SlideShare a Scribd company logo
1 of 123
Download to read offline
What you need to know to do successful
         IBM i upgrades to 6.1 or 7.1

Pete Massiello
iTech Solutions
pmassiello@itechsol.com
203-744-7854


iTech Solutions because IBM i (AS/400s) don’t come with System Administrators
                                                                                1
In this session


 We are going to run through all the steps required to do
 an upgrade: from when you initially start thinking about
 the upgrade, what you need to do to prepare for the
 upgrade, issues & concerns to address before we start
 the upgrade, the actual upgrade, and then the
 verification and conversions afterward.

  A successful upgrade is one which the users don’t
  know you worked all weekend, and they don’t realize
  anything has changed until you start rolling out the new
  features and functions.

          Copyright iTech Solutions
                                                             2
What we will cover…

      •   Map, starting, and documentation
      •   Analyze Object Conversion
      •   Release Mapping
      •   HMC, FSP, firmware, & IBM i
      •   Models
      •   Required PTFs, Resaves, and License Keys
      •   Image Catalogue & Preparing
      •   Right before the upgrade
      •   The Upgrade
      •   Verification
      •   Conversions & Afterwards
                       Copyright iTech Solutions
                                                     3
What we will cover…

      •   Map, starting, and documentation
      •   Analyze Object Conversion
      •   Release Mapping
      •   HMC, FSP, firmware, & IBM i
      •   Models
      •   Required PTFs, Resaves, and License Keys
      •   Image Catalogue & Preparing
      •   Right before the upgrade
      •   The Upgrade
      •   Verification
      •   Conversions & Afterwards
                       Copyright iTech Solutions
                                                     4
Introduction - MAP




         Copyright iTech Solutions
                                     5
Upgrade Map




  Copyright iTech Solutions
                              6
What you need before you start

•   Have your Business Partner order V5R4 , 6.1, or 7.1 about 6 weeks
    before your planned upgrade date.
•   Can also download software.
•   License Keys.
•   Order PSP PTF V5R4: SF98540 V6R1: SF98610 V7R1: SF98710
•   i5/OS V5R4 CDs, 6.1 & 7.1primarily on DVDs.
•   Manuals.
•   PTFs order about 2 weeks before the upgrade.
•   Save Media for backups
•   Approximately 6 hours of Dedicated system time.
•   Bottle of Tums (Optional)



              Copyright iTech Solutions
                                                                        7
V5R4: SC41-5120-09   V7R1: SC41-5120-11
V6R1: SC41-5120-10




                                          8
Manual – Memo to Users
https://publib.boulder.ibm.com/infocenter/systems/topic/rzaq9/rzaq9.pdf




           Copyright iTech Solutions
                                                                          9
Example of a change in Memo to Users




        Copyright iTech Solutions      10
What we will cover…

      •   Map, starting, and documentation
      •   Analyze Object Conversion
      •   Release Mapping
      •   HMC, FSP, firmware, & IBM i
      •   Models
      •   Required PTFs, Resaves, and License Keys
      •   Image Catalogue & Preparing
      •   Right before the upgrade
      •   The Upgrade
      •   Verification
      •   Conversions & Afterwards
                       Copyright iTech Solutions
                                                     11
ANZOBJCVN
 •   MOST IMPORTANT STEP GOING TO 6.1
      2 Months before: Run ANZOBJCVN to see what issues you
       might have .


 •   For V6R1, unique conversions will occur with programs in
     libraries, Java™ programs in directories, spooled files, and
     integrated file system names in files systems that are not case-
     sensitive. Before you upgrade to a new release, it is strongly
     recommended that you gather information about specific object
     types on your system.

 •   Going from V5R4 to 7.1 (Skipping 6.1) requires you to perform this
     as well.

                               Copyright iTech Solutions
                                                                        12
Verify 3rd Party Software


 Vendor   Product        Release       Libraries   Helpline Serial#
                                                            Dependent




           Copyright iTech Solutions
                                                                        13
What we will cover…

      •   Map, starting, and documentation
      •   Analyze Object Conversion
      •   Release Mapping
      •   HMC, FSP, firmware, & IBM I
      •   Models
      •   Required PTFs, Resaves, and License Keys
      •   Image Catalogue & Preparing
      •   Right before the upgrade
      •   The Upgrade
      •   Verification
      •   Conversions & Afterwards
                       Copyright iTech Solutions
                                                     14
Planning
 •   Make sure you read both those manuals and understand the
     changes in the new release.
 •   PTF for Latest issues
 •   V5R4 – SF98540
 •   V6R1 – SF98610
 •   V7R1 - SF98710




           Copyright iTech Solutions
                                                                15
Valid Upgrade paths i5/OS V5R4




 V5R2

                                    V5R4M0
                                    V5R4M5

 V5R3




        Copyright iTech Solutions
                                        16
Valid Upgrade paths IBM i 6.1




 V5R3



                                     6.1 or 6.1.1



 V5R4



         Copyright iTech Solutions
                                              17
Valid Upgrade paths IBM i 7.1




 V5R4



                                     7.1



 6.1



         Copyright iTech Solutions
                                     18
Release Support




        Copyright iTech Solutions
                                    19
Can Still Upgrade From V5R3




                              20
Skipping a release
 •   Going from V5R2 to V5R4 must read V5R3 install book
 •   What if you are at V4R5 or V5R1
 •   What if you are at V4R3 or V4R4
 •   What if you are at V4R1 or V4R2 (get more tums)

 •   Note: V5R3M5 of LIC uses V5R3M0 of i5/OS
            V5R4M5 of LIC uses V5R4M0 of i5/OS
            6.1.1 of LIC uses 6.1 of IBM i




           Copyright iTech Solutions
                                                           21
i5/OS, OS/400 support for Domino




                                   22
What we will cover…

      •   Map, starting, and documentation
      •   Analyze Object Conversion
      •   Release Mapping
      •   HMC, FSP, firmware, & IBM i
      •   Models
      •   Required PTFs, Resaves, and License Keys
      •   Image Catalogue & Preparing
      •   Right before the upgrade
      •   The Upgrade
      •   Verification
      •   Conversions & Afterwards
                       Copyright iTech Solutions
                                                     23
HMC, FSP, i5/OS




                  24
i5/OS, FSP, & HMC



                                         i5/OS         Linux        i5/OS




                                          SLIC                         SLIC
                                         A B                           A B

                                            Power Hypervisor PHYP
                                            Flexible Service Processor (FSP)
                                        HMC 1
                                                   Flash Memory
                                        HMC 2
                                                  Perm      Temp

                                          System Power Cont. Network (SPCN)
            Copyright iTech Solutions
                                                                               25
Order of Upgrades
 •   Upgrade the HMC
 •   Upgrade the FSP firmware
 •   Upgrade i5/OS & LIC




          Copyright iTech Solutions
                                      26
Firmware Requirements (1 of 2)
 •   V5R3M0 & V5R3M5 of i5/OS requires a minimum
     Firmware of:
      Power 5 – No Minimum.
      Power6 & Power7 Not supported.
 •   V5R4M0
      Power5 – SF235_160
      Power6 & Power7 Not Supported.
 •   V5R4M5
      Power5 – SF235_160
      Power6 – EM310_048, EL320_040, EH330_034
      Power7 – Not Supported.

          Copyright iTech Solutions
                                                   27
Firmware Requirements (2 of 2)
 •   6.1.0 of IBM i requires a minimum Firmware of:
       Power5 - SF240_332
      Power6 - EM320_040, EL320_040, EH330_034
      Power7 - Not supported
 •   6.1.1
      Power5 – SF240_332
      Power6 – EM320_040, EL320_040, EH330_034
      Power7 – AL710_043
 •   7.1.0
      Power5 – SF240_332
      Power6 - EM320_040, EL320_040, EH330_034
      Power7 – AL710_043


          Copyright iTech Solutions
                                                      28
HMC & FSP Code Combinations Power 7




        Copyright iTech Solutions
                                      29
HMC & FSP Code Combinations Power 6




                                      30
HMC & FSP Code Combinations Power 5




                                      31
HMC & FSP Code Combinations Power 5 (Cont.)




                                              32
DSPFMWSTS: V5R4M5 and above




       Copyright iTech Solutions
                                   33
No HMC & V5R4M0
 •   STRSST and sign in
 •   Select option 1 – Start Service tool
 •   Option 4 - Display/Alter/Dump
 •   Option 1 - Display/Alter Storage
 •   Option 2 – Licensed Internal Code Data
 •   Option 14 – Advanced Analysis
 •   Select FLASHLEVELS press Enter




          Copyright iTech Solutions
                                              34
Select Flashlevels




        Copyright iTech Solutions   35
Level & Update Policy




         Copyright iTech Solutions
                                     36
What we will cover…

      •   Map, starting, and documentation
      •   Analyze Object Conversion
      •   Release Mapping
      •   HMC, FSP, firmware, & IBM i
      •   Models
      •   Required PTFs, Resaves, and License Keys
      •   Image Catalogue & Preparing
      •   Right before the upgrade
      •   The Upgrade
      •   Verification
      •   Conversions & Afterwards
                       Copyright iTech Solutions
                                                     37
This table indicates which releases of IBM i, i5/OS or OS/400 are supported by each of the Power and System i models.


