SlideShare a Scribd company logo
6.1.2005
1
	
  
	
  
Kimberley Process Working Group on Monitoring
Informal working paper
Ad-hoc sub-group on alluvial diamond production
– proposed structure and main objectives –
1.The mandate
The 2004 Ottawa Plenary meeting of the Kimberley Process, in two sessions devoted
specifically to ‘capacity-building for Kimberley Process implementation’ and ‘development
diamonds’, considered the specific challenges facing alluvial diamond producing countries in
putting in place systems of traceability and control of diamond production and maximizing
the development potential of their diamond sectors. As a result of this discussion, Plenary
decided to mandate the Working Group on Monitoring to establish an ad-hoc sub-group to
address the challenges facing alluvial producers and promote the exchange of best practices; it
was understood in this context that the work of such a sub-group should be seen as part of the
wider efforts of the Kimberley Process to ensure effective internal controls and should be
fully consistent with the peer review system of the Kimberley Process (both of which fall
within the remit of the Working Group on Monitoring). It was decided that membership of the
sub-group should be drawn primarily from alluvial diamond-producing countries. It was
further decided that the ad-hoc sub-group should report back to the 2005 Plenary meeting
through the Chair of the Working Group on Monitoring.
2.Main outputs to be delivered by the sub-group
In accordance with the mandate from Plenary, the sub-group should present a report to the
2005 Plenary. Such a report could comprise the following main elements:
• A ‘stock-taking’ of the challenges facing alluvial producers with regard to
o Traceability of rough diamonds from mine to first export
o Licensing and effective supervision of artisanal miners
o Licensing and effective supervision of traders (such as négociants) and buying
offices
o Tax differentials and other incentives for cross-border smuggling
o Specific challenges facing different regions of production (with particular
reference to Central Africa, West Africa, and Latin America)
• An inventory of best practices, with particular regard to
o Existing efforts to ensure full traceability of production from mine to first
export
o Existing legal frameworks and systems for licensing of miners
o Existing legal frameworks and systems for licensing of traders (such as
négociants) and buying offices
o Comprehensive systems for assisting and supervising small-scale mining
• Recommendations and guidelines, with particular regard to
o Enhancing traceability of artisanal production at the national level
6.1.2005
2
	
  
	
  
o Enhancing interaction between relevant institutions and instruments at the
national level
o Enhancing interaction between relevant institutions at the regional level
• An overview of possible types of external technical assistance to support alluvial
diamond producers, with particular regard to
o Supporting national efforts to improve traceability of artisanal production
o Supporting national efforts to bring artisanal miners into the formal sector, and
to improve the technical capacity of small-scale mining
o Supporting national efforts to improve the coverage and effectiveness of land
registries
o Supporting efforts at the regional level to combat illicit trafficking of rough
diamonds
3.Composition and structure of the sub-group
3.1. Composition
The mandate from Plenary provides that membership of the sub-group should be drawn
primarily from alluvial diamond-producing countries. It is therefore proposed that the sub-
group should be open to all alluvial diamond-producing Participants in the KPCS.
As a first indication, the sub-group could thus comprise the following alluvial producers as
members:
- Angola
- Brazil
- Central African Republic
- Democratic Republic of Congo
- Côte d’Ivoire
- Ghana
- Guinea
- Guyana
- Namibia
- Sierra Leone
- South Africa
- Tanzania
- Togo
- Venezuela
The Chair and Vice-Chair of the Kimberley Process and the Chair of the Working Group on
Monitoring would be ex-officio members of the sub-group. The sub-group should also be
open to any members of the Working Group on Monitoring who wish to participate in its
deliberations. It would moreover comprise representatives of industry and civil society. The
Chair of the Working Group of Diamond Experts would be invited to participate in the sub-
group’s work. Moreover, the sub-group could invite representatives of bilateral and
multilateral donor organizations (including the international financial institutions) to
participate in its discussions as appropriate. It is understood that the major diamond trading
6.1.2005
3
	
  
	
