SlideShare a Scribd company logo
1 of 22
Using Market-Based Instruments and Issues in
Identifying, Designing and Implementing PES

Dr Mark Smith
IUCN Water Programme
Gland, Switzerland
Using market-based instruments to protect
water and wetland ecosystem services

• Taxes, fees, subsidies and charges
• Quantity-based instruments

• Liability-based instruments

• Voluntary schemes

• Payments for Ecosystem Services (PES)
INTERNATIONAL UNION FOR CONSERVATION OF NATURE
Scope and Limits of Market-Based Instruments
• A complement to environmental
regulation
• Allow more flexibility for private
actors, who can however choose
between eg. polluting and paying
• Often generate political opposition
and generally less accepted than
environmental standards

• In some cases undermining other
kinds of values e.g.
ethics, culture, rights

INTERNATIONAL UNION FOR CONSERVATION OF NATURE
1.

Incentives for water security

2.

Valuing and managing
watershed services

3.

Designing a payment
scheme

4.

Roadmap towards an
agreement

5.

Rules at work

6.

Learning from partner and
experience

INTERNATIONAL UNION FOR CONSERVATION OF NATURE
Creating Incentives
• PES use markets to create incentives for sustainable land and water
management
• Buyers and sellers of services
– upstream sellers exchange services for payment
– downstream buyers make payments in return for services
• Market set up to reward sellers by “internalising externalities”
– water quality
– reliable water supply
– flood control
– soil conservation
• Alternative incentives
– law, regulation
INTERNATIONAL UNION FOR CONSERVATION OF NATURE
Requirements for a marketplace
• recognition that watershed services can be traded
• prices can be agreed
• possible sellers exist
– landowners, farmers, communities
• possible buyers exist
– utilities, hydropower, municipalities, governments, farmers, industry
• brokers and facilitators
• property, access and use rights established
• transaction capacities: contracts and payment mechanisms

INTERNATIONAL UNION FOR CONSERVATION OF NATURE
How are valuations
relevant?
• Valuations demonstrate benefits

• Comparison of PWS to alternatives - CBA

• Valuations ≠ price

• Price depends on what it‟s worth paying

INTERNATIONAL UNION FOR CONSERVATION OF NATURE
Basic logic of PWS
Developing PWS

INTERNATIONAL UNION FOR CONSERVATION OF NATURE
Design – Payment for Watershed Services
1. Private payments

2. Cap and trade

transfer payments
land purchases
cost-sharing

regulatory cap
tradeable permits

PWS
Schemes
„salmon-safe‟ farms
organic farming
eco-labelling standards

3. Certification
INTERNATIONAL UNION FOR CONSERVATION OF NATURE

environmental taxes
subsidies
compensation schemes

4. Public payments
Some examples
Energia Global
(Costa Rica)

Nitrogen discharge
control
(Connecticut, USA)

compensation for watershed
management to reduce
sediment flux to hydropower

cap-and-trade scheme to
cap point source pollution

Salmon-Safe agriculture
(Washington, USA)

Nitrate in drinking water
(UK)

certification scheme for
watershed protection by
farmers to conserve
salmon habitat

compensation by
government for adhering to
land-use practices

INTERNATIONAL UNION FOR CONSERVATION OF NATURE
Financing mechanisms

INTERNATIONAL UNION FOR CONSERVATION OF NATURE
Process: roadmap to agreement
Engage
stakeholders
Convene the right

parties
Information &
analysis

Negotiation process

• Communicate
• Common vision
• involve potential buyers & sellers
• mobilise broker/intermediary
• specialist support & capacity building
• stakeholder analysis
• institutional analysis
• ecosystem service data & valuation

• collective learning
• consensus building
• agreement

INTERNATIONAL UNION FOR CONSERVATION OF NATURE
What‟s in the
Agreement?
• services to be provided & how
specified
• amount & form of compensation
• monitoring of implementation
• sanctions for non-compliance
• administration of scheme

INTERNATIONAL UNION FOR CONSERVATION OF NATURE
Making the rules

Institutional
Framework

Clarify land
& resource
tenure

Enforceable
rules &
transaction
mechanisms

INTERNATIONAL UNION FOR CONSERVATION OF NATURE

Compliance
&
enforcement
Synthesis

Payment
scheme
design

Learning &
adapting
Valuation
& CBA
Institutional
framework &
rules

INTERNATIONAL UNION FOR CONSERVATION OF NATURE

Building an
agreement
Resources
www.iucn.org/water/toolkits
www.waterandnature.org

www.teebweb.org

INTERNATIONAL UNION FOR CONSERVATION OF NATURE
www.watershedconnect.com

INTERNATIONAL UNION FOR CONSERVATION OF NATURE
IW:LEARN Community of Practice

More Related Content

What's hot

OECD Water Governance Initiative
OECD Water Governance InitiativeOECD Water Governance Initiative
OECD Water Governance InitiativeOECD Governance
 
Outcomes of cop22 safaa bahije, morocco
Outcomes of cop22   safaa bahije, moroccoOutcomes of cop22   safaa bahije, morocco
Outcomes of cop22 safaa bahije, moroccoOECD Governance
 
