MEDIUM VOLTAGE VARIABLE FREQUENCYDRIVE –FAULT FINDING
AND RECTIFICATION REPORT
LOCATION : RO PLANT KHORFAKKAN
EQUIPMENT DETALIS : POWER FLEX 7000 B FRAME – ALLEN BRADELY
DRIVE DETAILS :MEDIUM VOLTAGE,AIR COOLED VARIABLE
FREQUENCY AC DRIVE
MOTOR DETAILS :6600 VOLT,2000 HP,10-50 Hz SPEED RANGE
TAG NO :P-040-001
THE TEAM MEMBERS
Team Leader : Mr.Rajendrakumar.A.P, EMD Supervisor
Assistance : Mr. Mathews, Plant operator.
Supporting Team : Mr. Poly, Shift Supervisor
: Mr. Jobin, Plant Operator
Report Prepared By:
Mr.Rajendrakumar.A.P
Electrical Supervisor
RO plant Khorfakkan
FAULT REPORT
The operation In Charge reported on 15.04.2015 at 03:45 hrs that plant tripped on VFD fault. There
was no abnormality or any serious issues like burn smell etc, so it was decided to take up the issue
during general shift at 07:00 hrs in the morning.
On visual inspection the following faults observed in the VFD Display unit and noted to the
maintenance register.
1. 2U1C Fbk F0 Loss
2. 2U4A Fbk F0 Loss Time: 03:41:37 hrs
FAULT SHOWN IN THE DISPLAY 1
As a preliminary step
- Fault Acknowledged
- Given Reset, Found the fault is persisting.(NOTE : No more attempts should be made to
RESET the fault)
FAULT FINIDNG: THE ORIGIN OF FAULT AND LOCATION
- Referred to the original manual and the list of faults and possible reasons
- It is found clear from the trouble shooting that the fault is Major.
- Obtained work permit from the operation In Charge.
- Isolated 6.6 kv
- Opened the VFD panel isolator
- Obtained the KEY (mechanical Interlock) from the isolator panel to open the MV voltage
panels.
- Discharged the 6.6 KV with the help of Earth rod..Enough time given to ensure proper
discharge of any static charge to ensure the safety of working personnel.
- Visual inspection made to ensure the physical status of all components and any possible
damages.
- Located the rectifier bridge and associated circuits ( with control supply ON)
- Checked the cable tags to find out the fiber optic cable responsible for the fault and
inspected for any physical damage and found to be in good condition.
- Further inspection revealed that SGCT (Symmetrical Gate Fired Thyristors) firing cards of
the respective ( 2U1C, 2U4A) rectifier bridge not getting the power supply. Identified the
terminals and verified the DC 20 Volt is not available.
- Followed the drawing to see the source of power supply. The power supply was from
IGDPSM(Integrated gate driver power supply module).Found that, two out of six voltage
outputs are not working.
- The failure of the power supply module seemed to be secondary. The root cause can be the
card which uses the power supply.
- Checked the healthiness of the SGCT firing cards. Found that the respective cards are faulty.
- 2 Nos SGCT firing cards and 1 no of IGDPS Module found faulty. Referred to the manual
for replacement procedure. It was advised to change all the (one arm of rectifier bridge is
consists of three series thyristors) the thyristor cards at a time.ie,2 sets of integrated thyristor
firing cards, consisiting of three cards each.
- Checked the healthiness of all thyristors in the rectifier bridge and found healthy.
CONCLUSION
- Replacement of faulty cards
- SGCT Firing Card : 2 sets of 3 cards each
 : Card No:80173-109-01
 : Make: Mitsubishi Electric Company.
- IGDPSM :1 No
 : Card No:80026-044-06
 : Make: Rockwell
The requirements and the contact person details mailed to Mr.Ajay Alias, Station Manager.
PROCUREMENT OF SPARES
- Conformed the non-availability of cards at RO khorfakkan Stores on 15.04.2015 itself.
- Upon enquiry throughout the day, it is learned that procuring new cards will take one month
to three months or more.
- On 16.04.2015 as per information from station manager, checked the availability of cards at