  
Participants could also be invited to provide substantive input into the work of the sub-group
where appropriate.
3.2. Structure
The sub-group will report to the Working Group on Monitoring, and will report to Plenary
through its Chair, but should work as autonomously as possible within its mandate. The
substantive work of the sub-group will be coordinated by three Coordinators to be chosen
through consultations by the Chair of the Working Group on Monitoring; all major alluvial
diamond-producing regions should be represented among these Coordinators. The
Coordinators will be responsible for collecting relevant experiences and best practices,
including those specific to their regions, and for bringing these to the attention of the sub-
group as a whole. They will also be responsible for drafting the report that is to be presented
to the 2005 Plenary.
4.Working methods
The working methods of the sub-group should be adapted to its practical, results-oriented
mandate, which is focussed on the presentation of a report to Plenary and on the operational
exchange of best practices between alluvial diamond producing countries. Specifically, the
sub-group could use a combination of the following working methods to accomplish its
objectives:
• Discussion by electronic correspondence
• Occasional teleconferences to discuss strategic objectives and review progress
• Meetings hosted by one of the members of the sub-group, if considered
necessary
The Working Group should draw extensively on relevant work already accomplished in the
Kimberley Process, notably in the context of the peer review process; in this regard, it should
notably take into account annual reports and reports of review visits and missions.
The full Working Group on Monitoring would be kept informed of the sub-group’s
deliberations throughout. The sub-group could also provide occasional updates on its work to
Plenary through the Chair of the Kimberley Process.
5.Tentative work-plan
The following could serve as an indicative schedule for the timeframe in which the sub-group
could carry out its work:
• By 31 December 2004: finalize composition of sub-group and agree on basic
structure and objectives
• January 2005: convene first teleconference of entire sub-group and agree on
specific objectives and work-plan
• January-May 2005: conduct fact-finding work at the regional level to identify
challenges, best practices and technical assistance needs
6.1.2005
4
	
  
	
  
• June-July 2005: discussion of findings
• August-September 2005: compile final report and draft recommendations
• October 2005: present report to Plenary

More Related Content

Similar to 2005 WGAAP informal paper ad hoc sub-group on alluvial diamond production- - proposed structure and main objextives -

2016 Final Communiqué - the Kimberley Process Plenary Meeting 17 November
2016 Final Communiqué - the Kimberley Process Plenary Meeting 17 November 2016 Final Communiqué - the Kimberley Process Plenary Meeting 17 November
2016 Final Communiqué - the Kimberley Process Plenary Meeting 17 November
Dr Lendy Spires
 
2016 Final Communiqué - the Kimberley Process Plenary Meeting 17 November
2016 Final Communiqué - the Kimberley Process Plenary Meeting 17 November 2016 Final Communiqué - the Kimberley Process Plenary Meeting 17 November
2016 Final Communiqué - the Kimberley Process Plenary Meeting 17 November
Dr Lendy Spires
 
2014 Draft tor WGDE November Final
2014 Draft tor WGDE November Final2014 Draft tor WGDE November Final
2014 Draft tor WGDE November Final
Dr Lendy Spires
 
OECD-Day3-3TGKigali2013
OECD-Day3-3TGKigali2013OECD-Day3-3TGKigali2013
2015 Final communique plenary Angola
2015 Final communique plenary Angola2015 Final communique plenary Angola
2015 Final communique plenary Angola
Dr Lendy Spires
 
2015 Final Communique Plenary Luanda Angola eng
2015 Final Communique Plenary Luanda Angola eng2015 Final Communique Plenary Luanda Angola eng
2015 Final Communique Plenary Luanda Angola eng
Dr Lendy Spires
 
2010 Administrative Decision Cooperation Enhancement with the WCO
2010 Administrative Decision Cooperation Enhancement with the WCO2010 Administrative Decision Cooperation Enhancement with the WCO
2010 Administrative Decision Cooperation Enhancement with the WCO
Dr Lendy Spires
 
2004 Final Communique Meeting Gatineau (Canada)
2004 Final Communique Meeting Gatineau (Canada)2004 Final Communique Meeting Gatineau (Canada)
2004 Final Communique Meeting Gatineau (Canada)
Africa Diamonds
 
2012 Plenary Washington Plenary Communique
2012 Plenary Washington Plenary Communique2012 Plenary Washington Plenary Communique
2012 Plenary Washington Plenary Communique
Dr Lendy Spires
 
2012 Final Communique Plenary Washington
2012 Final Communique Plenary Washington2012 Final Communique Plenary Washington
2012 Final Communique Plenary Washington
Dr Lendy Spires
 
2013 Johannesburg plenary communique
2013 Johannesburg plenary communique 2013 Johannesburg plenary communique
2013 Johannesburg plenary communique
Africa Diamonds
 