Sustainable Transformation Of Agriculture at Scale: Opportunities and Challenges
Sustainable Transformation Of Agriculture at Scale: Opportunities and ChallengesSustainable Transformation Of Agriculture at Scale: Opportunities and Challenges
Sustainable Transformation Of Agriculture at Scale: Opportunities and ChallengesGlobal Landscapes Forum (GLF)
 
Wild Rivers Scott Buchanan 19.02.09
Wild Rivers Scott Buchanan  19.02.09Wild Rivers Scott Buchanan  19.02.09
Wild Rivers Scott Buchanan 19.02.09pdalby
 
SWOT Results WAVE Project
SWOT Results WAVE ProjectSWOT Results WAVE Project
SWOT Results WAVE ProjectAndreaNesdoly
 
Dr Linden Jack (Food Standards Agency (FSA)) - “The FSA and Shellfish”
Dr Linden Jack (Food Standards Agency (FSA)) - “The FSA and Shellfish”Dr Linden Jack (Food Standards Agency (FSA)) - “The FSA and Shellfish”
Dr Linden Jack (Food Standards Agency (FSA)) - “The FSA and Shellfish”Shellfish Association
 
Supporting REDD+ readiness and negotiations
Supporting REDD+ readiness and negotiationsSupporting REDD+ readiness and negotiations
Supporting REDD+ readiness and negotiationsIIED
 
Paepard presentation pastoralism financing
Paepard presentation pastoralism financingPaepard presentation pastoralism financing
Paepard presentation pastoralism financingFrancois Stepman
 
6. CaBA Conference 2017 Your Fisheries - Alistair Maltby
6. CaBA Conference 2017 Your Fisheries - Alistair Maltby6. CaBA Conference 2017 Your Fisheries - Alistair Maltby
6. CaBA Conference 2017 Your Fisheries - Alistair MaltbyCaBASupport
 
Soil and climate benefits of improved forage grasses
Soil and climate benefits of improved forage grassesSoil and climate benefits of improved forage grasses
Soil and climate benefits of improved forage grassesILRI
 
ICT water cluster meeting - FP7 - ISS-EWATUS
ICT water  cluster  meeting - FP7 - ISS-EWATUSICT water  cluster  meeting - FP7 - ISS-EWATUS
ICT water cluster meeting - FP7 - ISS-EWATUSEwa Magiera
 
Certified Organic Shrimp: A New Approach to Mangrove PES?
Certified Organic Shrimp: A New Approach to Mangrove PES?Certified Organic Shrimp: A New Approach to Mangrove PES?
Certified Organic Shrimp: A New Approach to Mangrove PES?CIFOR-ICRAF
 
Mr. Suresh Babu IEWP @ Workshop on River Basin Management Planning and Govern...
Mr. Suresh Babu IEWP @ Workshop on River Basin Management Planning and Govern...Mr. Suresh Babu IEWP @ Workshop on River Basin Management Planning and Govern...
Mr. Suresh Babu IEWP @ Workshop on River Basin Management Planning and Govern...India-EU Water Partnership
 
Territorial use rights
Territorial use rightsTerritorial use rights
Territorial use rightsKoushik Das
 
Towards a new international instrument on the conservation and sustainable us...
Towards a new international instrument on the conservation and sustainable us...Towards a new international instrument on the conservation and sustainable us...
Towards a new international instrument on the conservation and sustainable us...Glen Wright
 

What's hot (18)

OECD Water Governance Initiative
OECD Water Governance InitiativeOECD Water Governance Initiative
OECD Water Governance Initiative
 
Outcomes of cop22 safaa bahije, morocco
Outcomes of cop22   safaa bahije, moroccoOutcomes of cop22   safaa bahije, morocco
Outcomes of cop22 safaa bahije, morocco
 
Sustainable Transformation Of Agriculture at Scale: Opportunities and Challenges
Sustainable Transformation Of Agriculture at Scale: Opportunities and ChallengesSustainable Transformation Of Agriculture at Scale: Opportunities and Challenges
Sustainable Transformation Of Agriculture at Scale: Opportunities and Challenges
 
Wild Rivers Scott Buchanan 19.02.09
Wild Rivers Scott Buchanan  19.02.09Wild Rivers Scott Buchanan  19.02.09
Wild Rivers Scott Buchanan 19.02.09
 
SWOT Results WAVE Project
SWOT Results WAVE ProjectSWOT Results WAVE Project
SWOT Results WAVE Project
 
Rio reno patrickweiingertner-2
Rio reno patrickweiingertner-2Rio reno patrickweiingertner-2
Rio reno patrickweiingertner-2
 
Dr Linden Jack (Food Standards Agency (FSA)) - “The FSA and Shellfish”
Dr Linden Jack (Food Standards Agency (FSA)) - “The FSA and Shellfish”Dr Linden Jack (Food Standards Agency (FSA)) - “The FSA and Shellfish”
Dr Linden Jack (Food Standards Agency (FSA)) - “The FSA and Shellfish”
 
Supporting REDD+ readiness and negotiations
Supporting REDD+ readiness and negotiationsSupporting REDD+ readiness and negotiations
Supporting REDD+ readiness and negotiations
 
Paepard presentation pastoralism financing
Paepard presentation pastoralism financingPaepard presentation pastoralism financing
Paepard presentation pastoralism financing
 
