SlideShare a Scribd company logo
Client

   My Client is Nicki Minaj. I will be
producing a Digipak for her album, a
flyer advertising her tour and album
   and a programme for her tour.
Plan of time
•   Flyer: I will allow 5 days to design the final flyer and sent it to the
    printer to print the final product, after research I found it would take 2
    days to produce the flyers and have them sent off. So it total I will
    allow an 8 day period for producing the flyers. The extra day accounts
    for any problems with postage or any problems with the flyer being
    printed.

•   Programme: To print the programme it will take a little longer than the
    flyer as there are more pages, more pictures and more work that has
    to go in to the making of it. After looking at printing companies I will
    allow 2 weeks in total for the final products to be complete. 5 days will
    be allowed for the designing of the programme, leaving 9 days to
    have the final programme printed and sent back, again leaving some
    time for any problems that may occur.

•   Digipak: After doing some research I found that it takes 12 working
    days to produce my digipaks. I would then have to allow for designing
    time, 5 days, shipping time, sending it to them and them sending me
    the product, 7 days, and 3 days to allow for any problems that may
    occur. So in total it would take 27 days to have my digipaks complete.
Plan of Budget
•   Flyer:40,000 flyers cost £435 to print. They are available in the following paper
    types:




       I would use a silk finish (extra thick) for my flyers costing £435 for
       40,000.
Plan of Budget
•   Programme: For the programme I would use the same silk finish used on the
    flyer to keep the look consistent. This would cost £3090 for a four page book.
Plan of Budget
• Digipak: For 40,000 digipaks to be
  printed and sent it would cost £16,200
  as 2000 copies cost £810, I multiplied
  this by 20 to get my figure of £16,200.
Final Budget
• My over all budget for the production
  of my programme, digipak and flyer is
  £19,725. I will bring this budget up to
  £20,000 to make room for any added
  fees that may occur.
Front of Digipak plan
Back of Digipak plan
Programme plan
Page 1:   Page 4:
Programme plan
Page 2:
Programme plan
 Page 2:
Flyer plan

More Related Content

Similar to Unit17presentation

Presentation1
Presentation1Presentation1
Presentation1
Paigeamber123
 
The Presentation
The PresentationThe Presentation
The Presentation
awreade
 
Unit 13 - LO4
Unit 13 - LO4Unit 13 - LO4
Unit 13 - LO4
Morgan Pearson
 
Unit 30 LO3
Unit 30 LO3Unit 30 LO3
Unit 30 LO3
jessraymond1
 
Unit 14 LO3
Unit 14 LO3Unit 14 LO3
Unit 14 LO3
jessraymond1
 
Unit 13 - LO5
Unit 13 - LO5Unit 13 - LO5
Unit 13 - LO5
Morgan Pearson
 
Production plan
Production planProduction plan
Production plan
lkirkland123
 
As Media Production Diary
As Media Production DiaryAs Media Production Diary
As Media Production Diary
markodjuricic
 
Easy studio presentation-new
Easy studio presentation-newEasy studio presentation-new
Easy studio presentation-new
Easy Studio
 
Unit 30 LO3-5
Unit 30 LO3-5Unit 30 LO3-5
Unit 30 LO3-5
Ldowley
 
Unit 13 - LO5
Unit 13 - LO5Unit 13 - LO5
Unit 13 - LO5
Morgan Pearson
 
Production plan
Production planProduction plan
Production plan
lkirkland123
 
Daily production evaluation
Daily production evaluation Daily production evaluation
Daily production evaluation
Jude McMichan
 
Advertising plan and schedules
Advertising plan and schedulesAdvertising plan and schedules
Advertising plan and schedules
Chris Yarwood
 
Production plan 1
Production plan 1Production plan 1
Production plan 1
abigaillucie
 
Task 1
Task 1Task 1
Task 1
indaclub50
 
(8) planning
(8) planning(8) planning
(8) planning
erinlstephen
 
Pop up design process
Pop up design processPop up design process
Pop up design process
Athi Prem
 
