Workforce Planning is the process whereby the management of an organisation
try to ensure that they always have the right number of employees, with the
right knowledge and skills in place at the right time. This document provides a
Workforce Planning Model which can be applied in any organization; it also
incorporates a series of worksheets to facilitate effective project planning.
2015
A. Brogan
Human Resource Solutions
2015
Workforce Planning Model & Worksheets
Introduction
The purpose of these manpower planning guidelines is to assist managers to undertake
systematic planning for major structural changes about to take place in their area of
responsibility and which will therefore affect their staff. If worked through
conscientiously, they should ensure appropriate numbers and skills are in place at
each key project milestone.
The model takes managers through the process of clarifying the future situation and
articulating the implications of the changes for the workforce. This will allow the
estimate of future demand for staff in each staff group at each key date in the project.
Profiling the current workforce allows the estimate of internal supply, and by
comparing with the demand estimate, allows the quantification of areas of staffing
surplus or deficit. Based on the outcome of this, action plans are then drawn up to
look at how these difficulties can be addressed - allocating timescales and
responsibilities.
The final process involves ensuring there is a process whereby any changes which
affect the planning assumptions, are able to be fed into the demand / supply estimates
and the action plans adjusted accordingly. This process should also allow monitoring
of the action plans to ensure they remain on target.
The importance of embedding project based manpower planning in the context of a
strategic framework cannot be overemphasised, and the monitoring and evaluation
process should include a link with a high-level group considering overall manpower
strategy.
The way in which managers use these guidelines will vary depending on the situation
and the scale of the project. However it is likely that the process will be facilitated by
a Human Resources professional who will also help to supply much of the
information; particularly in relation to profiling the current workforce. Others
involved with the project group are likely to be operational managers whose staff are
affected, managers from other agencies / organisations where staff may transfer to or
from, professional advisers from the key functional groups and where appropriate a
member of the staff-side.
©2015 | Human-Resource-Solutions.co.uk | Page 2
Workforce Planning Model & Worksheets
Workforce Planning Model
©2015 | Human-Resource-Solutions.co.uk | Page 3
Clarify the future situation
Describe the Implications for the Workforce
Profile the current workforce
Estimate future demand for staff
Estimate future supply of staff
Action Plans to address
imbalances between demand
and supply
Monitor and continually evaluate
Surplus
staff
Insufficient
Staff
Workforce Planning Model & Worksheets
©2015 | Human-Resource-Solutions.co.uk | Page 4
Clarify the Future Situation
Objective: To clearly outline, in broad terms, the proposed
service change, the resource assumptions and the
manpower implications. To then break this down into
manageable stages. This will set the parameters of
the manpower planning project.
The first task is to clearly articulate the exact shape and scope of the
service change, this amounts to a "vision" of how the new service will
look. Then we must identify all services that are affected, and how they
will change. Broad timescales should be outlined at this stage.
The next stage is to identify non-staff resources which are affected by the
change. This usually amounts to buildings, equipment etc or financial
assets such as new contracts, transfer in or out of finances or budgetary
reductions. The purpose of this section is to clearly understand these and
determine to what extent they are limitations on the change project.
The next section outlines what the implications of the changes are for
staff.
• Consideration should be given firstly to broad numbers - is there a
need to increase or decrease numbers or will present numbers be
maintained.
• Does the skill-mix require to change - will this become richer or
diluted?
• Does this have implications for qualifications / skills required by
staff - how will these need to change?
• Will there need to be changes to working patterns / practices - e.g.
will staff be required to work more flexibly, change shift patterns,
interface with other agencies etc.
The final part of this section involves breaking the change project down
into discrete stages - usually around 3-4. This will identify each major
task or event, and put appropriate target dates and timescales to each.
Clarify the future situation
Describe the Implications for the Workforce
Profile the current workforce
Estimate future demand for staff
Estimate future supply of staff
Action Plans to address
imbalances between demand
and supply
Monitor and continually evaluate
Surplus
staff
Insufficient
Staff
Workforce Planning Model & Worksheets
Worksheet 1
Clarify the Future Situation
(Answer each section in very broad terms)
Identify the general shape and scope of the proposed business change Identify in this
section:
• The proposed
change
• The current
services which
will be affected
by the change
• The proposed
timescales
Identify the resources which will be affected by the change (exclude staff) Identify in this
section:
• Buildings and
other physical
resources
• Financial
resources -
additional /
reductions /
transfers
Identify the general staffing implications of the proposed change Identify in this
section:
• Increase /
decrease /
transfer of staff
• Changes to skill-
mix
• Changes in
qualifications /
skill required
• Changes to
working
practices
• Current staff
shortages
©2015 | Human-Resource-Solutions.co.uk | Page 5
Workforce Planning Model & Worksheets
Worksheet 1(continued)
Break the project down into a series of discrete stages (usually 3-4) and describe these
1ST
STAGE OF THE PROJECT Identify in this
section:
• The initial 3-4
major tasks or
events
• The appropriate
targets and
timescales
2nd
STAGE OF THE PROJECT Identify in this
section:
• The next 3-4
major tasks or
events
• The appropriate
targets and
timescales
3rd
STAGE OF THE PROJECT Identify in this
section:
• The next 3-4
major tasks or
events
• The appropriate
targets and
timescales
©2015 | Human-Resource-Solutions.co.uk | Page 6
Workforce Planning Model & Worksheets
©2015 | Human-Resource-Solutions.co.uk | Page 7
Describe the Implications for the Workforce
Objective: To identify in detail the specific workforce
implications for each key task / event at each stage in
the project
For each stage identified in Worksheet 1, outline the specific staff related
change that need to occur. For example:
• Will more or less of a particular staff group be necessary?
• Will there need to be a transfer between sites or agencies?
• Will the affected staff group need different skills and / or
qualifications?
• Will a different skill mix be required - if so how will this be
achieved?
• Will any services be rationalised, centralised or contracted out?
• Will management re-structuring be necessary?
The effects on the workforce should be quantified (even approximately)
where at all possible
Allocate key dates for each of the major workforce changes identified.
Clarify the future situation
Describe the Implications for the Workforce
Profile the current workforce
Estimate future demand for staff
Estimate future supply of staff
Action Plans to address
imbalances between demand
and supply
Monitor and continually evaluate
Surplus
staff
Insufficient
Staff
Workforce Planning Model & Worksheets
Worksheet 2
Implications for the Workforce
With reference to Worksheet 1, outline the staffing implications at each stage
1ST
STAGE OF THE PROJECT Identify for each task
/ event of this stage:
• The key date for
the task / event
• The staff related
change that will
occur
• The effect on the
workforce (more
/ less staff,
different skills,
different mix of
skills etc)
• Quantify the
effects where
possible
©2015 | Human-Resource-Solutions.co.uk | Page 8
Workforce Planning Model & Worksheets
©2015 | Human-Resource-Solutions.co.uk | Page 9
Workforce Planning Model & Worksheets
Worksheet 2 (continued)
2nd
STAGE OF THE PROJECT Identify in this
section:
As for Stage 1
©2015 | Human-Resource-Solutions.co.uk | Page 10
Workforce Planning Model & Worksheets
Worksheet 2 (continued)
3rd
STAGE OF THE PROJECT Identify in this
section:
As for stage 1
©2015 | Human-Resource-Solutions.co.uk | Page 11
Workforce Planning Model & Worksheets
©2015 | Human-Resource-Solutions.co.uk | Page 12
Estimate of Future Demand for Staff
Objective: To specify exact workforce numbers in each staff
group required at each key date.
For each stage in the project, identify the numbers in each staff group
affected, both in headcount and Whole Time Equivalent (WTE) it is
generally best to work in WTE's, however where there are large numbers
of part-time staff, it can be useful to consider headcount also.
If an adjustment is required this may also be noted at this stage. This may
be to ensure that current staffing figures fairly represent the present
situation. For example to take account of under or over establishment, or
results of a skill-mix exercise. The new figure should be entered in the
“adjustment" column.
The new WTE / headcount figure should be entered under each key date
(as identified in Worksheet 2). Obviously this may be different for the
same staff group at different dates e.g. a staged recruitment process.
Clarify the future situation
Describe the Implications for the Workforce
Profile the current workforce
Estimate future demand for staff
Estimate future supply of staff
Action Plans to address
imbalances between demand
and supply
Monitor and continually evaluate
Surplus
staff
Insufficient
Staff
Workforce Planning Model & Worksheets
Worksheet 3
Estimate of Future Demand for Staff
