Punyam Certification Inc.
Quality Procedure
No. QP/01
Revision No. 00
Date 01–06–2020
Prepared By Approved By Signature Page
Management
Representative
CEO 1 of 6
Procedure
For
Granting, maintaining, recertifying,
expanding and reducing the scope
of the certification, and suspending
or withdrawing the certification
Controlled Copy No.
Issued to
Issued by Management Representative
Revision details
Rev
No.
Issued on Details of amendment / revision made Reason for amendment
00 01–06–2020 First issue
Due to implementation of
ISO/IEC 17024
Punyam Certification Inc.
Quality Procedure
No. QP/01
Revision No. 00
Date 01–06–2020
Prepared By Approved By Signature Page
Management
Representative
CEO 2 of 6
1.0 Purpose
The purpose of this procedure is to describe a process for granting, maintaining,
recertifying, expanding and reducing the scope of the certification, and suspending or
withdrawing the certification.
2.0 Scope
This procedure applies to all types of certification scheme operated by Punyam.
3.0 Responsibility
3.1 Certification Manager is responsible for issue of certificate to certified person, review and
approval of certificate. He is authorized to send suspension or withdrawal letters / e-mails to
certified person. He is supported by the document controller for all routine activities, such as
granting, maintaining list of certified person, recertifying the person, expanding or reducing
the scope of certification as well as suspending or withdrawing the certification.
3.2 Management Representative is responsible to ensure that the list of certified persons is
maintained up to date by Certification Manager.
4.0 Description of Activity
4.1 Receipt and review of examination report
4.1.1 Examiners / Invigilators submit the examination documents to the Certification Manager
upon completion of examination.
4.1.2 All such documents are reviewed by the Certification Manager for the completeness of the
documents as well as verification of signature of the examiners / invigilators.
4.1.3 Examination documents of candidate are checked and score obtained by the candidate is
entered on the examination documents.
4.1.4 After review of documents, if the candidate has acquired required score at the end of
examination, the details of the same candidate is forwarded to the Document controller for
the preparation of certificate.
4.2 Certificate preparation, and granting / issue
4.2.1 Certificate is prepared on the name of its holder, means candidate, and all the requirements
as referred in the clause no. 9.4.8 of Quality Manual are taken care of and it is ensured that
the same are printed on the certificate. Standard templates for each type of certificates are
prepared and are maintained to prevent mistakes during preparation of such certificate.
4.2.2 Upon preparation of the certificate, the certificate is reviewed by Certification Manager.
Certification Manager reviews it against the application made by the candidate as well as the
examination documents.
4.2.3 Upon completion of satisfactory review, certificate is approved by Certification Manager. In
case of any mistake in the certificate, the same is sent back for correction to the Document
Controller.
4.2.4 Approved certificate is then granted / issued to the certified person as per the mailing
address given in the application. Before sending hard copy through courier, the certificate is
sent to certified person by e mail to check all his personal details to avoid any corrections
Punyam Certification Inc.
Quality Procedure
No. QP/01
Revision No. 00
Date 01–06–2020
Prepared By Approved By Signature Page
Management
Representative
CEO 3 of 6
later on.
4.2.5 Along with the certificate, the terms and conditions for its usage of certificate, mark and logo
is also submitted to the certified persons for ensuring safe and proper use of the certificate
by the certified person.
4.3 Maintaining the certification
4.3.1 Certificate is considered as valid till the expiry date printed on the certificate. For maintaining
the certificate, the certified person has to ensure that, he/she fulfill the re requirements given
in the terms and conditions for its usage of certificate, mark and logo.
4.3.2 Certified person is also required to complete the intermediate assessment, exams etc. as
per the scheme. If required, the certified person has to visit the Punyam for verification of
physical fitness to continue to comply with the requirements of relevant scheme.
4.4 Recertifying the certification
4.4.1 Certified person has to apply for the recertification before 30 days of the expiry of the
present certificate.
4.4.2 Upon receipt of request for the recertification, Certification Manager arranges for the
recertification before expiry. The certified person has to pass through all the examination
and evaluation requirements as per the certification scheme for the recertification.
4.4.3 Once the certified person fulfils the requirements of recertification, the same is processed
as per the details given in clause no. 4.2 for preparation and granting of certificate.
4.5 Expanding and reducing the scope of certification
4.5.1 Request for expanding or reducing the scope of certification is received from the certified
person. The same is received in the application form (F/CCS/01) with the details of
expansion or reduction in the present scope of certification.
4.5.2 The request for expansion or reduction is reviewed by Certification Manager.
4.5.3 In case of reduction in the scope of certification, the same is done by Certification Manager
and the new certificate based on the reduction in the scope is prepared and is issued to the
certified person. Based on the reduction, the detail of his/her certification is updated in the
list of certified persons.
4.5.4 In case of expanding the scope of certification, Certification Manager reviews the request
and identified the further assessment and examination for the certified person as per the
requirements of certification scheme.
4.5.5 Certified person is then informed to pass through the assessment examination process and
is given schedule for the assessment and examination.
4.5.6 Upon successful completion of assessment and examination, the certification of certified
person is amended with the inclusion of new skill (as per the expansion) and certificate is
granted as per the requirements referred in the clause no. 4.2.
4.6 Suspension and withdrawal of certificates
4.6.1 This instruction covers suspension procedures through withdrawal or cancellation of the
certificate and revision of the list of certified persons.
Punyam Certification Inc.
Quality Procedure
No. QP/01
Revision No. 00
Date 01–06–2020
Prepared By Approved By Signature Page
