CURRICULUM VITAE
VIJAYANAND.S
DO. No. 03,
YASODHA NAGAR,
THIRUVERUMBUR [PO],
TRICHY – 620 013,
Email ID: Vijayanand1284@gmail.com,
Contact No: + 91 9629930317.
+ 91 8220782988.
+ 91 9486953307.
UAE phone: +971 501524476.
OBJECTIVE
Having 10 years of Professional Experience in NDT COORDINATOR & TECHNICIAN involved
with various Activities and performing various NDT methods like Visual Inspection, Ultrasonic flaw detection,
Magnetic Particle Testing inspection, Dye Penetrant Testing Inspection, Hardness Testing, PMI Testing,
Corrosion Mapping, Thickness gauging, Valve Calibration Inspection, Hydro Test Inspection of Process
Piping, Underground piping, Pressure Vessels, Furnaces, Heat Exchangers & coolers, API Tanks,
Structures, Documentation control, Planning, for various industrial sectors including Oil & Gas Field (On
Shore & offshore), boilers, and other Construction projects. Full Conversant with various International Codes
and Standards like ASME Sec I, Sec II, Sec V, Sec VIII, sec IX, API-1104, AWS D 1.1, B31.1, B31.3, BSEN
Performing Calibration of NDT Equipment’s, Reporting of NDT Performed according to Procedures &
Client Specification.
EDUCATIONAL QUALIFICATION
ITI Welder,
 DME Diploma in Mechanical Engineering.
COMPUTER KNOWLEDGE
 Windows , Windows Vista, Windows XP
 MS-Office Word 2007, MS-Office Excel, MS-Office PowerPoint.
TECHNICAL QUALIFICATION
 WELDING TECHNOLOGY FOR FRESH ENGINEERS’ (IWS EC 011),
 ASNT NDT Level – II,
Ultrasonic Testing, Radiography Testing,
Magnetic Particle Testing,
Liquid Penetrated Testing,
API – Level – II T.K.Y. Joints ultrasonic testing.
 BASIC OFFSHORE SAFETY INDUCTION EMERGENCY
 BASIC H2S TRAINING
HANDLED EUIPMENT HANDIED
Magnetic Particle Testing : Prod, Yoke,
Liquid Penetrated Testing : Visible dye Penetrated,
Ultrasonic Testing : Pulse echo contact method, Kraut Kramer USM 32, Einstein
TFT, TFT Plus, (Modasonic Px-10 & 20). USM 35X DAC LEMO.
EXPERIENCE
Name of the Concern : INSPECTA INTERNATIONAL LLC, ABU DHABI, U.A.E,
Designation : NDT COORDINATOR,
Working Period : SEP 2014 [to] July 2016,
Client : ZADCO ACPT, ZADCO ZIRKU [offshore],
Client : BUNDUQ [offshore],
Project : CONDITION ASSESSMENT OF BUNDUQ PLATFORMS
BYABSEILING NDT PERSONNEL PROJECT,
JOB & RESPONSIBILITIES
 CVI Close visual inspection for wellhead platform complete structural and piping & coordinating
with three team of Rope access /NDT team at BUNDUQ ABU DHABI site.
 In-service inspection /Condition monitoring of Piping, Equipment’s & Tanks and coordinating
with two team of Rope access /NDT team at ZADCO ACPT ABU DHABI site.
 Prepares and obtains approvals for work permits to allow execution of work in a timely manner
to meet target set by Senior Plant Inspector On work completion ensure work permit is closed.
 Visual Inspection-CUI (Corrosion under Insulation), Visual Inspections for evaluating both
internal & external damages of various components including pipelines & equipment’s.
 Performing angle probe scanning for weld inspection (defect Identification, classifying the type
of Defects & Acceptance as per standard).
 To Identify & Monitor Defective Equipment, Manage NDT Inspection schedule & NDT Contract
personnel, Major contribution to Project Focus & Process Safety.
 Coordinating with RT, UT, MPT, and DPT & VT regarding various jobs during fabrication for
different clients.
 Preparing piping isometric drawings, making reports & maintaining inspection records for NDT
Department document purpose, thorough knowledge of isometric drawings of oil & gas.
 Conducting radiographic testing, UT angle probe scanning for butt weld & TKY joint, UT
thickness survey and PWHT vessels & pipelines.
