClassUP1 LabNames.docx
WorksheetPhysics I Thermal Expansion WorksheetClassUP1 LabNames.docx
 
Caeser II manual
Caeser II manualCaeser II manual
Caeser II manual
 
Tagliatela College of EngineeringEASC1112 – Methods of Engineeri.docx
Tagliatela College of EngineeringEASC1112 – Methods of Engineeri.docxTagliatela College of EngineeringEASC1112 – Methods of Engineeri.docx
Tagliatela College of EngineeringEASC1112 – Methods of Engineeri.docx
 
ANSYS Project
ANSYS ProjectANSYS Project
ANSYS Project
 
Coiled tubing calculations.pdf
Coiled tubing calculations.pdfCoiled tubing calculations.pdf
Coiled tubing calculations.pdf
 
01 kern's method.
01 kern's method.01 kern's method.
01 kern's method.
 
FABRICATION OF EXPERIMENTAL SETUP TO EVALUATE CONVECTIVE HEAT TRANSFER COEFFI...
FABRICATION OF EXPERIMENTAL SETUP TO EVALUATE CONVECTIVE HEAT TRANSFER COEFFI...FABRICATION OF EXPERIMENTAL SETUP TO EVALUATE CONVECTIVE HEAT TRANSFER COEFFI...
FABRICATION OF EXPERIMENTAL SETUP TO EVALUATE CONVECTIVE HEAT TRANSFER COEFFI...
 
D012462732
D012462732D012462732
D012462732
 
Experimental Investigation of Natural Convection Heat Transfer Enhancement fr...
Experimental Investigation of Natural Convection Heat Transfer Enhancement fr...Experimental Investigation of Natural Convection Heat Transfer Enhancement fr...
Experimental Investigation of Natural Convection Heat Transfer Enhancement fr...
 
Episode 39 : Hopper Design
Episode 39 :  Hopper Design Episode 39 :  Hopper Design
Episode 39 : Hopper Design
 
2008 - NOV.pdf
2008 - NOV.pdf2008 - NOV.pdf
2008 - NOV.pdf
 
IIt Jee advanced-2014 Solved Paper by Prabhat Gaurav
IIt Jee advanced-2014 Solved Paper by Prabhat GauravIIt Jee advanced-2014 Solved Paper by Prabhat Gaurav
IIt Jee advanced-2014 Solved Paper by Prabhat Gaurav
 

Recently uploaded

VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130Suhani Kapoor
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduitsrknatarajan
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Call Girls in Nagpur High Profile
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)simmis5
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSISrknatarajan
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingrakeshbaidya232001
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordAsst.prof M.Gokilavani
 

Recently uploaded (20)

VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
VIP Call Girls Service Hitech City Hyderabad Call +91-8250192130
 
UNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular ConduitsUNIT-II FMM-Flow Through Circular Conduits
UNIT-II FMM-Flow Through Circular Conduits
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...Top Rated  Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
Top Rated Pune Call Girls Budhwar Peth ⟟ 6297143586 ⟟ Call Me For Genuine Se...
 
Roadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and RoutesRoadmap to Membership of RICS - Pathways and Routes
Roadmap to Membership of RICS - Pathways and Routes
 
Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)Java Programming :Event Handling(Types of Events)
Java Programming :Event Handling(Types of Events)
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINEDJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
DJARUM4D - SLOT GACOR ONLINE | SLOT DEMO ONLINE
 
UNIT-III FMM. DIMENSIONAL ANALYSIS
UNIT-III FMM.        DIMENSIONAL ANALYSISUNIT-III FMM.        DIMENSIONAL ANALYSIS
UNIT-III FMM. DIMENSIONAL ANALYSIS
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(PRIYA) Rajgurunagar Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
Call Girls in Nagpur Suman Call 7001035870 Meet With Nagpur Escorts
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
Porous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writingPorous Ceramics seminar and technical writing
Porous Ceramics seminar and technical writing
 
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete RecordCCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
CCS335 _ Neural Networks and Deep Learning Laboratory_Lab Complete Record
 