Ecosystem Services Markets
Ecosystem Services MarketsEcosystem Services Markets
Ecosystem Services Markets
 
6. CaBA Conference 2017 Your Fisheries - Alistair Maltby
6. CaBA Conference 2017 Your Fisheries - Alistair Maltby6. CaBA Conference 2017 Your Fisheries - Alistair Maltby
6. CaBA Conference 2017 Your Fisheries - Alistair Maltby
 
Mark Reed
Mark Reed Mark Reed
Mark Reed
 
Soil and climate benefits of improved forage grasses
Soil and climate benefits of improved forage grassesSoil and climate benefits of improved forage grasses
Soil and climate benefits of improved forage grasses
 
ICT water cluster meeting - FP7 - ISS-EWATUS
ICT water  cluster  meeting - FP7 - ISS-EWATUSICT water  cluster  meeting - FP7 - ISS-EWATUS
ICT water cluster meeting - FP7 - ISS-EWATUS
 
Certified Organic Shrimp: A New Approach to Mangrove PES?
Certified Organic Shrimp: A New Approach to Mangrove PES?Certified Organic Shrimp: A New Approach to Mangrove PES?
Certified Organic Shrimp: A New Approach to Mangrove PES?
 
Mr. Suresh Babu IEWP @ Workshop on River Basin Management Planning and Govern...
Mr. Suresh Babu IEWP @ Workshop on River Basin Management Planning and Govern...Mr. Suresh Babu IEWP @ Workshop on River Basin Management Planning and Govern...
Mr. Suresh Babu IEWP @ Workshop on River Basin Management Planning and Govern...
 
Territorial use rights
Territorial use rightsTerritorial use rights
Territorial use rights
 
Towards a new international instrument on the conservation and sustainable us...
Towards a new international instrument on the conservation and sustainable us...Towards a new international instrument on the conservation and sustainable us...
Towards a new international instrument on the conservation and sustainable us...
 

Similar to Using Market-Based Instruments and Issues in Identifying, Designing and Implementing PES

Economic valuation and Payment for Ecosystem Services
Economic valuation and Payment for Ecosystem ServicesEconomic valuation and Payment for Ecosystem Services
Economic valuation and Payment for Ecosystem ServicesIwl Pcu
 
The Rivers Trust Autumn Conference: Day 2 - Session 3
The Rivers Trust Autumn Conference: Day 2 - Session 3The Rivers Trust Autumn Conference: Day 2 - Session 3
The Rivers Trust Autumn Conference: Day 2 - Session 3Westcountry Rivers Trust
 
Mr. Xavier Leflaive IEWP @ Workshop on Water allocation, water economics and ...
Mr. Xavier Leflaive IEWP @ Workshop on Water allocation, water economics and ...Mr. Xavier Leflaive IEWP @ Workshop on Water allocation, water economics and ...
Mr. Xavier Leflaive IEWP @ Workshop on Water allocation, water economics and ...India-EU Water Partnership
 
Climate finance hemraj (sth africa)key climate initiatives ccxg gf-march2014
Climate finance hemraj (sth africa)key climate initiatives ccxg gf-march2014Climate finance hemraj (sth africa)key climate initiatives ccxg gf-march2014
Climate finance hemraj (sth africa)key climate initiatives ccxg gf-march2014OECD Environment
 
SWaRMA_IRBM_Module1_#5, Experiences of IWRM implementation from Australia, An...
SWaRMA_IRBM_Module1_#5, Experiences of IWRM implementation from Australia, An...SWaRMA_IRBM_Module1_#5, Experiences of IWRM implementation from Australia, An...
SWaRMA_IRBM_Module1_#5, Experiences of IWRM implementation from Australia, An...ICIMOD
 
SWaRMA_IRBM_Module2_#7, Basin planning experience from Australia, Andrew Joh...
SWaRMA_IRBM_Module2_#7,  Basin planning experience from Australia, Andrew Joh...SWaRMA_IRBM_Module2_#7,  Basin planning experience from Australia, Andrew Joh...
SWaRMA_IRBM_Module2_#7, Basin planning experience from Australia, Andrew Joh...ICIMOD
 
Information and transboundary cooperation – challenges and responses (Frances...
Information and transboundary cooperation – challenges and responses (Frances...Information and transboundary cooperation – challenges and responses (Frances...
Information and transboundary cooperation – challenges and responses (Frances...Iwl Pcu
 
Financing FLR: Governance and funding opportunities for landscape management ...
Financing FLR: Governance and funding opportunities for landscape management ...Financing FLR: Governance and funding opportunities for landscape management ...
Financing FLR: Governance and funding opportunities for landscape management ...Etifor srl
 
An Introduction to Carbon Offsets, Markets and Projects
An Introduction to Carbon Offsets, Markets and ProjectsAn Introduction to Carbon Offsets, Markets and Projects
An Introduction to Carbon Offsets, Markets and ProjectsThe Climate Trust
 
Payments for peatland ecosystem services
Payments for peatland ecosystem servicesPayments for peatland ecosystem services
Payments for peatland ecosystem servicesAberdeen CES
 
IUKWC Workshop Nov16: Developing Hydro-climatic Services for Water Security –...
IUKWC Workshop Nov16: Developing Hydro-climatic Services for Water Security –...IUKWC Workshop Nov16: Developing Hydro-climatic Services for Water Security –...
IUKWC Workshop Nov16: Developing Hydro-climatic Services for Water Security –...India UK Water Centre (IUKWC)
 