any other plants with the help of stores In charge and found that Layyah Plant is having
spare cards .Information passed to Station Manager.
- Finally at 20.00 Hrs all arrangements were organized Mr.Faizal Sarkal to collect the spare
cards from layyah.
- Along with Station manager, I went to collect the cards from layyah power plant. After
verifying the cards, gate pass prepared and took the cards to RO Khorfakkan and reached the
plant early morning 03:00 hrs on 17.04.2015.Kept the Cards at a safe place.
IGDPSM SGCT FRING CARD
FAULT RECTIFICATION WORK – 17-04-2015 AT 08:00 Hrs
- Started organising the work at 8.00 hrs in the morning. List given to supporting team for
additional tools and equipment’s to be arranged. Air Blower, Vacuum Cleaner, Electrical
Contact Cleaner, Brushes.
- Control power supply switched OFF.
- Ensured the IGDPS module is not having any power supply.
- Noted down all the connection details to the IGDPS Module in the register.
- Removed the tying clips to the connecting cables
- Disconnected from respective terminals
- Unscrewed the 4 no’s fixing bolts
- Unpacked the new IGDPS module pack.
- ALL CARDS TO BE HANDLED CAREFULLY.THE INTERNAL PORTION SHOULD NOT BE
TOUCHED.ANY STATIC CHARGE CAN DESTROY THE CARD COMPONENTS.BODY STATIC
CHARGE SHOULD BE DISCHARGED BEFORE TOUCHING THE CARD AND HOLD THE CARDS BY
ITS SIDES SUCH A WAY THAT IINSIDE PORTION IS EXCLUDED.THE USE OF GROUNDED
WRIST STRAP IS MOST RECOMENDED
- Screwed the new card to the position.
Work underprogress
FaultySGCT Cards removed FaultyIGDPSmodule
- Noted down connection details to the 6 SGCT firing cards. The optical fibre cables
connected to the boards should be carefully handled; its bending radius should not be less
than 50 mm.
- Before going ahead with fixing the new SGCT firing cards, clean the panel with air blower
and vacuum cleaner. Use of these two equipment’s should be made carefully. Also clean
the heat sinks of the removed cards properly.
- Unpack the cards carefully and keep the Electrical joint compound safely. See the
instruction manual included. Follow the procedure as per the instruction manual for
removal and fixing the cards.
-
- Check healthiness of all thyristors of the new cards.
- Re-connect the input power connection to the IGDPS module.
- Take care not to connect the output power cables to Double ensure the proper tightness of
the clamp by checking the indicating washer turning resistance.
- Upon completion of fixing the thyristors, Re connect all optical fibre cables and power
cables as per noted down earlier to the IGDPS module.
- Ensure the panel is ready by all means, no tools or clothes should not be their inside the
panel.
- Switch On the Control power Supply
- Check the output voltages of the IGDPS module.
- After ensuring the correct output voltage reconnect the cables to the output terminals as
per noted down in the register.
- Checked the LED s indications in the SGCT cards, found correct.
- RESET fault in the display/controller Unit. Fault got RESET.
- Cleaned the rest of the panels and all filters.
- Closed all the panels, following the mechanical interlocks.
- Closed the VFD isolator
- Charged the 6.6 KV breaker
- Found the VFD Ready Indication.
- Given clearance to start the plant at 16.00 Hrs.
- During the starting of the motor one person was kept at the motor end to observe
abnormality if any. One person was at 6.6 KV breaker and two persons at VFD. At 17:00 Hrs
VFD started and found Start up and all parameters normal.
- Kept the VFD under observation for 8 hours.
- Found all parameters normal for rest of the operation and successfully concluded.
Special Thanks for Moral Support over phone
: Mr.Ajay Alias, Stn.Manager RO Khorfakkan
Special Thanks to all my TEAM Members.
-THANKS-
-

