SlideShare a Scribd company logo
DUCK LAST
 GROUP 7
WIND VANE
Table the component.
part name       vane            circuit          Socket Battery
part            As the air to s Include          It is A slot
description     pin the motor. A motor ,         Battery holder.
                                                 And locked
                                Battery          to the
                                holder, diodes   motorcycle.
Material        Plastic         Plastic, Mild    steel
                                Steel ,Copper
manufacturing       -           Assembly         Cutting,welding
process                                          ,drilling
quantity      1 piece           1 piece of       1 piece
                                each
Cost (Bath)     15              69               5
Total Cost 89 Bath
The number of hours spent in each
     manufacturing process.

   •   Cutting Process 5 minutes
   •   Welding Process 15 minutes
   •   Drilling Process 10 minutes
   •   Assembly Process 1 hour
Provide difficulties and problems
   encountered during the prototype
             development.

• Difficult to install the product on motorcycle.

• Find steel pipe has to be difficult.
The solutions for second prototype
 • Search studies of various devices. Available
   in the market. Then edit with my product.

 • The piece is then applied. Then re-use.
Thank You

More Related Content

Viewers also liked

Final project presentation
Final project presentationFinal project presentation
Final project presentation
kafanomsod
 
Week 5 Duck last
Week 5 Duck lastWeek 5 Duck last
Week 5 Duck last
kafanomsod
 
Project process model
Project process modelProject process model
Project process model
kafanomsod
 
Week7
Week7Week7
Week7
kafanomsod
 
Duck lastweek10
Duck lastweek10Duck lastweek10
Duck lastweek10
kafanomsod
 
Marcom12
Marcom12Marcom12
Marcom12
vvan_beek
 
Camera mouse2011manual
Camera mouse2011manualCamera mouse2011manual
Camera mouse2011manual
talash7
 
Power urban2
Power urban2Power urban2
Power urban2
ricmat1
 
Public speaking, a short intro
Public speaking, a short introPublic speaking, a short intro
Public speaking, a short intro
chrix_innispambid
 

Viewers also liked (10)

Final project presentation
Final project presentationFinal project presentation
Final project presentation
 
Week 5 Duck last
Week 5 Duck lastWeek 5 Duck last
Week 5 Duck last
 
Project process model
Project process modelProject process model
Project process model
 
Week7
Week7Week7
Week7
 
Duck lastweek10
Duck lastweek10Duck lastweek10
Duck lastweek10
 
Marcom12
Marcom12Marcom12
Marcom12
 
Camera mouse2011manual
Camera mouse2011manualCamera mouse2011manual
Camera mouse2011manual
 
Power urban2
Power urban2Power urban2
Power urban2
 
Public speaking, a short intro
Public speaking, a short introPublic speaking, a short intro
Public speaking, a short intro
 
MARCOM12
MARCOM12MARCOM12
MARCOM12
 

Similar to Week8

Case Study On Metal To Plastic Substitution Opm
Case Study On Metal To Plastic Substitution OpmCase Study On Metal To Plastic Substitution Opm
Case Study On Metal To Plastic Substitution Opm
Nilesh Nevrekar
 
Very High Speed Rate Shaping Fuel Injector
Very High Speed Rate Shaping Fuel InjectorVery High Speed Rate Shaping Fuel Injector
Very High Speed Rate Shaping Fuel Injector
Charlie Bright
 
Pushpinder.jbm.ppt
Pushpinder.jbm.pptPushpinder.jbm.ppt
Pushpinder.jbm.ppt
Pushpinder Singh
 
Soldering and PCB inspection training
Soldering and PCB inspection  trainingSoldering and PCB inspection  training
Soldering and PCB inspection training
Er. Manish Dwivedi
 
Generator Baisc Construction.pptx
Generator Baisc Construction.pptxGenerator Baisc Construction.pptx
Generator Baisc Construction.pptx
SunnyBhardwaj32
 
Casting manufacturing process improvement
Casting manufacturing process improvementCasting manufacturing process improvement
Casting manufacturing process improvement
Abdullah Ansari
 
Manufacturing of Large Electrical Machine
Manufacturing of Large Electrical MachineManufacturing of Large Electrical Machine
Manufacturing of Large Electrical Machine
VAIBHAV SINGH
 