2008 Final Communique New Delhi
2008 Final Communique New Delhi2008 Final Communique New Delhi
2008 Final Communique New Delhi
Dr Lendy Spires
 
2011 Final Communique Plenary Kinshasa
2011 Final Communique Plenary Kinshasa2011 Final Communique Plenary Kinshasa
2011 Final Communique Plenary Kinshasa
Dr Lendy Spires
 
2007 Kimberley Process Working Group on Statistics TOR
2007 Kimberley Process Working Group on Statistics TOR2007 Kimberley Process Working Group on Statistics TOR
2007 Kimberley Process Working Group on Statistics TOR
Dr Lendy Spires
 
2014 02 12 Short Report WGM Teleconference v1
2014 02 12 Short Report WGM Teleconference v12014 02 12 Short Report WGM Teleconference v1
2014 02 12 Short Report WGM Teleconference v1
Dr Lendy Spires
 
2013 Opening Plenary Minister Susan Shabangu Public
2013 Opening Plenary Minister Susan Shabangu Public2013 Opening Plenary Minister Susan Shabangu Public
2013 Opening Plenary Minister Susan Shabangu Public
Dr Lendy Spires
 
2014 Guangzhou plenary communique final
2014 Guangzhou plenary communique final2014 Guangzhou plenary communique final
2014 Guangzhou plenary communique final
Africa Diamonds
 
Communication Workshop in Lesotho Presented by Rose Mwebaza
 Communication Workshop in Lesotho Presented by Rose Mwebaza Communication Workshop in Lesotho Presented by Rose Mwebaza
Communication Workshop in Lesotho Presented by Rose Mwebaza
African Minerals Development Centre
 
2017 Kimberley Process Communique, 9-14 December 2017, Brisbane
2017 Kimberley Process Communique, 9-14 December 2017, Brisbane2017 Kimberley Process Communique, 9-14 December 2017, Brisbane
2017 Kimberley Process Communique, 9-14 December 2017, Brisbane
Dr Lendy Spires
 
2017 Kimberley Process Communique, 9-14 December 2017, Brisbane, Australia
2017 Kimberley Process Communique, 9-14 December 2017, Brisbane, Australia2017 Kimberley Process Communique, 9-14 December 2017, Brisbane, Australia
2017 Kimberley Process Communique, 9-14 December 2017, Brisbane, Australia
Dr Lendy Spires
 

Similar to 2005 WGAAP informal paper ad hoc sub-group on alluvial diamond production- - proposed structure and main objextives - (20)

2016 Final Communiqué - the Kimberley Process Plenary Meeting 17 November
2016 Final Communiqué - the Kimberley Process Plenary Meeting 17 November 2016 Final Communiqué - the Kimberley Process Plenary Meeting 17 November
2016 Final Communiqué - the Kimberley Process Plenary Meeting 17 November
 
2016 Final Communiqué - the Kimberley Process Plenary Meeting 17 November
2016 Final Communiqué - the Kimberley Process Plenary Meeting 17 November 2016 Final Communiqué - the Kimberley Process Plenary Meeting 17 November
2016 Final Communiqué - the Kimberley Process Plenary Meeting 17 November
 
2014 Draft tor WGDE November Final
2014 Draft tor WGDE November Final2014 Draft tor WGDE November Final
2014 Draft tor WGDE November Final
 
OECD-Day3-3TGKigali2013
OECD-Day3-3TGKigali2013OECD-Day3-3TGKigali2013
OECD-Day3-3TGKigali2013
 
2015 Final communique plenary Angola
2015 Final communique plenary Angola2015 Final communique plenary Angola
2015 Final communique plenary Angola
 
2015 Final Communique Plenary Luanda Angola eng
2015 Final Communique Plenary Luanda Angola eng2015 Final Communique Plenary Luanda Angola eng
2015 Final Communique Plenary Luanda Angola eng
 
2010 Administrative Decision Cooperation Enhancement with the WCO
2010 Administrative Decision Cooperation Enhancement with the WCO2010 Administrative Decision Cooperation Enhancement with the WCO
2010 Administrative Decision Cooperation Enhancement with the WCO
 
2004 Final Communique Meeting Gatineau (Canada)
2004 Final Communique Meeting Gatineau (Canada)2004 Final Communique Meeting Gatineau (Canada)
2004 Final Communique Meeting Gatineau (Canada)
 
