SlideShare a Scribd company logo
1 of 27
D M A I C
                       Six Sigma Tollgate



                                Turnover
                                Reduction




Kelly Kozik – Project Manager
                                                  1
D M A I C


                          Six Sigma

99.9% Quality is…...
•One hour of unsafe drinking water per month.
•Two unsafe plane landings per day at O’Hare International
airport.
•500 incorrect surgical operations each week.
•50 newborn babies dropped by doctors every day.
Six Sigma Quality is…...
•One second of unsafe drinking water every six years.
•One unsafe landing in all major United States airports in 10
years.
•1 incorrect surgical operation in 20 years.
•3 newborn babies dropped by doctors in 100 years.
(Medco Green Belt training manual 2005)
D M A I C

  Suggested Deliverables for the Define Stage of a
                Six Sigma Project



•Problem / Objective Statement
•Charter / Timeline
•Financial Estimate
•Baseline Data
•Conclusions/Next Steps
D M A I C

             Problem/Objective Statement
Problem Statement:
Between May 1, 2005 - April 30, 2006, the Willingboro
pharmacy lost 268 employees in the following areas;
pharmacy tech, warehouse, support and Rph. This cost the
pharmacy approximately $2 million in turnover expenses.
Objective Statement:
To reduce voluntary turnover in four classifications by 20%
annualized.

   Pharmacist
   Technician
   Support
   Warehouse
D M A I C


                                                      Project Charter
Team Name: Turnover Reduction
Process: Recruitment and Retention                                         Duration:                                   Team Meetings:
                                                                                                                       Every T hursday, 1:30pm - 2:30pm
Sponsor:                          Cham pion:                            Team w ork Location: Willingboro, NJ
Team Members                      Function                       Team Role           LOE      Attendance               Process Custom er (internal/external):
Ron Wizimirski      T raining                            Black Belt                                                    Internal: Hiring managers, employees
Kelly Kozik         Recruitment                          T eam Leader                                                  External: applicants
Pam West            Support                              T eam member                                                  Critical to Quality Metric(s):
Sam Addy            Customer Service                     T eam member                                                  T urnover
Debbie Bertino      T raining                            Meeting Minutes
Josef Blankenburg   Inventory                            T eam member                                                  Financial ‘Business Driver(s) Im pacted:
Chris Bizarro       Human Resources                      Champion                                                      cost of turnover
Cory Angelini       Business Planning                    T eam member
Bob Oehrle          Warehouse                            T eam Member                                                  Project Scope:
                                                                                                                       Identify and remove constraints to hiring / rentention of
                                                                                                                       employees


Problem Statement:
Between May 1, 2005 - April 30, 2006, the Willingboro pharmacy lost 268 employees in the following areas; pharmacy tech, warehouse, support and Rph. T his cost the pharmacy
approximately $2 million in turnover costs.




See timeline on next page
D M A I C


                                                 Timeline
Team Name: Turnover Reduction                                                     Timeline
  Step    11-May-06   15-Sep-06   15-Oct-06   15-Dec-07   15-Mar-07   30-Jun-07   31-Dec-07   30-Sep-08    Tools Used



Define




Measure




Analyze




Improve




Control



              Plan
D M A I C
                            Revised Turnover Cost Analysis
Analysis Period: May 1, 2005 - April 30, 2006
                                                   RPh            Tech        Support     Whse
Number of Terminations                                      6           77          106         79
Entry Wage for Job Class                                40.00        10.75        10.00      10.00
Average Wage for Job Class                              46.99        11.63        11.17      10.76
Average Trainer Wage for Job Class                      46.99        13.66        13.09      12.56
Hiring Cost per Hire                                   152.00       212.50       394.00     273.00
Total Hiring Cost                                      912.00     16362.50     41764.00 21567.00
Training Cost                                       19,276.86   118,754.25    79,529.75 75,420.88
Learning Curve Cost @ OT                            35,524.44   161,191.80   142,082.40 51,002.40
Time to Fill Position (days)                             71.0         36.9         47.6       37.2
Vacancy Cost @ OT                                  171,580.63   283,237.02   483,080.16 271,041.33
Turnover Cost for Job Class                        227,293.93   579,545.57   746,456.31 419,031.61
Turnover Cost per Employee                          37,882.32     7,526.57     7,042.04   5,304.20

Total Cost for 4 Primary Categories             1,972,327.41
Inputs:
Total Training Hrs (no productivity)                     348         7097         6284       6320
Total Peer Trainer Hrs (no productivity)                 114          212         1275        973
RPh Trainer Hrs (no productivity)                                     842
Learning Impact (ramp-up prod)
  Productivity Post-Training                             40%         40%          50%         50%
  Days to 100% Productivity                                35          50           40          20
  Labor Hrs to Make Up Productivity                        84         120           80          40
D M A I C


                                              Turnover
                          TOTAL               JOB ABANDONMENT   INVOLUNTARY   VOLUNTARY
SUPPORT                               106             34             33           39
                                                                                   
WAREHOUSE                               79            23             26           30
                                                                                   
TECHS                                   77            16             18           43
                                                                                   
RPH                                       6           1               0           5
                                                                                   
                                           
                                  268                 74             77          117
% of total turnover                                  27%            29%          44%


Voluntary resignations 
account for 44% of the 
annual attrition.
D M A I C

  Suggested Deliverables for the Measure
       Stage of a Six Sigma Project
• Completed checklist on 117 voluntary
  terminations from May 2005 – April 2006
   – Compiled info from voluntary terminations
   – Reviewed exit interviews, work schedules, training,
     referral, resignation letters, schedule changes, etc.
• Mailed an abbreviated Exit Interview/Cover Letter
  to those employees who had no exit interview.
• Completing checklist on employees who left from
  April 2006 to present to get additional data.
• Summarized and evaluated collected data
# Observations




                          0
                               20
                                      40
                                                 60
                                                        80
                                                              100
                                                                    120
                                                                            140
                                                                                        160
              personal
               reasons




        career change




        disat w/ mgmt,
            promo,
           working
          conditions,




                family




Group

             return to
              school
                                                                                                  2005/2006 reasons for leaving
                                                                                                                                  Pareto Analysis – Baseline Data




         disat w/ shift
          or schedule




        transportation
                          0
                                                                                              1




                              0.1
                                    0.2
                                           0.3
                                                  0.4
                                                        0.5
                                                              0.6
                                                                    0.7
                                                                          0.8
                                                                                  0.9
                                                                                                                                                                    D M A I C
D M A I C
                                              Pareto Analysis – Baseline Data


                                                      2005/2006 source

                                                                                                                            1


120                                                                                                                         0.9


                                                                                                                            0.8
100
                                                                                                                            0.7


80                                                                                                                          0.6


                                                                                                                            0.5
60
                                                                                                                            0.4


40                                                                                                                          0.3


                                                                                                                            0.2
20
                                                                                                                            0.1


 0                                                                                                                          0
      employee r ef erral   walk- ins   ads        schools   int er net   job f air   ot her   employment   t r ansf er s
                                                                                                 agency
                                                             Gro up
D M A I C


 Current Team Status - Progress
• Summarized and evaluated collected data
  and concluded that the data was
  insufficient.
• Focus groups were formed to extract data
  from current employees to find root cause.
D M A I C


 Cause and Effect Diagram
 4 Focus Groups – Over 200 Ideas Generated



                                        People           Method             Measure
                   Job
 Bonus for                                          Interview       Never get an
 performance                  More cross                            interview
                              training                   Orientation                        Emr Process
               Compensation
                                    Emp. Refrerral                            Training    Recognition
                                                            Clear Job
                   Rotating functions                       Descriptions
 Job is not what                                                                                        EMPLOYEE
 I expected                                   Cleaner Working areas         More chairs                 TURNOVER
                     Lack of growth                                         needed
                     opportunities             More decappers
Sups aren’t                                                                   Equipment
encouraging                                 Tools          More
                   Communication                           handhelds                         Make cafeteria
emp.                                                                                         better
                                                                              Day care
Development        No follow-up            Materials
during emr                                                 Environment