         Supported Models
        Type       Model       V3     V3        V4        V4        V4        V4        V4        V5        V5          V5   V5   6.1   7.1
                               R6     R7        R1        R2        R3        R4        R5        R1        R2          R3   R4


        9401       150                x         x         x         x         x         x         x         x

        9406       170                                    x         x         x         x         x         x           x

        9406       250                                                                  x         x         x           x

        9406       270                                                                  x         x         x           x    x

        9402       400         x      x         x         x         x         x         x         x

        9402       436                x         x         x         x         x         x         x

        9406       500         x      x         x         x         x         x         x         x

        9402       40S         x      x         x         x         x         x         x         x

        9406       50S         x      x         x         x         x         x         x         x

        9406       510         x      x         x         x         x         x         x         x

        9407       515                                                                                                       x    x     x

        9407-M15   Power 520                                                                                                 x1   x     x



        9405       520                                                                                                  x    x    x     x

        9406       520                                                                                                  x    x    x     x

        9408-M25   Power 520                                                                                                 x1   x     x



        9406       525                                                                                                       x    x     x

        9406       530         x      x         x         x         x         x         x         x

        9406       53S         x      x         x         x         x         x         x         x




                                                                                                                                              38
http://www-947.ibm.com/systems/support/i/planning/upgrade/osmapping.html

        Type   Model   V3   V3   V4   V4   V4   V4   V4   V5   V5   V5     V5   6.1   7.1
                       R6   R7   R1   R2   R3   R4   R5   R1   R2   R3     R4



        9406   600               x    x    x    x    x    x    x

        9406   620               x    x    x    x    x    x    x

        9406   640               x    x    x    x    x    x    x

        9406   650               x    x    x    x    x    x    x

        9406   720                         x    x    x    x    x    x

        9406   730                         x    x    x    x    x    x

        9406   740                         x    x    x    x    x    x

        9406   800                                             x    x      x    x

        9406   810                                             x    x      x    x

        9406   820                                   x    x    x    x      x

        9406   825                                             x    x      x    x

        9406   830                                   x    x    x    x      x

        9406   840                                   x    x    x    x      x

        9406   870                                             x    x      x    x

        9406   890                                             x    x      x    x

        9406   S10               x    x    x    x    x    x    x

        9406   S20               x    x    x    x    x    x    x

        9406   S30               x    x    x    x    x    x    x

        9406   S40               x    x    x    x    x    x    x

        9406   SB1               x    x    x    x    x    x    x

        9406   SB2                                   x    x    x    x      x

        9406   SB3                                   x    x    x    x      x

                                                                                            39
Models Not supported at Release

     •   V5R4: 150, 170, 250, 400, 40S, 436, 53S, 500, 510, 530,
         50S, 600, 620, 640, 650, 720, 730, 740, S10, S20, S30, S40,
         SB1
     •   V6R1: 270, 820, 830, 840, SB2, SB3 or earlier members of
         the iSeries family.
     • V7R1: 800, 810, 825, 870, and 890.
     __________________________________________________________

     •   V7R1 is supported on POWER5 models 515, 520, 525, 550, 570,
         595, POWER6 & POWER7 models.



               Copyright iTech Solutions
                                                                       40
SPD – Get Rid of it !!

•   Support of SPD I/O
    i5/OS V5R3 was the final release to support the attachment of
    SPD towers or SPD Migration Towers. Customers must
    complete the migration or conversion of I/O attached to their
    iSeries model 820, 830, or 840 via SPD towers or SPD Migration
    Towers before upgrading to V5R4. Any SPD I/O cards in these
    towers or older I/O devices which can only be attached to SPD
    cards must be replaced by newer I/O. SPD-attached PCI I/O
    towers #5065 or #5066 must be converted to the HSL-attached
    #5074 or #5079 PCI Expansion Towers or replaced with newer
    generation PCI-X towers such as #5094 or #5294. The PCI-X
    towers offer a higher speed HSL connection and the ability to
    support 15k rpm disk drives.




                Copyright iTech Solutions
                                                                     41
Load Source > 17GB




        Copyright iTech Solutions

                                    42
If Using Operations Console

•   Upgrade Operations console before
    the i5/OS upgrade using the CD/DVD                     Model        Location
    iSeries Setup and Operations.                          270          C07
•   Correct Card location in CEC
                                                           800 or 810   C07
•   Use Userid of 11111111 & password
    of 11111111 for connection of Ops                      820          C06
    Console during the upgrade                             825          C06
                                                           830 or SB2 C02
•   Direct attach NOT Supported in 7.1.                    840 or SB3 C02
    Convert to LAN Console before
    upgrade.                                               870 or 890   C02



                               Copyright iTech Solutions
                                                                                   43
Great website
http://www-304.ibm.com/jct01004c/systems/support/i/planning/index.html




     Copyright iTech Solutions
                                                                         44
What we will cover…

      •   Map, starting, and documentation
      •   Analyze Object Conversion
      •   Release Mapping
      •   HMC, FSP, firmware, & IBM i
      •   Models
      •   Required PTFs, Resaves, and License Keys
      •   Image Catalogue & Preparing
      •   Right before the upgrade
      •   The Upgrade
      •   Verification
      •   Conversions & Afterwards
                       Copyright iTech Solutions
                                                     45
Planning

 •   Verify what you have received is all the software you
     require.
 •   Already covered Server levels FSP Code
 •   From V5R1, V5R2, & V5R3: Need to load the CD Prepare
     for install PTFs for V5R1, V5R2, and V5R3.
 •   INSPTF LICPGM(*ALL) DEV(OPTxx) INSTYP(*IMMED)
 •   Check to see if IPL is required.




           Copyright iTech Solutions
                                                         46
Required PTFs before upgrading

 •   Here is the PTF list for going to:
      V5R3 APAR II14149

      V5R4 APAR II14131

      6.1 APAR II14310

      7.1 APAR II14482




           Copyright iTech Solutions
                                          47
SF98vrm – READ IT !




        Copyright iTech Solutions
                                    48
CDs – ReSpin or ReSave
 •   I_BASE_01 – Version

 Resave Identifier            LIC Marker PTF (999) OS Marker PTF (SS1)
 RSE(LIC 7.1.0) / RS 710-10        RE12066              AP11067        (Has TR-4)
 RSH(LIC 6.1.1) / RS 610-10(XPF) RE62108                AP09202
 RSG(LIC 6.1.0) / RS 610-10(XPF) RE09202                AP09202
 RSG(LIC 5.4.0) / RS 540-30(XPF) RE08281                AP07100
 RSF(LIC 5.4.5) / RS 540-30(XPF) RE59055                AP07100
 RSF(LIC 5.3.5) / RS 530-10(XPF) RE57131                AP05202


 http://www-947.ibm.com/systems/support/i/planning/resave/

 DVD installation media for i 7.1
   The DVD installation media is consolidated. Previously there were 51 sets of
   unique language version media. Now there are three sets of multiple language
   version media.
           Copyright iTech Solutions
                                                                                    49
License Keys


 •   No longer come printed with your order
 •   Locate the Customer packing list from your software order to
     obtain:
      Customer number

      Software Order




           Copyright iTech Solutions
                                                                    50
https://www-05.ibm.com/servers/eserver/ess/ProtectedServlet.wss




                  Copyright iTech Solutions

                                                                  51
Select License Keys you want




        Copyright iTech Solutions
                                    52
These are your Keys




        Copyright iTech Solutions
                                    53
Enter each Key




        Copyright iTech Solutions
                                    54
Confirmation on Key




        Copyright iTech Solutions   55
What we will cover…

      •   Map, starting, and documentation
      •   Analyze Object Conversion
      •   Release Mapping
      •   HMC, FSP, firmware, & IBM i
      •   Models
      •   Required PTFs, Resaves, and License Keys
      •   Image Catalogue & Preparing
      •   Right before the upgrade
      •   The Upgrade
      •   Verification
      •   Conversions & Afterwards
                       Copyright iTech Solutions
                                                     56
Lets start to Prepare: GO LICPGM




            Copyright iTech Solutions
                                        57
Prepare to Install




          Copyright iTech Solutions
                                      58
Increase License Internal code




         Copyright iTech Solutions
                                     59
Increase License Internal code




         Copyright iTech Solutions
License Internal Code
 •   An IPL MUST be done prior to the upgrade to increase this.
 •   Increases Licensed Internal code area by 4GB
 •   *** If coming from V5R2 (to V5R4) use the API QLPALCSP.
 •   If on V5R3M5 you have enough space for V5R4 or V6R1 or V7R1.




           Copyright iTech Solutions
                                                                61
Permanently Apply PTFs




 •   APYPTF LICPGM(*ALL) APY(*PERM)
     DELAYED(*IMMDLY) IPLAPY(*YES)

 •   Saves Space

 •   Can’t have any PTFs set for apply when the upgrade starts.




           Copyright iTech Solutions
                                                                  62
Timezone Support
 •   V5R2:
     CRTDTAARA QSYS/QWCTIMZON TYPE(*CHAR) LEN(16) Text(‘-
       05:00QN0500EST’)
 •   V5R3:
     WRKSYSVAL QTIMZON




          Copyright iTech Solutions
                                                            63
Document these System Values
 •   WRKSYSVAL
      QSYSLIBL __________

      QUSRLIBL __________

      QALWOBJRST _____ (Needs to be *All)

      QVFYOBJRST ______ (Max is 3)

      QSTRUPPGM _______________



 •   Good time to look at your startup program.




           Copyright iTech Solutions
                                                  64
Verify User Profiles & Cross Ref.




         Copyright iTech Solutions
                                     65
QSECOFR & Libraries
 •   Make sure the QSECOFR profile:
      Does not have a secondary language

 •   All IBM Libraries are in the SYSTEM ASP.