More Related Content

What's hot

Rajesh Resume ....
Rajesh Resume ....Rajesh Resume ....
Rajesh Resume ....Rajesh Ahdu
 
Nidec asi wind farm applications
Nidec asi wind farm applicationsNidec asi wind farm applications
Nidec asi wind farm applicationsNidec Corporation
 
Nidec asi variable frequency drives
Nidec asi variable frequency drivesNidec asi variable frequency drives
Nidec asi variable frequency drivesNidec Corporation
 
Tsi precision power conditioner
Tsi precision power conditionerTsi precision power conditioner
Tsi precision power conditionercw5lides
 
Modulador de Ancho de Pulso en Fuentes ATX Sdc7500
Modulador de Ancho de Pulso en Fuentes ATX Sdc7500Modulador de Ancho de Pulso en Fuentes ATX Sdc7500
Modulador de Ancho de Pulso en Fuentes ATX Sdc7500Juan Carlos Ruiz
 
Ornetpower Company Profile ENG 170515A
Ornetpower Company Profile ENG 170515AOrnetpower Company Profile ENG 170515A
Ornetpower Company Profile ENG 170515AZiv Farfara
 
IRJET - Designing of 1 Phase 5KVA Servo Stabilizer with Isolation Transformer
IRJET - Designing of 1 Phase 5KVA Servo Stabilizer with Isolation TransformerIRJET - Designing of 1 Phase 5KVA Servo Stabilizer with Isolation Transformer
IRJET - Designing of 1 Phase 5KVA Servo Stabilizer with Isolation TransformerIRJET Journal
 
Nidec asi silcovert h series
Nidec asi silcovert h seriesNidec asi silcovert h series
Nidec asi silcovert h seriesNidec Corporation
 
IRJET- Design Photovoltaic System with Constant Output using SEPIC Converter
IRJET-  	  Design Photovoltaic System with Constant Output using SEPIC ConverterIRJET-  	  Design Photovoltaic System with Constant Output using SEPIC Converter
IRJET- Design Photovoltaic System with Constant Output using SEPIC ConverterIRJET Journal
 
Instructinon manual eco
Instructinon manual   ecoInstructinon manual   eco
Instructinon manual ecoToàn Huỳnh
 
ELECHTRICAL COMMISSIONING TECHNICIAN 2201622
ELECHTRICAL   COMMISSIONING  TECHNICIAN   2201622ELECHTRICAL   COMMISSIONING  TECHNICIAN   2201622
ELECHTRICAL COMMISSIONING TECHNICIAN 2201622MOHAMMAD KHALID MUSTAFA
 
BLDC Motor Speed Control With RPM Display
 BLDC Motor Speed Control With RPM Display BLDC Motor Speed Control With RPM Display
BLDC Motor Speed Control With RPM DisplayEdgefxkits & Solutions
 
General Or Gc Electrical Safety
General Or Gc Electrical SafetyGeneral Or Gc Electrical Safety
General Or Gc Electrical Safetyjboullemet
 
Original PNP Transistor BD244TU BD244 244 TO-220 New Fairchild Semiconductor
Original PNP Transistor BD244TU BD244 244 TO-220 New Fairchild SemiconductorOriginal PNP Transistor BD244TU BD244 244 TO-220 New Fairchild Semiconductor
Original PNP Transistor BD244TU BD244 244 TO-220 New Fairchild SemiconductorAUTHELECTRONIC
 

What's hot (20)

Rajesh Resume ....
Rajesh Resume ....Rajesh Resume ....
Rajesh Resume ....
 
Nidec asi wind farm applications
Nidec asi wind farm applicationsNidec asi wind farm applications
Nidec asi wind farm applications
 
EPD Brochure
EPD BrochureEPD Brochure
EPD Brochure
 
Nidec asi variable frequency drives
Nidec asi variable frequency drivesNidec asi variable frequency drives
Nidec asi variable frequency drives
 
Transducer-Catalog
Transducer-CatalogTransducer-Catalog
Transducer-Catalog
 
cv-electrician
cv-electriciancv-electrician
cv-electrician
 
Tsi precision power conditioner
Tsi precision power conditionerTsi precision power conditioner
Tsi precision power conditioner
 