Sharmin and Christen 2
Sharmin and Christen 2Sharmin and Christen 2
Sharmin and Christen 2
Sharmin Miah
 
Production Plan
Production PlanProduction Plan
Production Plan
claireolney
 

Similar to Unit17presentation (20)

Presentation1
Presentation1Presentation1
Presentation1
 
The Presentation
The PresentationThe Presentation
The Presentation
 
Unit 13 - LO4
Unit 13 - LO4Unit 13 - LO4
Unit 13 - LO4
 
Unit 30 LO3
Unit 30 LO3Unit 30 LO3
Unit 30 LO3
 
Unit 14 LO3
Unit 14 LO3Unit 14 LO3
Unit 14 LO3
 
Unit 13 - LO5
Unit 13 - LO5Unit 13 - LO5
Unit 13 - LO5
 
Production plan
Production planProduction plan
Production plan
 
As Media Production Diary
As Media Production DiaryAs Media Production Diary
As Media Production Diary
 
Easy studio presentation-new
Easy studio presentation-newEasy studio presentation-new
Easy studio presentation-new
 
Unit 30 LO3-5
Unit 30 LO3-5Unit 30 LO3-5
Unit 30 LO3-5
 
Unit 13 - LO5
Unit 13 - LO5Unit 13 - LO5
Unit 13 - LO5
 
Production plan
Production planProduction plan
Production plan
 
Daily production evaluation
Daily production evaluation Daily production evaluation
Daily production evaluation
 
Advertising plan and schedules
Advertising plan and schedulesAdvertising plan and schedules
Advertising plan and schedules
 
Production plan 1
Production plan 1Production plan 1
Production plan 1
 
Task 1
Task 1Task 1
Task 1
 
(8) planning
(8) planning(8) planning
(8) planning
 
Pop up design process
Pop up design processPop up design process
Pop up design process
 
Sharmin and Christen 2
Sharmin and Christen 2Sharmin and Christen 2
Sharmin and Christen 2
 
Production Plan
Production PlanProduction Plan
Production Plan
 

Recently uploaded

How to Get CNIC Information System with Paksim Ga.pptx
How to Get CNIC Information System with Paksim Ga.pptxHow to Get CNIC Information System with Paksim Ga.pptx
How to Get CNIC Information System with Paksim Ga.pptx
danishmna97
 
Securing your Kubernetes cluster_ a step-by-step guide to success !
Securing your Kubernetes cluster_ a step-by-step guide to success !Securing your Kubernetes cluster_ a step-by-step guide to success !
Securing your Kubernetes cluster_ a step-by-step guide to success !
KatiaHIMEUR1
 
Alt. GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using ...
Alt. GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using ...Alt. GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using ...
Alt. GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using ...
James Anderson
 
Mind map of terminologies used in context of Generative AI
Mind map of terminologies used in context of Generative AIMind map of terminologies used in context of Generative AI
Mind map of terminologies used in context of Generative AI
Kumud Singh
 
Generative AI Deep Dive: Advancing from Proof of Concept to Production
Generative AI Deep Dive: Advancing from Proof of Concept to ProductionGenerative AI Deep Dive: Advancing from Proof of Concept to Production
Generative AI Deep Dive: Advancing from Proof of Concept to Production
Aggregage
 
Artificial Intelligence for XMLDevelopment
Artificial Intelligence for XMLDevelopmentArtificial Intelligence for XMLDevelopment
Artificial Intelligence for XMLDevelopment
Octavian Nadolu
 
Cosa hanno in comune un mattoncino Lego e la backdoor XZ?
Cosa hanno in comune un mattoncino Lego e la backdoor XZ?Cosa hanno in comune un mattoncino Lego e la backdoor XZ?
Cosa hanno in comune un mattoncino Lego e la backdoor XZ?
Speck&Tech
 