           Copyright iTech Solutions
                                                66
Compress Job Tables *NONE




        Copyright iTech Solutions
                                    67
Arrange the media in this Order
                                                x will be 1 for
•   I_BASE_01                                    Americas &
•   B29xx_01                                  western Europe f/c
•   B29xx_02                                        5817
                          xx will be 24 for
•   B29MM_03
•   B29MM_04
                            US English          DVDs for 7.1
•   D29xx_01                 DVDs for 6.1        I_BASE_01
•   D29xx_02                                   B_GROUPx_01
                             I_BASE_01
•   D29xx_03
                                               B_GROUPx_02
•   D29xx_04                  B29xx_01
•   D29xx_05                  B29xx_02          B_GROUPx_03
•   D29xx_06                                   B_GROUPx_04
                              F29xx_01
•   L29xx_01
•   L29xx_02                                   B_GROUPx_05
•   Any F29xx CDs to follow                    F_MULTI_NLV
               Copyright iTech Solutions            F29xx
                                                                   68
Required PTFs Image Catalogues
•   Upgrading from V5R2M0 –
     SI19886 & MF40360
•   Upgrading from V5R3M0 –
     SI28698, MF42598, MF43198
•   Upgrading from V5R3M5 –
     SI28698, MF42599, MF43355
•   Upgrading from V5R4M0 –
     SI35849, MF42600, MF43154, MF46264
•   Upgrading from V5R4M5 –
     SI35849, MF42601, MF43157, MF46288
•   Upgrading from V6R1M0 –
     SI39390, SI35186, SI35189, MF46292
•   Upgrading from V6R1M1 –
     SI39390, SI35186, SI35189
                                           69
Create Image Catalogue




        Copyright iTech Solutions
                                    70
Create Virtual Optical




         Copyright iTech Solutions
                                     71
Optical Devices Required




         Copyright iTech Solutions
                                     72
For Each CD in the Order we perform this




         Copyright iTech Solutions
                                           73
WRKIMGCLGE




             Copyright iTech Solutions   74
Associate Virtual Optical to Catalogue




    Copyright iTech Solutions
                                         75
Optical Device loaded and Ready




        Copyright iTech Solutions
                                    76
Create List for what to upgrade




         Copyright iTech Solutions
                                     77
Build the list




          Copyright iTech Solutions
                                      78
Select LPPs




              Copyright iTech Solutions
                                          79
F11 – Additional Storage




         Copyright iTech Solutions
                                     80
F11 – Expected release




         Copyright iTech Solutions
                                     81
F11 – Expected Action




               Copyright iTech Solutions
                                           82
Our menu




           Copyright iTech Solutions
                                       83
Software to Delete




               Copyright iTech Solutions
                                           84
Software not found on Media




             Copyright iTech Solutions
                                         85
Software for Target release




                Copyright iTech Solutions
                                            86
Software Licenses




              Copyright iTech Solutions
                                          87
Accept Software Licenses




               Copyright iTech Solutions
                                           88
Everyone must display YES




        Copyright iTech Solutions
                                    89
Estimate Additional Storage




                 Copyright iTech Solutions
                                             90
We have enough Disk space




        Copyright iTech Solutions
                                    91
Check Directory conversion V5R3




        Copyright iTech Solutions
                                    92
Set Console Type




        Copyright iTech Solutions
                                    93
Select Console




        Copyright iTech Solutions   94
Select YOUR console




                 Copyright iTech Solutions
                                             95
ANZOBJCVN


 •   Collect the data AGAIN and
     verify that there are NO
     programs on this report that
     you expect to run at 6.1 or
     7.1 !!!

       Copyright iTech Solutions
                                    96
What we will cover…

      •   Map, starting, and documentation
      •   Analyze Object Conversion
      •   Release Mapping
      •   HMC, FSP, firmware, & IBM i
      •   Models
      •   Required PTFs, Resaves, and License Keys
      •   Image Catalogue & Preparing
      •   Right before the upgrade
      •   The Upgrade
      •   Verification
      •   Conversions & Afterwards
                       Copyright iTech Solutions
                                                     97
If Using two-phase Commit




        Copyright iTech Solutions   98
No Commitment Definitions




        Copyright iTech Solutions
                                    99
Most important Step – FULL SAVE




        Copyright iTech Solutions   100
Verify for Upgrade




                     Copyright iTech Solutions

                                                 101
Verified




           Copyright iTech Solutions
                                       102
What we will cover…

      •   Map, starting, and documentation
      •   Analyze Object Conversion
      •   Release Mapping
      •   HMC, FSP, firmware, & IBM I
      •   Models
      •   Required PTFs, Resaves, and License Keys
      •   Image Catalogue & Preparing
      •   Right before the upgrade
      •   The Upgrade
      •   Verification
      •   Conversions & Afterwards
                       Copyright iTech Solutions
                                                     103
Start the Upgrade




         Copyright iTech Solutions   104
Sit back and relax while Image Catalogues do the work




         Copyright iTech Solutions
                                                        105
Next on the console
                    Install Licensed Internal Code - Status
 Install of the Licensed Internal Code in progress.
             +-------------------------------------------------------+
 Percent |                        XX %                                |
 Complete +-------------------------------------------------------+

 Elapsed time in minutes . . . . . . . . : x.x




             Copyright iTech Solutions
                                                                          106
IBM i being installed
 Message ID. . . : CPI2070                         i5/OS Installation Status
              +---------------------------------------------------+
 Stage 2       |                           XX %                   |
              +---------------------------------------------------+
 Installation                                                       Objects
 Stage                                                  Completed Restored
    1 Creating needed profiles and libraries . . . . : X
 >> 2 Restoring programs to library QSYS . . . . . . :                XXXXX
    3 Restoring language objects to library QSYS . . :
    4 Updating program table . . . . . . . . . . . . :
    5 Installing database files. . . . . . . . . . . :
    6 Installing base directory objects . . . . . . :
    7 Completing installation . . . . . . . . :
 i5/OS is a trademark of IBM in the United States and other countries.



              Copyright iTech Solutions
                                                                               107
Installing Licensed Programs




         Copyright iTech Solutions
                                     108
What we will cover…

      •   Map, starting, and documentation
      •   Analyze Object Conversion
      •   Release Mapping
      •   HMC, FSP, firmware, & IBM I
      •   Models
      •   Required PTFs, Resaves, and License Keys
      •   Image Catalogue & Preparing
      •   Right before the upgrade
      •   The Upgrade
      •   Verification
      •   Conversions & Afterwards
                       Copyright iTech Solutions
                                                     109
When Complete Check




       Copyright iTech Solutions   110
Verify Install




          Copyright iTech Solutions
                                      111
Automatic Installation completed




         Copyright iTech Solutions
                                     112
Verify
 •   Check messages in QSYSOPR
 •   Should not see any license Key messages
 •   Display LICPGM everything at right release
 •   Load the PTF (Cumulative, Groups, DB) & then IPL




           Copyright iTech Solutions
                                                        113
Multiple IPLs possible




         Copyright iTech Solutions
                                     114
INZSYS Started after First IPL




         Copyright iTech Solutions
                                     115
INZSYS Completed




        Copyright iTech Solutions
                                    116
What we will cover…

      •   Map, starting, and documentation
      •   Analyze Object Conversion
      •   Release Mapping
      •   HMC, FSP, firmware, & IBM I
      •   Models
      •   Required PTFs, Resaves, and License Keys
      •   Image Catalogue & Preparing
      •   Right before the upgrade
      •   The Upgrade
      •   Verification
      •   Conversions & Afterwards
                       Copyright iTech Solutions
                                                     117
Afterwards
 •   Update System Values that you changed.
 •   CFGACCWEB2
 •   Enable Service Director
 •   Check PM400
 •   Performance Data
 •   Delete Image Catalogues
 •   Test SNDPTFORD & SNDSRVRQS
 •   Cleanup PTF Groups WRKPTFGRP
 •   Update Client Access Clients
 •   Update iSeries Integrated Windows Servers


          Copyright iTech Solutions
                                                 118
Conversions
 •   V6R1 – ALL PROGRAMS




          Copyright iTech Solutions
                                      119
Conversions


 •   V5R4
      Data Queues

      User Queues

      *FILES

      SQLPGMs




          Copyright iTech Solutions
                                      120
SAVE – New starting point


 •   Full Save if have the time

 •   Otherwise (GO SAVE 22)
      SAVSYS

      SAVLIB *IBM

      SAV ('/QIBM/ProdData') + ('/QOpenSys/QIBM/ProdData'))




            Copyright iTech Solutions
                                                               121
7 Key Points to take home

 •   ANZOBJCVN, ANZOBJCVN, ANZOBJCVN !!!
 •   Get the required PTFs on your system before the
     upgrade.
 •   Check FSP Firmware minimum levels.
 •   Have a Good FULL Backup right before the upgrade.
 •   Have license keys and new PTFs available.
 •   Conversions need to complete afterwards.
 •   SAVE 22 or Full save after the conversions.



          Copyright iTech Solutions
                                                         122
Your Turn!




                   How to contact me:
                     Pete Massiello
             Email: pmassiello@itechsol.com
                    Twitter: petem59

More Related Content

What's hot

Best Practices For Using Virtualization In Development Environments
Best Practices For Using Virtualization In Development EnvironmentsBest Practices For Using Virtualization In Development Environments
Best Practices For Using Virtualization In Development EnvironmentsKnowledge Management Associates, LLC
 
SUSE Linux Enterprise Server 11 SP2 for IBM PowerLinux
SUSE Linux Enterprise Server 11 SP2 for IBM PowerLinuxSUSE Linux Enterprise Server 11 SP2 for IBM PowerLinux
SUSE Linux Enterprise Server 11 SP2 for IBM PowerLinuxPatrick Quairoli
 
Flash Arrays Enable the Next Generation Data Center
Flash Arrays Enable the Next Generation Data Center Flash Arrays Enable the Next Generation Data Center
Flash Arrays Enable the Next Generation Data Center NetApp
 
TechWiseTV Workshop: HyperFlex 3.0
TechWiseTV Workshop: HyperFlex 3.0TechWiseTV Workshop: HyperFlex 3.0
TechWiseTV Workshop: HyperFlex 3.0Robb Boyd
 
On command shift 1.0 release
On command shift 1.0 releaseOn command shift 1.0 release
On command shift 1.0 releaseTakano Masaru
 
What is the Siemens Open Library, and How it Decreased Development Time for E...
What is the Siemens Open Library, and How it Decreased Development Time for E...What is the Siemens Open Library, and How it Decreased Development Time for E...
What is the Siemens Open Library, and How it Decreased Development Time for E...DMC, Inc.
 