Ecosystem Valuation and Water Risk: Ed Pinero
Ecosystem Valuation and Water Risk: Ed Pinero Ecosystem Valuation and Water Risk: Ed Pinero
Ecosystem Valuation and Water Risk: Ed Pinero U.S. Water Alliance
 
Helen Clayton: EU and National Actions to Protect Citizens from Water Pollution
Helen Clayton: EU and National Actions to Protect Citizens from Water PollutionHelen Clayton: EU and National Actions to Protect Citizens from Water Pollution
Helen Clayton: EU and National Actions to Protect Citizens from Water PollutionTHL
 
The Gold Standard
The Gold StandardThe Gold Standard
The Gold StandardCIFOR-ICRAF
 

Similar to Using Market-Based Instruments and Issues in Identifying, Designing and Implementing PES (20)

Economic valuation and Payment for Ecosystem Services
Economic valuation and Payment for Ecosystem ServicesEconomic valuation and Payment for Ecosystem Services
Economic valuation and Payment for Ecosystem Services
 
The Rivers Trust Autumn Conference: Day 2 - Session 3
The Rivers Trust Autumn Conference: Day 2 - Session 3The Rivers Trust Autumn Conference: Day 2 - Session 3
The Rivers Trust Autumn Conference: Day 2 - Session 3
 
Great Lakes Corporate Water Stewardship
Great Lakes Corporate Water StewardshipGreat Lakes Corporate Water Stewardship
Great Lakes Corporate Water Stewardship
 
Mr. Xavier Leflaive IEWP @ Workshop on Water allocation, water economics and ...
Mr. Xavier Leflaive IEWP @ Workshop on Water allocation, water economics and ...Mr. Xavier Leflaive IEWP @ Workshop on Water allocation, water economics and ...
Mr. Xavier Leflaive IEWP @ Workshop on Water allocation, water economics and ...
 
Climate finance hemraj (sth africa)key climate initiatives ccxg gf-march2014
Climate finance hemraj (sth africa)key climate initiatives ccxg gf-march2014Climate finance hemraj (sth africa)key climate initiatives ccxg gf-march2014
Climate finance hemraj (sth africa)key climate initiatives ccxg gf-march2014
 
The Gold Standard - GIB Summit 2014 by Adrian Rimmer at GIB Summit
The Gold Standard - GIB Summit 2014 by Adrian Rimmer at GIB SummitThe Gold Standard - GIB Summit 2014 by Adrian Rimmer at GIB Summit
The Gold Standard - GIB Summit 2014 by Adrian Rimmer at GIB Summit
 
SWaRMA_IRBM_Module1_#5, Experiences of IWRM implementation from Australia, An...
SWaRMA_IRBM_Module1_#5, Experiences of IWRM implementation from Australia, An...SWaRMA_IRBM_Module1_#5, Experiences of IWRM implementation from Australia, An...
SWaRMA_IRBM_Module1_#5, Experiences of IWRM implementation from Australia, An...
 
SWaRMA_IRBM_Module2_#7, Basin planning experience from Australia, Andrew Joh...
SWaRMA_IRBM_Module2_#7,  Basin planning experience from Australia, Andrew Joh...SWaRMA_IRBM_Module2_#7,  Basin planning experience from Australia, Andrew Joh...
SWaRMA_IRBM_Module2_#7, Basin planning experience from Australia, Andrew Joh...
 
Integration of circular economy approach into sanitation service delivery for...
Integration of circular economy approach into sanitation service delivery for...Integration of circular economy approach into sanitation service delivery for...
Integration of circular economy approach into sanitation service delivery for...
 
Information and transboundary cooperation – challenges and responses (Frances...
Information and transboundary cooperation – challenges and responses (Frances...Information and transboundary cooperation – challenges and responses (Frances...
Information and transboundary cooperation – challenges and responses (Frances...
 
Financing FLR: Governance and funding opportunities for landscape management ...
Financing FLR: Governance and funding opportunities for landscape management ...Financing FLR: Governance and funding opportunities for landscape management ...
Financing FLR: Governance and funding opportunities for landscape management ...
 
Guy Duke
Guy DukeGuy Duke
Guy Duke
 
Potential ‘value’ of ecosystem services vis-à-vis cost of project implementat...
Potential ‘value’ of ecosystem services vis-à-vis cost of project implementat...Potential ‘value’ of ecosystem services vis-à-vis cost of project implementat...
Potential ‘value’ of ecosystem services vis-à-vis cost of project implementat...
 
An Introduction to Carbon Offsets, Markets and Projects
An Introduction to Carbon Offsets, Markets and ProjectsAn Introduction to Carbon Offsets, Markets and Projects
An Introduction to Carbon Offsets, Markets and Projects
 
Green infrastructure finance
Green infrastructure financeGreen infrastructure finance
Green infrastructure finance
 
Payments for peatland ecosystem services
Payments for peatland ecosystem servicesPayments for peatland ecosystem services
Payments for peatland ecosystem services
 
IUKWC Workshop Nov16: Developing Hydro-climatic Services for Water Security –...
IUKWC Workshop Nov16: Developing Hydro-climatic Services for Water Security –...IUKWC Workshop Nov16: Developing Hydro-climatic Services for Water Security –...
IUKWC Workshop Nov16: Developing Hydro-climatic Services for Water Security –...
 