Spatter Reduction by Prateek Biswas
Spatter Reduction by Prateek BiswasSpatter Reduction by Prateek Biswas
Spatter Reduction by Prateek Biswas
Prateek Biswas
 
Great Plains Diesel Technologies Injector
Great Plains Diesel Technologies InjectorGreat Plains Diesel Technologies Injector
Great Plains Diesel Technologies Injector
Doug Mitchell
 
Regis Pneumatic - Pneumatic Cylinder process presentation
Regis Pneumatic - Pneumatic Cylinder process presentationRegis Pneumatic - Pneumatic Cylinder process presentation
Regis Pneumatic - Pneumatic Cylinder process presentation
Regis-pneumatic
 
PCD Inserts (PCD Blade)
PCD Inserts (PCD Blade)PCD Inserts (PCD Blade)
Reduction of Splatters in Intercell Welding of a Lead Acid Battery
Reduction of Splatters in Intercell Welding of a Lead Acid BatteryReduction of Splatters in Intercell Welding of a Lead Acid Battery
Reduction of Splatters in Intercell Welding of a Lead Acid Battery
IRJET Journal
 
Introduction into Surface Mount Technology
Introduction into Surface Mount TechnologyIntroduction into Surface Mount Technology
Introduction into Surface Mount Technology
ShanmugaVelC1
 
Esab basic welding fillar metal technology
Esab basic welding fillar metal technologyEsab basic welding fillar metal technology
Esab basic welding fillar metal technology
ram111eg
 
9AKK105713A9851_L_Baldor_Session_5_LAC_Motors.pdf
9AKK105713A9851_L_Baldor_Session_5_LAC_Motors.pdf9AKK105713A9851_L_Baldor_Session_5_LAC_Motors.pdf
9AKK105713A9851_L_Baldor_Session_5_LAC_Motors.pdf
ssuserad9a2a
 
Advance manufacturing report
Advance manufacturing reportAdvance manufacturing report
Advance manufacturing report
SohailAkbar14
 
Ppt on manufacturing of ceiling fans byhavells haridwar
Ppt on manufacturing of ceiling fans byhavells haridwarPpt on manufacturing of ceiling fans byhavells haridwar
Ppt on manufacturing of ceiling fans byhavells haridwar
ShivPrasadyadav1
 
Electronic manufacturing v3.0 - Fab Academy 2016
Electronic manufacturing v3.0 - Fab Academy 2016Electronic manufacturing v3.0 - Fab Academy 2016
Electronic manufacturing v3.0 - Fab Academy 2016
seeedstudio
 
LED LAMP,INDUSTRIAL LED,PRODUCTION PROCESS OF LED,MODERN LIGHTING
LED LAMP,INDUSTRIAL LED,PRODUCTION PROCESS OF LED,MODERN LIGHTINGLED LAMP,INDUSTRIAL LED,PRODUCTION PROCESS OF LED,MODERN LIGHTING
LED LAMP,INDUSTRIAL LED,PRODUCTION PROCESS OF LED,MODERN LIGHTING
Sk Rabial
 
Paper id 21201487
Paper id 21201487Paper id 21201487
Paper id 21201487
IJRAT
 

Similar to Week8 (20)

Case Study On Metal To Plastic Substitution Opm
Case Study On Metal To Plastic Substitution OpmCase Study On Metal To Plastic Substitution Opm
Case Study On Metal To Plastic Substitution Opm
 
Very High Speed Rate Shaping Fuel Injector
Very High Speed Rate Shaping Fuel InjectorVery High Speed Rate Shaping Fuel Injector
Very High Speed Rate Shaping Fuel Injector
 
Pushpinder.jbm.ppt
Pushpinder.jbm.pptPushpinder.jbm.ppt
Pushpinder.jbm.ppt
 
Soldering and PCB inspection training
Soldering and PCB inspection  trainingSoldering and PCB inspection  training
Soldering and PCB inspection training
 
Generator Baisc Construction.pptx
Generator Baisc Construction.pptxGenerator Baisc Construction.pptx
Generator Baisc Construction.pptx
 