Intel NFVi Enabling Kit Demo/Lab
Intel NFVi Enabling Kit Demo/LabIntel NFVi Enabling Kit Demo/Lab
Intel NFVi Enabling Kit Demo/LabMichelle Holley
 
eFolder Expert Series Webinar — How to Back Up and Replicate Off-Site Using e...
eFolder Expert Series Webinar — How to Back Up and Replicate Off-Site Using e...eFolder Expert Series Webinar — How to Back Up and Replicate Off-Site Using e...
eFolder Expert Series Webinar — How to Back Up and Replicate Off-Site Using e...eFolder
 
VMworld Europe 204: Technical Deep Dive on EVO: RAIL, the new VMware Hyper-Co...
VMworld Europe 204: Technical Deep Dive on EVO: RAIL, the new VMware Hyper-Co...VMworld Europe 204: Technical Deep Dive on EVO: RAIL, the new VMware Hyper-Co...
VMworld Europe 204: Technical Deep Dive on EVO: RAIL, the new VMware Hyper-Co...VMworld
 
VMworld 2015: Take Virtualization to the Next Level vSphere with Operations M...
VMworld 2015: Take Virtualization to the Next Level vSphere with Operations M...VMworld 2015: Take Virtualization to the Next Level vSphere with Operations M...
VMworld 2015: Take Virtualization to the Next Level vSphere with Operations M...VMworld
 
Lenovo XClarity and Cisco UCS Manager Just the Facts
Lenovo XClarity and Cisco UCS Manager Just the FactsLenovo XClarity and Cisco UCS Manager Just the Facts
Lenovo XClarity and Cisco UCS Manager Just the FactsLenovo Data Center
 
Perforce on Tour 2015 - Optimising the Developer Pipeline at U-Blox
Perforce on Tour 2015 - Optimising the Developer Pipeline at U-BloxPerforce on Tour 2015 - Optimising the Developer Pipeline at U-Blox
Perforce on Tour 2015 - Optimising the Developer Pipeline at U-BloxPerforce
 
VMworld Europe 2014: What's New in vSphere?
VMworld Europe 2014: What's New in vSphere?VMworld Europe 2014: What's New in vSphere?
VMworld Europe 2014: What's New in vSphere?VMworld
 
Lenovo + VMware simplify and automate data center IT operations
Lenovo + VMware simplify and automate data center IT operationsLenovo + VMware simplify and automate data center IT operations
Lenovo + VMware simplify and automate data center IT operationsLenovo Data Center
 
VMworld 2014: What's New in vSphere
VMworld 2014: What's New in vSphereVMworld 2014: What's New in vSphere
VMworld 2014: What's New in vSphereVMworld
 
vRealize Operations (vROps) Management Pack for Lenovo Compute Overview
vRealize Operations (vROps) Management Pack for Lenovo Compute OverviewvRealize Operations (vROps) Management Pack for Lenovo Compute Overview
vRealize Operations (vROps) Management Pack for Lenovo Compute OverviewBlue Medora
 
Net1674 final emea
Net1674 final emeaNet1674 final emea
Net1674 final emeaVMworld
 
Lenovo XClarity and Dell Systems Management
Lenovo XClarity and Dell Systems ManagementLenovo XClarity and Dell Systems Management
Lenovo XClarity and Dell Systems ManagementLenovo Data Center
 

What's hot (19)

Best Practices For Using Virtualization In Development Environments
Best Practices For Using Virtualization In Development EnvironmentsBest Practices For Using Virtualization In Development Environments
Best Practices For Using Virtualization In Development Environments
 
SUSE Linux Enterprise Server 11 SP2 for IBM PowerLinux
SUSE Linux Enterprise Server 11 SP2 for IBM PowerLinuxSUSE Linux Enterprise Server 11 SP2 for IBM PowerLinux
SUSE Linux Enterprise Server 11 SP2 for IBM PowerLinux
 
Flash Arrays Enable the Next Generation Data Center
Flash Arrays Enable the Next Generation Data Center Flash Arrays Enable the Next Generation Data Center
Flash Arrays Enable the Next Generation Data Center
 
TechWiseTV Workshop: HyperFlex 3.0
TechWiseTV Workshop: HyperFlex 3.0TechWiseTV Workshop: HyperFlex 3.0
TechWiseTV Workshop: HyperFlex 3.0
 
On command shift 1.0 release
On command shift 1.0 releaseOn command shift 1.0 release
On command shift 1.0 release
 
What is the Siemens Open Library, and How it Decreased Development Time for E...
What is the Siemens Open Library, and How it Decreased Development Time for E...What is the Siemens Open Library, and How it Decreased Development Time for E...
What is the Siemens Open Library, and How it Decreased Development Time for E...
 
Intel NFVi Enabling Kit Demo/Lab
Intel NFVi Enabling Kit Demo/LabIntel NFVi Enabling Kit Demo/Lab
Intel NFVi Enabling Kit Demo/Lab
 
eFolder Expert Series Webinar — How to Back Up and Replicate Off-Site Using e...
eFolder Expert Series Webinar — How to Back Up and Replicate Off-Site Using e...eFolder Expert Series Webinar — How to Back Up and Replicate Off-Site Using e...
eFolder Expert Series Webinar — How to Back Up and Replicate Off-Site Using e...
 
Emc vipr srm workshop
Emc vipr srm workshopEmc vipr srm workshop
Emc vipr srm workshop
 
VMworld Europe 204: Technical Deep Dive on EVO: RAIL, the new VMware Hyper-Co...
VMworld Europe 204: Technical Deep Dive on EVO: RAIL, the new VMware Hyper-Co...VMworld Europe 204: Technical Deep Dive on EVO: RAIL, the new VMware Hyper-Co...
VMworld Europe 204: Technical Deep Dive on EVO: RAIL, the new VMware Hyper-Co...
 
VMworld 2015: Take Virtualization to the Next Level vSphere with Operations M...
VMworld 2015: Take Virtualization to the Next Level vSphere with Operations M...VMworld 2015: Take Virtualization to the Next Level vSphere with Operations M...
VMworld 2015: Take Virtualization to the Next Level vSphere with Operations M...
 
Lenovo XClarity and Cisco UCS Manager Just the Facts
Lenovo XClarity and Cisco UCS Manager Just the FactsLenovo XClarity and Cisco UCS Manager Just the Facts
Lenovo XClarity and Cisco UCS Manager Just the Facts
 
Perforce on Tour 2015 - Optimising the Developer Pipeline at U-Blox
Perforce on Tour 2015 - Optimising the Developer Pipeline at U-BloxPerforce on Tour 2015 - Optimising the Developer Pipeline at U-Blox
Perforce on Tour 2015 - Optimising the Developer Pipeline at U-Blox
 
VMworld Europe 2014: What's New in vSphere?
VMworld Europe 2014: What's New in vSphere?VMworld Europe 2014: What's New in vSphere?
VMworld Europe 2014: What's New in vSphere?
 
Lenovo + VMware simplify and automate data center IT operations
Lenovo + VMware simplify and automate data center IT operationsLenovo + VMware simplify and automate data center IT operations
Lenovo + VMware simplify and automate data center IT operations
 
VMworld 2014: What's New in vSphere
VMworld 2014: What's New in vSphereVMworld 2014: What's New in vSphere
VMworld 2014: What's New in vSphere
 
vRealize Operations (vROps) Management Pack for Lenovo Compute Overview
vRealize Operations (vROps) Management Pack for Lenovo Compute OverviewvRealize Operations (vROps) Management Pack for Lenovo Compute Overview
vRealize Operations (vROps) Management Pack for Lenovo Compute Overview
 
Net1674 final emea
Net1674 final emeaNet1674 final emea
Net1674 final emea
 
Lenovo XClarity and Dell Systems Management
Lenovo XClarity and Dell Systems ManagementLenovo XClarity and Dell Systems Management
Lenovo XClarity and Dell Systems Management
 

Similar to What you-need-to-know-to-do successful-upgrades

Symfony2 for legacy app rejuvenation: the eZ Publish case study
Symfony2 for legacy app rejuvenation: the eZ Publish case studySymfony2 for legacy app rejuvenation: the eZ Publish case study
Symfony2 for legacy app rejuvenation: the eZ Publish case studyGaetano Giunta
 
ITCamp 2011 - Alessandro Pilotti - Optimizing ASPNet and PHP apps on IIS 7.5
ITCamp 2011 - Alessandro Pilotti - Optimizing ASPNet and PHP apps on IIS 7.5ITCamp 2011 - Alessandro Pilotti - Optimizing ASPNet and PHP apps on IIS 7.5
ITCamp 2011 - Alessandro Pilotti - Optimizing ASPNet and PHP apps on IIS 7.5ITCamp
 
Informix IWA data life cycle mgmt & Performance on Intel.
Informix IWA data life cycle mgmt & Performance on Intel.Informix IWA data life cycle mgmt & Performance on Intel.
Informix IWA data life cycle mgmt & Performance on Intel.Keshav Murthy
 
Designing a Highly Available Environment Using Methods of Modern IT Infrastru...
Designing a Highly Available Environment Using Methods of Modern IT Infrastru...Designing a Highly Available Environment Using Methods of Modern IT Infrastru...
Designing a Highly Available Environment Using Methods of Modern IT Infrastru...Perforce
 
Running your IBM i Availability in the Cloud
Running your IBM i Availability in the CloudRunning your IBM i Availability in the Cloud
Running your IBM i Availability in the CloudPrecisely
 
Monitoring Alfresco with Nagios/Icinga
Monitoring Alfresco with Nagios/IcingaMonitoring Alfresco with Nagios/Icinga
Monitoring Alfresco with Nagios/IcingaToni de la Fuente
 
Opening last bits of the infrastructure
Opening last bits of the infrastructureOpening last bits of the infrastructure
Opening last bits of the infrastructureErwan Velu
 
Landing Teams within Linaro
Landing Teams within LinaroLanding Teams within Linaro
Landing Teams within LinaroJamieBennett
 
Automatize everything
Automatize everythingAutomatize everything
Automatize everythingBoris Bucha
 
Implementing a Hyper-V Virtualization Infrastructure
Implementing a Hyper-V Virtualization InfrastructureImplementing a Hyper-V Virtualization Infrastructure
Implementing a Hyper-V Virtualization InfrastructureASPE, Inc.
 
