Head of Engineering - Skytanking Holding
- Responsible for delivery of remote assistance towards the EPC contractor, elaboration
of maintenance procedures and records for the new Fuel Facility at Tan Son Nhat
International Airport (Ho Chi Minh, Vietnam). Determining action plan to refurbish
existing hydrant system, ensuring integration of refurbished existing hydrant in new
fuel facility and setup of commissioning allowing hydrant to be commissioned
simultaneously with the new fuel facility.
Duration: 2011 -2015
- Responsible for the concept design, investment cost estimation and construction
planning of a new Fuel facility at Lyon Saint-Exupéry Airport (France). The design is
in line with local legislation, meets the airports demands, the supply pipe pumping
planning and integrates the results of a preliminary danger study.
Duration: 2013
- Responsible for the assessment of the existing Fuel Facility against JIG and setup of
a spread investment plan at London City Airport. Concept designs for the extension
of the existing Fuel Facility and calculation of required investment cost.
Duration: 2014
- Responsible for the assessment of an existing off airport storage facility against JIG
3 at Honau (Germany).
Duration: 2014
- Responsible for the elaboration of the conceptual design specifications of a modular
designed small Fuel Facility at Bergamo Airport (Italy).
Duration: 2014
- Responsible for the concept design, investment cost estimation and expected
construction planning of a new Fuel Facility and hydrant system at Julius Nyerere
International Airport (Tanzania).
Duration: 2014
- Responsible for the concept design, investment cost estimation and expected
construction planning of a new fuel facility and hydrant system at Dublin Airport,
including layout drawings of buildings, a phased planning of the project since the new
fuel facility is constructed within the boundary limits of the existing fuel facility while
ensuring continuous existing fuel receipt, storage and ITP-activity.
Duration: 2015
- Responsible for the technical integrity assurance of fuel storage facilities and hydrant
systems within the Skytanking group.
Duration: 2014-2015

More Related Content

Similar to Work Experience - Head of Engineering - Skytanking Holding - Bart Kinnaert

cv_eugene_engels 2015 attachment
cv_eugene_engels 2015 attachmentcv_eugene_engels 2015 attachment
cv_eugene_engels 2015 attachmentEugene van Brakel
 
airsight GmbH - Selected Projects
airsight GmbH - Selected Projectsairsight GmbH - Selected Projects
airsight GmbH - Selected Projectsairsight GmbH
 
Kcn 2016 March Resume
Kcn 2016 March ResumeKcn 2016 March Resume
Kcn 2016 March ResumeKurt Nicholas
 
CV_Ken Loh_external
CV_Ken Loh_externalCV_Ken Loh_external
CV_Ken Loh_externalKen Loh
 
Capacity charging mechanism for shared CO2 transportation and storage infrast...
Capacity charging mechanism for shared CO2 transportation and storage infrast...Capacity charging mechanism for shared CO2 transportation and storage infrast...
Capacity charging mechanism for shared CO2 transportation and storage infrast...Global CCS Institute
 
PERSONAL EXPERIENCE RECORD-2015
PERSONAL EXPERIENCE RECORD-2015PERSONAL EXPERIENCE RECORD-2015
PERSONAL EXPERIENCE RECORD-2015gufron gufron
 
German perez lifes50+ design summary - deep wind 2018
German perez   lifes50+ design summary - deep wind 2018German perez   lifes50+ design summary - deep wind 2018
German perez lifes50+ design summary - deep wind 2018TECNALIA Marine Energy
 
RONALD CV 17.11.2015
RONALD CV 17.11.2015RONALD CV 17.11.2015
RONALD CV 17.11.2015Ronald Fung
 
John Stewart CV 2016
John Stewart CV 2016John Stewart CV 2016
John Stewart CV 2016John Stewart
 
CV Senior Quantity Surveyor(CIVIL)
CV Senior Quantity Surveyor(CIVIL)CV Senior Quantity Surveyor(CIVIL)
CV Senior Quantity Surveyor(CIVIL)Naeem Altaf Chughtai
 
Curriculum_Vitae_R. Schroedter April 2016
Curriculum_Vitae_R. Schroedter April 2016Curriculum_Vitae_R. Schroedter April 2016
Curriculum_Vitae_R. Schroedter April 2016Robert Schroedter
 
Ravindra_Planning Manager_CV_2016_Latest
Ravindra_Planning Manager_CV_2016_LatestRavindra_Planning Manager_CV_2016_Latest
Ravindra_Planning Manager_CV_2016_LatestRavindra Kauthalikar
 

Similar to Work Experience - Head of Engineering - Skytanking Holding - Bart Kinnaert (20)

CV_bioche_17_1_en
CV_bioche_17_1_enCV_bioche_17_1_en
CV_bioche_17_1_en
 
CV-2015 Rev 0
CV-2015 Rev 0CV-2015 Rev 0
CV-2015 Rev 0
 
cv_eugene_engels 2015 attachment
cv_eugene_engels 2015 attachmentcv_eugene_engels 2015 attachment
cv_eugene_engels 2015 attachment
 