 Coordinating for Carrying out MT on weld nozzle fillet weld and inspected on machined
components by using different methods like wet method and dry method using yoke and prod.
 Conducting PT inspection on Boiler Components, Heavy Structural Steel Beam, Main Column
and Towers.
 Conducting MT on heavy pressure vessels.
 Online inspection thickness gauge measurement for various products and corrosion monitoring.
 UT thickness of pressure vessels, process piping and plates for lamination.
 Radiography of tanks, vessels, pressure parts, prefabricated weld joints of pipes using
 Radiography testing of all butts – welds of piping and plates.
 A scan ultrasonic flaw detection of butt-welded joints of process piping systems.
 UT thickness gauging of test separators, oil storage tanks, vessels, scrubbers and receivers.
 MPI & DPI of weld joints instrument lines, crane & drilling equipment’s.
 Thorough knowledge of isometric drawings of oil & gas & power generation plants.
 Prepare and generate daily/weekly/monthly progress reports, maintaining inspection records.
 Computerized report preparations by using MS Word, Excel.
Name of the Concern : INTERNATIONAL INSPECTION SERVICES LTD, DUBAI U.A.E,
Designation : NDT Technician,
Working Period : APRIL 2012 [to] APRIL 2014,
Designation : NDT MULTI TECHNICIAN,
Client : ABU DHABI GAS INDUSTRIES LTD,
(GASCO) HABSHAN (UNIT-4)
Project : SHUTDOWN PROJECT
ABU DHABI, UAE,
Designation : PMI INSPECTION,
Client : RUWAIS REFINERY EXPANSION PROJECT
(TAKREER RRE-2)
RUWAIS, ABU DHABI, UAE,
Designation : NDT TECHNICIAN,
Client : TIGER STEEL,
ABU DHABI, UAE,
Designation : NDT TECHNICIAN,
Client : ADYARD,
Project : ONGC/ESSAR
ABU DHABI, UAE
Designation : NDT TECHNICIAN,
Client : GORICA GROUP,
Project : VARIOUS
DUBAI,
Designation : NDT TECHNICIAN,
Client : ADYARD,
Project : ZADCO UMM AL DALAKH,
[OPTIMA NO: 556683].
ABU DHABI, UAE,
Designation : PMI INSPECTION,
Client : TPC & EURO MECHANOCAL,
Project : VARIOUS
ABU DHABI, UAE,
Designation : NDT TECHNICIAN,
Client : QUALITY INTERNATIONAL,
Project : VARIOUS
DUBAI, UAE,
Designation : NDT TECHNICIAN,
Client : WILLIAM HARE,
Project : VARIOUS
ABU DHABI, UAE,
JOB & RESPONSIBILITIES
 UT carried out on the Tanks Bottom plates, Roof plates.
 Angle scanning for weld joints in wall of the Tanks.
 UT scanning for Pressure Vessels Dish End areas and Shells.
 UT Thickness Gauge for piping, Vessel Nozzles in Recovery area, Rundown area, Refrigeration
area.
 Corrosion mapping for Tank shells and RBI inspection.
 Magnetic Particle Testing for Tanks wall plates, pressure Vessels shell Weld joints and new
weld in various dia piping joints.
 Dye Penetrant Testing carried on new piping weld joints and Nozzle joints for inside the vessel.
 Hydro test inspection for different type of piping spools, Nitrogen hoses and Cryogenic hoses.
 Pressure test carried out on Various Dia for Ball valve, Gate valve, Globe valve, Butterfly valve,
Non return valve, Machine operating valves.
 Hardness testing for all pressure vessels and piping weld joints.
 Positive Material Identification (PMI) is the verification of materials (also weld materials).
 Attending the Shut Down jobs for forecasting the schedules.
 Visual Inspection Before and After Welding for Piping.
 Visual Inspection Blasting, Painting for Piping.
 To Undertaking RT Coordination.
EXPERIENCE
Name of the Concern : NDE INSPECTIONS,
RESEARCH INSTITUTE - TRAINING NDT,
APPROVED BY BHEL, DIRECTOR OF BOILERS,
Designation : NDT Technician, (UT, MT, PT & RT),
Working Period : AUGUST 2010 to APRIL 2012,
Projects : ALL INDIAN GOVERNMENT TPS BOILERS,
PRIVATE BOILERS.