How to Achieve 80% Faster Builds and DevOps at Scale With Git
How to Achieve 80% Faster Builds and DevOps at Scale With Git How to Achieve 80% Faster Builds and DevOps at Scale With Git
How to Achieve 80% Faster Builds and DevOps at Scale With Git Perforce
 
Functions and DevOps
Functions and DevOpsFunctions and DevOps
Functions and DevOpsShaun Smith
 
Средства разработки —IBM iSeries
Средства разработки —IBM iSeriesСредства разработки —IBM iSeries
Средства разработки —IBM iSeriesAndrew Fadeev
 
Robot - 5 Reasons Developers Love Robot Schedule
Robot - 5 Reasons Developers Love Robot ScheduleRobot - 5 Reasons Developers Love Robot Schedule
Robot - 5 Reasons Developers Love Robot ScheduleHelpSystems
 
Aging RPG Programmers in Charge of Your IBM i?
Aging RPG Programmers in Charge of Your IBM i?Aging RPG Programmers in Charge of Your IBM i?
Aging RPG Programmers in Charge of Your IBM i?HelpSystems
 
Cincom Smalltalk News
Cincom Smalltalk NewsCincom Smalltalk News
Cincom Smalltalk NewsESUG
 
IMCSummit 2015 - 1 IT Business - The Evolution of Pivotal Gemfire
IMCSummit 2015 - 1 IT Business  - The Evolution of Pivotal GemfireIMCSummit 2015 - 1 IT Business  - The Evolution of Pivotal Gemfire
IMCSummit 2015 - 1 IT Business - The Evolution of Pivotal GemfireIn-Memory Computing Summit
 
eFolder Expert Series Webinar - BDR Do's and Dont's: Featuring Andrew Bensing...
eFolder Expert Series Webinar - BDR Do's and Dont's: Featuring Andrew Bensing...eFolder Expert Series Webinar - BDR Do's and Dont's: Featuring Andrew Bensing...
eFolder Expert Series Webinar - BDR Do's and Dont's: Featuring Andrew Bensing...eFolder
 

Similar to What you-need-to-know-to-do successful-upgrades (20)

Symfony2 for legacy app rejuvenation: the eZ Publish case study
Symfony2 for legacy app rejuvenation: the eZ Publish case studySymfony2 for legacy app rejuvenation: the eZ Publish case study
Symfony2 for legacy app rejuvenation: the eZ Publish case study
 
ITCamp 2011 - Alessandro Pilotti - Optimizing ASPNet and PHP apps on IIS 7.5
ITCamp 2011 - Alessandro Pilotti - Optimizing ASPNet and PHP apps on IIS 7.5ITCamp 2011 - Alessandro Pilotti - Optimizing ASPNet and PHP apps on IIS 7.5
ITCamp 2011 - Alessandro Pilotti - Optimizing ASPNet and PHP apps on IIS 7.5
 
Informix IWA data life cycle mgmt & Performance on Intel.
Informix IWA data life cycle mgmt & Performance on Intel.Informix IWA data life cycle mgmt & Performance on Intel.
Informix IWA data life cycle mgmt & Performance on Intel.
 
Designing a Highly Available Environment Using Methods of Modern IT Infrastru...
Designing a Highly Available Environment Using Methods of Modern IT Infrastru...Designing a Highly Available Environment Using Methods of Modern IT Infrastru...
Designing a Highly Available Environment Using Methods of Modern IT Infrastru...
 
Running your IBM i Availability in the Cloud
Running your IBM i Availability in the CloudRunning your IBM i Availability in the Cloud
Running your IBM i Availability in the Cloud
 
Migrating from ibm to hpe
Migrating from ibm to hpeMigrating from ibm to hpe
Migrating from ibm to hpe
 
Monitoring Alfresco with Nagios/Icinga
Monitoring Alfresco with Nagios/IcingaMonitoring Alfresco with Nagios/Icinga
Monitoring Alfresco with Nagios/Icinga
 
Simics - Break the Rules of Product Development
Simics - Break the Rules of Product DevelopmentSimics - Break the Rules of Product Development
Simics - Break the Rules of Product Development
 
Opening last bits of the infrastructure
Opening last bits of the infrastructureOpening last bits of the infrastructure
Opening last bits of the infrastructure
 
Landing Teams within Linaro
Landing Teams within LinaroLanding Teams within Linaro
Landing Teams within Linaro
 
Automatize everything
Automatize everythingAutomatize everything
Automatize everything
 
Implementing a Hyper-V Virtualization Infrastructure
Implementing a Hyper-V Virtualization InfrastructureImplementing a Hyper-V Virtualization Infrastructure
Implementing a Hyper-V Virtualization Infrastructure
 
How to Achieve 80% Faster Builds and DevOps at Scale With Git
How to Achieve 80% Faster Builds and DevOps at Scale With Git How to Achieve 80% Faster Builds and DevOps at Scale With Git
How to Achieve 80% Faster Builds and DevOps at Scale With Git
 
Functions and DevOps
Functions and DevOpsFunctions and DevOps
Functions and DevOps
 
Средства разработки —IBM iSeries
Средства разработки —IBM iSeriesСредства разработки —IBM iSeries
Средства разработки —IBM iSeries
 
Robot - 5 Reasons Developers Love Robot Schedule
Robot - 5 Reasons Developers Love Robot ScheduleRobot - 5 Reasons Developers Love Robot Schedule
Robot - 5 Reasons Developers Love Robot Schedule
 
Aging RPG Programmers in Charge of Your IBM i?
Aging RPG Programmers in Charge of Your IBM i?Aging RPG Programmers in Charge of Your IBM i?
Aging RPG Programmers in Charge of Your IBM i?
 
Cincom Smalltalk News
Cincom Smalltalk NewsCincom Smalltalk News
Cincom Smalltalk News
 
IMCSummit 2015 - 1 IT Business - The Evolution of Pivotal Gemfire
IMCSummit 2015 - 1 IT Business  - The Evolution of Pivotal GemfireIMCSummit 2015 - 1 IT Business  - The Evolution of Pivotal Gemfire
IMCSummit 2015 - 1 IT Business - The Evolution of Pivotal Gemfire
 
eFolder Expert Series Webinar - BDR Do's and Dont's: Featuring Andrew Bensing...
eFolder Expert Series Webinar - BDR Do's and Dont's: Featuring Andrew Bensing...eFolder Expert Series Webinar - BDR Do's and Dont's: Featuring Andrew Bensing...
eFolder Expert Series Webinar - BDR Do's and Dont's: Featuring Andrew Bensing...
 

More from COMMON Europe

What's New in WebSphere Application Server
What's New in WebSphere Application ServerWhat's New in WebSphere Application Server
What's New in WebSphere Application ServerCOMMON Europe
 
Compiling the Compiler
Compiling the CompilerCompiling the Compiler
Compiling the CompilerCOMMON Europe
 
Workload Groups overview updates
Workload Groups overview updatesWorkload Groups overview updates
Workload Groups overview updatesCOMMON Europe
 
Why i - Common Europe 2012
Why i - Common Europe 2012Why i - Common Europe 2012
Why i - Common Europe 2012COMMON Europe
 
The Ruby OpenSSL extension
The Ruby OpenSSL extensionThe Ruby OpenSSL extension
The Ruby OpenSSL extensionCOMMON Europe
 
Using Ruby on IBM i (i5/OS)
Using Ruby on IBM i (i5/OS)Using Ruby on IBM i (i5/OS)
Using Ruby on IBM i (i5/OS)COMMON Europe
 
IBM Systems Director Navigator for i
IBM Systems Director Navigator for iIBM Systems Director Navigator for i
IBM Systems Director Navigator for iCOMMON Europe
 
IBM i Trends & Directions Common Europe 2012
IBM i Trends & Directions Common Europe 2012IBM i Trends & Directions Common Europe 2012
IBM i Trends & Directions Common Europe 2012COMMON Europe
 
IBM i Technology Refreshes Overview 2012 06-04
IBM i Technology Refreshes Overview 2012 06-04IBM i Technology Refreshes Overview 2012 06-04
IBM i Technology Refreshes Overview 2012 06-04COMMON Europe
 
IBM i 7.1 & TRs CEC 2012
IBM i 7.1 & TRs CEC 2012IBM i 7.1 & TRs CEC 2012
IBM i 7.1 & TRs CEC 2012COMMON Europe
 
DB2 Web Query whats new
DB2 Web Query whats newDB2 Web Query whats new
DB2 Web Query whats newCOMMON Europe
 
Access client solutions overview
Access client solutions overviewAccess client solutions overview
Access client solutions overviewCOMMON Europe
 
What's new with Zend server
What's new with Zend serverWhat's new with Zend server
What's new with Zend serverCOMMON Europe
 
Php arrays for RPG programmers
Php arrays for RPG programmersPhp arrays for RPG programmers
Php arrays for RPG programmersCOMMON Europe
 
Open source report writing tools for IBM i Vienna 2012
Open source report writing tools for IBM i  Vienna 2012Open source report writing tools for IBM i  Vienna 2012
Open source report writing tools for IBM i Vienna 2012COMMON Europe
 
Moving 5.4 to 7.1 AB
Moving 5.4 to 7.1 ABMoving 5.4 to 7.1 AB
Moving 5.4 to 7.1 ABCOMMON Europe
 
Introduction to My SQL
Introduction to My SQLIntroduction to My SQL
Introduction to My SQLCOMMON Europe
 
IBM CEC 2012 Storage june 11, 2012
IBM CEC 2012 Storage june 11, 2012IBM CEC 2012 Storage june 11, 2012
IBM CEC 2012 Storage june 11, 2012COMMON Europe
 
Getting started with PHP on IBM i
Getting started with PHP on IBM iGetting started with PHP on IBM i
Getting started with PHP on IBM iCOMMON Europe
 

More from COMMON Europe (20)

What's New in WebSphere Application Server
What's New in WebSphere Application ServerWhat's New in WebSphere Application Server
What's New in WebSphere Application Server
 
Compiling the Compiler
Compiling the CompilerCompiling the Compiler
Compiling the Compiler
 
Workload Groups overview updates
Workload Groups overview updatesWorkload Groups overview updates
Workload Groups overview updates
 
Why i - Common Europe 2012
Why i - Common Europe 2012Why i - Common Europe 2012
Why i - Common Europe 2012
 