Management
Representative
CEO 4 of 6
 Grounds for action are brought to the attention of the Certification Manager, who reviews
the information and decides whether to proceed. Either way, he / she issues a letter to
the certified person via registered mail / courier informing him/her of the details of the
grounds for action and the decision on whether to proceed.
 If the Certification Manager decides to proceed, the certified person must reply to
Punyam within fourteen days of receipt of letter.
 If the Certification Manager determines that the action or position contained in the
certified person’s reply is satisfactory, he issues a letter stating this, and mails it to the
certified person via registered mail.
 If actions are required, due dates must be set and Certification Manager must review the
actions at those times to ensure that they are effectively completed in order to prevent
suspension or cancellation.
 If the certified person does not reply in fourteen days, if the reply is not satisfactory, or if
the actions required are not effectively completed in the allowed time, the Certification
Manager determines whether to suspend or cancel certification.
 If the decision is made to cancel certification, the Certification Manager is responsible for
suspending the certified person or canceling the certified person from the list of certified
person, advising the certified person by registered mail / courier, and publicizing the
cancellation, if necessary.
4.6.2 The following reasons are considered grounds for suspension or cancellation;
 Major non-conformance(s) or effective corrective action not implemented within a
specified time period.
 Improper use of the certificate, symbol, or logo, not remedied to the satisfaction of
Punyam.
 Certified person ceases to supply services of the certified quality for an extended period
of time.
 Certified person persistently fails to meet any of the requirements for certification,
recertification, including requirements for the effectiveness.
 Certified person fails to meet financial obligations to Punyam
 Certified person makes a formal request to withdraw certification.
 Infringement by the certified person of any contractual conditions between the certified
person and Punyam
 Certified person is unable or unwilling to ensure conformance to revisions of the
standard.
 Existence of a serious complaint, or a large number of complaints from interested
parties.
 Certified person does not allow periodic examination to be conducted at the required
frequency.
4.7 Conditions for suspension or cancellation of certified person’s certification
Punyam Certification Inc.
Quality Procedure
No. QP/01
Revision No. 00
Date 01–06–2020
Prepared By Approved By Signature Page
Management
Representative
CEO 5 of 6
4.7.1 Subject to actions by the certified person, the following steps will be taken leading to
possible suspension or cancellation of the certified person's certification:
 Unless a reply to the letter accompanying notification is received within 14 days,
certification will be suspended and a notification of suspension may be published at the
discretion of Punyam
 The certified person's response to the accompanying letter will be reviewed and the
proceedings may be put on hold while clarification is sought.
 Where mutually agreed–upon corrective action is to be implemented, a time period for
implementation will be specified and a review of the corrective action will be undertaken
at the appointed time. This may be the subject of a special evaluation / assessment visit
or of the review of submitted objective evidence, at the discretion of Punyam, should the
corrective action not be considered adequate or not be completed by the appointed time,
certification will be automatically suspended.
 In the case of serious circumstances, Punyam may invoke suspension during the period
pending the implementation of corrective action.
 Where suspension has been invoked, unless otherwise specified, the certified person
must advise Punyam on every 14 days of the current situation of corrective action.
Failure to meet this requirement will result in cancellation of the certified person's
certification.
 Where suspension has been invoked due to failure to conduct periodic examination, the
certified person shall give justification for failure and offer suitable date. An additional day
shall be added to routine periodic days. The date shall not be later than 15 months from
the last examination. Failure to offer for examination within 15 months shall result in
cancellation of certification.
 When corrective action taken by the certified person to resolve the problem(s) is verified,
certification will be resumed. The period of certification will not be revised to cover the
period of suspension.
 Cancellation of certification will be invoked, following suspension of certification, where
the certified person fails to respond to Punyam’s communications within the 14 days’
grace period or fails to implement corrective action within the appointed time period.
 In extreme circumstances Punyam may invoke the cancellation of certification with
immediate effect without recourse to initial certification suspension.
 Cancellation of certification will require the certified person to assume the status of non–
approval and return all certification documentation to Punyam
 Use of certification documents, symbols, or logos by the certified person following
certification cancellation may result in legal action being taken against the certified
person.
 Re–approval after certification cancellation will be on the same basis, and follows the
same process as that of initial application for a new certified person. This will require a
full assessment, with optional document review at the discretion of Punyam
Punyam Certification Inc.
Quality Procedure
No. QP/01
Revision No. 00
Date 01–06–2020
Prepared By Approved By Signature Page
Management
Representative
CEO 6 of 6
 The de-certification will be published as a separate list which will be available at the
Punyam’s office and made available upon request.
 The certified person has the right to appeal against any decisions of Punyam, and a
copy of the appeals procedures will be made available upon request.
 Certification Manager shall remove the certified person from the list, where the certificate
has been cancelled. During suspension, suspension remark shall be put in the list of
certified person.
 The certified person files for all cancelled cases shall be archived for a period of 3
months and then destroyed.
5.0 Reference
5.1 ISO/IEC 17024:2012
6.0 Enclosure Nil
7.0 Formats / Exhibits
7.1 F/CCS/01 Application form
7.2 F/CCS/02 Certificate template