JOB & RESPONSIBILITIES
 Remaining Life Assessment Of Boilers And We Ensure Safety And Boiler Availability,
 We Extend The Life Of Boiler By RLA,
 All Coined Of Boilers NDT Testing for Condition Monitoring,
 Ultrasonic Thickness survey of Pipelines, vessels, towers Exchangers Boilers,
 Ultrasonic Testing in boiler drum all types butt joints and ,
 Inspected edge preparation before welding,
 To calibrate the equipment’s periodically,
 Performing and reporting UT, MT, PT and RT,
 Magnetic Particle testing of welded joints boiler and turbine pipe bends casting and forging.
EXPERIENCE
Name of the Concern : EVERESNDAI ENGG LLC, FZE
Hamriyah Free Zone,
Sharjah - U.A.E.
Designation : NDT Aassistant Technician, (UT, MT, PT),
Working Period : October 2006 – March 2009
Projects : Dubai mall, Burj Dubai. New Doha
International Airport, Capital gate,
Alshams Tower, Nakilat ship yard
Anandara, Tiara Tower, Saadiyat,
Convention centre Mumbai International Airport.
JOB & RESPONSIBILITIES
 Ultrasonic Testing in all types butt joints and
 Inspected edge preparation before welding.
 Performing and reporting UT, MT, PT & RT.
 Magnetic Particle testing of welded joints boiler and turbine pipe bends casting and forging.
PERSONAL PROFILE
Father’s Name : SELVARAJ. T.
Date of Birth : 12-01-1984.
Age : 32
Gender : Male.
Nationality : Indian.
Marital Status : Married.
Languages Known : English, Hindi, Malayalam and Tamil.
Address : NO 03 YASODHA NAGAR,
THIRUVERUMBUR [Po],
TRICHY – 620013.
Cell: +91 8124663307, +91 8220782988.
UAE phone: +971 501524476.
PASSPORT DETAILS
Passport No : J 7284737.
Date of Issue : 13/02/2012.
Date of Expiry : 12/02/2022.
Place of Issue : TRICHY-620013.
DECLARATIONS
I hereby declare that the above – mentioned information is true and correct to the best of my knowledge
and belief.
Place: Trichy-13 Yours Sincerely
Date: [VIJAY ANAND.S]

Vijay Anand Cv-2016

  • 1.
    CURRICULUM VITAE VIJAYANAND.S DO. No.03, YASODHA NAGAR, THIRUVERUMBUR [PO], TRICHY – 620 013, Email ID: Vijayanand1284@gmail.com, Contact No: + 91 9629930317. + 91 8220782988. + 91 9486953307. UAE phone: +971 501524476. OBJECTIVE Having 10 years of Professional Experience in NDT COORDINATOR & TECHNICIAN involved with various Activities and performing various NDT methods like Visual Inspection, Ultrasonic flaw detection, Magnetic Particle Testing inspection, Dye Penetrant Testing Inspection, Hardness Testing, PMI Testing, Corrosion Mapping, Thickness gauging, Valve Calibration Inspection, Hydro Test Inspection of Process Piping, Underground piping, Pressure Vessels, Furnaces, Heat Exchangers & coolers, API Tanks, Structures, Documentation control, Planning, for various industrial sectors including Oil & Gas Field (On Shore & offshore), boilers, and other Construction projects. Full Conversant with various International Codes and Standards like ASME Sec I, Sec II, Sec V, Sec VIII, sec IX, API-1104, AWS D 1.1, B31.1, B31.3, BSEN Performing Calibration of NDT Equipment’s, Reporting of NDT Performed according to Procedures & Client Specification. EDUCATIONAL QUALIFICATION ITI Welder,  DME Diploma in Mechanical Engineering. COMPUTER KNOWLEDGE  Windows , Windows Vista, Windows XP  MS-Office Word 2007, MS-Office Excel, MS-Office PowerPoint. TECHNICAL QUALIFICATION  WELDING TECHNOLOGY FOR FRESH ENGINEERS’ (IWS EC 011),  ASNT NDT Level – II, Ultrasonic Testing, Radiography Testing, Magnetic Particle Testing, Liquid Penetrated Testing, API – Level – II T.K.Y. Joints ultrasonic testing.  BASIC OFFSHORE SAFETY INDUCTION EMERGENCY
  • 2.