Ecosystem Valuation and Water Risk: Ed Pinero
Ecosystem Valuation and Water Risk: Ed Pinero Ecosystem Valuation and Water Risk: Ed Pinero
Ecosystem Valuation and Water Risk: Ed Pinero
 
Helen Clayton: EU and National Actions to Protect Citizens from Water Pollution
Helen Clayton: EU and National Actions to Protect Citizens from Water PollutionHelen Clayton: EU and National Actions to Protect Citizens from Water Pollution
Helen Clayton: EU and National Actions to Protect Citizens from Water Pollution
 
The Gold Standard
The Gold StandardThe Gold Standard
The Gold Standard
 

More from Iwl Pcu

Flood and Drought Management Tools (IWC8)
Flood and Drought Management Tools (IWC8)Flood and Drought Management Tools (IWC8)
Flood and Drought Management Tools (IWC8)Iwl Pcu
 
Caribbean Wastewater - Innovative Solutions (IWC8)
Caribbean Wastewater - Innovative Solutions (IWC8)Caribbean Wastewater - Innovative Solutions (IWC8)
Caribbean Wastewater - Innovative Solutions (IWC8)Iwl Pcu
 
Large Marine Ecosystems: Megaregional Best Practices for LME Assessment and M...
Large Marine Ecosystems: Megaregional Best Practices for LME Assessment and M...Large Marine Ecosystems: Megaregional Best Practices for LME Assessment and M...
Large Marine Ecosystems: Megaregional Best Practices for LME Assessment and M...Iwl Pcu
 
Understanding the audience (IWC8)
Understanding the audience (IWC8)Understanding the audience (IWC8)
Understanding the audience (IWC8)Iwl Pcu
 
Effective slide designing
Effective slide designingEffective slide designing
Effective slide designingIwl Pcu
 
How to communicate science effectively (IWC8 Presentation)
How to communicate science effectively (IWC8 Presentation)How to communicate science effectively (IWC8 Presentation)
How to communicate science effectively (IWC8 Presentation)Iwl Pcu
 
Presentation vs Publication
Presentation vs PublicationPresentation vs Publication
Presentation vs PublicationIwl Pcu
 
Introduction to Nutrient Roundtable (IWC8)
Introduction to Nutrient Roundtable (IWC8)Introduction to Nutrient Roundtable (IWC8)
Introduction to Nutrient Roundtable (IWC8)Iwl Pcu
 
GEF Oceanic Fisheries Management Project – Towards Transformation Change (IWC...
GEF Oceanic Fisheries Management Project – Towards Transformation Change (IWC...GEF Oceanic Fisheries Management Project – Towards Transformation Change (IWC...
GEF Oceanic Fisheries Management Project – Towards Transformation Change (IWC...Iwl Pcu
 
TDA/SAP Methodology Training Course Module 2 Section 1
TDA/SAP Methodology Training Course Module 2 Section 1TDA/SAP Methodology Training Course Module 2 Section 1
TDA/SAP Methodology Training Course Module 2 Section 1Iwl Pcu
 
TDA/SAP Methodology Training Course Module 2 Section 10
TDA/SAP Methodology Training Course Module 2 Section 10TDA/SAP Methodology Training Course Module 2 Section 10
TDA/SAP Methodology Training Course Module 2 Section 10Iwl Pcu
 
TDA/SAP Methodology Training Course Module 2 Section 10
TDA/SAP Methodology Training Course Module 2 Section 10TDA/SAP Methodology Training Course Module 2 Section 10
TDA/SAP Methodology Training Course Module 2 Section 10Iwl Pcu
 
TDA/SAP Methodology Training Course Module 2 Section 9
TDA/SAP Methodology Training Course Module 2 Section 9TDA/SAP Methodology Training Course Module 2 Section 9
TDA/SAP Methodology Training Course Module 2 Section 9Iwl Pcu
 
TDA/SAP Methodology Training Course Module 2 Section 5
TDA/SAP Methodology Training Course Module 2 Section 5TDA/SAP Methodology Training Course Module 2 Section 5
TDA/SAP Methodology Training Course Module 2 Section 5Iwl Pcu
 
TDA/SAP Methodology Training Course Module 2 Section 5
TDA/SAP Methodology Training Course Module 2 Section 5TDA/SAP Methodology Training Course Module 2 Section 5
TDA/SAP Methodology Training Course Module 2 Section 5Iwl Pcu
 
TDA/SAP Methodology Training Course Module 2 Section 5
TDA/SAP Methodology Training Course Module 2 Section 5TDA/SAP Methodology Training Course Module 2 Section 5
TDA/SAP Methodology Training Course Module 2 Section 5Iwl Pcu
 
TDA/SAP Methodology Training Course Module 2 Section 7
TDA/SAP Methodology Training Course Module 2 Section 7TDA/SAP Methodology Training Course Module 2 Section 7
TDA/SAP Methodology Training Course Module 2 Section 7Iwl Pcu
 