More Related Content

Similar to QP_01_Granting certification.doc

Annex 10 - Accreditation Assessors Forms.docx
Annex 10 - Accreditation Assessors Forms.docxAnnex 10 - Accreditation Assessors Forms.docx
Annex 10 - Accreditation Assessors Forms.docxssuser1934c21
 
PACCC? So Easy Even a Caveman Can Do It? Not quite. An Insight
PACCC? So Easy Even a Caveman Can Do It? Not quite. An InsightPACCC? So Easy Even a Caveman Can Do It? Not quite. An Insight
PACCC? So Easy Even a Caveman Can Do It? Not quite. An InsightArthur A Rimbold
 
Recruitment process (2)
Recruitment process (2)Recruitment process (2)
Recruitment process (2)Ankita Satam
 
Trainers’ Methodology Part 4.pptx
Trainers’ Methodology Part 4.pptxTrainers’ Methodology Part 4.pptx
Trainers’ Methodology Part 4.pptxMarioCaday1
 
Si quality manual
Si quality manualSi quality manual
Si quality manualrusyare
 
Sitxccs008 develop and manage quality customer service practices
Sitxccs008 develop and manage quality customer service practices Sitxccs008 develop and manage quality customer service practices
Sitxccs008 develop and manage quality customer service practices mybestassignmenthelp
 