                   Language             Employee
                   barriers             meetings
                                        needed
D M A I C
                    Affinity Diagram
         Evolved into 13 problem statements

•   #1-Need a cleaner place to         •   #8-Emp pay & incentives
    work                               •   # 9-Recognition incentives are
•   #2-Emp don’t have a clear              inconsistently…
    understanding of growth opp.       •   #10-Ramifications of Union
•   #3-Emr process is not effective        Contract
•   #4-No consistency in emp           •   #11-Onboarding process…
    training                               transition 90 day emp..
•   #5-Schedules are built solely on   •   #12-Company exhibits
    Bus needs..                            favoritism & inconsistency…
•   #6-Communication…                  •   #13-Available resources to do
•   #7-Better understanding of job         their job
    expectations
D M A I C

                 Interrelationship Diagraph
                Prioritized into 7 statements
•   #1-Need a cleaner place to work              Total Affects   •   #8-Emp pay & incentives                     Total Affects
                                                                 •   is affected by 9, 12, 2, 10, 6, 7
•   is affected by # 4, 7, 13                                    •       Affects 9
                                                 3                                                                   7
•                                                                •   # 9-Recognition incentive are inconsistently…
•   #2-Emp don’t have a clear understanding of growth opp.       •   is affected by 8, 7, 6, 12
•   is affected by # 3, 4, 5, 7, 11, 12                          •       Affects 8, 12
•       Affects 8, 12                                                                                                6
                                                  8              •   #10-Ramifications of Union Contract
•   #3-Emr process is not effective
•   is affected by # 4, 6, 5, 12, 7                              •   is affected by 7 Affects 8
                                                                                                                2
•       Affects 2, 4, 11
                                                  8              •   #11-Onboarding process…transition 90 day emp..
•   #4-No consistency is emp training                            •   is affected by 13, 4, 3, 6
•   is affected by # 3, 6, 5                                     •       Affects 7, 5, 2
                                                                                                                7
•       Affects 2, 13, 12, 11
                                                  7
•   #5-Schedules are built solely on Bus needs..
•   is affected by 7, 11
•       Affects 3, 12                             4
•   #6-Communication…
•   is affected by 4, 3, 2, 12, 11, 9, 8, 7
                                                  8
•   #7-Better understanding of job expectations
•   is affected by 4, 13, 11, 12, 6
•       Affects 8, 9, 10, 1, 2, 5                 11
D M A I C
                                                 Prioritization Matrix
 Identified topics to be
                                                                                           Ability
addressed at analyzing
                                                                              Is it        to
          phase
                                                                              feasible     assign
                                                                 Does it      from a       owner
                             Ability to                          affect all   cost         ship to   Reasona
                             quantify       Quick to             employee     perspectiv   single    bility of   Easily     TOT
                             results        implement?           groups?      e?           source    success     accepted   AL

Emp don't have a clear
understanding of
growth opp.                                                                                                                  247

No consistency in emp
training                                                                                                                     229

Schedules are built
solely on bus. needs                                                                                                         185

Recognition incentives
are inconsistently
applied                                                                                                                      213

Better understanding of
job expectations/ the on
boarding process does
not effectively transition
an employee (prior and
post hire)                                                                                                                   241

Company exhibits
favoritism &
inconsistency in its
decision making                                                                                                              147

                             1.      Little or no relationship
                             3.      Some relationship
                             5.      Strong relationship
D MA I C


         Areas of Improvement
• No Consistency in Employee Training

• Recognition Incentives are Inconsistently Applied

• Better Understanding of Job Expectations / On-boarding
  Process Does Not Effectively Transition and Employee

• Employees Do Not Have a Clear Understanding of Growth
  Opportunities
D MA I C

           Action Teams and Improvement
                     Processes
                         PROCESS          PROCESS OWNER           ORIGINATION DATE

                                    Q
                                    u
Job/Shift Rebid Process            XHR/ Departments                   Q2 2007

New Emr Process                    XHR (Training)                     Q2 2007

Internal Job Selection             XHR (Recruiting)                   Q2 2007

Above and Beyond                   XReward & Recognition's Team       Q2 2007

Department Goals and Metrics       XDepartments                       Q2 2007

Attendance Rewards                 XReward & Recognition's Team       Q1 2007

Buddy Program                      XSurvey Action Team

HR Information Days                XHR                                Q1 2007

Shift Meetings                     XDepartments                       Q2 2007

Quarterly Communication Sessions   XDirectors                         Q2 2007

Survey Action Teams                XDirectors                         Q2 2007

Prehire                             HR (Recruiting)                   Q2 2007

Post hire on-boarding
D MA I C
Please take a few minutes and answer the following questions as accurately as you can. This questionnaire is completely anonymous.
1.What is your level of awareness of the following:                  Select one the following responses:

                                                        ■  Heard About      ■  Don’t know      ■  Know a lot       ■  Helped 
                                        ■ No Idea
                                                              It              the details         about it          create it

  Job/Shift Rebid Process                                                                                           
  New EMR Process                                                                                                   
  Internal Job Selection                                                                                            
  Above and Beyond                                                                                                  
  Department Goals and Metrics                                                                                      
  Attendance Rewards                                                                                                
  Medco & Willingboro Newsletter                                                                                    
  “Buddy” Program                                                                                                   
  HR Information Days                                                                                               
  Shift Meetings                                                                                                    
  Quarterly Communication 
                                                                                                                    
  Sessions
  Survey Action Teams                                                                                               

1.Have you been a member of a team that developed any of the above? Please circle. Yes or No
2.If not, why?  Didn’t want to Didn’t know about it  I was not permitted
3.How long have you worked at Medco? Check One.
0-1year 1-3years 3-5years 5-8years 8 years or more
1.What department do you work in? Check One.
Admin BP CS HR Maint QRT Rph Security Support Syst. Coord. TA Tech Warehouse
1.What shift are you on? 1st  2nd 3rd
D MA I C



                Employees do not have a clear understanding of growth opportunities

                                                                EMR      Shift Rebid   Quarterly   Internal Job
                                                               Process    Program       HR Info      Selection
Item #                               Issues                                              Days


  1      No Job rotation into new skills                         X           X

  2      Only scheduled in areas where efficiencies are high     X           X

  3      Rated on items out of your control                      X
         Do not understand EMR numbers and effect on 
  4      promotion                                               X
         Do not understand development resources that are 
  5      available                                               X           X            X

  6      No promotion availability                               X                                      X

  7      Never receive feedback on promotion applications        X                        X             X

  8      Need development plan for growth                        X           X
D MA I C
Please take a few minutes and answer the following questions as accurately as you can. This questionnaire is completely anonymous.
1.What is your level of awareness of the following:                  Select one the following responses:

                                                        ■  Heard About      ■  Don’t know      ■  Know a lot       ■  Helped 
                                        ■ No Idea
                                                              It              the details         about it          create it

  Job/Shift Rebid Process                                                                                           
  New EMR Process                                                                                                   
  Internal Job Selection                                                                                            
  Above and Beyond                                                                                                  
  Department Goals and Metrics                                                                                      
  Attendance Rewards                                                                                                
  Medco & Willingboro Newsletter                                                                                    
  “Buddy” Program                                                                                                   
  HR Information Days                                                                                               
  Shift Meetings                                                                                                    
  Quarterly Communication 
                                                                                                                    