TDA/SAP Methodology Training Course Module 2 Section 5
TDA/SAP Methodology Training Course Module 2 Section 5TDA/SAP Methodology Training Course Module 2 Section 5
TDA/SAP Methodology Training Course Module 2 Section 5Iwl Pcu
 
TDA/SAP Methodology Training Course Module 2 Section 6
TDA/SAP Methodology Training Course Module 2 Section 6TDA/SAP Methodology Training Course Module 2 Section 6
TDA/SAP Methodology Training Course Module 2 Section 6Iwl Pcu
 
TDA/SAP Methodology Training Course Module 2 Section 5
TDA/SAP Methodology Training Course Module 2 Section 5TDA/SAP Methodology Training Course Module 2 Section 5
TDA/SAP Methodology Training Course Module 2 Section 5Iwl Pcu
 

More from Iwl Pcu (20)

Flood and Drought Management Tools (IWC8)
Flood and Drought Management Tools (IWC8)Flood and Drought Management Tools (IWC8)
Flood and Drought Management Tools (IWC8)
 
Caribbean Wastewater - Innovative Solutions (IWC8)
Caribbean Wastewater - Innovative Solutions (IWC8)Caribbean Wastewater - Innovative Solutions (IWC8)
Caribbean Wastewater - Innovative Solutions (IWC8)
 
Large Marine Ecosystems: Megaregional Best Practices for LME Assessment and M...
Large Marine Ecosystems: Megaregional Best Practices for LME Assessment and M...Large Marine Ecosystems: Megaregional Best Practices for LME Assessment and M...
Large Marine Ecosystems: Megaregional Best Practices for LME Assessment and M...
 
Understanding the audience (IWC8)
Understanding the audience (IWC8)Understanding the audience (IWC8)
Understanding the audience (IWC8)
 
Effective slide designing
Effective slide designingEffective slide designing
Effective slide designing
 
How to communicate science effectively (IWC8 Presentation)
How to communicate science effectively (IWC8 Presentation)How to communicate science effectively (IWC8 Presentation)
How to communicate science effectively (IWC8 Presentation)
 
Presentation vs Publication
Presentation vs PublicationPresentation vs Publication
Presentation vs Publication
 
Introduction to Nutrient Roundtable (IWC8)
Introduction to Nutrient Roundtable (IWC8)Introduction to Nutrient Roundtable (IWC8)
Introduction to Nutrient Roundtable (IWC8)
 
GEF Oceanic Fisheries Management Project – Towards Transformation Change (IWC...
GEF Oceanic Fisheries Management Project – Towards Transformation Change (IWC...GEF Oceanic Fisheries Management Project – Towards Transformation Change (IWC...
GEF Oceanic Fisheries Management Project – Towards Transformation Change (IWC...
 
TDA/SAP Methodology Training Course Module 2 Section 1
TDA/SAP Methodology Training Course Module 2 Section 1TDA/SAP Methodology Training Course Module 2 Section 1
TDA/SAP Methodology Training Course Module 2 Section 1
 
TDA/SAP Methodology Training Course Module 2 Section 10
TDA/SAP Methodology Training Course Module 2 Section 10TDA/SAP Methodology Training Course Module 2 Section 10
TDA/SAP Methodology Training Course Module 2 Section 10
 
TDA/SAP Methodology Training Course Module 2 Section 10
TDA/SAP Methodology Training Course Module 2 Section 10TDA/SAP Methodology Training Course Module 2 Section 10
TDA/SAP Methodology Training Course Module 2 Section 10
 
TDA/SAP Methodology Training Course Module 2 Section 9
TDA/SAP Methodology Training Course Module 2 Section 9TDA/SAP Methodology Training Course Module 2 Section 9
TDA/SAP Methodology Training Course Module 2 Section 9
 
TDA/SAP Methodology Training Course Module 2 Section 5
TDA/SAP Methodology Training Course Module 2 Section 5TDA/SAP Methodology Training Course Module 2 Section 5
TDA/SAP Methodology Training Course Module 2 Section 5
 
TDA/SAP Methodology Training Course Module 2 Section 5
TDA/SAP Methodology Training Course Module 2 Section 5TDA/SAP Methodology Training Course Module 2 Section 5
TDA/SAP Methodology Training Course Module 2 Section 5
 
TDA/SAP Methodology Training Course Module 2 Section 5
TDA/SAP Methodology Training Course Module 2 Section 5TDA/SAP Methodology Training Course Module 2 Section 5
TDA/SAP Methodology Training Course Module 2 Section 5
 
TDA/SAP Methodology Training Course Module 2 Section 7
TDA/SAP Methodology Training Course Module 2 Section 7TDA/SAP Methodology Training Course Module 2 Section 7
TDA/SAP Methodology Training Course Module 2 Section 7
 
TDA/SAP Methodology Training Course Module 2 Section 5
TDA/SAP Methodology Training Course Module 2 Section 5TDA/SAP Methodology Training Course Module 2 Section 5
TDA/SAP Methodology Training Course Module 2 Section 5
 
TDA/SAP Methodology Training Course Module 2 Section 6
TDA/SAP Methodology Training Course Module 2 Section 6TDA/SAP Methodology Training Course Module 2 Section 6
TDA/SAP Methodology Training Course Module 2 Section 6
 