A guide-to-internal-quality-assurance
A guide-to-internal-quality-assuranceA guide-to-internal-quality-assurance
A guide-to-internal-quality-assuranceIbrahim Khleifat
 
Quality assuring assessment guidelines for providers, revised 2013
Quality assuring assessment   guidelines for providers, revised 2013Quality assuring assessment   guidelines for providers, revised 2013
Quality assuring assessment guidelines for providers, revised 2013Ibrahim Khleifat
 
Quality assuring assessment guidelines for providers, revised 2013
Quality assuring assessment   guidelines for providers, revised 2013Quality assuring assessment   guidelines for providers, revised 2013
Quality assuring assessment guidelines for providers, revised 2013Ibrahim Khleifat
 
Leed v4-green-associate-candidate-handbook
Leed v4-green-associate-candidate-handbookLeed v4-green-associate-candidate-handbook
Leed v4-green-associate-candidate-handbookAhmed Abouelenin
 
PetroSync - IWCF Certification Drilling Well Control Level 2
PetroSync - IWCF Certification Drilling Well Control Level 2PetroSync - IWCF Certification Drilling Well Control Level 2
PetroSync - IWCF Certification Drilling Well Control Level 2PetroSync
 
PetroSync - IWCF Certification Drilling Well Control Level 3 & 4
PetroSync - IWCF Certification Drilling Well Control Level 3 & 4PetroSync - IWCF Certification Drilling Well Control Level 3 & 4
PetroSync - IWCF Certification Drilling Well Control Level 3 & 4PetroSync
 
BSAccount NameAmountAccount NameAmountCurrent AssetsCurrent Liabil
BSAccount NameAmountAccount NameAmountCurrent AssetsCurrent LiabilBSAccount NameAmountAccount NameAmountCurrent AssetsCurrent Liabil
BSAccount NameAmountAccount NameAmountCurrent AssetsCurrent LiabilCicelyBourqueju
 
PetroSync - IWCF Well Intervention Pressure Control 6.0
PetroSync - IWCF Well Intervention Pressure Control 6.0PetroSync - IWCF Well Intervention Pressure Control 6.0
PetroSync - IWCF Well Intervention Pressure Control 6.0Shanice Sua
 
ABN 28 615 702 335ACN 615 702 .docx
ABN 28 615 702 335ACN 615 702 .docxABN 28 615 702 335ACN 615 702 .docx
ABN 28 615 702 335ACN 615 702 .docxAbhinav816839
 
ABP (Association of Business Practitioners) Accreditation Process
ABP (Association of Business Practitioners) Accreditation ProcessABP (Association of Business Practitioners) Accreditation Process
ABP (Association of Business Practitioners) Accreditation ProcessABP_Qualifications
 
SEQOHS Certificate
SEQOHS CertificateSEQOHS Certificate
SEQOHS CertificateJoe Hollaway
 
Registration-Policy-and-Guidelines.pdf
Registration-Policy-and-Guidelines.pdfRegistration-Policy-and-Guidelines.pdf
Registration-Policy-and-Guidelines.pdfKevinRaman1
 
Do 22-s.-2015-hiring-guidelines-for-the-remaining-teaching-positions-effectiv...
Do 22-s.-2015-hiring-guidelines-for-the-remaining-teaching-positions-effectiv...Do 22-s.-2015-hiring-guidelines-for-the-remaining-teaching-positions-effectiv...
Do 22-s.-2015-hiring-guidelines-for-the-remaining-teaching-positions-effectiv...Carla Gomez
 
PetroSync - IWCF Drilling Well Control 6.0
PetroSync - IWCF Drilling Well Control 6.0PetroSync - IWCF Drilling Well Control 6.0
PetroSync - IWCF Drilling Well Control 6.0Shanice Sua
 

Similar to QP_01_Granting certification.doc (20)

Annex 10 - Accreditation Assessors Forms.docx
Annex 10 - Accreditation Assessors Forms.docxAnnex 10 - Accreditation Assessors Forms.docx
Annex 10 - Accreditation Assessors Forms.docx
 