Based on the staff implications identified in Worksheet 2, quantify the staff changes
New WTE (Headcount)
Grade Current WTE
(Headcount)
Adjustment Key Date Key Date Key Date Key Date
©2015 | Human-Resource-Solutions.co.uk | Page 13
Workforce Planning Model & Worksheets
©2015 | Human-Resource-Solutions.co.uk | Page 14
Workforce Planning Model & Worksheets
©2015 | Human-Resource-Solutions.co.uk | Page 15
Profile the Current Workforce
Objective: To allow managers to understand the current
workforce profile and thereby allow them to
estimate internal supply
STEPS
1. Identify all staff who are affected by the proposed changes broken
down by grade, headcount, WTE, part-time/ full time and sex
2. Profile the same staff group by grade and age & length of service;
the same profile should be completed for leavers.
3. Analysis of numbers of leavers and joiners for the last year;
calculate wastage rates and net flow for each staff group, and if
appropriate for each significant grade.
4. Analysis of leavers and joiners including source of recruitment,
reason for leaving and destination on leaving.
5. Identify all hard-to-fill posts / vacancies by staff group / grade and
length of time vacant
6. Analysis of absences for each staff group
7. Analysis of travel to work pattern by staff group
8. Based on the above information, estimate for each key date in the
project
• Staff lost through internal promotion
• Number of retirals
• Wastage rates
Clarify the future situation
Describe the Implications for the Workforce
Profile the current workforce
Estimate future demand for staff
Estimate future supply of staff
Action Plans to address
imbalances between demand
and supply
Monitor and continually evaluate
Surplus
staff
Insufficient
Staff
Workforce Planning Model & Worksheets
Worksheet 4
Profile the Current Workforce
Table 1 (May be headcount or WTE or both, and may be expressed in numbers or %)
Full-time Part-time
Staff Group
(or grade)
Number Male Female Male Female Total
Table 2 - Staff Group: (complete for current staff and leavers)
Length of
Service
(Years)
Age (in bands)
<18 18-
25
26-
30
31-
35
36-
40
41-
45
46-
50
51-
55
56-
60
60-
65
>65 TOTAL
(%)
<1
1-2
2-3
3-4
4-5
5-10
11-15
16-20
>20
TOTAL
(%)
Table 3 - Leavers, joiners and wastage rates for the last year
Staff Group Average
Staff-in-post
No. Of
Leavers
Wastage Rate No. Of New
Starts
Net Flow
(starts-
leavers)
©2015 | Human-Resource-Solutions.co.uk | Page 16
Workforce Planning Model & Worksheets
Worksheet 4(continued)
Profile the Current Workforce
Table 4a - Joiners analysis
Staff Group Source of recruitment Numbers
TOTAL
Table 4b - Leavers analysis - reasons for leaving
Staff Group Reason for leaving Numbers
TOTAL
Table 4c - Leavers analysis - Destination on leaving
Staff Group Destination on leaving Numbers
TOTAL
Table 5 - Vacancy analysis
Staff Group Hard to fill post Average time vacant
TOTAL
Table 6 - Absence analysis
Staff Group Sickness absence Maternity leave Other
©2015 | Human-Resource-Solutions.co.uk | Page 17
Workforce Planning Model & Worksheets
Table 7 - Travel to Work pattern
Staff Group Area %
Table 8 - Summary of wastage, promotions and retirals
Key Date:
Staff Group Wastage rate No. of promotions in
last year
No. of retirals
due up to key
date
©2015 | Human-Resource-Solutions.co.uk | Page 18
Workforce Planning Model & Worksheets
©2015 | Human-Resource-Solutions.co.uk | Page 19
Estimate future supply of staff
Objective: To calculate of the difference between estimated
demand and projected internal supply and thereby
quantify areas of surplus and / or deficit.
Clarify the future situation
Describe the Implications for the Workforce
Profile the current workforce
Estimate future demand for staff
Estimate future supply of staff
Action Plans to address
imbalances between demand
and supply
Monitor and continually evaluate
Surplus
staff
Insufficient
Staff
Workforce Planning Model & Worksheets
Worksheet 5a
Estimate future supply of staff
Calculation of difference between estimated
demand and projected internal supply
(complete a table for each affected staff group)
Staff Group
Key Date Key Date Key Date Key Date
Current staff
Losses: promotions
wastage
retirals
other
Difference
Gains: internal promotions
Total internal supply
New WTE required
Difference (Numbers to
divest, or recruit
externally)
©2015 | Human-Resource-Solutions.co.uk | Page 20
Workforce Planning Model & Worksheets
Worksheet 5b
Summary of manpower implications for each staff group
Staff Group Staff surplus / deficit Action Plan
Reference
Date Date Date Date
©2015 | Human-Resource-Solutions.co.uk | Page 21
Workforce Planning Model & Worksheets
©2015 | Human-Resource-Solutions.co.uk | Page 22
Action Plans to address imbalances
between demand and supply
Insufficient Staff
Objective: To outline action points, timescales and
responsibility to ensure that the necessary
actions are taken to, as far as possible, recruit
sufficient staff to meet workforce demand at
each key stage of the project.
Staff will need to be recruited from the external labour market. In
formulating the action plan for this, consider the following points:
1. Do you anticipate any problems reaching the desired level of
recruitment, based on past experience and current trends? If
not, carefully consider whether anything has changed, or will
change which may affect this over the lifespan of the project.
2. If you anticipate there may be some difficulties, then consider
the following:
• Have you targeted all possible sources such as colleges/
universities, older people, women returners etc?
• Have you tried adjusting the hours / flexibility to suit for
example working mothers
• What about crèche / childcare facilities
• Are pay and conditions an issue - if so could you vary
• Could you sponsor students through an appropriate course
• Are there staff internally who could be promoted (or quickly
developed to this level)
• Could you attract staff away from other parts of the service or
the private sector
• Are there any Government schemes which could
• Could this part of the service be contracted out
• Could the duties of this group be carried out by a less difficult
to recruit to group.
Clarify the future situation
Describe the Implications for the Workforce
Profile the current workforce
Estimate future demand for staff
Estimate future supply of staff
Action Plans to address
imbalances between demand
and supply
Monitor and continually evaluate
Surplus
staff
Insufficient
Staff
Workforce Planning Model & Worksheets
Worksheet 6a
Action Plan
Insufficient Staff
Staff Group: Reference Number:
Action Required Responsibility By when
©2015 | Human-Resource-Solutions.co.uk | Page 23
Workforce Planning Model & Worksheets
©2015 | Human-Resource-Solutions.co.uk | Page 24
Action Plans to address imbalances
between demand and supply
Surplus Staff
Objective: To outline action points, timescales and
responsibility to ensure that the necessary actions
are taken to reduce the workforce to meet new
demand levels at each key stage of the project.
Staffing levels need to be reduced; in formulating the action plan for
this, the following points should be borne in mind:
• How long would it take to shed the surplus staff through normal
methods - wastage, retirals (early or not), promotion? Would this
be acceptable or are more proactive methods required?
• Could the rest of the organisation assist by holding vacancies for
the staff affected, perhaps by using temporary contracts
• Could the excess staff be re-deployed within the organisation; if
so would some degree of re-training be necessary?
• Could they be transferred to another agency, again perhaps with
some re-training (does TUPE apply?)
• Have you taken into account the effect of sickness, leave, study
leave, maternity leave and other absences. Also have you looked
at how many staff are likely to retire in the near future
• If redundancy is the chosen option, then ensure the organisation
has a redundancy policy and that this is applied. Particularly in
relation to statutory consultation periods, and selection for
redundancy.
Clarify the future situation
Describe the Implications for the Workforce
Profile the current workforce
Estimate future demand for staff
Estimate future supply of staff
Action Plans to address
imbalances between demand
and supply
Monitor and continually evaluate
Surplus
staff
Insufficient
Staff
Clarify the future situation
Describe the Implications for the Workforce
Profile the current workforce
Estimate future demand for staff
Workforce Planning Model & Worksheets
Worksheet 6b
Action Plan
Surplus Staff
Staff Group: Reference Number:
Action Required Responsibility By when
©2015 | Human-Resource-Solutions.co.uk | Page 25
Workforce Planning Model & Worksheets
©2015 | Human-Resource-Solutions.co.uk | Page 26
Monitor and continually evaluate
Objective: To ensure that any changes which affect
the planning assumptions are fed into
the supply / demand estimates and the
action plans adjusted accordingly. To
further ensure that the agreed action
plans remain on target.
Ensure that when designing a monitoring and evaluation
system you consider the following:
• Is there a group which is overseeing the project e.g. a
steering group? If so how does this link to other similar
groups in the organisation.
• How will changes to strategy be fed into the manpower
assumptions regarding supply and demand
• How will the workforce action plans be monitored
• Do you have an early warning system to detect changes
in manpower trends, or in the environment?
Clarify the future situation
Describe the Implications for the Workforce
Profile the current workforce
Estimate future demand for staff
Estimate future supply of staff
Action Plans to address
imbalances between demand
and supply
Monitor and continually evaluate
Surplus
staff
Insufficient
Staff
Workforce Planning Model & Worksheets
Worksheet 7
Monitoring and Evaluation Process
Draw a schematic of how the manpower planning project will be monitored, and how the process of
continual evaluation will take place. Be sure to clearly show the allocation of responsibility.
©2015 | Human-Resource-Solutions.co.uk | Page 27