2012 Plenary Washington Plenary Communique
2012 Plenary Washington Plenary Communique2012 Plenary Washington Plenary Communique
2012 Plenary Washington Plenary Communique
 
2012 Final Communique Plenary Washington
2012 Final Communique Plenary Washington2012 Final Communique Plenary Washington
2012 Final Communique Plenary Washington
 
2013 Johannesburg plenary communique
2013 Johannesburg plenary communique 2013 Johannesburg plenary communique
2013 Johannesburg plenary communique
 
2008 Final Communique New Delhi
2008 Final Communique New Delhi2008 Final Communique New Delhi
2008 Final Communique New Delhi
 
2011 Final Communique Plenary Kinshasa
2011 Final Communique Plenary Kinshasa2011 Final Communique Plenary Kinshasa
2011 Final Communique Plenary Kinshasa
 
2007 Kimberley Process Working Group on Statistics TOR
2007 Kimberley Process Working Group on Statistics TOR2007 Kimberley Process Working Group on Statistics TOR
2007 Kimberley Process Working Group on Statistics TOR
 
2014 02 12 Short Report WGM Teleconference v1
2014 02 12 Short Report WGM Teleconference v12014 02 12 Short Report WGM Teleconference v1
2014 02 12 Short Report WGM Teleconference v1
 
2013 Opening Plenary Minister Susan Shabangu Public
2013 Opening Plenary Minister Susan Shabangu Public2013 Opening Plenary Minister Susan Shabangu Public
2013 Opening Plenary Minister Susan Shabangu Public
 
2014 Guangzhou plenary communique final
2014 Guangzhou plenary communique final2014 Guangzhou plenary communique final
2014 Guangzhou plenary communique final
 
Communication Workshop in Lesotho Presented by Rose Mwebaza
 Communication Workshop in Lesotho Presented by Rose Mwebaza Communication Workshop in Lesotho Presented by Rose Mwebaza
Communication Workshop in Lesotho Presented by Rose Mwebaza
 
2017 Kimberley Process Communique, 9-14 December 2017, Brisbane
2017 Kimberley Process Communique, 9-14 December 2017, Brisbane2017 Kimberley Process Communique, 9-14 December 2017, Brisbane
2017 Kimberley Process Communique, 9-14 December 2017, Brisbane
 
2017 Kimberley Process Communique, 9-14 December 2017, Brisbane, Australia
2017 Kimberley Process Communique, 9-14 December 2017, Brisbane, Australia2017 Kimberley Process Communique, 9-14 December 2017, Brisbane, Australia
2017 Kimberley Process Communique, 9-14 December 2017, Brisbane, Australia
 

Recently uploaded

PPT Item # 8 - Tuxedo Columbine 3way Stop
PPT Item # 8 - Tuxedo Columbine 3way StopPPT Item # 8 - Tuxedo Columbine 3way Stop
PPT Item # 8 - Tuxedo Columbine 3way Stop
ahcitycouncil
 
ZGB - The Role of Generative AI in Government transformation.pdf
ZGB - The Role of Generative AI in Government transformation.pdfZGB - The Role of Generative AI in Government transformation.pdf
ZGB - The Role of Generative AI in Government transformation.pdf
Saeed Al Dhaheri
 
MHM Roundtable Slide Deck WHA Side-event May 28 2024.pptx
MHM Roundtable Slide Deck WHA Side-event May 28 2024.pptxMHM Roundtable Slide Deck WHA Side-event May 28 2024.pptx
MHM Roundtable Slide Deck WHA Side-event May 28 2024.pptx
ILC- UK
 
Many ways to support street children.pptx
Many ways to support street children.pptxMany ways to support street children.pptx
Many ways to support street children.pptx
SERUDS INDIA
 
Russian anarchist and anti-war movement in the third year of full-scale war
Russian anarchist and anti-war movement in the third year of full-scale warRussian anarchist and anti-war movement in the third year of full-scale war
Russian anarchist and anti-war movement in the third year of full-scale war
Antti Rautiainen
 
快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样
快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样
快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样
850fcj96
 
PPT Item # 5 - 5330 Broadway ARB Case # 930F
PPT Item # 5 - 5330 Broadway ARB Case # 930FPPT Item # 5 - 5330 Broadway ARB Case # 930F
PPT Item # 5 - 5330 Broadway ARB Case # 930F
ahcitycouncil
 