PACCC? So Easy Even a Caveman Can Do It? Not quite. An Insight
PACCC? So Easy Even a Caveman Can Do It? Not quite. An InsightPACCC? So Easy Even a Caveman Can Do It? Not quite. An Insight
PACCC? So Easy Even a Caveman Can Do It? Not quite. An Insight
 
Recruitment process (2)
Recruitment process (2)Recruitment process (2)
Recruitment process (2)
 
Trainers’ Methodology Part 4.pptx
Trainers’ Methodology Part 4.pptxTrainers’ Methodology Part 4.pptx
Trainers’ Methodology Part 4.pptx
 
Si quality manual
Si quality manualSi quality manual
Si quality manual
 
Sitxccs008 develop and manage quality customer service practices
Sitxccs008 develop and manage quality customer service practices Sitxccs008 develop and manage quality customer service practices
Sitxccs008 develop and manage quality customer service practices
 
A guide-to-internal-quality-assurance
A guide-to-internal-quality-assuranceA guide-to-internal-quality-assurance
A guide-to-internal-quality-assurance
 
Quality assuring assessment guidelines for providers, revised 2013
Quality assuring assessment   guidelines for providers, revised 2013Quality assuring assessment   guidelines for providers, revised 2013
Quality assuring assessment guidelines for providers, revised 2013
 
Quality assuring assessment guidelines for providers, revised 2013
Quality assuring assessment   guidelines for providers, revised 2013Quality assuring assessment   guidelines for providers, revised 2013
Quality assuring assessment guidelines for providers, revised 2013
 
Leed v4-green-associate-candidate-handbook
Leed v4-green-associate-candidate-handbookLeed v4-green-associate-candidate-handbook
Leed v4-green-associate-candidate-handbook
 
PetroSync - IWCF Certification Drilling Well Control Level 2
PetroSync - IWCF Certification Drilling Well Control Level 2PetroSync - IWCF Certification Drilling Well Control Level 2
PetroSync - IWCF Certification Drilling Well Control Level 2
 
PetroSync - IWCF Certification Drilling Well Control Level 3 & 4
PetroSync - IWCF Certification Drilling Well Control Level 3 & 4PetroSync - IWCF Certification Drilling Well Control Level 3 & 4
PetroSync - IWCF Certification Drilling Well Control Level 3 & 4
 
BSAccount NameAmountAccount NameAmountCurrent AssetsCurrent Liabil
BSAccount NameAmountAccount NameAmountCurrent AssetsCurrent LiabilBSAccount NameAmountAccount NameAmountCurrent AssetsCurrent Liabil
BSAccount NameAmountAccount NameAmountCurrent AssetsCurrent Liabil
 
PetroSync - IWCF Well Intervention Pressure Control 6.0
PetroSync - IWCF Well Intervention Pressure Control 6.0PetroSync - IWCF Well Intervention Pressure Control 6.0
PetroSync - IWCF Well Intervention Pressure Control 6.0
 
ABN 28 615 702 335ACN 615 702 .docx
ABN 28 615 702 335ACN 615 702 .docxABN 28 615 702 335ACN 615 702 .docx
ABN 28 615 702 335ACN 615 702 .docx
 
ABP (Association of Business Practitioners) Accreditation Process
ABP (Association of Business Practitioners) Accreditation ProcessABP (Association of Business Practitioners) Accreditation Process
ABP (Association of Business Practitioners) Accreditation Process
 
SEQOHS Certificate
SEQOHS CertificateSEQOHS Certificate
SEQOHS Certificate
 
Registration-Policy-and-Guidelines.pdf
Registration-Policy-and-Guidelines.pdfRegistration-Policy-and-Guidelines.pdf
Registration-Policy-and-Guidelines.pdf
 
Do 22-s.-2015-hiring-guidelines-for-the-remaining-teaching-positions-effectiv...
Do 22-s.-2015-hiring-guidelines-for-the-remaining-teaching-positions-effectiv...Do 22-s.-2015-hiring-guidelines-for-the-remaining-teaching-positions-effectiv...
Do 22-s.-2015-hiring-guidelines-for-the-remaining-teaching-positions-effectiv...
 