More Related Content

What's hot

Customer Experience Reimagined
Customer Experience ReimaginedCustomer Experience Reimagined
Customer Experience Reimaginedaccenture
 
Technology Vision 2022: Meet Me in the Metaverse
Technology Vision 2022: Meet Me in the MetaverseTechnology Vision 2022: Meet Me in the Metaverse
Technology Vision 2022: Meet Me in the Metaverseaccenture
 
Digital Supply Chain Workforce Future | Accenture
Digital Supply Chain Workforce Future | AccentureDigital Supply Chain Workforce Future | Accenture
Digital Supply Chain Workforce Future | Accentureaccenture
 
Operating Model PPT Infographics Graphics Template Mission And Guiding Princi...
Operating Model PPT Infographics Graphics Template Mission And Guiding Princi...Operating Model PPT Infographics Graphics Template Mission And Guiding Princi...
Operating Model PPT Infographics Graphics Template Mission And Guiding Princi...SlideTeam
 
Digital Transformation From Strategy To Implementation
Digital Transformation From Strategy To ImplementationDigital Transformation From Strategy To Implementation
Digital Transformation From Strategy To ImplementationScopernia
 
The Industrialist: Trends & Innovations - November 2022
The Industrialist: Trends & Innovations - November 2022The Industrialist: Trends & Innovations - November 2022
The Industrialist: Trends & Innovations - November 2022accenture
 
Building Digital Strategy Roadmap For Digital Transformation Complete Deck
Building Digital Strategy Roadmap For Digital Transformation Complete DeckBuilding Digital Strategy Roadmap For Digital Transformation Complete Deck
Building Digital Strategy Roadmap For Digital Transformation Complete DeckSlideTeam
 