Casting manufacturing process improvement
Casting manufacturing process improvementCasting manufacturing process improvement
Casting manufacturing process improvement
 
Manufacturing of Large Electrical Machine
Manufacturing of Large Electrical MachineManufacturing of Large Electrical Machine
Manufacturing of Large Electrical Machine
 
Spatter Reduction by Prateek Biswas
Spatter Reduction by Prateek BiswasSpatter Reduction by Prateek Biswas
Spatter Reduction by Prateek Biswas
 
Great Plains Diesel Technologies Injector
Great Plains Diesel Technologies InjectorGreat Plains Diesel Technologies Injector
Great Plains Diesel Technologies Injector
 
Regis Pneumatic - Pneumatic Cylinder process presentation
Regis Pneumatic - Pneumatic Cylinder process presentationRegis Pneumatic - Pneumatic Cylinder process presentation
Regis Pneumatic - Pneumatic Cylinder process presentation
 
PCD Inserts (PCD Blade)
PCD Inserts (PCD Blade)PCD Inserts (PCD Blade)
PCD Inserts (PCD Blade)
 
Reduction of Splatters in Intercell Welding of a Lead Acid Battery
Reduction of Splatters in Intercell Welding of a Lead Acid BatteryReduction of Splatters in Intercell Welding of a Lead Acid Battery
Reduction of Splatters in Intercell Welding of a Lead Acid Battery
 
Introduction into Surface Mount Technology
Introduction into Surface Mount TechnologyIntroduction into Surface Mount Technology
Introduction into Surface Mount Technology
 
Esab basic welding fillar metal technology
Esab basic welding fillar metal technologyEsab basic welding fillar metal technology
Esab basic welding fillar metal technology
 
9AKK105713A9851_L_Baldor_Session_5_LAC_Motors.pdf
9AKK105713A9851_L_Baldor_Session_5_LAC_Motors.pdf9AKK105713A9851_L_Baldor_Session_5_LAC_Motors.pdf
9AKK105713A9851_L_Baldor_Session_5_LAC_Motors.pdf
 
Advance manufacturing report
Advance manufacturing reportAdvance manufacturing report
Advance manufacturing report
 
Ppt on manufacturing of ceiling fans byhavells haridwar
Ppt on manufacturing of ceiling fans byhavells haridwarPpt on manufacturing of ceiling fans byhavells haridwar
Ppt on manufacturing of ceiling fans byhavells haridwar
 
Electronic manufacturing v3.0 - Fab Academy 2016
Electronic manufacturing v3.0 - Fab Academy 2016Electronic manufacturing v3.0 - Fab Academy 2016
Electronic manufacturing v3.0 - Fab Academy 2016
 
LED LAMP,INDUSTRIAL LED,PRODUCTION PROCESS OF LED,MODERN LIGHTING
LED LAMP,INDUSTRIAL LED,PRODUCTION PROCESS OF LED,MODERN LIGHTINGLED LAMP,INDUSTRIAL LED,PRODUCTION PROCESS OF LED,MODERN LIGHTING
LED LAMP,INDUSTRIAL LED,PRODUCTION PROCESS OF LED,MODERN LIGHTING
 
Paper id 21201487
Paper id 21201487Paper id 21201487
Paper id 21201487
 

Week8

  • 1. DUCK LAST GROUP 7 WIND VANE
  • 2. Table the component. part name vane circuit Socket Battery part As the air to s Include It is A slot description pin the motor. A motor , Battery holder. And locked Battery to the holder, diodes motorcycle. Material Plastic Plastic, Mild steel Steel ,Copper manufacturing - Assembly Cutting,welding process ,drilling quantity 1 piece 1 piece of 1 piece each Cost (Bath) 15 69 5
  • 4. The number of hours spent in each manufacturing process. • Cutting Process 5 minutes • Welding Process 15 minutes • Drilling Process 10 minutes • Assembly Process 1 hour
  • 5. Provide difficulties and problems encountered during the prototype development. • Difficult to install the product on motorcycle. • Find steel pipe has to be difficult.
  • 6. The solutions for second prototype • Search studies of various devices. Available in the market. Then edit with my product. • The piece is then applied. Then re-use.
  • 7.