PetroSync - IWCF Drilling Well Control 6.0
PetroSync - IWCF Drilling Well Control 6.0PetroSync - IWCF Drilling Well Control 6.0
PetroSync - IWCF Drilling Well Control 6.0
 

Recently uploaded

18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdfssuser54595a
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Educationpboyjonauth
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeThiyagu K
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxGaneshChakor2
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13Steve Thomason
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxheathfieldcps1
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionSafetyChain Software
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...EduSkills OECD
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformChameera Dedduwage
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdfQucHHunhnh
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Krashi Coaching
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxiammrhaywood
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxSayali Powar
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationnomboosow
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactPECB
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)eniolaolutunde
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfciinovamais
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104misteraugie
 

Recently uploaded (20)

18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
18-04-UA_REPORT_MEDIALITERAСY_INDEX-DM_23-1-final-eng.pdf
 
Introduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher EducationIntroduction to ArtificiaI Intelligence in Higher Education
Introduction to ArtificiaI Intelligence in Higher Education
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and Mode
 
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptxINDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
 
Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1
 
CARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptxCARE OF CHILD IN INCUBATOR..........pptx
CARE OF CHILD IN INCUBATOR..........pptx
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory Inspection
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy Reform
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
 
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptxSOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
SOCIAL AND HISTORICAL CONTEXT - LFTVD.pptx
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communication
 
Beyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global ImpactBeyond the EU: DORA and NIS 2 Directive's Global Impact
Beyond the EU: DORA and NIS 2 Directive's Global Impact
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104Nutritional Needs Presentation - HLTH 104
Nutritional Needs Presentation - HLTH 104
 