一比一原版(WSU毕业证)西悉尼大学毕业证成绩单
一比一原版(WSU毕业证)西悉尼大学毕业证成绩单一比一原版(WSU毕业证)西悉尼大学毕业证成绩单
一比一原版(WSU毕业证)西悉尼大学毕业证成绩单
evkovas
 
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdfPNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
ClaudioTebaldi2
 
一比一原版(UOW毕业证)伍伦贡大学毕业证成绩单
一比一原版(UOW毕业证)伍伦贡大学毕业证成绩单一比一原版(UOW毕业证)伍伦贡大学毕业证成绩单
一比一原版(UOW毕业证)伍伦贡大学毕业证成绩单
ehbuaw
 
What is the point of small housing associations.pptx
What is the point of small housing associations.pptxWhat is the point of small housing associations.pptx
What is the point of small housing associations.pptx
Paul Smith
 
Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...
Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...
Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...
Congressional Budget Office
 
一比一原版(UQ毕业证)昆士兰大学毕业证成绩单
一比一原版(UQ毕业证)昆士兰大学毕业证成绩单一比一原版(UQ毕业证)昆士兰大学毕业证成绩单
一比一原版(UQ毕业证)昆士兰大学毕业证成绩单
ehbuaw
 
PD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptx
PD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptxPD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptx
PD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptx
RIDPRO11
 
Get Government Grants and Assistance Program
Get Government Grants and Assistance ProgramGet Government Grants and Assistance Program
Get Government Grants and Assistance Program
Get Government Grants
 
NHAI_Under_Implementation_01-05-2024.pdf
NHAI_Under_Implementation_01-05-2024.pdfNHAI_Under_Implementation_01-05-2024.pdf
NHAI_Under_Implementation_01-05-2024.pdf
AjayVejendla3
 
The Role of a Process Server in real estate
The Role of a Process Server in real estateThe Role of a Process Server in real estate
The Role of a Process Server in real estate
oklahomajudicialproc1
 
一比一原版(Adelaide毕业证)阿德莱德大学毕业证成绩单
一比一原版(Adelaide毕业证)阿德莱德大学毕业证成绩单一比一原版(Adelaide毕业证)阿德莱德大学毕业证成绩单
一比一原版(Adelaide毕业证)阿德莱德大学毕业证成绩单
ehbuaw
 
PPT Item # 9 - 2024 Street Maintenance Program(SMP) Amendment
PPT Item # 9 - 2024 Street Maintenance Program(SMP) AmendmentPPT Item # 9 - 2024 Street Maintenance Program(SMP) Amendment
PPT Item # 9 - 2024 Street Maintenance Program(SMP) Amendment
ahcitycouncil
 
如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样
如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样
如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样
850fcj96
 

Recently uploaded (20)

PPT Item # 8 - Tuxedo Columbine 3way Stop
PPT Item # 8 - Tuxedo Columbine 3way StopPPT Item # 8 - Tuxedo Columbine 3way Stop
PPT Item # 8 - Tuxedo Columbine 3way Stop
 
ZGB - The Role of Generative AI in Government transformation.pdf
ZGB - The Role of Generative AI in Government transformation.pdfZGB - The Role of Generative AI in Government transformation.pdf
ZGB - The Role of Generative AI in Government transformation.pdf
 
MHM Roundtable Slide Deck WHA Side-event May 28 2024.pptx
MHM Roundtable Slide Deck WHA Side-event May 28 2024.pptxMHM Roundtable Slide Deck WHA Side-event May 28 2024.pptx
MHM Roundtable Slide Deck WHA Side-event May 28 2024.pptx
 
Many ways to support street children.pptx
Many ways to support street children.pptxMany ways to support street children.pptx
Many ways to support street children.pptx
 
Russian anarchist and anti-war movement in the third year of full-scale war
Russian anarchist and anti-war movement in the third year of full-scale warRussian anarchist and anti-war movement in the third year of full-scale war
Russian anarchist and anti-war movement in the third year of full-scale war
 
快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样
快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样
快速制作(ocad毕业证书)加拿大安大略艺术设计学院毕业证本科学历雅思成绩单原版一模一样
 
PPT Item # 5 - 5330 Broadway ARB Case # 930F
PPT Item # 5 - 5330 Broadway ARB Case # 930FPPT Item # 5 - 5330 Broadway ARB Case # 930F
PPT Item # 5 - 5330 Broadway ARB Case # 930F
 