Modulador de Ancho de Pulso en Fuentes ATX Sdc7500
Modulador de Ancho de Pulso en Fuentes ATX Sdc7500Modulador de Ancho de Pulso en Fuentes ATX Sdc7500
Modulador de Ancho de Pulso en Fuentes ATX Sdc7500
 
Ornetpower Company Profile ENG 170515A
Ornetpower Company Profile ENG 170515AOrnetpower Company Profile ENG 170515A
Ornetpower Company Profile ENG 170515A
 
IRJET - Designing of 1 Phase 5KVA Servo Stabilizer with Isolation Transformer
IRJET - Designing of 1 Phase 5KVA Servo Stabilizer with Isolation TransformerIRJET - Designing of 1 Phase 5KVA Servo Stabilizer with Isolation Transformer
IRJET - Designing of 1 Phase 5KVA Servo Stabilizer with Isolation Transformer
 
Resume
ResumeResume
Resume
 
Nidec asi silcovert h series
Nidec asi silcovert h seriesNidec asi silcovert h series
Nidec asi silcovert h series
 
IRJET- Design Photovoltaic System with Constant Output using SEPIC Converter
IRJET-  	  Design Photovoltaic System with Constant Output using SEPIC ConverterIRJET-  	  Design Photovoltaic System with Constant Output using SEPIC Converter
IRJET- Design Photovoltaic System with Constant Output using SEPIC Converter
 
Ka7500 b
Ka7500 bKa7500 b
Ka7500 b
 
Instructinon manual eco
Instructinon manual   ecoInstructinon manual   eco
Instructinon manual eco
 
ELECHTRICAL COMMISSIONING TECHNICIAN 2201622
ELECHTRICAL   COMMISSIONING  TECHNICIAN   2201622ELECHTRICAL   COMMISSIONING  TECHNICIAN   2201622
ELECHTRICAL COMMISSIONING TECHNICIAN 2201622
 
BLDC Motor Speed Control With RPM Display
 BLDC Motor Speed Control With RPM Display BLDC Motor Speed Control With RPM Display
BLDC Motor Speed Control With RPM Display
 
Nidec asi silcovert gn
Nidec asi silcovert gnNidec asi silcovert gn
Nidec asi silcovert gn
 
General Or Gc Electrical Safety
General Or Gc Electrical SafetyGeneral Or Gc Electrical Safety
General Or Gc Electrical Safety
 
Original PNP Transistor BD244TU BD244 244 TO-220 New Fairchild Semiconductor
Original PNP Transistor BD244TU BD244 244 TO-220 New Fairchild SemiconductorOriginal PNP Transistor BD244TU BD244 244 TO-220 New Fairchild Semiconductor
Original PNP Transistor BD244TU BD244 244 TO-220 New Fairchild Semiconductor
 

Similar to MEDIUM VOLTAGE DRIVE FAULT RECTIFICATION

HarmonicFilter_VFDdrives2014
HarmonicFilter_VFDdrives2014HarmonicFilter_VFDdrives2014
HarmonicFilter_VFDdrives2014Kanai Banerjee
 
Sv i c5-eng_100323
Sv i c5-eng_100323Sv i c5-eng_100323
Sv i c5-eng_100323Chan Suk
 
Case Study – How an Unchecked Capacitor can cause loss of revenue
Case Study – How an Unchecked Capacitor can cause loss of revenueCase Study – How an Unchecked Capacitor can cause loss of revenue
Case Study – How an Unchecked Capacitor can cause loss of revenueSystem Protection
 
sharp_14mn10_ch_sn-000.pptx
sharp_14mn10_ch_sn-000.pptxsharp_14mn10_ch_sn-000.pptx
sharp_14mn10_ch_sn-000.pptxssuser27df19
 
Sudden three phase short-circuit test
Sudden three phase short-circuit testSudden three phase short-circuit test
Sudden three phase short-circuit testDonald Stephen
 
Vipin Resume
Vipin ResumeVipin Resume
Vipin ResumeVipin Das
 
Mohamed Saad Resume
Mohamed Saad ResumeMohamed Saad Resume
Mohamed Saad ResumeMohamed Saad
 