QP_01_Granting certification.doc

  • 1. Punyam Certification Inc. Quality Procedure No. QP/01 Revision No. 00 Date 01–06–2020 Prepared By Approved By Signature Page Management Representative CEO 1 of 6 Procedure For Granting, maintaining, recertifying, expanding and reducing the scope of the certification, and suspending or withdrawing the certification Controlled Copy No. Issued to Issued by Management Representative Revision details Rev No. Issued on Details of amendment / revision made Reason for amendment 00 01–06–2020 First issue Due to implementation of ISO/IEC 17024
  • 2. Punyam Certification Inc. Quality Procedure No. QP/01 Revision No. 00 Date 01–06–2020 Prepared By Approved By Signature Page Management Representative CEO 2 of 6 1.0 Purpose The purpose of this procedure is to describe a process for granting, maintaining, recertifying, expanding and reducing the scope of the certification, and suspending or withdrawing the certification. 2.0 Scope This procedure applies to all types of certification scheme operated by Punyam. 3.0 Responsibility 3.1 Certification Manager is responsible for issue of certificate to certified person, review and approval of certificate. He is authorized to send suspension or withdrawal letters / e-mails to certified person. He is supported by the document controller for all routine activities, such as granting, maintaining list of certified person, recertifying the person, expanding or reducing the scope of certification as well as suspending or withdrawing the certification. 3.2 Management Representative is responsible to ensure that the list of certified persons is maintained up to date by Certification Manager. 4.0 Description of Activity 4.1 Receipt and review of examination report 4.1.1 Examiners / Invigilators submit the examination documents to the Certification Manager upon completion of examination. 4.1.2 All such documents are reviewed by the Certification Manager for the completeness of the documents as well as verification of signature of the examiners / invigilators. 4.1.3 Examination documents of candidate are checked and score obtained by the candidate is entered on the examination documents. 4.1.4 After review of documents, if the candidate has acquired required score at the end of examination, the details of the same candidate is forwarded to the Document controller for the preparation of certificate. 4.2 Certificate preparation, and granting / issue 4.2.1 Certificate is prepared on the name of its holder, means candidate, and all the requirements as referred in the clause no. 9.4.8 of Quality Manual are taken care of and it is ensured that the same are printed on the certificate. Standard templates for each type of certificates are prepared and are maintained to prevent mistakes during preparation of such certificate. 4.2.2 Upon preparation of the certificate, the certificate is reviewed by Certification Manager. Certification Manager reviews it against the application made by the candidate as well as the examination documents. 4.2.3 Upon completion of satisfactory review, certificate is approved by Certification Manager. In case of any mistake in the certificate, the same is sent back for correction to the Document Controller. 4.2.4 Approved certificate is then granted / issued to the certified person as per the mailing address given in the application. Before sending hard copy through courier, the certificate is sent to certified person by e mail to check all his personal details to avoid any corrections
  • 3. Punyam Certification Inc. Quality Procedure No. QP/01 Revision No. 00 Date 01–06–2020 Prepared By Approved By Signature Page Management Representative CEO 3 of 6 later on. 4.2.5 Along with the certificate, the terms and conditions for its usage of certificate, mark and logo is also submitted to the certified persons for ensuring safe and proper use of the certificate by the certified person. 4.3 Maintaining the certification 4.3.1 Certificate is considered as valid till the expiry date printed on the certificate. For maintaining the certificate, the certified person has to ensure that, he/she fulfill the re requirements given in the terms and conditions for its usage of certificate, mark and logo. 4.3.2 Certified person is also required to complete the intermediate assessment, exams etc. as per the scheme. If required, the certified person has to visit the Punyam for verification of physical fitness to continue to comply with the requirements of relevant scheme. 4.4 Recertifying the certification 4.4.1 Certified person has to apply for the recertification before 30 days of the expiry of the present certificate. 4.4.2 Upon receipt of request for the recertification, Certification Manager arranges for the recertification before expiry. The certified person has to pass through all the examination and evaluation requirements as per the certification scheme for the recertification. 4.4.3 Once the certified person fulfils the requirements of recertification, the same is processed as per the details given in clause no. 4.2 for preparation and granting of certificate. 4.5 Expanding and reducing the scope of certification 4.5.1 Request for expanding or reducing the scope of certification is received from the certified person. The same is received in the application form (F/CCS/01) with the details of expansion or reduction in the present scope of certification. 4.5.2 The request for expansion or reduction is reviewed by Certification Manager. 4.5.3 In case of reduction in the scope of certification, the same is done by Certification Manager and the new certificate based on the reduction in the scope is prepared and is issued to the certified person. Based on the reduction, the detail of his/her certification is updated in the list of certified persons. 4.5.4 In case of expanding the scope of certification, Certification Manager reviews the request and identified the further assessment and examination for the certified person as per the requirements of certification scheme. 4.5.5 Certified person is then informed to pass through the assessment examination process and is given schedule for the assessment and examination. 4.5.6 Upon successful completion of assessment and examination, the certification of certified person is amended with the inclusion of new skill (as per the expansion) and certificate is granted as per the requirements referred in the clause no. 4.2. 4.6 Suspension and withdrawal of certificates 4.6.1 This instruction covers suspension procedures through withdrawal or cancellation of the certificate and revision of the list of certified persons.