TDA/SAP Methodology Training Course Module 2 Section 5
TDA/SAP Methodology Training Course Module 2 Section 5TDA/SAP Methodology Training Course Module 2 Section 5
TDA/SAP Methodology Training Course Module 2 Section 5
 

Recently uploaded

Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024BookNet Canada
 
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Patryk Bandurski
 
Pigging Solutions Piggable Sweeping Elbows
Pigging Solutions Piggable Sweeping ElbowsPigging Solutions Piggable Sweeping Elbows
Pigging Solutions Piggable Sweeping ElbowsPigging Solutions
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsMaria Levchenko
 
Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Paola De la Torre
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerThousandEyes
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptxHampshireHUG
 
Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Allon Mureinik
 
Benefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other FrameworksBenefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other FrameworksSoftradix Technologies
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreternaman860154
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdfhans926745
 
Key Features Of Token Development (1).pptx
Key  Features Of Token  Development (1).pptxKey  Features Of Token  Development (1).pptx
Key Features Of Token Development (1).pptxLBM Solutions
 
Unblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesUnblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesSinan KOZAK
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024Rafal Los
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking MenDelhi Call girls
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsEnterprise Knowledge
 
AI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsAI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsMemoori
 
How to Remove Document Management Hurdles with X-Docs?
How to Remove Document Management Hurdles with X-Docs?How to Remove Document Management Hurdles with X-Docs?
How to Remove Document Management Hurdles with X-Docs?XfilesPro
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationSafe Software
 
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticsKotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticscarlostorres15106
 

Recently uploaded (20)

Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
Transcript: #StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
 
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
Integration and Automation in Practice: CI/CD in Mule Integration and Automat...
 
Pigging Solutions Piggable Sweeping Elbows
Pigging Solutions Piggable Sweeping ElbowsPigging Solutions Piggable Sweeping Elbows
Pigging Solutions Piggable Sweeping Elbows
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed texts
 
Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101Salesforce Community Group Quito, Salesforce 101
Salesforce Community Group Quito, Salesforce 101
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
 
Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)Injustice - Developers Among Us (SciFiDevCon 2024)
Injustice - Developers Among Us (SciFiDevCon 2024)
 
Benefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other FrameworksBenefits Of Flutter Compared To Other Frameworks
Benefits Of Flutter Compared To Other Frameworks
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreter
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf
 
Key Features Of Token Development (1).pptx
Key  Features Of Token  Development (1).pptxKey  Features Of Token  Development (1).pptx
Key Features Of Token Development (1).pptx
 
Unblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen FramesUnblocking The Main Thread Solving ANRs and Frozen Frames
Unblocking The Main Thread Solving ANRs and Frozen Frames
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI Solutions
 
AI as an Interface for Commercial Buildings
AI as an Interface for Commercial BuildingsAI as an Interface for Commercial Buildings
AI as an Interface for Commercial Buildings
 
How to Remove Document Management Hurdles with X-Docs?
How to Remove Document Management Hurdles with X-Docs?How to Remove Document Management Hurdles with X-Docs?
How to Remove Document Management Hurdles with X-Docs?
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
 
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmaticsKotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
Kotlin Multiplatform & Compose Multiplatform - Starter kit for pragmatics
 

Using Market-Based Instruments and Issues in Identifying, Designing and Implementing PES