  Sessions
  Survey Action Teams                                                                                               

1.Have you been a member of a team that developed any of the above? Please circle. Yes or No
2.If not, why?  Didn’t want to Didn’t know about it  I was not permitted
3.How long have you worked at Medco? Check One.
0-1year 1-3years 3-5years 5-8years 8 years or more
1.What department do you work in? Check One.
Admin BP CS HR Maint QRT Rph Security Support Syst. Coord. TA Tech Warehouse
1.What shift are you on? 1st  2nd 3rd
D MA I C


                                                         Impact Survey
This demographic informat ion is optional. However, it may be helpful in analyzing the dat a. Thank you.
De par t m en t
Sh i f t
How lon g have you w ork ed f or Medco? -
Circle one opt ion
                                                         Less than 1 yr      1-3yrs       3-5yrs          more than 5yrs
Ag e – ci r cl e on e o pt i on                          18-25       26-34            35-42          43-50              50 +
Gen d er – ci r cl e on e o pt i on                      M            F
Tot al y e ar s i n t h e w o r k f o r ce – ci r cl e
on e opt i on
                                                         Less than 1 yr      1-3yrs       3-5yrs          5-7 yrs        more than 7 years

                                                                                          St r on g l y        Ag r ee             N eu t r a l   Di sag r ee
                                                                                                                                                                St r on g l y Di sag r ee
                                                                                           Ag r ee
                                                                                                                                                                             5
                                                                                               1                    2                   3             4
Medco’s new hire processes make it difficult for a newly hired
employee to do a good job.
Medco’s new hire processes make it easy for a newly hired
employee to find things in and around the pharmacy.
I think it’s important that new employees learn what is expected of
them right away.
The company clearly communicates how people are selected for
new positions.
I understood the job rebidding process we went through last
summer.
When I was a new employee, it was important to me to find a
person or people to have breaks and lunch with right away.
I don’t care if I have my schedule in advance.

I believe that there are internal promotion opportunities for
employees at Medco.

As a new employee, I got enough training that I didn’t need to ask
questions once I was assigned to the work area.
I believe that it’s my responsibility to figure out how to be
successful at my job.
I want to know how my job affects the rest of the department

I want to know ahead of time what I will be doing (at least a week
in advance).
D MA I C


                Turnover reduction / savings
                                                                                                                         52-week Rolling 52-week Annual
                                 52-week Rolling Average                                      Weekly                      Average Wkly       Turnover
Week Ending:            1/0/1900       Headcount           52-week Rolling Average Terms    Headcount     Weekly Terms      Turnover      Percentage Rate
  Location                                         Chg vs.                         Chg vs.        Chg vs.        Chg vs.          Chg vs.         Chg vs. 2008
 Description      Job Category Current              Prior Current                   Prior Current Prior Current Prior Current Prior Current Prior Goals
NJ WILLINGBORO
                Back End Support      444.29           1.08    2.00    8.66   1.95%      -0.63   0.0058   -470.99   0.3039      -4.70      30.00%      29.41%    0.00%   -30.91% 30%
                Pharm Tech            316.31           1.27    2.00    8.66   2.74%      -0.02   0.0064   -325.99    0.33       -3.67      15.00%      14.36%    0.00%   -33.33% 15%
                Pharmacist            133.35           0.35    0.00    0.00   0.00%      -0.17   0.0012   -141.00    0.06       -0.94      5.00%       4.87%     0.00%    -6.77% 5%
NEW JERSEY AT HOME
                Pharmacist            48.27            2.13    0.00                      -0.08   0.0028   -76.00    0.145       -0.86      5.00%       4.83%     0.00%   -8.67%   5%



                  Project                            Major Metric                                 Major Metric                                           Cost / Savings
                                                                                  Baseline          Q2 Avg                   Variance               Q1 - Q2 2008 Est 2008 TY
    Turnover Reduction                                                                           As of June W4

                    RPH                              RPH % Turnover                    5.47%         3.71%                    (1.76 Pts)        $        (21,350) $ (42,700)
                    Tech                             Tech % Turnover                  52.82%         30.68%                  (22.14 Pts)        $        (88,782) $ (177,564)
               Support & Whse                   Support & Whse Turnover %             59.44%         25.60%                  (33.84 Pts)        $       (153,836) $ (307,673)
                                                                                                                                                      $263,968       $527,937

                             Mid-year (Q2) metrics 20% savings met. Annualized savings of $1M/50%
D MA I C


        Control Plan Strategy
• Our recommendations are based on current
  process/team and employee data
• In order to control this turnover reduction
  we will rely on continued feedback from the
  survey actions teams and our annual
  employee surveys. The processes will then
  need to be adjusted accordingly.
D MA I C


                                  Recommendations
VERY WELL RECEIVED, SHOULD BE MAINTAINED:                                     WELL RECEIVED, BUT NEED TO BE BETTER COMMUNICATED
                                                                              BY PROCESS OWNERS:
•    DEPT. GOALS + METRICS
     Employees unequivocally want to know about their job and how it          •    ABOVE & BEYOND (WOW Program)
     affects their department. This program should definitely be maintained        This program is well supported and recognized by the employee
     and communicated at the dept. level.                                          population and should continue. There is an opportunity to reach 37%
•    SHIFT MEETINGS                                                                more employees who are either unaware of the work being done or
     Employees feel strongly that this is a positive improvement, therefore        who think it needs improvement. Better communication of the awards
     we recommend it continue. Seventy three percent find it useful                and results
•    NEW HIRE PROCESS                                                         •    ATTENDANCE REWARDS
     Most of the employee population has not been through this process             This program is highly supported by employees; however the program
     (38% were unaware), but we recommend it continue and be evaluated             details and the implementation of the rewards should be evaluated and
     periodically.                                                                 communicated to employees. There seemed to be confusion on award
                                                                                   criteria.
OPPORTUNITY FOR IMPROVEMENT:                                                  •    INTERNAL JOB SELECTIONS
                                                                                   We strongly recommend improving on the communication to the
                                                                                   employees how this process works. Over fifty percent of the employees
•    EMR PROCESS                                                                   responded either neutral or negative.
     Overall this process has shown improvement, however additional
     progress is needed with regard to career discussions.
                                                                              •    QUARTERLY COMMUNICATION SESSIONS
                                                                                   The findings were that most employees do not know what these
•    BUDDY PROGRAM                                                                 sessions are. There is a need to communicate the purpose more
     Employees strongly support the concept of this program and its                effectively.
     potential effectiveness. Thirty five percent of the employees had no          Type of information employees would like to see presented
     positive or negative reply. This could mean they were unaware of the
     program. The recommendation is to re-establish, re-evaluate, and              Cost=24.19%                       Quality=30.38% Willingboro
     revise this program to meet the employee and department needs                 specific info=39.70% Other=5.72%

•    WILLINGBORO NEWSLETTER                                                   •    SURVEY ACTION
     Had a positive impact on employees and the recommendation is to               Results show there is a definite opportunity on communicating the
     restart the distribution. Sixty five percent wanted a Willingboro             programs and their results to employees. Fifty three percent were not
     specific newsletter                                                           aware of the work being done, however fifty percent felt it was
                                                                                   valuable.
D MA I C


 Turnover reduction / savings
                                                                                    52-week Rolling 52-week Annual
                          52-week Rolling 52-week Rolling Weekly                     Average Wkly Retention
  Week Ending: 2/19/2011 Average Headcount Average Terms Headcount      Weekly Terms Turnover Percentage Rate
   Location                        Chg vs.      Chg vs.        Chg vs.      Chg vs.       Chg vs.       Chg vs. 2011
  Description Job Category Current Prior Current Prior Current Prior Current Prior Current Prior Current Prior Goals