Rectifier Operations & Maintenance - Don Olson - 2.4.2020
Rectifier Operations & Maintenance - Don Olson - 2.4.2020Rectifier Operations & Maintenance - Don Olson - 2.4.2020
Rectifier Operations & Maintenance - Don Olson - 2.4.2020nacetwincities
 
Directions for Mobile Traffic Light | Road signalization SISAS BG
Directions for Mobile Traffic Light | Road signalization SISAS BGDirections for Mobile Traffic Light | Road signalization SISAS BG
Directions for Mobile Traffic Light | Road signalization SISAS BGSisas BG
 
DATASHEET INVERSORES R6 SAJ TRIFASICOS LV
DATASHEET INVERSORES R6 SAJ TRIFASICOS LVDATASHEET INVERSORES R6 SAJ TRIFASICOS LV
DATASHEET INVERSORES R6 SAJ TRIFASICOS LVgrupopridesolar
 

Similar to MEDIUM VOLTAGE DRIVE FAULT RECTIFICATION (20)

Regülatör
RegülatörRegülatör
Regülatör
 
HarmonicFilter_VFDdrives2014
HarmonicFilter_VFDdrives2014HarmonicFilter_VFDdrives2014
HarmonicFilter_VFDdrives2014
 
Ap
ApAp
Ap
 
I c5 eng_100323
I c5 eng_100323I c5 eng_100323
I c5 eng_100323
 
Sv i c5-eng_100323
Sv i c5-eng_100323Sv i c5-eng_100323
Sv i c5-eng_100323
 
Case Study – How an Unchecked Capacitor can cause loss of revenue
Case Study – How an Unchecked Capacitor can cause loss of revenueCase Study – How an Unchecked Capacitor can cause loss of revenue
Case Study – How an Unchecked Capacitor can cause loss of revenue
 
Etracer6415BND Etracer4415BND user manual by Ultisolar New Energy
Etracer6415BND Etracer4415BND user manual by Ultisolar New Energy Etracer6415BND Etracer4415BND user manual by Ultisolar New Energy
Etracer6415BND Etracer4415BND user manual by Ultisolar New Energy
 
sharp_14mn10_ch_sn-000.pptx
sharp_14mn10_ch_sn-000.pptxsharp_14mn10_ch_sn-000.pptx
sharp_14mn10_ch_sn-000.pptx
 
Sudden three phase short-circuit test
Sudden three phase short-circuit testSudden three phase short-circuit test
Sudden three phase short-circuit test
 
Wp series manual
Wp series manualWp series manual
Wp series manual
 
Vipin Resume
Vipin ResumeVipin Resume
Vipin Resume
 
Mohamed Saad Resume
Mohamed Saad ResumeMohamed Saad Resume
Mohamed Saad Resume
 
Ctara report
Ctara reportCtara report
Ctara report
 
Raju cv
Raju cv Raju cv
Raju cv
 
SRINIVASAN_RESUME_UPDATED__FINAL (2)
SRINIVASAN_RESUME_UPDATED__FINAL (2)SRINIVASAN_RESUME_UPDATED__FINAL (2)
SRINIVASAN_RESUME_UPDATED__FINAL (2)
 
Ultisolar iT3415 iT4415 iT6415 iTracer User Manual
Ultisolar iT3415 iT4415 iT6415  iTracer User ManualUltisolar iT3415 iT4415 iT6415  iTracer User Manual
Ultisolar iT3415 iT4415 iT6415 iTracer User Manual
 
Rectifier Operations & Maintenance - Don Olson - 2.4.2020
Rectifier Operations & Maintenance - Don Olson - 2.4.2020Rectifier Operations & Maintenance - Don Olson - 2.4.2020
Rectifier Operations & Maintenance - Don Olson - 2.4.2020
 
Sensors and Actuators
Sensors and ActuatorsSensors and Actuators
Sensors and Actuators
 
Directions for Mobile Traffic Light | Road signalization SISAS BG
Directions for Mobile Traffic Light | Road signalization SISAS BGDirections for Mobile Traffic Light | Road signalization SISAS BG
Directions for Mobile Traffic Light | Road signalization SISAS BG
 