一比一原版(WSU毕业证)西悉尼大学毕业证成绩单
一比一原版(WSU毕业证)西悉尼大学毕业证成绩单一比一原版(WSU毕业证)西悉尼大学毕业证成绩单
一比一原版(WSU毕业证)西悉尼大学毕业证成绩单
 
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdfPNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
PNRR MADRID GREENTECH FOR BROWN NETWORKS NETWORKS MUR_MUSA_TEBALDI.pdf
 
一比一原版(UOW毕业证)伍伦贡大学毕业证成绩单
一比一原版(UOW毕业证)伍伦贡大学毕业证成绩单一比一原版(UOW毕业证)伍伦贡大学毕业证成绩单
一比一原版(UOW毕业证)伍伦贡大学毕业证成绩单
 
What is the point of small housing associations.pptx
What is the point of small housing associations.pptxWhat is the point of small housing associations.pptx
What is the point of small housing associations.pptx
 
Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...
Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...
Effects of Extreme Temperatures From Climate Change on the Medicare Populatio...
 
一比一原版(UQ毕业证)昆士兰大学毕业证成绩单
一比一原版(UQ毕业证)昆士兰大学毕业证成绩单一比一原版(UQ毕业证)昆士兰大学毕业证成绩单
一比一原版(UQ毕业证)昆士兰大学毕业证成绩单
 
PD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptx
PD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptxPD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptx
PD-1602-as-amended-by-RA-9287-Anti-Illegal-Gambling-Law.pptx
 
Get Government Grants and Assistance Program
Get Government Grants and Assistance ProgramGet Government Grants and Assistance Program
Get Government Grants and Assistance Program
 
NHAI_Under_Implementation_01-05-2024.pdf
NHAI_Under_Implementation_01-05-2024.pdfNHAI_Under_Implementation_01-05-2024.pdf
NHAI_Under_Implementation_01-05-2024.pdf
 
The Role of a Process Server in real estate
The Role of a Process Server in real estateThe Role of a Process Server in real estate
The Role of a Process Server in real estate
 
一比一原版(Adelaide毕业证)阿德莱德大学毕业证成绩单
一比一原版(Adelaide毕业证)阿德莱德大学毕业证成绩单一比一原版(Adelaide毕业证)阿德莱德大学毕业证成绩单
一比一原版(Adelaide毕业证)阿德莱德大学毕业证成绩单
 
PPT Item # 9 - 2024 Street Maintenance Program(SMP) Amendment
PPT Item # 9 - 2024 Street Maintenance Program(SMP) AmendmentPPT Item # 9 - 2024 Street Maintenance Program(SMP) Amendment
PPT Item # 9 - 2024 Street Maintenance Program(SMP) Amendment
 
如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样
如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样
如何办理(uoit毕业证书)加拿大安大略理工大学毕业证文凭证书录取通知原版一模一样
 