EXTERNAL PRESSURE CALC.ppt

  • 1. API Preparatory Class Lesson 7 External Pressure Calculations
  • 2. (a) Rules for the design of shells and tubes under external pressure given in this Division are limited to cylindrical shells, with or without stiffening rings, tubes, and spherical shells….. (b) The symbols defined below are used in the procedures of this paragraph: A = factor determined from Fig. G in Subpart 3 of Section II, Part D and used to enter the applicable material chart in Subpart 3 of Section II, Part D…… B = factor determined from the applicable material chart in Subpart 3 of Section II, Part D for maximum design metal temperature, psi . UG – 28 Thickness of Shells and Tubes Under External Pressure Page 24 Section VIII
  • 3. Do = outside diameter of cylindrical shell course or tube, in. E = Not on exam. L = total length, in. (mm), of a tube between tubesheets, or design length of a vessel section between lines of support (see Fig. UG-28.1). A line of support is: (1) a circumferential line on a head…. Not on exam! (2) a stiffening ring……. Not on exam! (3) a jacket closure ……. Not on exam! (4) a cone-to-cylinder Not on exam! P = external design pressure, psi UG – 28
  • 4. Pa = calculated value of maximum allowable external working pressure for the assumed value of t, psi Ro = outside radius of spherical shell, in. t = minimum required thickness of cylindrical shell or tube, or spherical shell, in. ts = nominal thickness of cylindrical shell or tube, in. Beginning with UG-28(c) there are step by step instructions for working these problems. We will go through these steps one at a time. UG – 28
  • 5. (c) Cylindrical Shells and Tubes. The required minimum thickness of a cylindrical shell or tube under external pressure, either seamless or with longitudinal butt joints, shall be……. 1. Cylinders having Do /t values > or = 10: Step 1 Assume a value for t and determine the ratios L/Do and Do /t. * You do not assume a value for thickness (t) on the exam, it will be given in the stated problem for the external pressure shell or tube calculation. As will the (Do) Diameter Outside and the (L) Length in other words all that is needed to solve the problem will be provided. Looking at an example, we can start learning this process. UG – 28
  • 6. 1. Cylinders having Do /t values > or = 10: Step 1 Assume a value for t and determine the ratios L/Do and Do /t. Example: The cylinder has corroded to a wall thickness of 0.530”, its length is 120” and the outside diameter is 10”. It operates at 500 oF So then; Temperature = 500 oF t = 0.530” L = 120” Do = 10” Calculate Do/t = 10/.530 = 18.8 call it 19 (no need to be exact) Now we do L/Do = 120/10 = 12 UG – 28
  • 7. Step 2 Enter Fig. G in Subpart 3 of Section II, Part at the value of L/Do determined in Step 1. For values of L/Do greater than 50, enter the chart at a value of L/Do = 50. For values of L/Do less than 0.05, enter the chart at a value of L/Do = 0.05. In our example problem we must go up the left side of the Fig. G until we reach the value of L/Do of 12. • Using the chart we have the following; UG – 28
  • 8.
  • 9. Step 3 Move horizontally to the line for the value Do /t determined in Step 1.... Which in our case was 19, but we will round this to 20 since these problems are not meant to be extremely precise. So now we have. UG – 28
  • 10.
  • 11. Step 3. Continued. From this point of intersection move vertically downward to determine the value of factor A. Which gives us the following; UG – 28
  • 12.
  • 13. Step 4 Using the value of A calculated in Step 3, enter the applicable material chart in Subpart 3 of Section II, Part D for the material under consideration. Move vertically to an intersection with the material/temperature line for the design temperature see UG-20). Interpolation may be made between lines for intermediate temperatures. In cases where the value of A falls to the right of the end of the material /temperature line, assume an intersection with the horizontal projection of the upper end of the material/temperature line. To use the next figure we enter at the bottom at the value Factor A = .0028 and then up to our temperature of 500 oF. UG – 28
  • 14. Factor A = .0028 and then up to our temperature of 500 oF.
  • 15. Factor B is 12,000. Plug it into the formula below and we have our External Pressure allowable, Pa Which will be; UG – 28 ) t D 3( 4B = Pa o psi 800 60 000 , 48 20 x 3 12,000 x 4 = Pa  
  • 16. All that work just to find Factor B is and plug it into the simple formula below. UG – 28 ) t D 3( 4B = Pa o As regards the final answers to these problems, because of the difficulty of being precise with the Fig. G there will always be some difference from one person to the next in the determination of Factor A. This is allowed for on the exam by listing choices of answers that are in a range of +/- 5%. In our previous problem the answer was 800 psi, on the exam the correct choice would have been offered as 760 to 840 psi, i.e. Answer Range: 760 – 840 psi