The Ruby OpenSSL extension
The Ruby OpenSSL extensionThe Ruby OpenSSL extension
The Ruby OpenSSL extension
 
Using Ruby on IBM i (i5/OS)
Using Ruby on IBM i (i5/OS)Using Ruby on IBM i (i5/OS)
Using Ruby on IBM i (i5/OS)
 
IBM Systems Director Navigator for i
IBM Systems Director Navigator for iIBM Systems Director Navigator for i
IBM Systems Director Navigator for i
 
IBM i Trends & Directions Common Europe 2012
IBM i Trends & Directions Common Europe 2012IBM i Trends & Directions Common Europe 2012
IBM i Trends & Directions Common Europe 2012
 
IBM i Technology Refreshes Overview 2012 06-04
IBM i Technology Refreshes Overview 2012 06-04IBM i Technology Refreshes Overview 2012 06-04
IBM i Technology Refreshes Overview 2012 06-04
 
IBM i 7.1 & TRs CEC 2012
IBM i 7.1 & TRs CEC 2012IBM i 7.1 & TRs CEC 2012
IBM i 7.1 & TRs CEC 2012
 
DB2 Web Query whats new
DB2 Web Query whats newDB2 Web Query whats new
DB2 Web Query whats new
 
Access client solutions overview
Access client solutions overviewAccess client solutions overview
Access client solutions overview
 
What's new with Zend server
What's new with Zend serverWhat's new with Zend server
What's new with Zend server
 
RPG investment
RPG investmentRPG investment
RPG investment
 
Php arrays for RPG programmers
Php arrays for RPG programmersPhp arrays for RPG programmers
Php arrays for RPG programmers
 
Open source report writing tools for IBM i Vienna 2012
Open source report writing tools for IBM i  Vienna 2012Open source report writing tools for IBM i  Vienna 2012
Open source report writing tools for IBM i Vienna 2012
 
Moving 5.4 to 7.1 AB
Moving 5.4 to 7.1 ABMoving 5.4 to 7.1 AB
Moving 5.4 to 7.1 AB
 
Introduction to My SQL
Introduction to My SQLIntroduction to My SQL
Introduction to My SQL
 
IBM CEC 2012 Storage june 11, 2012
IBM CEC 2012 Storage june 11, 2012IBM CEC 2012 Storage june 11, 2012
IBM CEC 2012 Storage june 11, 2012
 
Getting started with PHP on IBM i
Getting started with PHP on IBM iGetting started with PHP on IBM i
Getting started with PHP on IBM i
 

Recently uploaded

04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptxHampshireHUG
 
Understanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitectureUnderstanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitecturePixlogix Infotech
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsEnterprise Knowledge
 
Key Features Of Token Development (1).pptx
Key  Features Of Token  Development (1).pptxKey  Features Of Token  Development (1).pptx
Key Features Of Token Development (1).pptxLBM Solutions
 
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Patryk Bandurski
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountPuma Security, LLC
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsMaria Levchenko
 
Azure Monitor & Application Insight to monitor Infrastructure & Application
Azure Monitor & Application Insight to monitor Infrastructure & ApplicationAzure Monitor & Application Insight to monitor Infrastructure & Application
Azure Monitor & Application Insight to monitor Infrastructure & ApplicationAndikSusilo4
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slidespraypatel2
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationMichael W. Hawkins
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxMalak Abu Hammad
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)Gabriella Davis
 
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure serviceWhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure servicePooja Nehwal
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreternaman860154
 
Pigging Solutions Piggable Sweeping Elbows
Pigging Solutions Piggable Sweeping ElbowsPigging Solutions Piggable Sweeping Elbows
Pigging Solutions Piggable Sweeping ElbowsPigging Solutions
 
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationBeyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationSafe Software
 
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | DelhiFULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhisoniya singh
 
How to Remove Document Management Hurdles with X-Docs?
How to Remove Document Management Hurdles with X-Docs?How to Remove Document Management Hurdles with X-Docs?
How to Remove Document Management Hurdles with X-Docs?XfilesPro
 
Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Paola De la Torre
 
My Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationMy Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationRidwan Fadjar
 

Recently uploaded (20)

04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
 
Understanding the Laravel MVC Architecture
Understanding the Laravel MVC ArchitectureUnderstanding the Laravel MVC Architecture
Understanding the Laravel MVC Architecture
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI Solutions
 
Key Features Of Token Development (1).pptx
Key  Features Of Token  Development (1).pptxKey  Features Of Token  Development (1).pptx
Key Features Of Token Development (1).pptx
 
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path Mount
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed texts
 
Azure Monitor & Application Insight to monitor Infrastructure & Application
Azure Monitor & Application Insight to monitor Infrastructure & ApplicationAzure Monitor & Application Insight to monitor Infrastructure & Application
Azure Monitor & Application Insight to monitor Infrastructure & Application
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slides
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day Presentation
 
The Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptxThe Codex of Business Writing Software for Real-World Solutions 2.pptx
The Codex of Business Writing Software for Real-World Solutions 2.pptx
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)
 
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure serviceWhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
WhatsApp 9892124323 ✓Call Girls In Kalyan ( Mumbai ) secure service
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreter
 
Pigging Solutions Piggable Sweeping Elbows
Pigging Solutions Piggable Sweeping ElbowsPigging Solutions Piggable Sweeping Elbows
Pigging Solutions Piggable Sweeping Elbows
 
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry InnovationBeyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
Beyond Boundaries: Leveraging No-Code Solutions for Industry Innovation
 
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | DelhiFULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
 
How to Remove Document Management Hurdles with X-Docs?
How to Remove Document Management Hurdles with X-Docs?How to Remove Document Management Hurdles with X-Docs?
How to Remove Document Management Hurdles with X-Docs?
 
Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101
 
My Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationMy Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 Presentation
 