  • 1. Using Market-Based Instruments and Issues in Identifying, Designing and Implementing PES Dr Mark Smith IUCN Water Programme Gland, Switzerland
  • 2.
  • 3. Using market-based instruments to protect water and wetland ecosystem services • Taxes, fees, subsidies and charges • Quantity-based instruments • Liability-based instruments • Voluntary schemes • Payments for Ecosystem Services (PES) INTERNATIONAL UNION FOR CONSERVATION OF NATURE
  • 4. Scope and Limits of Market-Based Instruments • A complement to environmental regulation • Allow more flexibility for private actors, who can however choose between eg. polluting and paying • Often generate political opposition and generally less accepted than environmental standards • In some cases undermining other kinds of values e.g. ethics, culture, rights INTERNATIONAL UNION FOR CONSERVATION OF NATURE
  • 5. 1. Incentives for water security 2. Valuing and managing watershed services 3. Designing a payment scheme 4. Roadmap towards an agreement 5. Rules at work 6. Learning from partner and experience INTERNATIONAL UNION FOR CONSERVATION OF NATURE
  • 6. Creating Incentives • PES use markets to create incentives for sustainable land and water management • Buyers and sellers of services – upstream sellers exchange services for payment – downstream buyers make payments in return for services • Market set up to reward sellers by “internalising externalities” – water quality – reliable water supply – flood control – soil conservation • Alternative incentives – law, regulation INTERNATIONAL UNION FOR CONSERVATION OF NATURE
  • 7. Requirements for a marketplace • recognition that watershed services can be traded • prices can be agreed • possible sellers exist – landowners, farmers, communities • possible buyers exist – utilities, hydropower, municipalities, governments, farmers, industry • brokers and facilitators • property, access and use rights established • transaction capacities: contracts and payment mechanisms INTERNATIONAL UNION FOR CONSERVATION OF NATURE
  • 8.
  • 9. How are valuations relevant? • Valuations demonstrate benefits • Comparison of PWS to alternatives - CBA • Valuations ≠ price • Price depends on what it‟s worth paying INTERNATIONAL UNION FOR CONSERVATION OF NATURE
  • 11.
  • 12. Developing PWS INTERNATIONAL UNION FOR CONSERVATION OF NATURE
  • 13. Design – Payment for Watershed Services 1. Private payments 2. Cap and trade transfer payments land purchases cost-sharing regulatory cap tradeable permits PWS Schemes „salmon-safe‟ farms organic farming eco-labelling standards 3. Certification INTERNATIONAL UNION FOR CONSERVATION OF NATURE environmental taxes subsidies compensation schemes 4. Public payments
  • 14. Some examples Energia Global (Costa Rica) Nitrogen discharge control (Connecticut, USA) compensation for watershed management to reduce sediment flux to hydropower cap-and-trade scheme to cap point source pollution Salmon-Safe agriculture (Washington, USA) Nitrate in drinking water (UK) certification scheme for watershed protection by farmers to conserve salmon habitat compensation by government for adhering to land-use practices INTERNATIONAL UNION FOR CONSERVATION OF NATURE
  • 15. Financing mechanisms INTERNATIONAL UNION FOR CONSERVATION OF NATURE
  • 16. Process: roadmap to agreement Engage stakeholders Convene the right parties Information & analysis Negotiation process • Communicate • Common vision • involve potential buyers & sellers • mobilise broker/intermediary • specialist support & capacity building • stakeholder analysis • institutional analysis • ecosystem service data & valuation • collective learning • consensus building • agreement INTERNATIONAL UNION FOR CONSERVATION OF NATURE
  • 17. What‟s in the Agreement? • services to be provided & how specified • amount & form of compensation • monitoring of implementation • sanctions for non-compliance • administration of scheme INTERNATIONAL UNION FOR CONSERVATION OF NATURE
  • 18. Making the rules Institutional Framework Clarify land & resource tenure Enforceable rules & transaction mechanisms INTERNATIONAL UNION FOR CONSERVATION OF NATURE Compliance & enforcement
  • 19. Synthesis Payment scheme design Learning & adapting Valuation & CBA Institutional framework & rules INTERNATIONAL UNION FOR CONSERVATION OF NATURE Building an agreement

Editor's Notes

  1. Taxes, fees and charges discourage environmentally harmful activities by increasing their costs compared to other more environmentally friendly alternatives. Subsidies, where duly targeted, reduce the costs related to sustainable activities or products, thereby increasing their marketcompetitiveness. In theory, environmental taxes are more efficient than regulation because they make agents with lower abatement costs pollute (and pay) less than those with higher costs.Quantity-based instruments, such as tradable permit schemes, set a limit on the use of a resource, allocate the use right certificates to the users by auctions or free of charge, and create an artificial market for trading the rights. Water banks are innovative instruments that are generally used to deal with droughts in order to use in urban areas part of the water normally employed in agriculture and to compensate the farmers for the economic loss that results.Liability-based instruments assign responsibility or preventing and remediating environmental impacts to those who cause them. An example is the liability regime established in the European Union, which specifically includes damage both to water objectives and biodiversity objectives within the scope of the regime. The law requires, for example, that if a company discharges pollutants causing damage which threatens the legalobjectives of EU water policy, it is required to pay for the restoration. This provides a strong incentive to avoid such damage.Voluntary offsetting schemes also exist that encourage private, companies and public bodies to offset their impacts by financing restoration or conservation projects. Currently, the most used offsetting schemes are voluntary carbon credits programmes, which in recent years have shown a promising growth rate. Carbon offsetting schemes represent an interesting option to find additional financing for wetland mangrove conservation or enhancement, because wetlands including mangroves provide an important carbon sequestration function.
  2. The use of MBIs should be seen as a complement to environmental regulation, which is only adequate in some specific contexts. For example, water rights trading can only work where illegal water abstraction is prevented by effective regulation.MBIs typically allow more flexibility to private actors, who can choose between polluting and paying a tax or buy a tradable right or be subject to liability. Therefore, it may not be advisable to use them to protect high-value water and wetland ecosystems or to achieve site-specific protection goals.Incentive-based approaches are often designed using a trial-and-error procedure, which allows the tax or the amount of tradable permits to be gradually adjusted to reach the desired objective. For this reason, MBIs should not be used where failures can lead to severe and irreversibleenvironmental impacts.Introducing environmental taxes or charges often generates political opposition and is generally less accepted than setting technical requirements through environmental standards (hence a reward scheme tends to be more acceptable than a punitive charging or taxation scheme). Furthermore, MBIs can be questioned under an ethical point of view, as in some way they may be perceived as giving the “right to pollute” to those who can afford to pay.In some cases, monetary valuation and MBIs can even undermine the use of other kinds of languages and values (e.g. those related to ethics, culture, human rights), and evidence has been found on the fact that under some circumstances a monetary incentive can “crowd-out”moral, intrinsic motivations for environmental protection.
  3. price depends on negotiation: buyers won’t pay more than an alternative (eg filtration plant); sellers won’t accept less than opportunity cost or cost incurred. Price depends on negotiation between them. If sellers costs are higher than willingness to pay or higher than cost of buyer’s alternative infrastructure, then there is no deal and PWS won’t work