Marketing strategy and first 90 day plan
Marketing strategy and first 90 day planMarketing strategy and first 90 day plan
Marketing strategy and first 90 day planJanice Zhang
 
Accenture Tech Vision 2020 for SAP Solutions
Accenture Tech Vision 2020 for SAP SolutionsAccenture Tech Vision 2020 for SAP Solutions
Accenture Tech Vision 2020 for SAP SolutionsAccenture Technology
 
The CPG Digital Revolution: Moving from Analog to Digital Operating Model
The CPG Digital Revolution: Moving from Analog to Digital Operating ModelThe CPG Digital Revolution: Moving from Analog to Digital Operating Model
The CPG Digital Revolution: Moving from Analog to Digital Operating Modelaccenture
 
Business Strategy Presentation Template 2023 - By ex-Mckinsey and BCG consult...
Business Strategy Presentation Template 2023 - By ex-Mckinsey and BCG consult...Business Strategy Presentation Template 2023 - By ex-Mckinsey and BCG consult...
Business Strategy Presentation Template 2023 - By ex-Mckinsey and BCG consult...Slideworks
 
Zed-Sales™ - Channel Sales & Distribution Management System by Zed Axis Techn...
Zed-Sales™ - Channel Sales & Distribution Management System by Zed Axis Techn...Zed-Sales™ - Channel Sales & Distribution Management System by Zed Axis Techn...
Zed-Sales™ - Channel Sales & Distribution Management System by Zed Axis Techn...Rakesh Kumar
 
Reinventing Enterprise Operations
Reinventing Enterprise OperationsReinventing Enterprise Operations
Reinventing Enterprise Operationsaccenture
 
Accenture Tech Vision 2020 - Overview
Accenture Tech Vision 2020 - OverviewAccenture Tech Vision 2020 - Overview
Accenture Tech Vision 2020 - Overviewaccenture
 
A Turn for the Better: Intelligent Health Operations
A Turn for the Better: Intelligent Health OperationsA Turn for the Better: Intelligent Health Operations
A Turn for the Better: Intelligent Health OperationsAccenture Operations
 
X Istech RPO - Offshore RPO services India
X Istech RPO - Offshore RPO services IndiaX Istech RPO - Offshore RPO services India
X Istech RPO - Offshore RPO services IndiaX-istech Pvt Ltd
 
“Show Me the Future of Work” Employee Experience Redefined with AI (Daren Goe...
“Show Me the Future of Work” Employee Experience Redefined with AI (Daren Goe...“Show Me the Future of Work” Employee Experience Redefined with AI (Daren Goe...
“Show Me the Future of Work” Employee Experience Redefined with AI (Daren Goe...Digital Workplace Experience
 

What's hot (20)

Customer Experience Reimagined
Customer Experience ReimaginedCustomer Experience Reimagined
Customer Experience Reimagined
 
Technology Vision 2022: Meet Me in the Metaverse
Technology Vision 2022: Meet Me in the MetaverseTechnology Vision 2022: Meet Me in the Metaverse
Technology Vision 2022: Meet Me in the Metaverse
 
Digital Supply Chain Workforce Future | Accenture
Digital Supply Chain Workforce Future | AccentureDigital Supply Chain Workforce Future | Accenture
Digital Supply Chain Workforce Future | Accenture
 
Operating Model PPT Infographics Graphics Template Mission And Guiding Princi...
Operating Model PPT Infographics Graphics Template Mission And Guiding Princi...Operating Model PPT Infographics Graphics Template Mission And Guiding Princi...
Operating Model PPT Infographics Graphics Template Mission And Guiding Princi...
 
Digital Transformation From Strategy To Implementation
Digital Transformation From Strategy To ImplementationDigital Transformation From Strategy To Implementation
Digital Transformation From Strategy To Implementation
 
The Industrialist: Trends & Innovations - November 2022
The Industrialist: Trends & Innovations - November 2022The Industrialist: Trends & Innovations - November 2022
The Industrialist: Trends & Innovations - November 2022
 
Building Digital Strategy Roadmap For Digital Transformation Complete Deck
Building Digital Strategy Roadmap For Digital Transformation Complete DeckBuilding Digital Strategy Roadmap For Digital Transformation Complete Deck
Building Digital Strategy Roadmap For Digital Transformation Complete Deck
 
Marketing strategy and first 90 day plan
Marketing strategy and first 90 day planMarketing strategy and first 90 day plan
Marketing strategy and first 90 day plan
 
2023 Digital Trends
2023 Digital Trends 2023 Digital Trends
2023 Digital Trends
 
Accenture Tech Vision 2020 for SAP Solutions
Accenture Tech Vision 2020 for SAP SolutionsAccenture Tech Vision 2020 for SAP Solutions
Accenture Tech Vision 2020 for SAP Solutions
 
The CPG Digital Revolution: Moving from Analog to Digital Operating Model
The CPG Digital Revolution: Moving from Analog to Digital Operating ModelThe CPG Digital Revolution: Moving from Analog to Digital Operating Model
The CPG Digital Revolution: Moving from Analog to Digital Operating Model
 
HR Analytics & HR Tools
HR Analytics & HR ToolsHR Analytics & HR Tools
HR Analytics & HR Tools
 
Business Plan Presentation
Business Plan PresentationBusiness Plan Presentation
Business Plan Presentation
 
Business Strategy Presentation Template 2023 - By ex-Mckinsey and BCG consult...
Business Strategy Presentation Template 2023 - By ex-Mckinsey and BCG consult...Business Strategy Presentation Template 2023 - By ex-Mckinsey and BCG consult...
Business Strategy Presentation Template 2023 - By ex-Mckinsey and BCG consult...
 
Zed-Sales™ - Channel Sales & Distribution Management System by Zed Axis Techn...
Zed-Sales™ - Channel Sales & Distribution Management System by Zed Axis Techn...Zed-Sales™ - Channel Sales & Distribution Management System by Zed Axis Techn...
Zed-Sales™ - Channel Sales & Distribution Management System by Zed Axis Techn...
 
Reinventing Enterprise Operations
Reinventing Enterprise OperationsReinventing Enterprise Operations
Reinventing Enterprise Operations
 
Accenture Tech Vision 2020 - Overview
Accenture Tech Vision 2020 - OverviewAccenture Tech Vision 2020 - Overview
Accenture Tech Vision 2020 - Overview
 
A Turn for the Better: Intelligent Health Operations
A Turn for the Better: Intelligent Health OperationsA Turn for the Better: Intelligent Health Operations
A Turn for the Better: Intelligent Health Operations
 
X Istech RPO - Offshore RPO services India
X Istech RPO - Offshore RPO services IndiaX Istech RPO - Offshore RPO services India
X Istech RPO - Offshore RPO services India
 
“Show Me the Future of Work” Employee Experience Redefined with AI (Daren Goe...
“Show Me the Future of Work” Employee Experience Redefined with AI (Daren Goe...“Show Me the Future of Work” Employee Experience Redefined with AI (Daren Goe...
“Show Me the Future of Work” Employee Experience Redefined with AI (Daren Goe...
 