Goodbye Windows 11: Make Way for Nitrux Linux 3.5.0!
Goodbye Windows 11: Make Way for Nitrux Linux 3.5.0!Goodbye Windows 11: Make Way for Nitrux Linux 3.5.0!
Goodbye Windows 11: Make Way for Nitrux Linux 3.5.0!
SOFTTECHHUB
 
“Building and Scaling AI Applications with the Nx AI Manager,” a Presentation...
“Building and Scaling AI Applications with the Nx AI Manager,” a Presentation...“Building and Scaling AI Applications with the Nx AI Manager,” a Presentation...
“Building and Scaling AI Applications with the Nx AI Manager,” a Presentation...
Edge AI and Vision Alliance
 
GraphSummit Singapore | Neo4j Product Vision & Roadmap - Q2 2024
GraphSummit Singapore | Neo4j Product Vision & Roadmap - Q2 2024GraphSummit Singapore | Neo4j Product Vision & Roadmap - Q2 2024
GraphSummit Singapore | Neo4j Product Vision & Roadmap - Q2 2024
Neo4j
 
Uni Systems Copilot event_05062024_C.Vlachos.pdf
Uni Systems Copilot event_05062024_C.Vlachos.pdfUni Systems Copilot event_05062024_C.Vlachos.pdf
Uni Systems Copilot event_05062024_C.Vlachos.pdf
Uni Systems S.M.S.A.
 
Removing Uninteresting Bytes in Software Fuzzing
Removing Uninteresting Bytes in Software FuzzingRemoving Uninteresting Bytes in Software Fuzzing
Removing Uninteresting Bytes in Software Fuzzing
Aftab Hussain
 
Large Language Model (LLM) and it’s Geospatial Applications
Large Language Model (LLM) and it’s Geospatial ApplicationsLarge Language Model (LLM) and it’s Geospatial Applications
Large Language Model (LLM) and it’s Geospatial Applications
Rohit Gautam
 
Pushing the limits of ePRTC: 100ns holdover for 100 days
Pushing the limits of ePRTC: 100ns holdover for 100 daysPushing the limits of ePRTC: 100ns holdover for 100 days
Pushing the limits of ePRTC: 100ns holdover for 100 days
Adtran
 
Essentials of Automations: The Art of Triggers and Actions in FME
Essentials of Automations: The Art of Triggers and Actions in FMEEssentials of Automations: The Art of Triggers and Actions in FME
Essentials of Automations: The Art of Triggers and Actions in FME
Safe Software
 
GraphSummit Singapore | Graphing Success: Revolutionising Organisational Stru...
GraphSummit Singapore | Graphing Success: Revolutionising Organisational Stru...GraphSummit Singapore | Graphing Success: Revolutionising Organisational Stru...
GraphSummit Singapore | Graphing Success: Revolutionising Organisational Stru...
Neo4j
 
20240605 QFM017 Machine Intelligence Reading List May 2024
20240605 QFM017 Machine Intelligence Reading List May 202420240605 QFM017 Machine Intelligence Reading List May 2024
20240605 QFM017 Machine Intelligence Reading List May 2024
Matthew Sinclair
 
National Security Agency - NSA mobile device best practices
National Security Agency - NSA mobile device best practicesNational Security Agency - NSA mobile device best practices
National Security Agency - NSA mobile device best practices
Quotidiano Piemontese
 
TrustArc Webinar - 2024 Global Privacy Survey
TrustArc Webinar - 2024 Global Privacy SurveyTrustArc Webinar - 2024 Global Privacy Survey
TrustArc Webinar - 2024 Global Privacy Survey
TrustArc
 
みなさんこんにちはこれ何文字まで入るの?40文字以下不可とか本当に意味わからないけどこれ限界文字数書いてないからマジでやばい文字数いけるんじゃないの?えこ...
みなさんこんにちはこれ何文字まで入るの?40文字以下不可とか本当に意味わからないけどこれ限界文字数書いてないからマジでやばい文字数いけるんじゃないの?えこ...みなさんこんにちはこれ何文字まで入るの?40文字以下不可とか本当に意味わからないけどこれ限界文字数書いてないからマジでやばい文字数いけるんじゃないの?えこ...
みなさんこんにちはこれ何文字まで入るの?40文字以下不可とか本当に意味わからないけどこれ限界文字数書いてないからマジでやばい文字数いけるんじゃないの?えこ...
名前 です男
 