What you-need-to-know-to-do successful-upgrades

  • 1. What you need to know to do successful IBM i upgrades to 6.1 or 7.1 Pete Massiello iTech Solutions pmassiello@itechsol.com 203-744-7854 iTech Solutions because IBM i (AS/400s) don’t come with System Administrators 1
  • 2. In this session We are going to run through all the steps required to do an upgrade: from when you initially start thinking about the upgrade, what you need to do to prepare for the upgrade, issues & concerns to address before we start the upgrade, the actual upgrade, and then the verification and conversions afterward. A successful upgrade is one which the users don’t know you worked all weekend, and they don’t realize anything has changed until you start rolling out the new features and functions. Copyright iTech Solutions 2
  • 3. What we will cover… • Map, starting, and documentation • Analyze Object Conversion • Release Mapping • HMC, FSP, firmware, & IBM i • Models • Required PTFs, Resaves, and License Keys • Image Catalogue & Preparing • Right before the upgrade • The Upgrade • Verification • Conversions & Afterwards Copyright iTech Solutions 3
  • 4. What we will cover… • Map, starting, and documentation • Analyze Object Conversion • Release Mapping • HMC, FSP, firmware, & IBM i • Models • Required PTFs, Resaves, and License Keys • Image Catalogue & Preparing • Right before the upgrade • The Upgrade • Verification • Conversions & Afterwards Copyright iTech Solutions 4
  • 5. Introduction - MAP Copyright iTech Solutions 5
  • 6. Upgrade Map Copyright iTech Solutions 6
  • 7. What you need before you start • Have your Business Partner order V5R4 , 6.1, or 7.1 about 6 weeks before your planned upgrade date. • Can also download software. • License Keys. • Order PSP PTF V5R4: SF98540 V6R1: SF98610 V7R1: SF98710 • i5/OS V5R4 CDs, 6.1 & 7.1primarily on DVDs. • Manuals. • PTFs order about 2 weeks before the upgrade. • Save Media for backups • Approximately 6 hours of Dedicated system time. • Bottle of Tums (Optional) Copyright iTech Solutions 7
  • 8. V5R4: SC41-5120-09 V7R1: SC41-5120-11 V6R1: SC41-5120-10 8
  • 9. Manual – Memo to Users https://publib.boulder.ibm.com/infocenter/systems/topic/rzaq9/rzaq9.pdf Copyright iTech Solutions 9
  • 10. Example of a change in Memo to Users Copyright iTech Solutions 10
  • 11. What we will cover… • Map, starting, and documentation • Analyze Object Conversion • Release Mapping • HMC, FSP, firmware, & IBM i • Models • Required PTFs, Resaves, and License Keys • Image Catalogue & Preparing • Right before the upgrade • The Upgrade • Verification • Conversions & Afterwards Copyright iTech Solutions 11
  • 12. ANZOBJCVN • MOST IMPORTANT STEP GOING TO 6.1  2 Months before: Run ANZOBJCVN to see what issues you might have . • For V6R1, unique conversions will occur with programs in libraries, Java™ programs in directories, spooled files, and integrated file system names in files systems that are not case- sensitive. Before you upgrade to a new release, it is strongly recommended that you gather information about specific object types on your system. • Going from V5R4 to 7.1 (Skipping 6.1) requires you to perform this as well. Copyright iTech Solutions 12
  • 13. Verify 3rd Party Software Vendor Product Release Libraries Helpline Serial# Dependent Copyright iTech Solutions 13
  • 14. What we will cover… • Map, starting, and documentation • Analyze Object Conversion • Release Mapping • HMC, FSP, firmware, & IBM I • Models • Required PTFs, Resaves, and License Keys • Image Catalogue & Preparing • Right before the upgrade • The Upgrade • Verification • Conversions & Afterwards Copyright iTech Solutions 14
  • 15. Planning • Make sure you read both those manuals and understand the changes in the new release. • PTF for Latest issues • V5R4 – SF98540 • V6R1 – SF98610 • V7R1 - SF98710 Copyright iTech Solutions 15
  • 16. Valid Upgrade paths i5/OS V5R4 V5R2 V5R4M0 V5R4M5 V5R3 Copyright iTech Solutions 16
  • 17. Valid Upgrade paths IBM i 6.1 V5R3 6.1 or 6.1.1 V5R4 Copyright iTech Solutions 17
  • 18. Valid Upgrade paths IBM i 7.1 V5R4 7.1 6.1 Copyright iTech Solutions 18
  • 19. Release Support Copyright iTech Solutions 19
  • 20. Can Still Upgrade From V5R3 20
  • 21. Skipping a release • Going from V5R2 to V5R4 must read V5R3 install book • What if you are at V4R5 or V5R1 • What if you are at V4R3 or V4R4 • What if you are at V4R1 or V4R2 (get more tums) • Note: V5R3M5 of LIC uses V5R3M0 of i5/OS V5R4M5 of LIC uses V5R4M0 of i5/OS 6.1.1 of LIC uses 6.1 of IBM i Copyright iTech Solutions 21
  • 22. i5/OS, OS/400 support for Domino 22
  • 23. What we will cover… • Map, starting, and documentation • Analyze Object Conversion • Release Mapping • HMC, FSP, firmware, & IBM i • Models • Required PTFs, Resaves, and License Keys • Image Catalogue & Preparing • Right before the upgrade • The Upgrade • Verification • Conversions & Afterwards Copyright iTech Solutions 23
  • 25. i5/OS, FSP, & HMC i5/OS Linux i5/OS SLIC SLIC A B A B Power Hypervisor PHYP Flexible Service Processor (FSP) HMC 1 Flash Memory HMC 2 Perm Temp System Power Cont. Network (SPCN) Copyright iTech Solutions 25
  • 26. Order of Upgrades • Upgrade the HMC • Upgrade the FSP firmware • Upgrade i5/OS & LIC Copyright iTech Solutions 26
  • 27. Firmware Requirements (1 of 2) • V5R3M0 & V5R3M5 of i5/OS requires a minimum Firmware of:  Power 5 – No Minimum.  Power6 & Power7 Not supported. • V5R4M0  Power5 – SF235_160  Power6 & Power7 Not Supported. • V5R4M5  Power5 – SF235_160  Power6 – EM310_048, EL320_040, EH330_034  Power7 – Not Supported. Copyright iTech Solutions 27
  • 28. Firmware Requirements (2 of 2) • 6.1.0 of IBM i requires a minimum Firmware of:  Power5 - SF240_332  Power6 - EM320_040, EL320_040, EH330_034  Power7 - Not supported • 6.1.1  Power5 – SF240_332  Power6 – EM320_040, EL320_040, EH330_034  Power7 – AL710_043 • 7.1.0  Power5 – SF240_332  Power6 - EM320_040, EL320_040, EH330_034  Power7 – AL710_043 Copyright iTech Solutions 28
  • 29. HMC & FSP Code Combinations Power 7 Copyright iTech Solutions 29
  • 30. HMC & FSP Code Combinations Power 6 30
  • 31. HMC & FSP Code Combinations Power 5 31
  • 32. HMC & FSP Code Combinations Power 5 (Cont.) 32
  • 33. DSPFMWSTS: V5R4M5 and above Copyright iTech Solutions 33
  • 34. No HMC & V5R4M0 • STRSST and sign in • Select option 1 – Start Service tool • Option 4 - Display/Alter/Dump • Option 1 - Display/Alter Storage • Option 2 – Licensed Internal Code Data • Option 14 – Advanced Analysis • Select FLASHLEVELS press Enter Copyright iTech Solutions 34
  • 35. Select Flashlevels Copyright iTech Solutions 35
  • 36. Level & Update Policy Copyright iTech Solutions 36
  • 37. What we will cover… • Map, starting, and documentation • Analyze Object Conversion • Release Mapping • HMC, FSP, firmware, & IBM i • Models • Required PTFs, Resaves, and License Keys • Image Catalogue & Preparing • Right before the upgrade • The Upgrade • Verification • Conversions & Afterwards Copyright iTech Solutions 37
  • 38. This table indicates which releases of IBM i, i5/OS or OS/400 are supported by each of the Power and System i models. Supported Models Type Model V3 V3 V4 V4 V4 V4 V4 V5 V5 V5 V5 6.1 7.1 R6 R7 R1 R2 R3 R4 R5 R1 R2 R3 R4 9401 150 x x x x x x x x 9406 170 x x x x x x x 9406 250 x x x x 9406 270 x x x x x 9402 400 x x x x x x x x 9402 436 x x x x x x x 9406 500 x x x x x x x x 9402 40S x x x x x x x x 9406 50S x x x x x x x x 9406 510 x x x x x x x x 9407 515 x x x 9407-M15 Power 520 x1 x x 9405 520 x x x x 9406 520 x x x x 9408-M25 Power 520 x1 x x 9406 525 x x x 9406 530 x x x x x x x x 9406 53S x x x x x x x x 38
  • 39. http://www-947.ibm.com/systems/support/i/planning/upgrade/osmapping.html Type Model V3 V3 V4 V4 V4 V4 V4 V5 V5 V5 V5 6.1 7.1 R6 R7 R1 R2 R3 R4 R5 R1 R2 R3 R4 9406 600 x x x x x x x 9406 620 x x x x x x x 9406 640 x x x x x x x 9406 650 x x x x x x x 9406 720 x x x x x x 9406 730 x x x x x x 9406 740 x x x x x x 9406 800 x x x x 9406 810 x x x x 9406 820 x x x x x 9406 825 x x x x 9406 830 x x x x x 9406 840 x x x x x 9406 870 x x x x 9406 890 x x x x 9406 S10 x x x x x x x 9406 S20 x x x x x x x 9406 S30 x x x x x x x 9406 S40 x x x x x x x 9406 SB1 x x x x x x x 9406 SB2 x x x x x 9406 SB3 x x x x x 39
  • 40. Models Not supported at Release • V5R4: 150, 170, 250, 400, 40S, 436, 53S, 500, 510, 530, 50S, 600, 620, 640, 650, 720, 730, 740, S10, S20, S30, S40, SB1 • V6R1: 270, 820, 830, 840, SB2, SB3 or earlier members of the iSeries family. • V7R1: 800, 810, 825, 870, and 890. __________________________________________________________ • V7R1 is supported on POWER5 models 515, 520, 525, 550, 570, 595, POWER6 & POWER7 models. Copyright iTech Solutions 40
  • 41. SPD – Get Rid of it !! • Support of SPD I/O i5/OS V5R3 was the final release to support the attachment of SPD towers or SPD Migration Towers. Customers must complete the migration or conversion of I/O attached to their iSeries model 820, 830, or 840 via SPD towers or SPD Migration Towers before upgrading to V5R4. Any SPD I/O cards in these towers or older I/O devices which can only be attached to SPD cards must be replaced by newer I/O. SPD-attached PCI I/O towers #5065 or #5066 must be converted to the HSL-attached #5074 or #5079 PCI Expansion Towers or replaced with newer generation PCI-X towers such as #5094 or #5294. The PCI-X towers offer a higher speed HSL connection and the ability to support 15k rpm disk drives. Copyright iTech Solutions 41
  • 42. Load Source > 17GB Copyright iTech Solutions 42
  • 43. If Using Operations Console • Upgrade Operations console before the i5/OS upgrade using the CD/DVD Model Location iSeries Setup and Operations. 270 C07 • Correct Card location in CEC 800 or 810 C07 • Use Userid of 11111111 & password of 11111111 for connection of Ops 820 C06 Console during the upgrade 825 C06 830 or SB2 C02 • Direct attach NOT Supported in 7.1. 840 or SB3 C02 Convert to LAN Console before upgrade. 870 or 890 C02 Copyright iTech Solutions 43
  • 45. What we will cover… • Map, starting, and documentation • Analyze Object Conversion • Release Mapping • HMC, FSP, firmware, & IBM i • Models • Required PTFs, Resaves, and License Keys • Image Catalogue & Preparing • Right before the upgrade • The Upgrade • Verification • Conversions & Afterwards Copyright iTech Solutions 45
  • 46. Planning • Verify what you have received is all the software you require. • Already covered Server levels FSP Code • From V5R1, V5R2, & V5R3: Need to load the CD Prepare for install PTFs for V5R1, V5R2, and V5R3. • INSPTF LICPGM(*ALL) DEV(OPTxx) INSTYP(*IMMED) • Check to see if IPL is required. Copyright iTech Solutions 46