Similar to Plan your workforce with this model

Resourcing strategy mpp 5
Resourcing strategy mpp 5Resourcing strategy mpp 5
Resourcing strategy mpp 5Tufail Ahmed
 
Human Resource PlanProject NameTable of Contents2Introdu.docx
Human Resource PlanProject NameTable of Contents2Introdu.docxHuman Resource PlanProject NameTable of Contents2Introdu.docx
Human Resource PlanProject NameTable of Contents2Introdu.docxwellesleyterresa
 
10072014OTML HR Workforce Planning an overview
10072014OTML HR Workforce Planning an overview10072014OTML HR Workforce Planning an overview
10072014OTML HR Workforce Planning an overviewLawrence (Laurie) Turnbull
 
Appendix 1 Edited for Eduserv application Business Change Strategy v0.1 draft
Appendix 1 Edited for Eduserv application Business Change Strategy v0.1 draftAppendix 1 Edited for Eduserv application Business Change Strategy v0.1 draft
Appendix 1 Edited for Eduserv application Business Change Strategy v0.1 draftmandy stuart
 
6 I need the overall earned value analysis.  (That is, overall i.docx
6 I need the overall earned value analysis.  (That is, overall i.docx6 I need the overall earned value analysis.  (That is, overall i.docx
6 I need the overall earned value analysis.  (That is, overall i.docxalinainglis
 
Operations ppt
Operations pptOperations ppt
Operations pptPritam RW
 
Aggregate planning
Aggregate planningAggregate planning
Aggregate planningPritam RW
 
Operations ppt
Operations pptOperations ppt
Operations pptPritam RW
 
2-PHRM-2.pptx human resources documents
2-PHRM-2.pptx  human resources documents2-PHRM-2.pptx  human resources documents
2-PHRM-2.pptx human resources documentskasahun bedaso
 
Savvy PMOs Guide to Resource Planning EB945LTREN.pdf
Savvy PMOs Guide to Resource Planning EB945LTREN.pdfSavvy PMOs Guide to Resource Planning EB945LTREN.pdf
Savvy PMOs Guide to Resource Planning EB945LTREN.pdfAlisa Smith
 
(Brian dost central office) rasco, brian u. - pmdp mmc 27-capstone project id...
(Brian dost central office) rasco, brian u. - pmdp mmc 27-capstone project id...(Brian dost central office) rasco, brian u. - pmdp mmc 27-capstone project id...
(Brian dost central office) rasco, brian u. - pmdp mmc 27-capstone project id...CHED
 
Cmgt410
Cmgt410Cmgt410
Cmgt410sci207
 
Hitchhikers guide to_data_center_facility_ops
Hitchhikers guide to_data_center_facility_opsHitchhikers guide to_data_center_facility_ops
Hitchhikers guide to_data_center_facility_opsavdsouza
 
Cmgt 410
Cmgt 410Cmgt 410
Cmgt 410sci207
 
Cmgt 410
Cmgt 410Cmgt 410
Cmgt 410joituy
 
Bsc how to fill initiatives templates-14 june10
Bsc how to fill initiatives templates-14 june10Bsc how to fill initiatives templates-14 june10
Bsc how to fill initiatives templates-14 june10Ajoy Jauhar
 

Similar to Plan your workforce with this model (20)

Resourcing strategy mpp 5
Resourcing strategy mpp 5Resourcing strategy mpp 5
Resourcing strategy mpp 5
 
Human Resource PlanProject NameTable of Contents2Introdu.docx
Human Resource PlanProject NameTable of Contents2Introdu.docxHuman Resource PlanProject NameTable of Contents2Introdu.docx
Human Resource PlanProject NameTable of Contents2Introdu.docx
 
10072014OTML HR Workforce Planning an overview
10072014OTML HR Workforce Planning an overview10072014OTML HR Workforce Planning an overview
10072014OTML HR Workforce Planning an overview
 
Appendix 1 Edited for Eduserv application Business Change Strategy v0.1 draft
Appendix 1 Edited for Eduserv application Business Change Strategy v0.1 draftAppendix 1 Edited for Eduserv application Business Change Strategy v0.1 draft
Appendix 1 Edited for Eduserv application Business Change Strategy v0.1 draft
 
6 I need the overall earned value analysis.  (That is, overall i.docx
6 I need the overall earned value analysis.  (That is, overall i.docx6 I need the overall earned value analysis.  (That is, overall i.docx
6 I need the overall earned value analysis.  (That is, overall i.docx
 
Operations ppt
Operations pptOperations ppt
Operations ppt
 
Aggregate planning
Aggregate planningAggregate planning
Aggregate planning
 
Operations ppt
Operations pptOperations ppt
Operations ppt
 
2-PHRM-2.pptx human resources documents
2-PHRM-2.pptx  human resources documents2-PHRM-2.pptx  human resources documents
2-PHRM-2.pptx human resources documents
 
Savvy PMOs Guide to Resource Planning EB945LTREN.pdf
Savvy PMOs Guide to Resource Planning EB945LTREN.pdfSavvy PMOs Guide to Resource Planning EB945LTREN.pdf
Savvy PMOs Guide to Resource Planning EB945LTREN.pdf
 
(Brian dost central office) rasco, brian u. - pmdp mmc 27-capstone project id...
(Brian dost central office) rasco, brian u. - pmdp mmc 27-capstone project id...(Brian dost central office) rasco, brian u. - pmdp mmc 27-capstone project id...
(Brian dost central office) rasco, brian u. - pmdp mmc 27-capstone project id...
 