NJ WILLINGBORO
           Back End Support 449.04    (0.64) 0.66 (0.04) 437     0.00      0     (2.00) 0.15% -0.01% 92.21% 0.44% 90%
           Pharm Tech        305.92   0.26   0.77 (0.02) 309     0.00      0     (1.00) 0.25% -0.01% 86.60% 0.34% 85%
           Pharmacist        126.40   (0.09) 0.08 0.00    125    0.00      0      0.00 0.06% 0.00% 96.84% 0.00% 96%
D MA I C


Turnover reduction snapshot
 •   2006 turnover
 •   RPH 10%
 •   Pharmacy Technician 65%
 •   Pharmacy Support (shipping and packing) 60%
 •   Warehouse 80%

 •   2008 turnover was reduced
 •   RPH 5.47%
 •   Pharmacy Technician 52.4%
 •   Pharmacy Support (shipping and packing) 59.44*
 •   Warehouse 59%.44*
 •   (Operations made the decision to measure support and warehouse as one in early 2007)
 •   Mid-year Q2 metrics 20% savings met (slide 23). Annualized savings of $1M/50%

 •   Retention of February 2011
 •   RPH 96.84% (3.16 turnover)
 •   Pharmacy Technician 86.6% (13.4% turnover)
 •   Pharmacy Support & Warehouse 92.21% (7.79% turnover)

More Related Content

What's hot

Employee Attrition Rate, MBA HR, Final Project Report.
Employee Attrition Rate, MBA HR, Final Project Report.Employee Attrition Rate, MBA HR, Final Project Report.
Employee Attrition Rate, MBA HR, Final Project Report.GK Sinha
 
A study on level of employee job satisfaction conducted at bharathi associate...
A study on level of employee job satisfaction conducted at bharathi associate...A study on level of employee job satisfaction conducted at bharathi associate...
A study on level of employee job satisfaction conducted at bharathi associate...Projects Kart
 
A project report on a study on employees job satisfaction @ enjayes spices an...
A project report on a study on employees job satisfaction @ enjayes spices an...A project report on a study on employees job satisfaction @ enjayes spices an...
A project report on a study on employees job satisfaction @ enjayes spices an...Subodh G Krishna
 
ATTRITION,EMPLOYEE RETENTION
ATTRITION,EMPLOYEE RETENTIONATTRITION,EMPLOYEE RETENTION
ATTRITION,EMPLOYEE RETENTIONMADAN PANDIA
 
DABUR MICRO AND MACRO ENVIRONMENT
DABUR MICRO AND MACRO ENVIRONMENTDABUR MICRO AND MACRO ENVIRONMENT
DABUR MICRO AND MACRO ENVIRONMENTMaher Manan
 
Performance appraisal process
Performance appraisal processPerformance appraisal process
Performance appraisal processsamueltee212
 
Job satisfaction Research based project-presentation
Job satisfaction Research based project-presentationJob satisfaction Research based project-presentation
Job satisfaction Research based project-presentationHARSH SHAH
 
Employee Attrition
Employee AttritionEmployee Attrition
Employee AttritionVinay sattur
 
HR Practices at HUL
HR Practices at HUL HR Practices at HUL
HR Practices at HUL Madhav Desai
 
A study on level of job satisfaction in quality dept employees
A study on level of job satisfaction in quality dept employeesA study on level of job satisfaction in quality dept employees
A study on level of job satisfaction in quality dept employeesProjects Kart
 
A research on effectiveness of training & development programme at t. t. min...
A research  on effectiveness of training & development programme at t. t. min...A research  on effectiveness of training & development programme at t. t. min...
A research on effectiveness of training & development programme at t. t. min...Projects Kart
 
Cipd. Hr.Recruitment
Cipd. Hr.RecruitmentCipd. Hr.Recruitment
Cipd. Hr.Recruitmentguest4d05539
 
Hr policies of hul
Hr policies of hulHr policies of hul
Hr policies of hulShiwani Sahu
 
A study on level of job satisfaction amongst quality dept employees in go go ...
A study on level of job satisfaction amongst quality dept employees in go go ...A study on level of job satisfaction amongst quality dept employees in go go ...
A study on level of job satisfaction amongst quality dept employees in go go ...Projects Kart
 
FMCG Industry
FMCG IndustryFMCG Industry
FMCG IndustryBir Singh
 
Performance appraisal & employee satisfaction in pharmaceutical industry in b...
Performance appraisal & employee satisfaction in pharmaceutical industry in b...Performance appraisal & employee satisfaction in pharmaceutical industry in b...
Performance appraisal & employee satisfaction in pharmaceutical industry in b...Ahmed Mahin
 

What's hot (20)

Employee Attrition Rate, MBA HR, Final Project Report.
Employee Attrition Rate, MBA HR, Final Project Report.Employee Attrition Rate, MBA HR, Final Project Report.
Employee Attrition Rate, MBA HR, Final Project Report.
 
A study on level of employee job satisfaction conducted at bharathi associate...
A study on level of employee job satisfaction conducted at bharathi associate...A study on level of employee job satisfaction conducted at bharathi associate...
A study on level of employee job satisfaction conducted at bharathi associate...
 
A project report on a study on employees job satisfaction @ enjayes spices an...
A project report on a study on employees job satisfaction @ enjayes spices an...A project report on a study on employees job satisfaction @ enjayes spices an...
A project report on a study on employees job satisfaction @ enjayes spices an...
 
ATTRITION,EMPLOYEE RETENTION
ATTRITION,EMPLOYEE RETENTIONATTRITION,EMPLOYEE RETENTION
ATTRITION,EMPLOYEE RETENTION
 
DABUR MICRO AND MACRO ENVIRONMENT
DABUR MICRO AND MACRO ENVIRONMENTDABUR MICRO AND MACRO ENVIRONMENT
DABUR MICRO AND MACRO ENVIRONMENT
 
Performance appraisal process
Performance appraisal processPerformance appraisal process
Performance appraisal process
 
Job satisfaction Research based project-presentation
Job satisfaction Research based project-presentationJob satisfaction Research based project-presentation
Job satisfaction Research based project-presentation
 
Employee Attrition
Employee AttritionEmployee Attrition
Employee Attrition
 
Employee retention
Employee retentionEmployee retention
Employee retention
 
HR Practices at HUL
HR Practices at HUL HR Practices at HUL
HR Practices at HUL
 
A study on level of job satisfaction in quality dept employees
A study on level of job satisfaction in quality dept employeesA study on level of job satisfaction in quality dept employees
A study on level of job satisfaction in quality dept employees
 
A research on effectiveness of training & development programme at t. t. min...
A research  on effectiveness of training & development programme at t. t. min...A research  on effectiveness of training & development programme at t. t. min...
A research on effectiveness of training & development programme at t. t. min...
 
Cipd. Hr.Recruitment
Cipd. Hr.RecruitmentCipd. Hr.Recruitment
Cipd. Hr.Recruitment
 
Hr policies of hul
Hr policies of hulHr policies of hul
Hr policies of hul
 
Godrej Industries - August 2012
Godrej Industries - August 2012Godrej Industries - August 2012
Godrej Industries - August 2012
 
A study on level of job satisfaction amongst quality dept employees in go go ...
A study on level of job satisfaction amongst quality dept employees in go go ...A study on level of job satisfaction amongst quality dept employees in go go ...
A study on level of job satisfaction amongst quality dept employees in go go ...
 
Employee engagement
Employee engagementEmployee engagement
Employee engagement
 
FMCG Industry
FMCG IndustryFMCG Industry
FMCG Industry
 
Performance appraisal & employee satisfaction in pharmaceutical industry in b...
Performance appraisal & employee satisfaction in pharmaceutical industry in b...Performance appraisal & employee satisfaction in pharmaceutical industry in b...
Performance appraisal & employee satisfaction in pharmaceutical industry in b...
 