CV Claire McCann
CV Claire McCannCV Claire McCann
CV Claire McCann
 
airsight GmbH - Selected Projects
airsight GmbH - Selected Projectsairsight GmbH - Selected Projects
airsight GmbH - Selected Projects
 
CV_Cost Engineer
CV_Cost EngineerCV_Cost Engineer
CV_Cost Engineer
 
Kcn 2016 March Resume
Kcn 2016 March ResumeKcn 2016 March Resume
Kcn 2016 March Resume
 
Esteban Raganit_2016
Esteban Raganit_2016Esteban Raganit_2016
Esteban Raganit_2016
 
CV_Ken Loh_external
CV_Ken Loh_externalCV_Ken Loh_external
CV_Ken Loh_external
 
V.GUHAN-CV 01 link
V.GUHAN-CV 01 linkV.GUHAN-CV 01 link
V.GUHAN-CV 01 link
 
Capacity charging mechanism for shared CO2 transportation and storage infrast...
Capacity charging mechanism for shared CO2 transportation and storage infrast...Capacity charging mechanism for shared CO2 transportation and storage infrast...
Capacity charging mechanism for shared CO2 transportation and storage infrast...
 
PERSONAL EXPERIENCE RECORD-2015
PERSONAL EXPERIENCE RECORD-2015PERSONAL EXPERIENCE RECORD-2015
PERSONAL EXPERIENCE RECORD-2015
 
German perez lifes50+ design summary - deep wind 2018
German perez   lifes50+ design summary - deep wind 2018German perez   lifes50+ design summary - deep wind 2018
German perez lifes50+ design summary - deep wind 2018
 
RONALD CV 17.11.2015
RONALD CV 17.11.2015RONALD CV 17.11.2015
RONALD CV 17.11.2015
 
ATB PE Portfolio2016
ATB PE Portfolio2016ATB PE Portfolio2016
ATB PE Portfolio2016
 
John Stewart CV 2016
John Stewart CV 2016John Stewart CV 2016
John Stewart CV 2016
 
CV Senior Quantity Surveyor(CIVIL)
CV Senior Quantity Surveyor(CIVIL)CV Senior Quantity Surveyor(CIVIL)
CV Senior Quantity Surveyor(CIVIL)
 
Curriculum_Vitae_R. Schroedter April 2016
Curriculum_Vitae_R. Schroedter April 2016Curriculum_Vitae_R. Schroedter April 2016
Curriculum_Vitae_R. Schroedter April 2016
 
Ravindra_Planning Manager_CV_2016_Latest
Ravindra_Planning Manager_CV_2016_LatestRavindra_Planning Manager_CV_2016_Latest
Ravindra_Planning Manager_CV_2016_Latest
 
Mutlaq AL-Busaidi
Mutlaq AL-BusaidiMutlaq AL-Busaidi
Mutlaq AL-Busaidi
 

Work Experience - Head of Engineering - Skytanking Holding - Bart Kinnaert

  • 1. Skytanking Page 1 of 1 Work Experience Head of Engineering - Skytanking Holding - Responsible for delivery of remote assistance towards the EPC contractor, elaboration of maintenance procedures and records for the new Fuel Facility at Tan Son Nhat International Airport (Ho Chi Minh, Vietnam). Determining action plan to refurbish existing hydrant system, ensuring integration of refurbished existing hydrant in new fuel facility and setup of commissioning allowing hydrant to be commissioned simultaneously with the new fuel facility. Duration: 2011 -2015 - Responsible for the concept design, investment cost estimation and construction planning of a new Fuel facility at Lyon Saint-Exupéry Airport (France). The design is in line with local legislation, meets the airports demands, the supply pipe pumping planning and integrates the results of a preliminary danger study. Duration: 2013 - Responsible for the assessment of the existing Fuel Facility against JIG and setup of a spread investment plan at London City Airport. Concept designs for the extension of the existing Fuel Facility and calculation of required investment cost. Duration: 2014 - Responsible for the assessment of an existing off airport storage facility against JIG 3 at Honau (Germany). Duration: 2014 - Responsible for the elaboration of the conceptual design specifications of a modular designed small Fuel Facility at Bergamo Airport (Italy). Duration: 2014 - Responsible for the concept design, investment cost estimation and expected construction planning of a new Fuel Facility and hydrant system at Julius Nyerere International Airport (Tanzania). Duration: 2014 - Responsible for the concept design, investment cost estimation and expected construction planning of a new fuel facility and hydrant system at Dublin Airport, including layout drawings of buildings, a phased planning of the project since the new fuel facility is constructed within the boundary limits of the existing fuel facility while ensuring continuous existing fuel receipt, storage and ITP-activity. Duration: 2015 - Responsible for the technical integrity assurance of fuel storage facilities and hydrant systems within the Skytanking group. Duration: 2014-2015