2014 RTP Program
RTP (Return-to-Production) Program – Restore economic production rates to wells that are
currently shut-in. Bennefits – maintain the life of asset as a cashflow generator which
reduces our total lifting cost and prolongs the asset retirement obligation of the wellbore.
Program Well Count of 15 wells.
Programs AFE Budget of 3,130 M$ - (Current Spend of 1,144 M$; 37%)
Program results 9/15 projects completed; production rate of 488 BOPD
2014 TTRC Program
TTRC (Through Tubing Recompletion – riggless activity) Program – Restore economic
production rates to wells that are currently shut-in or sub-economic. Benefits – maintain
the life of asset as a cash-flow generator which reduces our total lifting cost, prolongs the
asset retirement obligation of the wellbore and harvest the value from reserve profiles that
are not economic using a rig activity approach for wellbore recompletion of the asset.
Program Well Count of 7 wells.
Programs AFE Budget of 2,130 M$ - (Current Spend of 1,851 M$; 87%)
¼ of the cost of RRC.
Program results 6/7 projects completed; production rate of 98 BOPD.
2014 RRC Program
RRC (Rig Recompletion – rig activity) Program – Restore economic production rates to
wells that are currently shut-in or sub-economic. Benefits – maintain the life of asset as a
cash-flow generator which reduces our total lifting cost, prolongs the asset retirement
obligation of the wellbore and harvest the value from reserve profiles that are economic
using a rig activity approach for wellbore recompletion of the asset.
Program Well Count of 16 wells.
Programs AFE Budget of 9,232 M$ - (Current Spend of 7,690 M$; 83%)
Production FOI = 6X rate of TRRC production rates.
Program results 16/16 projects completed; production rate of 656 BOPD.
2014 Q4 RB slides
2014 Q4 RB slides
2014 Q4 RB slides

More Related Content

Viewers also liked

丁原:海量数据迁移方案
丁原:海量数据迁移方案丁原:海量数据迁移方案
丁原:海量数据迁移方案YANGL *
 
Universidad modular abierta
Universidad modular abiertaUniversidad modular abierta
Universidad modular abiertanurysita aguirre
 
shining_starr_newsletter_SEPT2015
shining_starr_newsletter_SEPT2015shining_starr_newsletter_SEPT2015
shining_starr_newsletter_SEPT2015MaryStarr
 
Presentacion ingles
Presentacion inglesPresentacion ingles
Presentacion inglesyobanarley
 
Yrityskauppa - mutta onko johto valmis?
Yrityskauppa - mutta onko johto valmis?Yrityskauppa - mutta onko johto valmis?
Yrityskauppa - mutta onko johto valmis?Anne Ala-Nissilä
 
What is DNA – Mocomi Kids
What is DNA – Mocomi KidsWhat is DNA – Mocomi Kids
What is DNA – Mocomi KidsMocomi Kids
 
Bootstrap 3 Talk - What is Bootstrap 3 | 聊聊 Bootstrap 3 - 初識什麼是 Bootstrap 3
Bootstrap 3 Talk - What is Bootstrap 3 | 聊聊 Bootstrap 3 - 初識什麼是 Bootstrap 3Bootstrap 3 Talk - What is Bootstrap 3 | 聊聊 Bootstrap 3 - 初識什麼是 Bootstrap 3
Bootstrap 3 Talk - What is Bootstrap 3 | 聊聊 Bootstrap 3 - 初識什麼是 Bootstrap 3Code Basic
 
Responsive Web Design for Universal Access 2016
Responsive Web Design for Universal Access 2016Responsive Web Design for Universal Access 2016
Responsive Web Design for Universal Access 2016Kate Walser
 
Buku 1 studi_industri_kreatif_indonesia_2007_bagian_1
Buku 1 studi_industri_kreatif_indonesia_2007_bagian_1Buku 1 studi_industri_kreatif_indonesia_2007_bagian_1
Buku 1 studi_industri_kreatif_indonesia_2007_bagian_1Novianti Sari
 
Kkm ipa kelas vii 2015 2016
Kkm ipa kelas vii 2015 2016Kkm ipa kelas vii 2015 2016
Kkm ipa kelas vii 2015 2016Yus Rina
 

Viewers also liked (17)

丁原:海量数据迁移方案
丁原:海量数据迁移方案丁原:海量数据迁移方案
丁原:海量数据迁移方案
 
Der
DerDer
Der
 
Universidad modular abierta
Universidad modular abiertaUniversidad modular abierta
Universidad modular abierta
 
Presentation docker
Presentation dockerPresentation docker
Presentation docker
 
Plan de grupo
Plan de grupoPlan de grupo
Plan de grupo
 
shining_starr_newsletter_SEPT2015
shining_starr_newsletter_SEPT2015shining_starr_newsletter_SEPT2015
shining_starr_newsletter_SEPT2015
 
English project
English projectEnglish project
English project
 
t30.05
t30.05t30.05
t30.05
 
Presentacion ingles
Presentacion inglesPresentacion ingles
Presentacion ingles
 
A quien corresponda
A quien correspondaA quien corresponda
A quien corresponda
 
Yrityskauppa - mutta onko johto valmis?
Yrityskauppa - mutta onko johto valmis?Yrityskauppa - mutta onko johto valmis?
Yrityskauppa - mutta onko johto valmis?
 