DATASHEET INVERSORES R6 SAJ TRIFASICOS LV
DATASHEET INVERSORES R6 SAJ TRIFASICOS LVDATASHEET INVERSORES R6 SAJ TRIFASICOS LV
DATASHEET INVERSORES R6 SAJ TRIFASICOS LV
 

MEDIUM VOLTAGE DRIVE FAULT RECTIFICATION

  • 1. MEDIUM VOLTAGE VARIABLE FREQUENCYDRIVE –FAULT FINDING AND RECTIFICATION REPORT LOCATION : RO PLANT KHORFAKKAN EQUIPMENT DETALIS : POWER FLEX 7000 B FRAME – ALLEN BRADELY DRIVE DETAILS :MEDIUM VOLTAGE,AIR COOLED VARIABLE FREQUENCY AC DRIVE MOTOR DETAILS :6600 VOLT,2000 HP,10-50 Hz SPEED RANGE TAG NO :P-040-001 THE TEAM MEMBERS Team Leader : Mr.Rajendrakumar.A.P, EMD Supervisor Assistance : Mr. Mathews, Plant operator. Supporting Team : Mr. Poly, Shift Supervisor : Mr. Jobin, Plant Operator Report Prepared By: Mr.Rajendrakumar.A.P Electrical Supervisor RO plant Khorfakkan
  • 2. FAULT REPORT The operation In Charge reported on 15.04.2015 at 03:45 hrs that plant tripped on VFD fault. There was no abnormality or any serious issues like burn smell etc, so it was decided to take up the issue during general shift at 07:00 hrs in the morning. On visual inspection the following faults observed in the VFD Display unit and noted to the maintenance register. 1. 2U1C Fbk F0 Loss 2. 2U4A Fbk F0 Loss Time: 03:41:37 hrs FAULT SHOWN IN THE DISPLAY 1 As a preliminary step - Fault Acknowledged - Given Reset, Found the fault is persisting.(NOTE : No more attempts should be made to RESET the fault) FAULT FINIDNG: THE ORIGIN OF FAULT AND LOCATION - Referred to the original manual and the list of faults and possible reasons
  • 3. - It is found clear from the trouble shooting that the fault is Major. - Obtained work permit from the operation In Charge. - Isolated 6.6 kv - Opened the VFD panel isolator - Obtained the KEY (mechanical Interlock) from the isolator panel to open the MV voltage panels. - Discharged the 6.6 KV with the help of Earth rod..Enough time given to ensure proper discharge of any static charge to ensure the safety of working personnel. - Visual inspection made to ensure the physical status of all components and any possible damages. - Located the rectifier bridge and associated circuits ( with control supply ON) - Checked the cable tags to find out the fiber optic cable responsible for the fault and inspected for any physical damage and found to be in good condition. - Further inspection revealed that SGCT (Symmetrical Gate Fired Thyristors) firing cards of the respective ( 2U1C, 2U4A) rectifier bridge not getting the power supply. Identified the terminals and verified the DC 20 Volt is not available. - Followed the drawing to see the source of power supply. The power supply was from IGDPSM(Integrated gate driver power supply module).Found that, two out of six voltage outputs are not working. - The failure of the power supply module seemed to be secondary. The root cause can be the card which uses the power supply. - Checked the healthiness of the SGCT firing cards. Found that the respective cards are faulty. - 2 Nos SGCT firing cards and 1 no of IGDPS Module found faulty. Referred to the manual for replacement procedure. It was advised to change all the (one arm of rectifier bridge is consists of three series thyristors) the thyristor cards at a time.ie,2 sets of integrated thyristor firing cards, consisiting of three cards each. - Checked the healthiness of all thyristors in the rectifier bridge and found healthy. CONCLUSION - Replacement of faulty cards - SGCT Firing Card : 2 sets of 3 cards each  : Card No:80173-109-01  : Make: Mitsubishi Electric Company. - IGDPSM :1 No  : Card No:80026-044-06  : Make: Rockwell The requirements and the contact person details mailed to Mr.Ajay Alias, Station Manager. PROCUREMENT OF SPARES - Conformed the non-availability of cards at RO khorfakkan Stores on 15.04.2015 itself.