  • 47. Required PTFs before upgrading • Here is the PTF list for going to:  V5R3 APAR II14149  V5R4 APAR II14131  6.1 APAR II14310  7.1 APAR II14482 Copyright iTech Solutions 47
  • 48. SF98vrm – READ IT ! Copyright iTech Solutions 48
  • 49. CDs – ReSpin or ReSave • I_BASE_01 – Version Resave Identifier LIC Marker PTF (999) OS Marker PTF (SS1) RSE(LIC 7.1.0) / RS 710-10 RE12066 AP11067 (Has TR-4) RSH(LIC 6.1.1) / RS 610-10(XPF) RE62108 AP09202 RSG(LIC 6.1.0) / RS 610-10(XPF) RE09202 AP09202 RSG(LIC 5.4.0) / RS 540-30(XPF) RE08281 AP07100 RSF(LIC 5.4.5) / RS 540-30(XPF) RE59055 AP07100 RSF(LIC 5.3.5) / RS 530-10(XPF) RE57131 AP05202 http://www-947.ibm.com/systems/support/i/planning/resave/ DVD installation media for i 7.1 The DVD installation media is consolidated. Previously there were 51 sets of unique language version media. Now there are three sets of multiple language version media. Copyright iTech Solutions 49
  • 50. License Keys • No longer come printed with your order • Locate the Customer packing list from your software order to obtain:  Customer number  Software Order Copyright iTech Solutions 50
  • 52. Select License Keys you want Copyright iTech Solutions 52
  • 53. These are your Keys Copyright iTech Solutions 53
  • 54. Enter each Key Copyright iTech Solutions 54
  • 55. Confirmation on Key Copyright iTech Solutions 55
  • 56. What we will cover… • Map, starting, and documentation • Analyze Object Conversion • Release Mapping • HMC, FSP, firmware, & IBM i • Models • Required PTFs, Resaves, and License Keys • Image Catalogue & Preparing • Right before the upgrade • The Upgrade • Verification • Conversions & Afterwards Copyright iTech Solutions 56
  • 57. Lets start to Prepare: GO LICPGM Copyright iTech Solutions 57
  • 58. Prepare to Install Copyright iTech Solutions 58
  • 59. Increase License Internal code Copyright iTech Solutions 59
  • 60. Increase License Internal code Copyright iTech Solutions
  • 61. License Internal Code • An IPL MUST be done prior to the upgrade to increase this. • Increases Licensed Internal code area by 4GB • *** If coming from V5R2 (to V5R4) use the API QLPALCSP. • If on V5R3M5 you have enough space for V5R4 or V6R1 or V7R1. Copyright iTech Solutions 61
  • 62. Permanently Apply PTFs • APYPTF LICPGM(*ALL) APY(*PERM) DELAYED(*IMMDLY) IPLAPY(*YES) • Saves Space • Can’t have any PTFs set for apply when the upgrade starts. Copyright iTech Solutions 62
  • 63. Timezone Support • V5R2: CRTDTAARA QSYS/QWCTIMZON TYPE(*CHAR) LEN(16) Text(‘- 05:00QN0500EST’) • V5R3: WRKSYSVAL QTIMZON Copyright iTech Solutions 63
  • 64. Document these System Values • WRKSYSVAL  QSYSLIBL __________  QUSRLIBL __________  QALWOBJRST _____ (Needs to be *All)  QVFYOBJRST ______ (Max is 3)  QSTRUPPGM _______________ • Good time to look at your startup program. Copyright iTech Solutions 64
  • 65. Verify User Profiles & Cross Ref. Copyright iTech Solutions 65
  • 66. QSECOFR & Libraries • Make sure the QSECOFR profile:  Does not have a secondary language • All IBM Libraries are in the SYSTEM ASP. Copyright iTech Solutions 66
  • 67. Compress Job Tables *NONE Copyright iTech Solutions 67
  • 68. Arrange the media in this Order x will be 1 for • I_BASE_01 Americas & • B29xx_01 western Europe f/c • B29xx_02 5817 xx will be 24 for • B29MM_03 • B29MM_04 US English DVDs for 7.1 • D29xx_01 DVDs for 6.1 I_BASE_01 • D29xx_02 B_GROUPx_01 I_BASE_01 • D29xx_03 B_GROUPx_02 • D29xx_04 B29xx_01 • D29xx_05 B29xx_02 B_GROUPx_03 • D29xx_06 B_GROUPx_04 F29xx_01 • L29xx_01 • L29xx_02 B_GROUPx_05 • Any F29xx CDs to follow F_MULTI_NLV Copyright iTech Solutions F29xx 68
  • 69. Required PTFs Image Catalogues • Upgrading from V5R2M0 –  SI19886 & MF40360 • Upgrading from V5R3M0 –  SI28698, MF42598, MF43198 • Upgrading from V5R3M5 –  SI28698, MF42599, MF43355 • Upgrading from V5R4M0 –  SI35849, MF42600, MF43154, MF46264 • Upgrading from V5R4M5 –  SI35849, MF42601, MF43157, MF46288 • Upgrading from V6R1M0 –  SI39390, SI35186, SI35189, MF46292 • Upgrading from V6R1M1 –  SI39390, SI35186, SI35189 69
  • 70. Create Image Catalogue Copyright iTech Solutions 70
  • 71. Create Virtual Optical Copyright iTech Solutions 71
  • 72. Optical Devices Required Copyright iTech Solutions 72
  • 73. For Each CD in the Order we perform this Copyright iTech Solutions 73
  • 74. WRKIMGCLGE Copyright iTech Solutions 74
  • 75. Associate Virtual Optical to Catalogue Copyright iTech Solutions 75
  • 76. Optical Device loaded and Ready Copyright iTech Solutions 76
  • 77. Create List for what to upgrade Copyright iTech Solutions 77
  • 78. Build the list Copyright iTech Solutions 78
  • 79. Select LPPs Copyright iTech Solutions 79
  • 80. F11 – Additional Storage Copyright iTech Solutions 80
  • 81. F11 – Expected release Copyright iTech Solutions 81
  • 82. F11 – Expected Action Copyright iTech Solutions 82
  • 83. Our menu Copyright iTech Solutions 83
  • 84. Software to Delete Copyright iTech Solutions 84
  • 85. Software not found on Media Copyright iTech Solutions 85
  • 86. Software for Target release Copyright iTech Solutions 86
  • 87. Software Licenses Copyright iTech Solutions 87
  • 88. Accept Software Licenses Copyright iTech Solutions 88
  • 89. Everyone must display YES Copyright iTech Solutions 89
  • 90. Estimate Additional Storage Copyright iTech Solutions 90
  • 91. We have enough Disk space Copyright iTech Solutions 91
  • 92. Check Directory conversion V5R3 Copyright iTech Solutions 92
  • 93. Set Console Type Copyright iTech Solutions 93
  • 94. Select Console Copyright iTech Solutions 94
  • 95. Select YOUR console Copyright iTech Solutions 95
  • 96. ANZOBJCVN • Collect the data AGAIN and verify that there are NO programs on this report that you expect to run at 6.1 or 7.1 !!! Copyright iTech Solutions 96
  • 97. What we will cover… • Map, starting, and documentation • Analyze Object Conversion • Release Mapping • HMC, FSP, firmware, & IBM i • Models • Required PTFs, Resaves, and License Keys • Image Catalogue & Preparing • Right before the upgrade • The Upgrade • Verification • Conversions & Afterwards Copyright iTech Solutions 97
  • 98. If Using two-phase Commit Copyright iTech Solutions 98
  • 99. No Commitment Definitions Copyright iTech Solutions 99
  • 100. Most important Step – FULL SAVE Copyright iTech Solutions 100
  • 101. Verify for Upgrade Copyright iTech Solutions 101
  • 102. Verified Copyright iTech Solutions 102
  • 103. What we will cover… • Map, starting, and documentation • Analyze Object Conversion • Release Mapping • HMC, FSP, firmware, & IBM I • Models • Required PTFs, Resaves, and License Keys • Image Catalogue & Preparing • Right before the upgrade • The Upgrade • Verification • Conversions & Afterwards Copyright iTech Solutions 103
  • 104. Start the Upgrade Copyright iTech Solutions 104
  • 105. Sit back and relax while Image Catalogues do the work Copyright iTech Solutions 105
  • 106. Next on the console Install Licensed Internal Code - Status Install of the Licensed Internal Code in progress. +-------------------------------------------------------+ Percent | XX % | Complete +-------------------------------------------------------+ Elapsed time in minutes . . . . . . . . : x.x Copyright iTech Solutions 106
  • 107. IBM i being installed Message ID. . . : CPI2070 i5/OS Installation Status +---------------------------------------------------+ Stage 2 | XX % | +---------------------------------------------------+ Installation Objects Stage Completed Restored 1 Creating needed profiles and libraries . . . . : X >> 2 Restoring programs to library QSYS . . . . . . : XXXXX 3 Restoring language objects to library QSYS . . : 4 Updating program table . . . . . . . . . . . . : 5 Installing database files. . . . . . . . . . . : 6 Installing base directory objects . . . . . . : 7 Completing installation . . . . . . . . : i5/OS is a trademark of IBM in the United States and other countries. Copyright iTech Solutions 107
  • 108. Installing Licensed Programs Copyright iTech Solutions 108
  • 109. What we will cover… • Map, starting, and documentation • Analyze Object Conversion • Release Mapping • HMC, FSP, firmware, & IBM I • Models • Required PTFs, Resaves, and License Keys • Image Catalogue & Preparing • Right before the upgrade • The Upgrade • Verification • Conversions & Afterwards Copyright iTech Solutions 109
  • 110. When Complete Check Copyright iTech Solutions 110
  • 111. Verify Install Copyright iTech Solutions 111
  • 112. Automatic Installation completed Copyright iTech Solutions 112
  • 113. Verify • Check messages in QSYSOPR • Should not see any license Key messages • Display LICPGM everything at right release • Load the PTF (Cumulative, Groups, DB) & then IPL Copyright iTech Solutions 113
  • 114. Multiple IPLs possible Copyright iTech Solutions 114
  • 115. INZSYS Started after First IPL Copyright iTech Solutions 115
  • 116. INZSYS Completed Copyright iTech Solutions 116
  • 117. What we will cover… • Map, starting, and documentation • Analyze Object Conversion • Release Mapping • HMC, FSP, firmware, & IBM I • Models • Required PTFs, Resaves, and License Keys • Image Catalogue & Preparing • Right before the upgrade • The Upgrade • Verification • Conversions & Afterwards Copyright iTech Solutions 117
  • 118. Afterwards • Update System Values that you changed. • CFGACCWEB2 • Enable Service Director • Check PM400 • Performance Data • Delete Image Catalogues • Test SNDPTFORD & SNDSRVRQS • Cleanup PTF Groups WRKPTFGRP • Update Client Access Clients • Update iSeries Integrated Windows Servers Copyright iTech Solutions 118
  • 119. Conversions • V6R1 – ALL PROGRAMS Copyright iTech Solutions 119
  • 120. Conversions • V5R4  Data Queues  User Queues  *FILES  SQLPGMs Copyright iTech Solutions 120
  • 121. SAVE – New starting point • Full Save if have the time • Otherwise (GO SAVE 22)  SAVSYS  SAVLIB *IBM  SAV ('/QIBM/ProdData') + ('/QOpenSys/QIBM/ProdData')) Copyright iTech Solutions 121
  • 122. 7 Key Points to take home • ANZOBJCVN, ANZOBJCVN, ANZOBJCVN !!! • Get the required PTFs on your system before the upgrade. • Check FSP Firmware minimum levels. • Have a Good FULL Backup right before the upgrade. • Have license keys and new PTFs available. • Conversions need to complete afterwards. • SAVE 22 or Full save after the conversions. Copyright iTech Solutions 122
  • 123. Your Turn! How to contact me: Pete Massiello Email: pmassiello@itechsol.com Twitter: petem59