2005 WGAAP informal paper ad hoc sub-group on alluvial diamond production- - proposed structure and main objextives -

  • 1. 6.1.2005 1     Kimberley Process Working Group on Monitoring Informal working paper Ad-hoc sub-group on alluvial diamond production – proposed structure and main objectives – 1.The mandate The 2004 Ottawa Plenary meeting of the Kimberley Process, in two sessions devoted specifically to ‘capacity-building for Kimberley Process implementation’ and ‘development diamonds’, considered the specific challenges facing alluvial diamond producing countries in putting in place systems of traceability and control of diamond production and maximizing the development potential of their diamond sectors. As a result of this discussion, Plenary decided to mandate the Working Group on Monitoring to establish an ad-hoc sub-group to address the challenges facing alluvial producers and promote the exchange of best practices; it was understood in this context that the work of such a sub-group should be seen as part of the wider efforts of the Kimberley Process to ensure effective internal controls and should be fully consistent with the peer review system of the Kimberley Process (both of which fall within the remit of the Working Group on Monitoring). It was decided that membership of the sub-group should be drawn primarily from alluvial diamond-producing countries. It was further decided that the ad-hoc sub-group should report back to the 2005 Plenary meeting through the Chair of the Working Group on Monitoring. 2.Main outputs to be delivered by the sub-group In accordance with the mandate from Plenary, the sub-group should present a report to the 2005 Plenary. Such a report could comprise the following main elements: • A ‘stock-taking’ of the challenges facing alluvial producers with regard to o Traceability of rough diamonds from mine to first export o Licensing and effective supervision of artisanal miners o Licensing and effective supervision of traders (such as négociants) and buying offices o Tax differentials and other incentives for cross-border smuggling o Specific challenges facing different regions of production (with particular reference to Central Africa, West Africa, and Latin America) • An inventory of best practices, with particular regard to o Existing efforts to ensure full traceability of production from mine to first export o Existing legal frameworks and systems for licensing of miners o Existing legal frameworks and systems for licensing of traders (such as négociants) and buying offices o Comprehensive systems for assisting and supervising small-scale mining • Recommendations and guidelines, with particular regard to o Enhancing traceability of artisanal production at the national level
  • 2. 6.1.2005 2     o Enhancing interaction between relevant institutions and instruments at the national level o Enhancing interaction between relevant institutions at the regional level • An overview of possible types of external technical assistance to support alluvial diamond producers, with particular regard to o Supporting national efforts to improve traceability of artisanal production o Supporting national efforts to bring artisanal miners into the formal sector, and to improve the technical capacity of small-scale mining o Supporting national efforts to improve the coverage and effectiveness of land registries o Supporting efforts at the regional level to combat illicit trafficking of rough diamonds 3.Composition and structure of the sub-group 3.1. Composition The mandate from Plenary provides that membership of the sub-group should be drawn primarily from alluvial diamond-producing countries. It is therefore proposed that the sub- group should be open to all alluvial diamond-producing Participants in the KPCS. As a first indication, the sub-group could thus comprise the following alluvial producers as members: - Angola - Brazil - Central African Republic - Democratic Republic of Congo - Côte d’Ivoire - Ghana - Guinea - Guyana - Namibia - Sierra Leone - South Africa - Tanzania - Togo - Venezuela The Chair and Vice-Chair of the Kimberley Process and the Chair of the Working Group on Monitoring would be ex-officio members of the sub-group. The sub-group should also be open to any members of the Working Group on Monitoring who wish to participate in its deliberations. It would moreover comprise representatives of industry and civil society. The Chair of the Working Group of Diamond Experts would be invited to participate in the sub- group’s work. Moreover, the sub-group could invite representatives of bilateral and multilateral donor organizations (including the international financial institutions) to participate in its discussions as appropriate. It is understood that the major diamond trading
  • 3. 6.1.2005 3     Participants could also be invited to provide substantive input into the work of the sub-group where appropriate. 3.2. Structure The sub-group will report to the Working Group on Monitoring, and will report to Plenary through its Chair, but should work as autonomously as possible within its mandate. The substantive work of the sub-group will be coordinated by three Coordinators to be chosen through consultations by the Chair of the Working Group on Monitoring; all major alluvial diamond-producing regions should be represented among these Coordinators. The Coordinators will be responsible for collecting relevant experiences and best practices, including those specific to their regions, and for bringing these to the attention of the sub- group as a whole. They will also be responsible for drafting the report that is to be presented to the 2005 Plenary. 4.Working methods The working methods of the sub-group should be adapted to its practical, results-oriented mandate, which is focussed on the presentation of a report to Plenary and on the operational exchange of best practices between alluvial diamond producing countries. Specifically, the sub-group could use a combination of the following working methods to accomplish its objectives: • Discussion by electronic correspondence • Occasional teleconferences to discuss strategic objectives and review progress • Meetings hosted by one of the members of the sub-group, if considered necessary The Working Group should draw extensively on relevant work already accomplished in the Kimberley Process, notably in the context of the peer review process; in this regard, it should notably take into account annual reports and reports of review visits and missions. The full Working Group on Monitoring would be kept informed of the sub-group’s deliberations throughout. The sub-group could also provide occasional updates on its work to Plenary through the Chair of the Kimberley Process. 5.Tentative work-plan The following could serve as an indicative schedule for the timeframe in which the sub-group could carry out its work: • By 31 December 2004: finalize composition of sub-group and agree on basic structure and objectives • January 2005: convene first teleconference of entire sub-group and agree on specific objectives and work-plan • January-May 2005: conduct fact-finding work at the regional level to identify challenges, best practices and technical assistance needs
  • 4. 6.1.2005 4     • June-July 2005: discussion of findings • August-September 2005: compile final report and draft recommendations • October 2005: present report to Plenary