önningar etnografiska museet
önningar etnografiska museetönningar etnografiska museet
önningar etnografiska museet
 
What is DNA – Mocomi Kids
What is DNA – Mocomi KidsWhat is DNA – Mocomi Kids
What is DNA – Mocomi Kids
 
Bootstrap 3 Talk - What is Bootstrap 3 | 聊聊 Bootstrap 3 - 初識什麼是 Bootstrap 3
Bootstrap 3 Talk - What is Bootstrap 3 | 聊聊 Bootstrap 3 - 初識什麼是 Bootstrap 3Bootstrap 3 Talk - What is Bootstrap 3 | 聊聊 Bootstrap 3 - 初識什麼是 Bootstrap 3
Bootstrap 3 Talk - What is Bootstrap 3 | 聊聊 Bootstrap 3 - 初識什麼是 Bootstrap 3
 
Responsive Web Design for Universal Access 2016
Responsive Web Design for Universal Access 2016Responsive Web Design for Universal Access 2016
Responsive Web Design for Universal Access 2016
 
Buku 1 studi_industri_kreatif_indonesia_2007_bagian_1
Buku 1 studi_industri_kreatif_indonesia_2007_bagian_1Buku 1 studi_industri_kreatif_indonesia_2007_bagian_1
Buku 1 studi_industri_kreatif_indonesia_2007_bagian_1
 
Kkm ipa kelas vii 2015 2016
Kkm ipa kelas vii 2015 2016Kkm ipa kelas vii 2015 2016
Kkm ipa kelas vii 2015 2016
 

Similar to 2014 Q4 RB slides

Dublin Port Company - Energy Case Study
Dublin Port Company - Energy Case StudyDublin Port Company - Energy Case Study
Dublin Port Company - Energy Case StudyCodema
 
DarlingtonRefurb_PerfomanceReport_July2014
DarlingtonRefurb_PerfomanceReport_July2014DarlingtonRefurb_PerfomanceReport_July2014
DarlingtonRefurb_PerfomanceReport_July2014Piyush Sharma
 
NYPD3 Selective Reopener Nersa public hearings - 23 June 2015
NYPD3 Selective Reopener  Nersa public hearings  - 23 June 2015NYPD3 Selective Reopener  Nersa public hearings  - 23 June 2015
NYPD3 Selective Reopener Nersa public hearings - 23 June 2015Matthew Le Cordeur
 
Projects - Lead operations process engineer
Projects - Lead operations process engineerProjects - Lead operations process engineer
Projects - Lead operations process engineerChris Owen
 
Capacity Building to WSCs - Foundations of a Schedule Controls.pdf
Capacity Building to WSCs -  Foundations of a Schedule Controls.pdfCapacity Building to WSCs -  Foundations of a Schedule Controls.pdf
Capacity Building to WSCs - Foundations of a Schedule Controls.pdfkhaled nassar
 
Tolling group leader Positions
Tolling group leader PositionsTolling group leader Positions
Tolling group leader PositionsWeidong Ping
 
Resume - Marcela Thedim - Project Manager - 2016.
Resume - Marcela Thedim - Project Manager - 2016.Resume - Marcela Thedim - Project Manager - 2016.
Resume - Marcela Thedim - Project Manager - 2016.Marcela Thedim
 
Rp kane cv jun11
Rp kane cv jun11Rp kane cv jun11
Rp kane cv jun11Rick Kane
 
Robert Sharp CV May 2016
Robert Sharp CV May 2016Robert Sharp CV May 2016
Robert Sharp CV May 2016Robert Sharp
 
CGE User Group Aberdeen - BowtieXP Audit Module
CGE User Group Aberdeen - BowtieXP Audit ModuleCGE User Group Aberdeen - BowtieXP Audit Module
CGE User Group Aberdeen - BowtieXP Audit ModulePaul McCulloch
 
Comprehensive Energy Management Strategy
Comprehensive Energy Management StrategyComprehensive Energy Management Strategy
Comprehensive Energy Management StrategySchneider Electric
 
ACCIONA Spain Investors Day 2015
ACCIONA Spain Investors Day 2015ACCIONA Spain Investors Day 2015
ACCIONA Spain Investors Day 2015acciona
 

Similar to 2014 Q4 RB slides (20)

Dublin Port Company - Energy Case Study
Dublin Port Company - Energy Case StudyDublin Port Company - Energy Case Study
Dublin Port Company - Energy Case Study
 
Solwatt Energy Performance Contract
Solwatt Energy Performance ContractSolwatt Energy Performance Contract
Solwatt Energy Performance Contract
 