  • 4. - Upon enquiry throughout the day, it is learned that procuring new cards will take one month to three months or more. - On 16.04.2015 as per information from station manager, checked the availability of cards at any other plants with the help of stores In charge and found that Layyah Plant is having spare cards .Information passed to Station Manager. - Finally at 20.00 Hrs all arrangements were organized Mr.Faizal Sarkal to collect the spare cards from layyah. - Along with Station manager, I went to collect the cards from layyah power plant. After verifying the cards, gate pass prepared and took the cards to RO Khorfakkan and reached the plant early morning 03:00 hrs on 17.04.2015.Kept the Cards at a safe place. IGDPSM SGCT FRING CARD FAULT RECTIFICATION WORK – 17-04-2015 AT 08:00 Hrs - Started organising the work at 8.00 hrs in the morning. List given to supporting team for additional tools and equipment’s to be arranged. Air Blower, Vacuum Cleaner, Electrical Contact Cleaner, Brushes. - Control power supply switched OFF. - Ensured the IGDPS module is not having any power supply. - Noted down all the connection details to the IGDPS Module in the register. - Removed the tying clips to the connecting cables - Disconnected from respective terminals - Unscrewed the 4 no’s fixing bolts - Unpacked the new IGDPS module pack. - ALL CARDS TO BE HANDLED CAREFULLY.THE INTERNAL PORTION SHOULD NOT BE TOUCHED.ANY STATIC CHARGE CAN DESTROY THE CARD COMPONENTS.BODY STATIC CHARGE SHOULD BE DISCHARGED BEFORE TOUCHING THE CARD AND HOLD THE CARDS BY ITS SIDES SUCH A WAY THAT IINSIDE PORTION IS EXCLUDED.THE USE OF GROUNDED WRIST STRAP IS MOST RECOMENDED - Screwed the new card to the position.
  • 5. Work underprogress FaultySGCT Cards removed FaultyIGDPSmodule - Noted down connection details to the 6 SGCT firing cards. The optical fibre cables connected to the boards should be carefully handled; its bending radius should not be less than 50 mm.
  • 6. - Before going ahead with fixing the new SGCT firing cards, clean the panel with air blower and vacuum cleaner. Use of these two equipment’s should be made carefully. Also clean the heat sinks of the removed cards properly. - Unpack the cards carefully and keep the Electrical joint compound safely. See the instruction manual included. Follow the procedure as per the instruction manual for removal and fixing the cards. -
  • 7.
  • 8. - Check healthiness of all thyristors of the new cards. - Re-connect the input power connection to the IGDPS module. - Take care not to connect the output power cables to Double ensure the proper tightness of the clamp by checking the indicating washer turning resistance. - Upon completion of fixing the thyristors, Re connect all optical fibre cables and power cables as per noted down earlier to the IGDPS module. - Ensure the panel is ready by all means, no tools or clothes should not be their inside the panel. - Switch On the Control power Supply - Check the output voltages of the IGDPS module. - After ensuring the correct output voltage reconnect the cables to the output terminals as per noted down in the register. - Checked the LED s indications in the SGCT cards, found correct. - RESET fault in the display/controller Unit. Fault got RESET. - Cleaned the rest of the panels and all filters. - Closed all the panels, following the mechanical interlocks. - Closed the VFD isolator - Charged the 6.6 KV breaker - Found the VFD Ready Indication. - Given clearance to start the plant at 16.00 Hrs. - During the starting of the motor one person was kept at the motor end to observe abnormality if any. One person was at 6.6 KV breaker and two persons at VFD. At 17:00 Hrs VFD started and found Start up and all parameters normal.
  • 9. - Kept the VFD under observation for 8 hours. - Found all parameters normal for rest of the operation and successfully concluded. Special Thanks for Moral Support over phone : Mr.Ajay Alias, Stn.Manager RO Khorfakkan Special Thanks to all my TEAM Members. -THANKS-
  • 10. -