Cmgt410
Cmgt410Cmgt410
Cmgt410
 
Cmgt410
Cmgt410Cmgt410
Cmgt410
 
Cmgt410
Cmgt410Cmgt410
Cmgt410
 
Hitchhikers guide to_data_center_facility_ops
Hitchhikers guide to_data_center_facility_opsHitchhikers guide to_data_center_facility_ops
Hitchhikers guide to_data_center_facility_ops
 
Cmgt 410
Cmgt 410Cmgt 410
Cmgt 410
 
Cmgt 410
Cmgt 410Cmgt 410
Cmgt 410
 
Cmgt 410
Cmgt 410Cmgt 410
Cmgt 410
 
Cmgt 410
Cmgt 410Cmgt 410
Cmgt 410
 
Bsc how to fill initiatives templates-14 june10
Bsc how to fill initiatives templates-14 june10Bsc how to fill initiatives templates-14 june10
Bsc how to fill initiatives templates-14 june10
 

Recently uploaded

HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSRajkumarAkumalla
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxupamatechverse
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxupamatechverse
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130Suhani Kapoor
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)Suman Mia
 
Analog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAnalog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAbhinavSharma374939
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVRajaP95
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations120cr0395
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝soniya singh
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...Soham Mondal
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxAsutosh Ranjan
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Dr.Costas Sachpazis
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Serviceranjana rawat
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSCAESB
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 

Recently uploaded (20)

HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICSHARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
HARDNESS, FRACTURE TOUGHNESS AND STRENGTH OF CERAMICS
 
Introduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptxIntroduction to IEEE STANDARDS and its different types.pptx
Introduction to IEEE STANDARDS and its different types.pptx
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
Introduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptxIntroduction to Multiple Access Protocol.pptx
Introduction to Multiple Access Protocol.pptx
 
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
VIP Call Girls Service Kondapur Hyderabad Call +91-8250192130
 
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)Software Development Life Cycle By  Team Orange (Dept. of Pharmacy)
Software Development Life Cycle By Team Orange (Dept. of Pharmacy)
 
Analog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAnalog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog Converter
 
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IVHARMONY IN THE NATURE AND EXISTENCE - Unit-IV
HARMONY IN THE NATURE AND EXISTENCE - Unit-IV
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
Extrusion Processes and Their Limitations
Extrusion Processes and Their LimitationsExtrusion Processes and Their Limitations
Extrusion Processes and Their Limitations
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
Model Call Girl in Narela Delhi reach out to us at 🔝8264348440🔝
 
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
OSVC_Meta-Data based Simulation Automation to overcome Verification Challenge...
 
Coefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptxCoefficient of Thermal Expansion and their Importance.pptx
Coefficient of Thermal Expansion and their Importance.pptx
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
Structural Analysis and Design of Foundations: A Comprehensive Handbook for S...
 
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
(RIA) Call Girls Bhosari ( 7001035870 ) HI-Fi Pune Escorts Service
 
GDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentationGDSC ASEB Gen AI study jams presentation
GDSC ASEB Gen AI study jams presentation
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 