Solwatt Energy Performance Contract
Solwatt Energy Performance ContractSolwatt Energy Performance Contract
Solwatt Energy Performance Contract
 
DarlingtonRefurb_PerfomanceReport_July2014
DarlingtonRefurb_PerfomanceReport_July2014DarlingtonRefurb_PerfomanceReport_July2014
DarlingtonRefurb_PerfomanceReport_July2014
 
Final er slides 3 2 15_2_pm
Final er slides 3 2  15_2_pmFinal er slides 3 2  15_2_pm
Final er slides 3 2 15_2_pm
 
AESP_Spring
AESP_SpringAESP_Spring
AESP_Spring
 
NYPD3 Selective Reopener Nersa public hearings - 23 June 2015
NYPD3 Selective Reopener  Nersa public hearings  - 23 June 2015NYPD3 Selective Reopener  Nersa public hearings  - 23 June 2015
NYPD3 Selective Reopener Nersa public hearings - 23 June 2015
 
Projects - Lead operations process engineer
Projects - Lead operations process engineerProjects - Lead operations process engineer
Projects - Lead operations process engineer
 
Capacity Building to WSCs - Foundations of a Schedule Controls.pdf
Capacity Building to WSCs -  Foundations of a Schedule Controls.pdfCapacity Building to WSCs -  Foundations of a Schedule Controls.pdf
Capacity Building to WSCs - Foundations of a Schedule Controls.pdf
 
Experience
ExperienceExperience
Experience
 
MM_SNOPUD_TRIFOLD
MM_SNOPUD_TRIFOLDMM_SNOPUD_TRIFOLD
MM_SNOPUD_TRIFOLD
 
Gemcom whittle brochure
Gemcom whittle brochureGemcom whittle brochure
Gemcom whittle brochure
 
Tolling group leader Positions
Tolling group leader PositionsTolling group leader Positions
Tolling group leader Positions
 
Resume - Marcela Thedim - Project Manager - 2016.
Resume - Marcela Thedim - Project Manager - 2016.Resume - Marcela Thedim - Project Manager - 2016.
Resume - Marcela Thedim - Project Manager - 2016.
 
Rp kane cv jun11
Rp kane cv jun11Rp kane cv jun11
Rp kane cv jun11
 
Robert Sharp CV May 2016
Robert Sharp CV May 2016Robert Sharp CV May 2016
Robert Sharp CV May 2016
 
CGE User Group Aberdeen - BowtieXP Audit Module
CGE User Group Aberdeen - BowtieXP Audit ModuleCGE User Group Aberdeen - BowtieXP Audit Module
CGE User Group Aberdeen - BowtieXP Audit Module
 
Small Power Generation Plant
Small Power Generation PlantSmall Power Generation Plant
Small Power Generation Plant
 
Comprehensive Energy Management Strategy
Comprehensive Energy Management StrategyComprehensive Energy Management Strategy
Comprehensive Energy Management Strategy
 
ACCIONA Spain Investors Day 2015
ACCIONA Spain Investors Day 2015ACCIONA Spain Investors Day 2015
ACCIONA Spain Investors Day 2015
 

2014 Q4 RB slides

  • 1. 2014 RTP Program RTP (Return-to-Production) Program – Restore economic production rates to wells that are currently shut-in. Bennefits – maintain the life of asset as a cashflow generator which reduces our total lifting cost and prolongs the asset retirement obligation of the wellbore. Program Well Count of 15 wells. Programs AFE Budget of 3,130 M$ - (Current Spend of 1,144 M$; 37%) Program results 9/15 projects completed; production rate of 488 BOPD
  • 2. 2014 TTRC Program TTRC (Through Tubing Recompletion – riggless activity) Program – Restore economic production rates to wells that are currently shut-in or sub-economic. Benefits – maintain the life of asset as a cash-flow generator which reduces our total lifting cost, prolongs the asset retirement obligation of the wellbore and harvest the value from reserve profiles that are not economic using a rig activity approach for wellbore recompletion of the asset. Program Well Count of 7 wells. Programs AFE Budget of 2,130 M$ - (Current Spend of 1,851 M$; 87%) ¼ of the cost of RRC. Program results 6/7 projects completed; production rate of 98 BOPD.
  • 3. 2014 RRC Program RRC (Rig Recompletion – rig activity) Program – Restore economic production rates to wells that are currently shut-in or sub-economic. Benefits – maintain the life of asset as a cash-flow generator which reduces our total lifting cost, prolongs the asset retirement obligation of the wellbore and harvest the value from reserve profiles that are economic using a rig activity approach for wellbore recompletion of the asset. Program Well Count of 16 wells. Programs AFE Budget of 9,232 M$ - (Current Spend of 7,690 M$; 83%) Production FOI = 6X rate of TRRC production rates. Program results 16/16 projects completed; production rate of 656 BOPD.