     BASIC H2STRAINING HANDLED EUIPMENT HANDIED Magnetic Particle Testing : Prod, Yoke, Liquid Penetrated Testing : Visible dye Penetrated, Ultrasonic Testing : Pulse echo contact method, Kraut Kramer USM 32, Einstein TFT, TFT Plus, (Modasonic Px-10 & 20). USM 35X DAC LEMO. EXPERIENCE Name of the Concern : INSPECTA INTERNATIONAL LLC, ABU DHABI, U.A.E, Designation : NDT COORDINATOR, Working Period : SEP 2014 [to] July 2016, Client : ZADCO ACPT, ZADCO ZIRKU [offshore], Client : BUNDUQ [offshore], Project : CONDITION ASSESSMENT OF BUNDUQ PLATFORMS BYABSEILING NDT PERSONNEL PROJECT, JOB & RESPONSIBILITIES  CVI Close visual inspection for wellhead platform complete structural and piping & coordinating with three team of Rope access /NDT team at BUNDUQ ABU DHABI site.  In-service inspection /Condition monitoring of Piping, Equipment’s & Tanks and coordinating with two team of Rope access /NDT team at ZADCO ACPT ABU DHABI site.  Prepares and obtains approvals for work permits to allow execution of work in a timely manner to meet target set by Senior Plant Inspector On work completion ensure work permit is closed.  Visual Inspection-CUI (Corrosion under Insulation), Visual Inspections for evaluating both internal & external damages of various components including pipelines & equipment’s.  Performing angle probe scanning for weld inspection (defect Identification, classifying the type of Defects & Acceptance as per standard).  To Identify & Monitor Defective Equipment, Manage NDT Inspection schedule & NDT Contract personnel, Major contribution to Project Focus & Process Safety.  Coordinating with RT, UT, MPT, and DPT & VT regarding various jobs during fabrication for different clients.  Preparing piping isometric drawings, making reports & maintaining inspection records for NDT Department document purpose, thorough knowledge of isometric drawings of oil & gas.  Conducting radiographic testing, UT angle probe scanning for butt weld & TKY joint, UT thickness survey and PWHT vessels & pipelines.  Coordinating for Carrying out MT on weld nozzle fillet weld and inspected on machined components by using different methods like wet method and dry method using yoke and prod.  Conducting PT inspection on Boiler Components, Heavy Structural Steel Beam, Main Column and Towers.  Conducting MT on heavy pressure vessels.  Online inspection thickness gauge measurement for various products and corrosion monitoring.  UT thickness of pressure vessels, process piping and plates for lamination.  Radiography of tanks, vessels, pressure parts, prefabricated weld joints of pipes using  Radiography testing of all butts – welds of piping and plates.
  • 3.
     A scanultrasonic flaw detection of butt-welded joints of process piping systems.  UT thickness gauging of test separators, oil storage tanks, vessels, scrubbers and receivers.  MPI & DPI of weld joints instrument lines, crane & drilling equipment’s.  Thorough knowledge of isometric drawings of oil & gas & power generation plants.  Prepare and generate daily/weekly/monthly progress reports, maintaining inspection records.  Computerized report preparations by using MS Word, Excel. Name of the Concern : INTERNATIONAL INSPECTION SERVICES LTD, DUBAI U.A.E, Designation : NDT Technician, Working Period : APRIL 2012 [to] APRIL 2014, Designation : NDT MULTI TECHNICIAN, Client : ABU DHABI GAS INDUSTRIES LTD, (GASCO) HABSHAN (UNIT-4) Project : SHUTDOWN PROJECT ABU DHABI, UAE, Designation : PMI INSPECTION, Client : RUWAIS REFINERY EXPANSION PROJECT (TAKREER RRE-2) RUWAIS, ABU DHABI, UAE, Designation : NDT TECHNICIAN, Client : TIGER STEEL, ABU DHABI, UAE, Designation : NDT TECHNICIAN, Client : ADYARD, Project : ONGC/ESSAR ABU DHABI, UAE Designation : NDT TECHNICIAN, Client : GORICA GROUP, Project : VARIOUS DUBAI, Designation : NDT TECHNICIAN, Client : ADYARD, Project : ZADCO UMM AL DALAKH, [OPTIMA NO: 556683]. ABU DHABI, UAE, Designation : PMI INSPECTION, Client : TPC & EURO MECHANOCAL, Project : VARIOUS ABU DHABI, UAE, Designation : NDT TECHNICIAN, Client : QUALITY INTERNATIONAL, Project : VARIOUS DUBAI, UAE, Designation : NDT TECHNICIAN,
  • 4.