Plan your workforce with this model

  • 1. Workforce Planning Model & Worksheets ©2015 | Human-Resource-Solutions.co.uk | Page 1 Workforce Planning Model & Worksheets Human Resource Solutions Workforce Planning is the process whereby the management of an organisation try to ensure that they always have the right number of employees, with the right knowledge and skills in place at the right time. This document provides a Workforce Planning Model which can be applied in any organization; it also incorporates a series of worksheets to facilitate effective project planning. 2015 A. Brogan Human Resource Solutions 2015
  • 2. Workforce Planning Model & Worksheets Introduction The purpose of these manpower planning guidelines is to assist managers to undertake systematic planning for major structural changes about to take place in their area of responsibility and which will therefore affect their staff. If worked through conscientiously, they should ensure appropriate numbers and skills are in place at each key project milestone. The model takes managers through the process of clarifying the future situation and articulating the implications of the changes for the workforce. This will allow the estimate of future demand for staff in each staff group at each key date in the project. Profiling the current workforce allows the estimate of internal supply, and by comparing with the demand estimate, allows the quantification of areas of staffing surplus or deficit. Based on the outcome of this, action plans are then drawn up to look at how these difficulties can be addressed - allocating timescales and responsibilities. The final process involves ensuring there is a process whereby any changes which affect the planning assumptions, are able to be fed into the demand / supply estimates and the action plans adjusted accordingly. This process should also allow monitoring of the action plans to ensure they remain on target. The importance of embedding project based manpower planning in the context of a strategic framework cannot be overemphasised, and the monitoring and evaluation process should include a link with a high-level group considering overall manpower strategy. The way in which managers use these guidelines will vary depending on the situation and the scale of the project. However it is likely that the process will be facilitated by a Human Resources professional who will also help to supply much of the information; particularly in relation to profiling the current workforce. Others involved with the project group are likely to be operational managers whose staff are affected, managers from other agencies / organisations where staff may transfer to or from, professional advisers from the key functional groups and where appropriate a member of the staff-side. ©2015 | Human-Resource-Solutions.co.uk | Page 2
  • 3. Workforce Planning Model & Worksheets Workforce Planning Model ©2015 | Human-Resource-Solutions.co.uk | Page 3 Clarify the future situation Describe the Implications for the Workforce Profile the current workforce Estimate future demand for staff Estimate future supply of staff Action Plans to address imbalances between demand and supply Monitor and continually evaluate Surplus staff Insufficient Staff
  • 4. Workforce Planning Model & Worksheets ©2015 | Human-Resource-Solutions.co.uk | Page 4 Clarify the Future Situation Objective: To clearly outline, in broad terms, the proposed service change, the resource assumptions and the manpower implications. To then break this down into manageable stages. This will set the parameters of the manpower planning project. The first task is to clearly articulate the exact shape and scope of the service change, this amounts to a "vision" of how the new service will look. Then we must identify all services that are affected, and how they will change. Broad timescales should be outlined at this stage. The next stage is to identify non-staff resources which are affected by the change. This usually amounts to buildings, equipment etc or financial assets such as new contracts, transfer in or out of finances or budgetary reductions. The purpose of this section is to clearly understand these and determine to what extent they are limitations on the change project. The next section outlines what the implications of the changes are for staff. • Consideration should be given firstly to broad numbers - is there a need to increase or decrease numbers or will present numbers be maintained. • Does the skill-mix require to change - will this become richer or diluted? • Does this have implications for qualifications / skills required by staff - how will these need to change? • Will there need to be changes to working patterns / practices - e.g. will staff be required to work more flexibly, change shift patterns, interface with other agencies etc. The final part of this section involves breaking the change project down into discrete stages - usually around 3-4. This will identify each major task or event, and put appropriate target dates and timescales to each. Clarify the future situation Describe the Implications for the Workforce Profile the current workforce Estimate future demand for staff Estimate future supply of staff Action Plans to address imbalances between demand and supply Monitor and continually evaluate Surplus staff Insufficient Staff
  • 5. Workforce Planning Model & Worksheets Worksheet 1 Clarify the Future Situation (Answer each section in very broad terms) Identify the general shape and scope of the proposed business change Identify in this section: • The proposed change • The current services which will be affected by the change • The proposed timescales Identify the resources which will be affected by the change (exclude staff) Identify in this section: • Buildings and other physical resources • Financial resources - additional / reductions / transfers Identify the general staffing implications of the proposed change Identify in this section: • Increase / decrease / transfer of staff • Changes to skill- mix • Changes in qualifications / skill required • Changes to working practices • Current staff shortages ©2015 | Human-Resource-Solutions.co.uk | Page 5
  • 6. Workforce Planning Model & Worksheets Worksheet 1(continued) Break the project down into a series of discrete stages (usually 3-4) and describe these 1ST STAGE OF THE PROJECT Identify in this section: • The initial 3-4 major tasks or events • The appropriate targets and timescales 2nd STAGE OF THE PROJECT Identify in this section: • The next 3-4 major tasks or events • The appropriate targets and timescales 3rd STAGE OF THE PROJECT Identify in this section: • The next 3-4 major tasks or events • The appropriate targets and timescales ©2015 | Human-Resource-Solutions.co.uk | Page 6
  • 7. Workforce Planning Model & Worksheets ©2015 | Human-Resource-Solutions.co.uk | Page 7 Describe the Implications for the Workforce Objective: To identify in detail the specific workforce implications for each key task / event at each stage in the project For each stage identified in Worksheet 1, outline the specific staff related change that need to occur. For example: • Will more or less of a particular staff group be necessary? • Will there need to be a transfer between sites or agencies? • Will the affected staff group need different skills and / or qualifications? • Will a different skill mix be required - if so how will this be achieved? • Will any services be rationalised, centralised or contracted out? • Will management re-structuring be necessary? The effects on the workforce should be quantified (even approximately) where at all possible Allocate key dates for each of the major workforce changes identified. Clarify the future situation Describe the Implications for the Workforce Profile the current workforce Estimate future demand for staff Estimate future supply of staff Action Plans to address imbalances between demand and supply Monitor and continually evaluate Surplus staff Insufficient Staff
  • 8. Workforce Planning Model & Worksheets Worksheet 2 Implications for the Workforce With reference to Worksheet 1, outline the staffing implications at each stage 1ST STAGE OF THE PROJECT Identify for each task / event of this stage: • The key date for the task / event • The staff related change that will occur • The effect on the workforce (more / less staff, different skills, different mix of skills etc) • Quantify the effects where possible ©2015 | Human-Resource-Solutions.co.uk | Page 8
  • 9. Workforce Planning Model & Worksheets ©2015 | Human-Resource-Solutions.co.uk | Page 9
  • 10. Workforce Planning Model & Worksheets Worksheet 2 (continued) 2nd STAGE OF THE PROJECT Identify in this section: As for Stage 1 ©2015 | Human-Resource-Solutions.co.uk | Page 10
  • 11. Workforce Planning Model & Worksheets Worksheet 2 (continued) 3rd STAGE OF THE PROJECT Identify in this section: As for stage 1 ©2015 | Human-Resource-Solutions.co.uk | Page 11
  • 12. Workforce Planning Model & Worksheets ©2015 | Human-Resource-Solutions.co.uk | Page 12 Estimate of Future Demand for Staff Objective: To specify exact workforce numbers in each staff group required at each key date. For each stage in the project, identify the numbers in each staff group affected, both in headcount and Whole Time Equivalent (WTE) it is generally best to work in WTE's, however where there are large numbers of part-time staff, it can be useful to consider headcount also. If an adjustment is required this may also be noted at this stage. This may be to ensure that current staffing figures fairly represent the present situation. For example to take account of under or over establishment, or results of a skill-mix exercise. The new figure should be entered in the “adjustment" column. The new WTE / headcount figure should be entered under each key date (as identified in Worksheet 2). Obviously this may be different for the same staff group at different dates e.g. a staged recruitment process. Clarify the future situation Describe the Implications for the Workforce Profile the current workforce Estimate future demand for staff Estimate future supply of staff Action Plans to address imbalances between demand and supply Monitor and continually evaluate Surplus staff Insufficient Staff