EMPLOYEE ENGAGEMENT PROJECT
EMPLOYEE ENGAGEMENT PROJECTEMPLOYEE ENGAGEMENT PROJECT
EMPLOYEE ENGAGEMENT PROJECT
 

Viewers also liked (16)

ROI of Custom Panels and Private Communities
ROI of Custom Panels and Private CommunitiesROI of Custom Panels and Private Communities
ROI of Custom Panels and Private Communities
 
ALU project(segma team)
ALU project(segma team)ALU project(segma team)
ALU project(segma team)
 
Pharmex Six Sigma Project
Pharmex Six Sigma ProjectPharmex Six Sigma Project
Pharmex Six Sigma Project
 
Yellow School Bus 6 Sigma Project
Yellow School Bus 6 Sigma ProjectYellow School Bus 6 Sigma Project
Yellow School Bus 6 Sigma Project
 
basil_cv
basil_cvbasil_cv
basil_cv
 
LeanCor Consulting Webinar: How to Deploy Continuous Improvement in the Wareh...
LeanCor Consulting Webinar: How to Deploy Continuous Improvement in the Wareh...LeanCor Consulting Webinar: How to Deploy Continuous Improvement in the Wareh...
LeanCor Consulting Webinar: How to Deploy Continuous Improvement in the Wareh...
 
Nuclear Hazards
Nuclear HazardsNuclear Hazards
Nuclear Hazards
 
Six Sigma Project Charter
Six Sigma Project CharterSix Sigma Project Charter
Six Sigma Project Charter
 
PNI - 2016
PNI - 2016PNI - 2016
PNI - 2016
 
Lean Six Sigma Green Belt roadmap poster
Lean Six Sigma Green Belt roadmap posterLean Six Sigma Green Belt roadmap poster
Lean Six Sigma Green Belt roadmap poster
 
Computer science project work
Computer science project workComputer science project work
Computer science project work
 
Six segma ass 1
Six segma ass 1Six segma ass 1
Six segma ass 1
 
Inventory Control Final Ppt
Inventory Control Final PptInventory Control Final Ppt
Inventory Control Final Ppt
 
Database vs Data Warehouse: A Comparative Review
Database vs Data Warehouse: A Comparative ReviewDatabase vs Data Warehouse: A Comparative Review
Database vs Data Warehouse: A Comparative Review
 
Data Warehouse Modeling
Data Warehouse ModelingData Warehouse Modeling
Data Warehouse Modeling
 
DATA WAREHOUSE -- ETL testing Plan
DATA WAREHOUSE -- ETL testing PlanDATA WAREHOUSE -- ETL testing Plan
DATA WAREHOUSE -- ETL testing Plan
 

Similar to Turnover reduction control phase

Which Metrics Do You Need to Give Your CFO to Get Approval for an HR Investment
Which Metrics Do You Need to Give Your CFO to Get Approval for an HR InvestmentWhich Metrics Do You Need to Give Your CFO to Get Approval for an HR Investment
Which Metrics Do You Need to Give Your CFO to Get Approval for an HR InvestmentChris Chamberlain
 
Measuring Quality of Hire
Measuring Quality of HireMeasuring Quality of Hire
Measuring Quality of HireRyan Heinl
 
Converting Strategy To Value
Converting Strategy To ValueConverting Strategy To Value
Converting Strategy To Valueskeenen1
 
Operatiional Audit
Operatiional AuditOperatiional Audit
Operatiional AuditMalay Paul
 
Shine Anq2010 Presentation Uday Mishra (Ndpl) In51
Shine Anq2010 Presentation Uday Mishra (Ndpl) In51Shine Anq2010 Presentation Uday Mishra (Ndpl) In51
Shine Anq2010 Presentation Uday Mishra (Ndpl) In51Uday Mishra
 
Achieving Built-in-Quality: Actions and Implementation
Achieving Built-in-Quality: Actions and ImplementationAchieving Built-in-Quality: Actions and Implementation
Achieving Built-in-Quality: Actions and ImplementationApril Bright
 
Realizing Successful Transformation Within Politically Charged Environments
Realizing Successful Transformation Within Politically Charged EnvironmentsRealizing Successful Transformation Within Politically Charged Environments
Realizing Successful Transformation Within Politically Charged EnvironmentsNathaniel Palmer
 
Realizing Successful Transformation Within Politically Charged Environments
Realizing Successful Transformation Within Politically Charged EnvironmentsRealizing Successful Transformation Within Politically Charged Environments
Realizing Successful Transformation Within Politically Charged EnvironmentsNathaniel Palmer
 
Final Presentation Insight-2
Final Presentation Insight-2Final Presentation Insight-2
Final Presentation Insight-2Carl Schiro
 
A Closer Look at Churn - June 2012
A Closer Look at Churn - June 2012A Closer Look at Churn - June 2012
A Closer Look at Churn - June 2012Neil Hartz
 
Business Performance Management - Process Approach
Business Performance Management - Process ApproachBusiness Performance Management - Process Approach
Business Performance Management - Process ApproachAjay Koul
 
SL-slides-for-IQPC-Webbinar v5 copy
SL-slides-for-IQPC-Webbinar v5 copySL-slides-for-IQPC-Webbinar v5 copy
SL-slides-for-IQPC-Webbinar v5 copySofia Passova
 
XP Day: Using cost of delay – Joshua Arnold
XP Day: Using cost of delay – Joshua ArnoldXP Day: Using cost of delay – Joshua Arnold
XP Day: Using cost of delay – Joshua ArnoldJoshua Arnold
 
Procurement : Resisting price increase
Procurement : Resisting price increaseProcurement : Resisting price increase
Procurement : Resisting price increaseVarmahk
 
Joshua Arnold – Using Cost of Delay
Joshua Arnold – Using Cost of DelayJoshua Arnold – Using Cost of Delay
Joshua Arnold – Using Cost of DelayJoshua Arnold
 
Lean six sigma executive overview (case study) templates
Lean six sigma executive overview (case study) templatesLean six sigma executive overview (case study) templates
Lean six sigma executive overview (case study) templatesSteven Bonacorsi
 
Enterprise Continual Improvement Office Session 208 Timothy Rogers
Enterprise Continual Improvement Office Session 208 Timothy RogersEnterprise Continual Improvement Office Session 208 Timothy Rogers
Enterprise Continual Improvement Office Session 208 Timothy Rogerstrogers77
 
How to Contain the Costs of Workload Automation
How to Contain the Costs of Workload AutomationHow to Contain the Costs of Workload Automation
How to Contain the Costs of Workload AutomationSkybot Software
 

Similar to Turnover reduction control phase (20)

Which Metrics Do You Need to Give Your CFO to Get Approval for an HR Investment
Which Metrics Do You Need to Give Your CFO to Get Approval for an HR InvestmentWhich Metrics Do You Need to Give Your CFO to Get Approval for an HR Investment
Which Metrics Do You Need to Give Your CFO to Get Approval for an HR Investment
 
Measuring Quality of Hire
Measuring Quality of HireMeasuring Quality of Hire
Measuring Quality of Hire
 
Converting Strategy To Value
Converting Strategy To ValueConverting Strategy To Value
Converting Strategy To Value
 
Operatiional Audit
Operatiional AuditOperatiional Audit
Operatiional Audit
 
Sitex orbis a case study
Sitex orbis   a case studySitex orbis   a case study
Sitex orbis a case study
 
Shine Anq2010 Presentation Uday Mishra (Ndpl) In51
Shine Anq2010 Presentation Uday Mishra (Ndpl) In51Shine Anq2010 Presentation Uday Mishra (Ndpl) In51
Shine Anq2010 Presentation Uday Mishra (Ndpl) In51
 