    Client : WILLIAMHARE, Project : VARIOUS ABU DHABI, UAE, JOB & RESPONSIBILITIES  UT carried out on the Tanks Bottom plates, Roof plates.  Angle scanning for weld joints in wall of the Tanks.  UT scanning for Pressure Vessels Dish End areas and Shells.  UT Thickness Gauge for piping, Vessel Nozzles in Recovery area, Rundown area, Refrigeration area.  Corrosion mapping for Tank shells and RBI inspection.  Magnetic Particle Testing for Tanks wall plates, pressure Vessels shell Weld joints and new weld in various dia piping joints.  Dye Penetrant Testing carried on new piping weld joints and Nozzle joints for inside the vessel.  Hydro test inspection for different type of piping spools, Nitrogen hoses and Cryogenic hoses.  Pressure test carried out on Various Dia for Ball valve, Gate valve, Globe valve, Butterfly valve, Non return valve, Machine operating valves.  Hardness testing for all pressure vessels and piping weld joints.  Positive Material Identification (PMI) is the verification of materials (also weld materials).  Attending the Shut Down jobs for forecasting the schedules.  Visual Inspection Before and After Welding for Piping.  Visual Inspection Blasting, Painting for Piping.  To Undertaking RT Coordination. EXPERIENCE Name of the Concern : NDE INSPECTIONS, RESEARCH INSTITUTE - TRAINING NDT, APPROVED BY BHEL, DIRECTOR OF BOILERS, Designation : NDT Technician, (UT, MT, PT & RT), Working Period : AUGUST 2010 to APRIL 2012, Projects : ALL INDIAN GOVERNMENT TPS BOILERS, PRIVATE BOILERS. JOB & RESPONSIBILITIES  Remaining Life Assessment Of Boilers And We Ensure Safety And Boiler Availability,  We Extend The Life Of Boiler By RLA,  All Coined Of Boilers NDT Testing for Condition Monitoring,  Ultrasonic Thickness survey of Pipelines, vessels, towers Exchangers Boilers,  Ultrasonic Testing in boiler drum all types butt joints and ,  Inspected edge preparation before welding,  To calibrate the equipment’s periodically,  Performing and reporting UT, MT, PT and RT,  Magnetic Particle testing of welded joints boiler and turbine pipe bends casting and forging. EXPERIENCE Name of the Concern : EVERESNDAI ENGG LLC, FZE Hamriyah Free Zone, Sharjah - U.A.E. Designation : NDT Aassistant Technician, (UT, MT, PT),
  • 5.
    Working Period :October 2006 – March 2009 Projects : Dubai mall, Burj Dubai. New Doha International Airport, Capital gate, Alshams Tower, Nakilat ship yard Anandara, Tiara Tower, Saadiyat, Convention centre Mumbai International Airport. JOB & RESPONSIBILITIES  Ultrasonic Testing in all types butt joints and  Inspected edge preparation before welding.  Performing and reporting UT, MT, PT & RT.  Magnetic Particle testing of welded joints boiler and turbine pipe bends casting and forging. PERSONAL PROFILE Father’s Name : SELVARAJ. T. Date of Birth : 12-01-1984. Age : 32 Gender : Male. Nationality : Indian. Marital Status : Married. Languages Known : English, Hindi, Malayalam and Tamil. Address : NO 03 YASODHA NAGAR, THIRUVERUMBUR [Po], TRICHY – 620013. Cell: +91 8124663307, +91 8220782988. UAE phone: +971 501524476. PASSPORT DETAILS Passport No : J 7284737. Date of Issue : 13/02/2012. Date of Expiry : 12/02/2022. Place of Issue : TRICHY-620013. DECLARATIONS I hereby declare that the above – mentioned information is true and correct to the best of my knowledge and belief. Place: Trichy-13 Yours Sincerely Date: [VIJAY ANAND.S]