  • 17. To Summarize UG-28 External calculations depart significantly from internal calculations simply because under external pressure the vessel is being crushed. Internal pressure wants to tear the vessel apart. Because of the crushing or buckling load, the Length the Outside Diameter and the Thickness of the vessel are important. External pressure problems are based on the thickness of the shell to the outside diameter ratios. There are two types of external pressure calculations, the type we will use is when the O.D to (Do) thickness ratio (t) is greater than 10 and the other type, not on the test, is when it is less than 10.
  • 18. To Summarize UG-28 In order to solve these types of problems two charts will be required. The first chart Fig. G is used to find a value called Factor A and then Factor A is used to find a Factor B in the second material specific chart. The value of Factor B found is the number needed to solve the problem using the formula given in paragraph UG-28 (c)(1) step 6. As stated in the API 510 Body of Knowledge, these charts will be provided in the exam body, IF an external calculation is given on the examination. One more problem. Find the allowed external pressure on an existing vessel of a known thickness with a Do/t ratio > 10.
  • 19. UG-28 Problem: A vessel is operating under an external pressure, the operating temperature is 500° F. The outside diameter of the vessel is 40 inches. Its length is 70 inches. The vessel’s wall is 1.25 inches thick and is of SA-515-70 plate. Its specified min. yield is 38,000 psi. What is the maximum external pressure allowed? Givens: Temp = 500° F t = 1.25 L = 70 inches D0 = 40 inches
  • 20. UG – 28 From UG-28 (c)Cylindrical Shells and Tubes. The required minimum thickness of a shell or a tube under external pressure, either seamless or with longitudinal butt joints, shall be determined by the following procedure. (1) Cylinders having a Testing to see if this paragraph applies: 10 values t Do ³
  • 21. UG – 28 Step 1 Our value of Do is 40 inches and L is 70 inches. We will use these to determine the ratio of: 32 = 1.25 40 = t Do 1.75 = 40 70 = o D L Step 2 Enter the Factor A chart at the value of 1.75 determined above. Step 3 Then move across horizontally to the curve Do/t = 32. Then down from this point to find the value of Factor A which is .0045
  • 22.
  • 23. UG – 28 Step 4. Using our value of Factor A calculated in Step 3, enter the Factor B (CS-2) chart on the bottom. Then vertically to the material temperature line given in the stated problem (in our case 500 o F).
  • 24.
  • 25. UG – 28 Step 5 Then across to find the value of Factor B. We find that Factor B is approximately 13000. Step 6 Using this value of Factor B, calculate the value of the maximum allowable external pressure Pa using the following formula: ) t D 3( 4B = Pa o psi 541.66 = 96 52,000 = 3(32) 4x13,000 = Pa Answer Range: 514 – 568 psi
  • 26. Class Quiz UG-28 A vessel under external pressure has been found to a thickness of 1.123 ". The vessel is 8'-2" long and operates at a temperature of 300 oF. The vessel’s outside diameter is 54 inches. It is made of a material with a minimum yield of 30,000 psi. Presently the external working pressure is 350 psi. May this vessel continue to operate in accordance with the Code? Show all work and quote code paragraphs used.
  • 27. (1) Cylinders having: UG – 28 10 values t Do ³ Testing to see if this paragraph applies: 48.08 = 1.123 54 = t Do Step 1 Our value of Do is 54 inches and L is 98 inches. We will use these to determine the ratio of: 1.81 = 54 98 = o D L Step 2 Enter the Factor A chart at the value of 1.8 determined above.
  • 28. UG – 28 Step 3. Then move across horizontally to the curve at approximately Do/t = 48. Then down from this point to find the value of Factor A which is approximately .0022
  • 29.
  • 30. Step 4 Using our value of Factor A calculated in Step 3, enter the Factor B (CS-2) chart on the bottom, then vertically up to the material temperature line given in the stated problem (in our case 300 o F). Step 5 Next step is across to find the value of Factor B. We find that Factor B is approximately 15000. Note due to the variance in the reading of the charts answers and values may vary, but should be within a 5% range of the solution. UG – 28
  • 31.
  • 32. Step 6 Using this value of Factor B, calculate the value of the maximum allowable external pressure Pa using the following formula: UG – 28 ) t D 3( 4B = Pa o psi 416.66 = 144 60,000 = 3(48) 4x15,000 = Pa Answer Range: 395 - 437 psi