Recently uploaded (20)

How to Get CNIC Information System with Paksim Ga.pptx
How to Get CNIC Information System with Paksim Ga.pptxHow to Get CNIC Information System with Paksim Ga.pptx
How to Get CNIC Information System with Paksim Ga.pptx
 
Securing your Kubernetes cluster_ a step-by-step guide to success !
Securing your Kubernetes cluster_ a step-by-step guide to success !Securing your Kubernetes cluster_ a step-by-step guide to success !
Securing your Kubernetes cluster_ a step-by-step guide to success !
 
Alt. GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using ...
Alt. GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using ...Alt. GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using ...
Alt. GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using ...
 
Mind map of terminologies used in context of Generative AI
Mind map of terminologies used in context of Generative AIMind map of terminologies used in context of Generative AI
Mind map of terminologies used in context of Generative AI
 
Generative AI Deep Dive: Advancing from Proof of Concept to Production
Generative AI Deep Dive: Advancing from Proof of Concept to ProductionGenerative AI Deep Dive: Advancing from Proof of Concept to Production
Generative AI Deep Dive: Advancing from Proof of Concept to Production
 
Artificial Intelligence for XMLDevelopment
Artificial Intelligence for XMLDevelopmentArtificial Intelligence for XMLDevelopment
Artificial Intelligence for XMLDevelopment
 
Cosa hanno in comune un mattoncino Lego e la backdoor XZ?
Cosa hanno in comune un mattoncino Lego e la backdoor XZ?Cosa hanno in comune un mattoncino Lego e la backdoor XZ?
Cosa hanno in comune un mattoncino Lego e la backdoor XZ?
 
Goodbye Windows 11: Make Way for Nitrux Linux 3.5.0!
Goodbye Windows 11: Make Way for Nitrux Linux 3.5.0!Goodbye Windows 11: Make Way for Nitrux Linux 3.5.0!
Goodbye Windows 11: Make Way for Nitrux Linux 3.5.0!
 
“Building and Scaling AI Applications with the Nx AI Manager,” a Presentation...
“Building and Scaling AI Applications with the Nx AI Manager,” a Presentation...“Building and Scaling AI Applications with the Nx AI Manager,” a Presentation...
“Building and Scaling AI Applications with the Nx AI Manager,” a Presentation...
 
GraphSummit Singapore | Neo4j Product Vision & Roadmap - Q2 2024
GraphSummit Singapore | Neo4j Product Vision & Roadmap - Q2 2024GraphSummit Singapore | Neo4j Product Vision & Roadmap - Q2 2024
GraphSummit Singapore | Neo4j Product Vision & Roadmap - Q2 2024
 
Uni Systems Copilot event_05062024_C.Vlachos.pdf
Uni Systems Copilot event_05062024_C.Vlachos.pdfUni Systems Copilot event_05062024_C.Vlachos.pdf
Uni Systems Copilot event_05062024_C.Vlachos.pdf
 
Removing Uninteresting Bytes in Software Fuzzing
Removing Uninteresting Bytes in Software FuzzingRemoving Uninteresting Bytes in Software Fuzzing
Removing Uninteresting Bytes in Software Fuzzing
 
Large Language Model (LLM) and it’s Geospatial Applications
Large Language Model (LLM) and it’s Geospatial ApplicationsLarge Language Model (LLM) and it’s Geospatial Applications
Large Language Model (LLM) and it’s Geospatial Applications
 
Pushing the limits of ePRTC: 100ns holdover for 100 days
Pushing the limits of ePRTC: 100ns holdover for 100 daysPushing the limits of ePRTC: 100ns holdover for 100 days
Pushing the limits of ePRTC: 100ns holdover for 100 days
 