Achieving Built-in-Quality: Actions and Implementation
Achieving Built-in-Quality: Actions and ImplementationAchieving Built-in-Quality: Actions and Implementation
Achieving Built-in-Quality: Actions and Implementation
 
Realizing Successful Transformation Within Politically Charged Environments
Realizing Successful Transformation Within Politically Charged EnvironmentsRealizing Successful Transformation Within Politically Charged Environments
Realizing Successful Transformation Within Politically Charged Environments
 
Realizing Successful Transformation Within Politically Charged Environments
Realizing Successful Transformation Within Politically Charged EnvironmentsRealizing Successful Transformation Within Politically Charged Environments
Realizing Successful Transformation Within Politically Charged Environments
 
Final Presentation Insight-2
Final Presentation Insight-2Final Presentation Insight-2
Final Presentation Insight-2
 
Overtime and oversight2
Overtime and oversight2Overtime and oversight2
Overtime and oversight2
 
A Closer Look at Churn - June 2012
A Closer Look at Churn - June 2012A Closer Look at Churn - June 2012
A Closer Look at Churn - June 2012
 
Business Performance Management - Process Approach
Business Performance Management - Process ApproachBusiness Performance Management - Process Approach
Business Performance Management - Process Approach
 
SL-slides-for-IQPC-Webbinar v5 copy
SL-slides-for-IQPC-Webbinar v5 copySL-slides-for-IQPC-Webbinar v5 copy
SL-slides-for-IQPC-Webbinar v5 copy
 
XP Day: Using cost of delay – Joshua Arnold
XP Day: Using cost of delay – Joshua ArnoldXP Day: Using cost of delay – Joshua Arnold
XP Day: Using cost of delay – Joshua Arnold
 
Procurement : Resisting price increase
Procurement : Resisting price increaseProcurement : Resisting price increase
Procurement : Resisting price increase
 
Joshua Arnold – Using Cost of Delay
Joshua Arnold – Using Cost of DelayJoshua Arnold – Using Cost of Delay
Joshua Arnold – Using Cost of Delay
 
Lean six sigma executive overview (case study) templates
Lean six sigma executive overview (case study) templatesLean six sigma executive overview (case study) templates
Lean six sigma executive overview (case study) templates
 
Enterprise Continual Improvement Office Session 208 Timothy Rogers
Enterprise Continual Improvement Office Session 208 Timothy RogersEnterprise Continual Improvement Office Session 208 Timothy Rogers
Enterprise Continual Improvement Office Session 208 Timothy Rogers
 
How to Contain the Costs of Workload Automation
How to Contain the Costs of Workload AutomationHow to Contain the Costs of Workload Automation
How to Contain the Costs of Workload Automation
 