  • 4. Punyam Certification Inc. Quality Procedure No. QP/01 Revision No. 00 Date 01–06–2020 Prepared By Approved By Signature Page Management Representative CEO 4 of 6  Grounds for action are brought to the attention of the Certification Manager, who reviews the information and decides whether to proceed. Either way, he / she issues a letter to the certified person via registered mail / courier informing him/her of the details of the grounds for action and the decision on whether to proceed.  If the Certification Manager decides to proceed, the certified person must reply to Punyam within fourteen days of receipt of letter.  If the Certification Manager determines that the action or position contained in the certified person’s reply is satisfactory, he issues a letter stating this, and mails it to the certified person via registered mail.  If actions are required, due dates must be set and Certification Manager must review the actions at those times to ensure that they are effectively completed in order to prevent suspension or cancellation.  If the certified person does not reply in fourteen days, if the reply is not satisfactory, or if the actions required are not effectively completed in the allowed time, the Certification Manager determines whether to suspend or cancel certification.  If the decision is made to cancel certification, the Certification Manager is responsible for suspending the certified person or canceling the certified person from the list of certified person, advising the certified person by registered mail / courier, and publicizing the cancellation, if necessary. 4.6.2 The following reasons are considered grounds for suspension or cancellation;  Major non-conformance(s) or effective corrective action not implemented within a specified time period.  Improper use of the certificate, symbol, or logo, not remedied to the satisfaction of Punyam.  Certified person ceases to supply services of the certified quality for an extended period of time.  Certified person persistently fails to meet any of the requirements for certification, recertification, including requirements for the effectiveness.  Certified person fails to meet financial obligations to Punyam  Certified person makes a formal request to withdraw certification.  Infringement by the certified person of any contractual conditions between the certified person and Punyam  Certified person is unable or unwilling to ensure conformance to revisions of the standard.  Existence of a serious complaint, or a large number of complaints from interested parties.  Certified person does not allow periodic examination to be conducted at the required frequency. 4.7 Conditions for suspension or cancellation of certified person’s certification
  • 5. Punyam Certification Inc. Quality Procedure No. QP/01 Revision No. 00 Date 01–06–2020 Prepared By Approved By Signature Page Management Representative CEO 5 of 6 4.7.1 Subject to actions by the certified person, the following steps will be taken leading to possible suspension or cancellation of the certified person's certification:  Unless a reply to the letter accompanying notification is received within 14 days, certification will be suspended and a notification of suspension may be published at the discretion of Punyam  The certified person's response to the accompanying letter will be reviewed and the proceedings may be put on hold while clarification is sought.  Where mutually agreed–upon corrective action is to be implemented, a time period for implementation will be specified and a review of the corrective action will be undertaken at the appointed time. This may be the subject of a special evaluation / assessment visit or of the review of submitted objective evidence, at the discretion of Punyam, should the corrective action not be considered adequate or not be completed by the appointed time, certification will be automatically suspended.  In the case of serious circumstances, Punyam may invoke suspension during the period pending the implementation of corrective action.  Where suspension has been invoked, unless otherwise specified, the certified person must advise Punyam on every 14 days of the current situation of corrective action. Failure to meet this requirement will result in cancellation of the certified person's certification.  Where suspension has been invoked due to failure to conduct periodic examination, the certified person shall give justification for failure and offer suitable date. An additional day shall be added to routine periodic days. The date shall not be later than 15 months from the last examination. Failure to offer for examination within 15 months shall result in cancellation of certification.  When corrective action taken by the certified person to resolve the problem(s) is verified, certification will be resumed. The period of certification will not be revised to cover the period of suspension.  Cancellation of certification will be invoked, following suspension of certification, where the certified person fails to respond to Punyam’s communications within the 14 days’ grace period or fails to implement corrective action within the appointed time period.  In extreme circumstances Punyam may invoke the cancellation of certification with immediate effect without recourse to initial certification suspension.  Cancellation of certification will require the certified person to assume the status of non– approval and return all certification documentation to Punyam  Use of certification documents, symbols, or logos by the certified person following certification cancellation may result in legal action being taken against the certified person.  Re–approval after certification cancellation will be on the same basis, and follows the same process as that of initial application for a new certified person. This will require a full assessment, with optional document review at the discretion of Punyam
  • 6. Punyam Certification Inc. Quality Procedure No. QP/01 Revision No. 00 Date 01–06–2020 Prepared By Approved By Signature Page Management Representative CEO 6 of 6  The de-certification will be published as a separate list which will be available at the Punyam’s office and made available upon request.  The certified person has the right to appeal against any decisions of Punyam, and a copy of the appeals procedures will be made available upon request.  Certification Manager shall remove the certified person from the list, where the certificate has been cancelled. During suspension, suspension remark shall be put in the list of certified person.  The certified person files for all cancelled cases shall be archived for a period of 3 months and then destroyed. 5.0 Reference 5.1 ISO/IEC 17024:2012 6.0 Enclosure Nil 7.0 Formats / Exhibits 7.1 F/CCS/01 Application form 7.2 F/CCS/02 Certificate template