Essentials of Automations: The Art of Triggers and Actions in FME
Essentials of Automations: The Art of Triggers and Actions in FMEEssentials of Automations: The Art of Triggers and Actions in FME
Essentials of Automations: The Art of Triggers and Actions in FME
 
GraphSummit Singapore | Graphing Success: Revolutionising Organisational Stru...
GraphSummit Singapore | Graphing Success: Revolutionising Organisational Stru...GraphSummit Singapore | Graphing Success: Revolutionising Organisational Stru...
GraphSummit Singapore | Graphing Success: Revolutionising Organisational Stru...
 
20240605 QFM017 Machine Intelligence Reading List May 2024
20240605 QFM017 Machine Intelligence Reading List May 202420240605 QFM017 Machine Intelligence Reading List May 2024
20240605 QFM017 Machine Intelligence Reading List May 2024
 
National Security Agency - NSA mobile device best practices
National Security Agency - NSA mobile device best practicesNational Security Agency - NSA mobile device best practices
National Security Agency - NSA mobile device best practices
 
TrustArc Webinar - 2024 Global Privacy Survey
TrustArc Webinar - 2024 Global Privacy SurveyTrustArc Webinar - 2024 Global Privacy Survey
TrustArc Webinar - 2024 Global Privacy Survey
 
みなさんこんにちはこれ何文字まで入るの?40文字以下不可とか本当に意味わからないけどこれ限界文字数書いてないからマジでやばい文字数いけるんじゃないの?えこ...
みなさんこんにちはこれ何文字まで入るの?40文字以下不可とか本当に意味わからないけどこれ限界文字数書いてないからマジでやばい文字数いけるんじゃないの?えこ...みなさんこんにちはこれ何文字まで入るの?40文字以下不可とか本当に意味わからないけどこれ限界文字数書いてないからマジでやばい文字数いけるんじゃないの?えこ...
みなさんこんにちはこれ何文字まで入るの?40文字以下不可とか本当に意味わからないけどこれ限界文字数書いてないからマジでやばい文字数いけるんじゃないの?えこ...
 

Unit17presentation

  • 1. Client My Client is Nicki Minaj. I will be producing a Digipak for her album, a flyer advertising her tour and album and a programme for her tour.
  • 2. Plan of time • Flyer: I will allow 5 days to design the final flyer and sent it to the printer to print the final product, after research I found it would take 2 days to produce the flyers and have them sent off. So it total I will allow an 8 day period for producing the flyers. The extra day accounts for any problems with postage or any problems with the flyer being printed. • Programme: To print the programme it will take a little longer than the flyer as there are more pages, more pictures and more work that has to go in to the making of it. After looking at printing companies I will allow 2 weeks in total for the final products to be complete. 5 days will be allowed for the designing of the programme, leaving 9 days to have the final programme printed and sent back, again leaving some time for any problems that may occur. • Digipak: After doing some research I found that it takes 12 working days to produce my digipaks. I would then have to allow for designing time, 5 days, shipping time, sending it to them and them sending me the product, 7 days, and 3 days to allow for any problems that may occur. So in total it would take 27 days to have my digipaks complete.
  • 3. Plan of Budget • Flyer:40,000 flyers cost £435 to print. They are available in the following paper types: I would use a silk finish (extra thick) for my flyers costing £435 for 40,000.
  • 4. Plan of Budget • Programme: For the programme I would use the same silk finish used on the flyer to keep the look consistent. This would cost £3090 for a four page book.
  • 5. Plan of Budget • Digipak: For 40,000 digipaks to be printed and sent it would cost £16,200 as 2000 copies cost £810, I multiplied this by 20 to get my figure of £16,200.
  • 6. Final Budget • My over all budget for the production of my programme, digipak and flyer is £19,725. I will bring this budget up to £20,000 to make room for any added fees that may occur.