Turnover reduction control phase

  • 1. D M A I C Six Sigma Tollgate Turnover Reduction Kelly Kozik – Project Manager 1
  • 2. D M A I C Six Sigma 99.9% Quality is…... •One hour of unsafe drinking water per month. •Two unsafe plane landings per day at O’Hare International airport. •500 incorrect surgical operations each week. •50 newborn babies dropped by doctors every day. Six Sigma Quality is…... •One second of unsafe drinking water every six years. •One unsafe landing in all major United States airports in 10 years. •1 incorrect surgical operation in 20 years. •3 newborn babies dropped by doctors in 100 years. (Medco Green Belt training manual 2005)
  • 3. D M A I C Suggested Deliverables for the Define Stage of a Six Sigma Project •Problem / Objective Statement •Charter / Timeline •Financial Estimate •Baseline Data •Conclusions/Next Steps
  • 4. D M A I C Problem/Objective Statement Problem Statement: Between May 1, 2005 - April 30, 2006, the Willingboro pharmacy lost 268 employees in the following areas; pharmacy tech, warehouse, support and Rph. This cost the pharmacy approximately $2 million in turnover expenses. Objective Statement: To reduce voluntary turnover in four classifications by 20% annualized. Pharmacist Technician Support Warehouse
  • 5. D M A I C Project Charter Team Name: Turnover Reduction Process: Recruitment and Retention Duration: Team Meetings: Every T hursday, 1:30pm - 2:30pm Sponsor: Cham pion: Team w ork Location: Willingboro, NJ Team Members Function Team Role LOE Attendance Process Custom er (internal/external): Ron Wizimirski T raining Black Belt Internal: Hiring managers, employees Kelly Kozik Recruitment T eam Leader External: applicants Pam West Support T eam member Critical to Quality Metric(s): Sam Addy Customer Service T eam member T urnover Debbie Bertino T raining Meeting Minutes Josef Blankenburg Inventory T eam member Financial ‘Business Driver(s) Im pacted: Chris Bizarro Human Resources Champion cost of turnover Cory Angelini Business Planning T eam member Bob Oehrle Warehouse T eam Member Project Scope: Identify and remove constraints to hiring / rentention of employees Problem Statement: Between May 1, 2005 - April 30, 2006, the Willingboro pharmacy lost 268 employees in the following areas; pharmacy tech, warehouse, support and Rph. T his cost the pharmacy approximately $2 million in turnover costs. See timeline on next page
  • 6. D M A I C Timeline Team Name: Turnover Reduction Timeline Step 11-May-06 15-Sep-06 15-Oct-06 15-Dec-07 15-Mar-07 30-Jun-07 31-Dec-07 30-Sep-08 Tools Used Define Measure Analyze Improve Control Plan
  • 7. D M A I C Revised Turnover Cost Analysis Analysis Period: May 1, 2005 - April 30, 2006 RPh Tech Support Whse Number of Terminations 6 77 106 79 Entry Wage for Job Class 40.00 10.75 10.00 10.00 Average Wage for Job Class 46.99 11.63 11.17 10.76 Average Trainer Wage for Job Class 46.99 13.66 13.09 12.56 Hiring Cost per Hire 152.00 212.50 394.00 273.00 Total Hiring Cost 912.00 16362.50 41764.00 21567.00 Training Cost 19,276.86 118,754.25 79,529.75 75,420.88 Learning Curve Cost @ OT 35,524.44 161,191.80 142,082.40 51,002.40 Time to Fill Position (days) 71.0 36.9 47.6 37.2 Vacancy Cost @ OT 171,580.63 283,237.02 483,080.16 271,041.33 Turnover Cost for Job Class 227,293.93 579,545.57 746,456.31 419,031.61 Turnover Cost per Employee 37,882.32 7,526.57 7,042.04 5,304.20 Total Cost for 4 Primary Categories 1,972,327.41 Inputs: Total Training Hrs (no productivity) 348 7097 6284 6320 Total Peer Trainer Hrs (no productivity) 114 212 1275 973 RPh Trainer Hrs (no productivity) 842 Learning Impact (ramp-up prod) Productivity Post-Training 40% 40% 50% 50% Days to 100% Productivity 35 50 40 20 Labor Hrs to Make Up Productivity 84 120 80 40
  • 8. D M A I C Turnover TOTAL JOB ABANDONMENT INVOLUNTARY VOLUNTARY SUPPORT 106 34 33 39         WAREHOUSE 79 23 26 30         TECHS 77 16 18 43         RPH 6 1 0 5                           268 74 77 117 % of total turnover   27% 29% 44% Voluntary resignations  account for 44% of the  annual attrition.
  • 9. D M A I C Suggested Deliverables for the Measure Stage of a Six Sigma Project • Completed checklist on 117 voluntary terminations from May 2005 – April 2006 – Compiled info from voluntary terminations – Reviewed exit interviews, work schedules, training, referral, resignation letters, schedule changes, etc. • Mailed an abbreviated Exit Interview/Cover Letter to those employees who had no exit interview. • Completing checklist on employees who left from April 2006 to present to get additional data. • Summarized and evaluated collected data
  • 10. # Observations 0 20 40 60 80 100 120 140 160 personal reasons career change disat w/ mgmt, promo, working conditions, family Group return to school 2005/2006 reasons for leaving Pareto Analysis – Baseline Data disat w/ shift or schedule transportation 0 1 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 0.9 D M A I C
  • 11. D M A I C Pareto Analysis – Baseline Data 2005/2006 source 1 120 0.9 0.8 100 0.7 80 0.6 0.5 60 0.4 40 0.3 0.2 20 0.1 0 0 employee r ef erral walk- ins ads schools int er net job f air ot her employment t r ansf er s agency Gro up
  • 12. D M A I C Current Team Status - Progress • Summarized and evaluated collected data and concluded that the data was insufficient. • Focus groups were formed to extract data from current employees to find root cause.
  • 13. D M A I C Cause and Effect Diagram 4 Focus Groups – Over 200 Ideas Generated People Method Measure Job Bonus for Interview Never get an performance More cross interview training Orientation Emr Process Compensation Emp. Refrerral Training Recognition Clear Job Rotating functions Descriptions Job is not what EMPLOYEE I expected Cleaner Working areas More chairs TURNOVER Lack of growth needed opportunities More decappers Sups aren’t Equipment encouraging Tools More Communication handhelds Make cafeteria emp. better Day care Development No follow-up Materials during emr Environment Language Employee barriers meetings needed
  • 14. D M A I C Affinity Diagram Evolved into 13 problem statements • #1-Need a cleaner place to • #8-Emp pay & incentives work • # 9-Recognition incentives are • #2-Emp don’t have a clear inconsistently… understanding of growth opp. • #10-Ramifications of Union • #3-Emr process is not effective Contract • #4-No consistency in emp • #11-Onboarding process… training transition 90 day emp.. • #5-Schedules are built solely on • #12-Company exhibits Bus needs.. favoritism & inconsistency… • #6-Communication… • #13-Available resources to do • #7-Better understanding of job their job expectations
  • 15. D M A I C Interrelationship Diagraph Prioritized into 7 statements • #1-Need a cleaner place to work Total Affects • #8-Emp pay & incentives Total Affects • is affected by 9, 12, 2, 10, 6, 7 • is affected by # 4, 7, 13 • Affects 9 3 7 • • # 9-Recognition incentive are inconsistently… • #2-Emp don’t have a clear understanding of growth opp. • is affected by 8, 7, 6, 12 • is affected by # 3, 4, 5, 7, 11, 12 • Affects 8, 12 • Affects 8, 12 6 8 • #10-Ramifications of Union Contract • #3-Emr process is not effective • is affected by # 4, 6, 5, 12, 7 • is affected by 7 Affects 8 2 • Affects 2, 4, 11 8 • #11-Onboarding process…transition 90 day emp.. • #4-No consistency is emp training • is affected by 13, 4, 3, 6 • is affected by # 3, 6, 5 • Affects 7, 5, 2 7 • Affects 2, 13, 12, 11 7 • #5-Schedules are built solely on Bus needs.. • is affected by 7, 11 • Affects 3, 12 4 • #6-Communication… • is affected by 4, 3, 2, 12, 11, 9, 8, 7 8 • #7-Better understanding of job expectations • is affected by 4, 13, 11, 12, 6 • Affects 8, 9, 10, 1, 2, 5 11
  • 16. D M A I C Prioritization Matrix Identified topics to be Ability addressed at analyzing Is it to phase feasible assign Does it from a owner Ability to affect all cost ship to Reasona quantify Quick to employee perspectiv single bility of Easily TOT results implement? groups? e? source success accepted AL Emp don't have a clear understanding of growth opp.               247 No consistency in emp training               229 Schedules are built solely on bus. needs               185 Recognition incentives are inconsistently applied               213 Better understanding of job expectations/ the on boarding process does not effectively transition an employee (prior and post hire)               241 Company exhibits favoritism & inconsistency in its decision making               147 1. Little or no relationship 3. Some relationship 5. Strong relationship
  • 17. D MA I C Areas of Improvement • No Consistency in Employee Training • Recognition Incentives are Inconsistently Applied • Better Understanding of Job Expectations / On-boarding Process Does Not Effectively Transition and Employee • Employees Do Not Have a Clear Understanding of Growth Opportunities
  • 18. D MA I C Action Teams and Improvement Processes PROCESS PROCESS OWNER ORIGINATION DATE Q u Job/Shift Rebid Process XHR/ Departments Q2 2007 New Emr Process XHR (Training) Q2 2007 Internal Job Selection XHR (Recruiting) Q2 2007 Above and Beyond XReward & Recognition's Team Q2 2007 Department Goals and Metrics XDepartments Q2 2007 Attendance Rewards XReward & Recognition's Team Q1 2007 Buddy Program XSurvey Action Team HR Information Days XHR  Q1 2007 Shift Meetings XDepartments Q2 2007 Quarterly Communication Sessions XDirectors Q2 2007 Survey Action Teams XDirectors Q2 2007 Prehire  HR (Recruiting) Q2 2007 Post hire on-boarding