  • 13. Workforce Planning Model & Worksheets Worksheet 3 Estimate of Future Demand for Staff Based on the staff implications identified in Worksheet 2, quantify the staff changes New WTE (Headcount) Grade Current WTE (Headcount) Adjustment Key Date Key Date Key Date Key Date ©2015 | Human-Resource-Solutions.co.uk | Page 13
  • 14. Workforce Planning Model & Worksheets ©2015 | Human-Resource-Solutions.co.uk | Page 14
  • 15. Workforce Planning Model & Worksheets ©2015 | Human-Resource-Solutions.co.uk | Page 15 Profile the Current Workforce Objective: To allow managers to understand the current workforce profile and thereby allow them to estimate internal supply STEPS 1. Identify all staff who are affected by the proposed changes broken down by grade, headcount, WTE, part-time/ full time and sex 2. Profile the same staff group by grade and age & length of service; the same profile should be completed for leavers. 3. Analysis of numbers of leavers and joiners for the last year; calculate wastage rates and net flow for each staff group, and if appropriate for each significant grade. 4. Analysis of leavers and joiners including source of recruitment, reason for leaving and destination on leaving. 5. Identify all hard-to-fill posts / vacancies by staff group / grade and length of time vacant 6. Analysis of absences for each staff group 7. Analysis of travel to work pattern by staff group 8. Based on the above information, estimate for each key date in the project • Staff lost through internal promotion • Number of retirals • Wastage rates Clarify the future situation Describe the Implications for the Workforce Profile the current workforce Estimate future demand for staff Estimate future supply of staff Action Plans to address imbalances between demand and supply Monitor and continually evaluate Surplus staff Insufficient Staff
  • 16. Workforce Planning Model & Worksheets Worksheet 4 Profile the Current Workforce Table 1 (May be headcount or WTE or both, and may be expressed in numbers or %) Full-time Part-time Staff Group (or grade) Number Male Female Male Female Total Table 2 - Staff Group: (complete for current staff and leavers) Length of Service (Years) Age (in bands) <18 18- 25 26- 30 31- 35 36- 40 41- 45 46- 50 51- 55 56- 60 60- 65 >65 TOTAL (%) <1 1-2 2-3 3-4 4-5 5-10 11-15 16-20 >20 TOTAL (%) Table 3 - Leavers, joiners and wastage rates for the last year Staff Group Average Staff-in-post No. Of Leavers Wastage Rate No. Of New Starts Net Flow (starts- leavers) ©2015 | Human-Resource-Solutions.co.uk | Page 16
  • 17. Workforce Planning Model & Worksheets Worksheet 4(continued) Profile the Current Workforce Table 4a - Joiners analysis Staff Group Source of recruitment Numbers TOTAL Table 4b - Leavers analysis - reasons for leaving Staff Group Reason for leaving Numbers TOTAL Table 4c - Leavers analysis - Destination on leaving Staff Group Destination on leaving Numbers TOTAL Table 5 - Vacancy analysis Staff Group Hard to fill post Average time vacant TOTAL Table 6 - Absence analysis Staff Group Sickness absence Maternity leave Other ©2015 | Human-Resource-Solutions.co.uk | Page 17
  • 18. Workforce Planning Model & Worksheets Table 7 - Travel to Work pattern Staff Group Area % Table 8 - Summary of wastage, promotions and retirals Key Date: Staff Group Wastage rate No. of promotions in last year No. of retirals due up to key date ©2015 | Human-Resource-Solutions.co.uk | Page 18
  • 19. Workforce Planning Model & Worksheets ©2015 | Human-Resource-Solutions.co.uk | Page 19 Estimate future supply of staff Objective: To calculate of the difference between estimated demand and projected internal supply and thereby quantify areas of surplus and / or deficit. Clarify the future situation Describe the Implications for the Workforce Profile the current workforce Estimate future demand for staff Estimate future supply of staff Action Plans to address imbalances between demand and supply Monitor and continually evaluate Surplus staff Insufficient Staff
  • 20. Workforce Planning Model & Worksheets Worksheet 5a Estimate future supply of staff Calculation of difference between estimated demand and projected internal supply (complete a table for each affected staff group) Staff Group Key Date Key Date Key Date Key Date Current staff Losses: promotions wastage retirals other Difference Gains: internal promotions Total internal supply New WTE required Difference (Numbers to divest, or recruit externally) ©2015 | Human-Resource-Solutions.co.uk | Page 20
  • 21. Workforce Planning Model & Worksheets Worksheet 5b Summary of manpower implications for each staff group Staff Group Staff surplus / deficit Action Plan Reference Date Date Date Date ©2015 | Human-Resource-Solutions.co.uk | Page 21
  • 22. Workforce Planning Model & Worksheets ©2015 | Human-Resource-Solutions.co.uk | Page 22 Action Plans to address imbalances between demand and supply Insufficient Staff Objective: To outline action points, timescales and responsibility to ensure that the necessary actions are taken to, as far as possible, recruit sufficient staff to meet workforce demand at each key stage of the project. Staff will need to be recruited from the external labour market. In formulating the action plan for this, consider the following points: 1. Do you anticipate any problems reaching the desired level of recruitment, based on past experience and current trends? If not, carefully consider whether anything has changed, or will change which may affect this over the lifespan of the project. 2. If you anticipate there may be some difficulties, then consider the following: • Have you targeted all possible sources such as colleges/ universities, older people, women returners etc? • Have you tried adjusting the hours / flexibility to suit for example working mothers • What about crèche / childcare facilities • Are pay and conditions an issue - if so could you vary • Could you sponsor students through an appropriate course • Are there staff internally who could be promoted (or quickly developed to this level) • Could you attract staff away from other parts of the service or the private sector • Are there any Government schemes which could • Could this part of the service be contracted out • Could the duties of this group be carried out by a less difficult to recruit to group. Clarify the future situation Describe the Implications for the Workforce Profile the current workforce Estimate future demand for staff Estimate future supply of staff Action Plans to address imbalances between demand and supply Monitor and continually evaluate Surplus staff Insufficient Staff
  • 23. Workforce Planning Model & Worksheets Worksheet 6a Action Plan Insufficient Staff Staff Group: Reference Number: Action Required Responsibility By when ©2015 | Human-Resource-Solutions.co.uk | Page 23
  • 24. Workforce Planning Model & Worksheets ©2015 | Human-Resource-Solutions.co.uk | Page 24 Action Plans to address imbalances between demand and supply Surplus Staff Objective: To outline action points, timescales and responsibility to ensure that the necessary actions are taken to reduce the workforce to meet new demand levels at each key stage of the project. Staffing levels need to be reduced; in formulating the action plan for this, the following points should be borne in mind: • How long would it take to shed the surplus staff through normal methods - wastage, retirals (early or not), promotion? Would this be acceptable or are more proactive methods required? • Could the rest of the organisation assist by holding vacancies for the staff affected, perhaps by using temporary contracts • Could the excess staff be re-deployed within the organisation; if so would some degree of re-training be necessary? • Could they be transferred to another agency, again perhaps with some re-training (does TUPE apply?) • Have you taken into account the effect of sickness, leave, study leave, maternity leave and other absences. Also have you looked at how many staff are likely to retire in the near future • If redundancy is the chosen option, then ensure the organisation has a redundancy policy and that this is applied. Particularly in relation to statutory consultation periods, and selection for redundancy. Clarify the future situation Describe the Implications for the Workforce Profile the current workforce Estimate future demand for staff Estimate future supply of staff Action Plans to address imbalances between demand and supply Monitor and continually evaluate Surplus staff Insufficient Staff Clarify the future situation Describe the Implications for the Workforce Profile the current workforce Estimate future demand for staff
  • 25. Workforce Planning Model & Worksheets Worksheet 6b Action Plan Surplus Staff Staff Group: Reference Number: Action Required Responsibility By when ©2015 | Human-Resource-Solutions.co.uk | Page 25
  • 26. Workforce Planning Model & Worksheets ©2015 | Human-Resource-Solutions.co.uk | Page 26 Monitor and continually evaluate Objective: To ensure that any changes which affect the planning assumptions are fed into the supply / demand estimates and the action plans adjusted accordingly. To further ensure that the agreed action plans remain on target. Ensure that when designing a monitoring and evaluation system you consider the following: • Is there a group which is overseeing the project e.g. a steering group? If so how does this link to other similar groups in the organisation. • How will changes to strategy be fed into the manpower assumptions regarding supply and demand • How will the workforce action plans be monitored • Do you have an early warning system to detect changes in manpower trends, or in the environment? Clarify the future situation Describe the Implications for the Workforce Profile the current workforce Estimate future demand for staff Estimate future supply of staff Action Plans to address imbalances between demand and supply Monitor and continually evaluate Surplus staff Insufficient Staff
  • 27. Workforce Planning Model & Worksheets Worksheet 7 Monitoring and Evaluation Process Draw a schematic of how the manpower planning project will be monitored, and how the process of continual evaluation will take place. Be sure to clearly show the allocation of responsibility. ©2015 | Human-Resource-Solutions.co.uk | Page 27