  • 19. D MA I C Please take a few minutes and answer the following questions as accurately as you can. This questionnaire is completely anonymous. 1.What is your level of awareness of the following: Select one the following responses: ■  Heard About  ■  Don’t know  ■  Know a lot  ■  Helped  ■ No Idea It the details about it create it Job/Shift Rebid Process      New EMR Process      Internal Job Selection      Above and Beyond      Department Goals and Metrics      Attendance Rewards      Medco & Willingboro Newsletter      “Buddy” Program      HR Information Days      Shift Meetings      Quarterly Communication       Sessions Survey Action Teams      1.Have you been a member of a team that developed any of the above? Please circle. Yes or No 2.If not, why?  Didn’t want to Didn’t know about it  I was not permitted 3.How long have you worked at Medco? Check One. 0-1year 1-3years 3-5years 5-8years 8 years or more 1.What department do you work in? Check One. Admin BP CS HR Maint QRT Rph Security Support Syst. Coord. TA Tech Warehouse 1.What shift are you on? 1st  2nd 3rd
  • 20. D MA I C Employees do not have a clear understanding of growth opportunities EMR Shift Rebid Quarterly Internal Job Process Program HR Info Selection Item # Issues Days 1 No Job rotation into new skills X X 2 Only scheduled in areas where efficiencies are high X X 3 Rated on items out of your control X Do not understand EMR numbers and effect on  4 promotion X Do not understand development resources that are  5 available X X X 6 No promotion availability X X 7 Never receive feedback on promotion applications X X X 8 Need development plan for growth X X
  • 21. D MA I C Please take a few minutes and answer the following questions as accurately as you can. This questionnaire is completely anonymous. 1.What is your level of awareness of the following: Select one the following responses: ■  Heard About  ■  Don’t know  ■  Know a lot  ■  Helped  ■ No Idea It the details about it create it Job/Shift Rebid Process      New EMR Process      Internal Job Selection      Above and Beyond      Department Goals and Metrics      Attendance Rewards      Medco & Willingboro Newsletter      “Buddy” Program      HR Information Days      Shift Meetings      Quarterly Communication       Sessions Survey Action Teams      1.Have you been a member of a team that developed any of the above? Please circle. Yes or No 2.If not, why?  Didn’t want to Didn’t know about it  I was not permitted 3.How long have you worked at Medco? Check One. 0-1year 1-3years 3-5years 5-8years 8 years or more 1.What department do you work in? Check One. Admin BP CS HR Maint QRT Rph Security Support Syst. Coord. TA Tech Warehouse 1.What shift are you on? 1st  2nd 3rd
  • 22. D MA I C Impact Survey This demographic informat ion is optional. However, it may be helpful in analyzing the dat a. Thank you. De par t m en t Sh i f t How lon g have you w ork ed f or Medco? - Circle one opt ion Less than 1 yr 1-3yrs 3-5yrs more than 5yrs Ag e – ci r cl e on e o pt i on 18-25 26-34 35-42 43-50 50 + Gen d er – ci r cl e on e o pt i on M F Tot al y e ar s i n t h e w o r k f o r ce – ci r cl e on e opt i on Less than 1 yr 1-3yrs 3-5yrs 5-7 yrs more than 7 years St r on g l y Ag r ee N eu t r a l Di sag r ee St r on g l y Di sag r ee Ag r ee 5 1 2 3 4 Medco’s new hire processes make it difficult for a newly hired employee to do a good job. Medco’s new hire processes make it easy for a newly hired employee to find things in and around the pharmacy. I think it’s important that new employees learn what is expected of them right away. The company clearly communicates how people are selected for new positions. I understood the job rebidding process we went through last summer. When I was a new employee, it was important to me to find a person or people to have breaks and lunch with right away. I don’t care if I have my schedule in advance. I believe that there are internal promotion opportunities for employees at Medco. As a new employee, I got enough training that I didn’t need to ask questions once I was assigned to the work area. I believe that it’s my responsibility to figure out how to be successful at my job. I want to know how my job affects the rest of the department I want to know ahead of time what I will be doing (at least a week in advance).
  • 23. D MA I C Turnover reduction / savings 52-week Rolling 52-week Annual 52-week Rolling Average Weekly Average Wkly Turnover Week Ending: 1/0/1900 Headcount 52-week Rolling Average Terms Headcount Weekly Terms Turnover Percentage Rate Location Chg vs. Chg vs. Chg vs. Chg vs. Chg vs. Chg vs. 2008 Description Job Category Current Prior Current Prior Current Prior Current Prior Current Prior Current Prior Goals NJ WILLINGBORO Back End Support 444.29 1.08 2.00 8.66 1.95% -0.63 0.0058 -470.99 0.3039 -4.70 30.00% 29.41% 0.00% -30.91% 30% Pharm Tech 316.31 1.27 2.00 8.66 2.74% -0.02 0.0064 -325.99 0.33 -3.67 15.00% 14.36% 0.00% -33.33% 15% Pharmacist 133.35 0.35 0.00 0.00 0.00% -0.17 0.0012 -141.00 0.06 -0.94 5.00% 4.87% 0.00% -6.77% 5% NEW JERSEY AT HOME Pharmacist 48.27 2.13 0.00 -0.08 0.0028 -76.00 0.145 -0.86 5.00% 4.83% 0.00% -8.67% 5% Project Major Metric Major Metric Cost / Savings Baseline Q2 Avg Variance Q1 - Q2 2008 Est 2008 TY Turnover Reduction As of June W4 RPH RPH % Turnover 5.47% 3.71% (1.76 Pts) $ (21,350) $ (42,700) Tech Tech % Turnover 52.82% 30.68% (22.14 Pts) $ (88,782) $ (177,564) Support & Whse Support & Whse Turnover % 59.44% 25.60% (33.84 Pts) $ (153,836) $ (307,673) $263,968 $527,937 Mid-year (Q2) metrics 20% savings met. Annualized savings of $1M/50%
  • 24. D MA I C Control Plan Strategy • Our recommendations are based on current process/team and employee data • In order to control this turnover reduction we will rely on continued feedback from the survey actions teams and our annual employee surveys. The processes will then need to be adjusted accordingly.
  • 25. D MA I C Recommendations VERY WELL RECEIVED, SHOULD BE MAINTAINED: WELL RECEIVED, BUT NEED TO BE BETTER COMMUNICATED BY PROCESS OWNERS: • DEPT. GOALS + METRICS Employees unequivocally want to know about their job and how it • ABOVE & BEYOND (WOW Program) affects their department. This program should definitely be maintained This program is well supported and recognized by the employee and communicated at the dept. level. population and should continue. There is an opportunity to reach 37% • SHIFT MEETINGS more employees who are either unaware of the work being done or Employees feel strongly that this is a positive improvement, therefore who think it needs improvement. Better communication of the awards we recommend it continue. Seventy three percent find it useful and results • NEW HIRE PROCESS • ATTENDANCE REWARDS Most of the employee population has not been through this process This program is highly supported by employees; however the program (38% were unaware), but we recommend it continue and be evaluated details and the implementation of the rewards should be evaluated and periodically. communicated to employees. There seemed to be confusion on award criteria. OPPORTUNITY FOR IMPROVEMENT: • INTERNAL JOB SELECTIONS We strongly recommend improving on the communication to the employees how this process works. Over fifty percent of the employees • EMR PROCESS responded either neutral or negative. Overall this process has shown improvement, however additional progress is needed with regard to career discussions. • QUARTERLY COMMUNICATION SESSIONS The findings were that most employees do not know what these • BUDDY PROGRAM sessions are. There is a need to communicate the purpose more Employees strongly support the concept of this program and its effectively. potential effectiveness. Thirty five percent of the employees had no Type of information employees would like to see presented positive or negative reply. This could mean they were unaware of the program. The recommendation is to re-establish, re-evaluate, and Cost=24.19% Quality=30.38% Willingboro revise this program to meet the employee and department needs specific info=39.70% Other=5.72% • WILLINGBORO NEWSLETTER • SURVEY ACTION Had a positive impact on employees and the recommendation is to Results show there is a definite opportunity on communicating the restart the distribution. Sixty five percent wanted a Willingboro programs and their results to employees. Fifty three percent were not specific newsletter aware of the work being done, however fifty percent felt it was valuable.
  • 26. D MA I C Turnover reduction / savings 52-week Rolling 52-week Annual 52-week Rolling 52-week Rolling Weekly Average Wkly Retention Week Ending: 2/19/2011 Average Headcount Average Terms Headcount Weekly Terms Turnover Percentage Rate Location Chg vs. Chg vs. Chg vs. Chg vs. Chg vs. Chg vs. 2011 Description Job Category Current Prior Current Prior Current Prior Current Prior Current Prior Current Prior Goals NJ WILLINGBORO Back End Support 449.04 (0.64) 0.66 (0.04) 437 0.00 0 (2.00) 0.15% -0.01% 92.21% 0.44% 90% Pharm Tech 305.92 0.26 0.77 (0.02) 309 0.00 0 (1.00) 0.25% -0.01% 86.60% 0.34% 85% Pharmacist 126.40 (0.09) 0.08 0.00 125 0.00 0 0.00 0.06% 0.00% 96.84% 0.00% 96%
  • 27. D MA I C Turnover reduction snapshot • 2006 turnover • RPH 10% • Pharmacy Technician 65% • Pharmacy Support (shipping and packing) 60% • Warehouse 80% • 2008 turnover was reduced • RPH 5.47% • Pharmacy Technician 52.4% • Pharmacy Support (shipping and packing) 59.44* • Warehouse 59%.44* • (Operations made the decision to measure support and warehouse as one in early 2007) • Mid-year Q2 metrics 20% savings met (slide 23). Annualized savings of $1M/50% • Retention of February 2011 • RPH 96.84% (3.16 turnover) • Pharmacy Technician 86.6% (13.4% turnover) • Pharmacy Support & Warehouse 92.21% (7.79% turnover)

Editor's Notes

  1. 2 We have set up this presentation so that each section displays the tools that are recommended/available for each stage. This list is not meant to be either restrictive, nor all-inclusive. It is up to the discretion of the team to use what is appropriate.
  2. 2 We have set up this presentation so that each section displays the tools that are recommended/available for each stage. This list is not meant to be either restrictive, nor all-inclusive. It is up to the discretion of the team to use what is appropriate.
  3. Combined Problem and Objective statement