Speaker : SONJAI KUMAR
Company : AVIVA LIFE INSURANCE
AGENDA
► Why is Assets and Liability Management (ALM) necessary in the life
insurance business for its financial health and what are the
implications?
► How assets and liability management is performed in the life
insurance business?
► What are the factors affecting the ALM?
► What are the issues and challenges in the Indian market in
managing the ALM risk?
► What are the simple measures used in managing the ALM risk?
 To manage Change in interest rate risk?
Assets Liability
Longer in term
ShorterinTerm
Change in
Liability
Change in
Assets Change in Assets
minus Liability
Risk= Exposure*Duration Gap
Impact the bottom line
Delta “I”
(ALM)
 Nature of Liability- types of Products
Unit Linked
Products
Non-Participating
Product in Profit
Participating
Product in Profit
Maturity depends
on Market Value
Guaranteed
Liability on
Maturity
Guaranteed +
Discretionary
Benefit
No ALM Risk High ALM Risk Medium ALM Risk
Increasing Guarantees
with term through bonus
additions
2001-2010 2010 Post 2010
Pre-dominantly
ULIP were sold
IRDA-SEBI Spat on
ULIP products and
subsequent
restrictions on
charges by IRDA
Market moved to
Traditional
Products
Indian Product Market Scenario
Par
Non-Par
Many Players Selling Par
Many Players Selling
Term product with only
death benefit
Some players are selling
products with maturity
guarantee
X
Par Non-Par
Guaranteed Sum Assured
(GSA)- Small in Amount
Bonus (B) every year that
becomes guaranteed on
maturity and Death
Death Benefit = GSA + B
Bonus declared up to time of
death
Maturity = GSA+B+TB
TB= Terminal Bonus
Guaranteed Sum Assured (GSA)
Bonus = NIL
Death Benefit = GSA
Maturity = GSA
Total Pay out Rs.500,000/-
Total Bonus= 300,000
Similar to
fixed and
floating
interest rate
GSA = 200,000
Time
Benefits
Rs.500,000
Par Non-Par
Increasing Guarantee but has a
slow increasing Guarantee
Interest rate risk is medium/low
ALM is important
Maturity = GSA+B+TB
TB= Terminal Bonus
Has Guarantee at the on set
Interest rate risk is very high
ALM is very important
Current risk in the Indian Market is
from fall in future interest rate
Focus Point
Lets look at a simple example:
► An insurance company collects premium from customers and provides a guaranteed return
of 6% over the policy period (which is say 20 years);
► Further, the premium collected from customers is invested in Corporate Bonds/Govt
Securities at a return of 8%.
6 months later, the interest rate falls to 5%. What’s the impact on the insurance company:
► Insurance company faces the risk of reinvestment of future premium at lower interest
rates. Incase fall in interest rate is permanent, the company may have to pay from its
pocket as the returns are guaranteed for the customer.
In the above scenario, what would be the risk if interest rates were to fall to 7% in place of 5%?
► Profit Margins will get compressed as the Insurer will earn less return on the investment.
So an insurer has a risk of ‘falling’ interest rate.
Reinvestment
Risk
Liability
Duration at
times has
absurd value
Liquidity Risk
In the event of
fall in interest
rate future
premium will be
invested at
higher price
Due to the
nature of the
liability cash
flows, duration
value is assured
For a long term
products such as
whole life
product,
maximum term
of assets could
be around 30
years or so
Hedging
instrument
Shorter Asset
Term
Indian Regulator
has just allowed
using interest
rate derivatives
to hedge the
risk.
Initial days
In case of mass
surrender, risk
of liquidity
Assets Longer than Liability Liability Longer than Assets
Rise in Interest rate is a risk
Assets to be sold @ cheaper price
on liability maturity
Example- General Insurance and
Health Insurance Products
Shareholder’s Fund
Fall in interest rate is a risk
Reinvestment risk of future
premium
Typical Life Insurance long term
products
Maturity = GSA
Invest Short term Invest longer term
Duration
Matching
Cash flow
matching
Regulatory
minimum
requirement
Some players are
matching
duration of assets
and liability
Project Assets
and Liability cash
flow into future
and invest assets
based on the
visual gap
Calculate
exposure on
change in interest
rate by 1 bps
Strategic Assets
Allocation
It has its own
challenges
Simple, but lack
quantification
PVBP
Some may be
using
Allocate Assets
on criteria such
as profit, keeping
risk within
appetite and stay
within
constraints
?
Change in Liability
Assets
Optimization
Constraints
Performance
indicator
Risk Indicator
Policyholder
Shareholder
Risk
Appetite/Tolerance
Duration
Regulatory
Overall Match by
“Nature”, “Term &
"Currency” of
Liability
Assets Liability Default
Assets are
Longer- Loans
Liabilities are
shorter-
Deposits
Liquidity risk
is more
prominent
ProductsLiquidity
What can be learnt ?
Assets are
Shorter
Liabilities are
Longer
Liquidity risk
is less
prominent
Par and Non-
Par
Floating and
Fixed Rates
Premium
Lapse
EMI Default
Banking
Life
Insurance
Level Premium
Increasing Benefits
in a probabilistic
sense
Shorter Tenure of
Assets
Liability are due to
the customer and
Cannot be
adjusted
ALM focus on
Optimizing assets
portfolio given
the liability
Match Assets by
“Nature”, “Term &
"Currency” of
Liability
Year
Premium
Income
Gross
Interest
Income
Initial
Expenses
Renewal
Expenses
Initial
Commission
Renewal
Commission
Death
Claim
Survival
Benefit**
Surrender
Claims
Net CF
1 500,000 15,843 160,700 613 148,250 - 10,144 - 20,923 175,212
2 423,449 35,658 - 4,630 - 21,172 9,521 - 44,704 379,079
3 379,565 56,812 - 4,409 - 7,591 9,393 - 28,341 386,643
4 358,985 77,351 - 4,431 - 7,180 9,726 - 35,724 379,275
5 339,377 97,241 - 4,455 - 6,788 10,019 - 42,197 373,159
6 320,699 135,548 - 4,476 - 6,414 10,279 - 47,828 387,250
7 302,912 163,594 - 4,495 - 6,058 10,501 - 53,734 391,719
8 285,977 192,719 - 4,514 - 5,720 10,697 - 66,470 391,296
9 269,856 222,536 - 4,532 - 5,397 10,877 - 77,759 393,827
10 254,510 243,072 - 4,548 - 5,090 11,048 - 89,016 387,879
11 239,902 262,527 - 4,563 - 4,798 11,220 - 104,672 377,176
12 225,995 210,974 - 4,574 - 4,520 11,383 - - 416,492
13 - 214,719 - 2,490 - - - 335,927 - (123,697)
14 - 282,097 - 2,420 - - - 335,927 - (56,250)
15 - 269,784 - 2,347 - - - 335,927 - (68,490)
16 - 224,732 - 2,271 - - - 335,927 - (113,466)
17 - 243,153 - 2,191 - - - 335,927 - (94,964)
18 - 202,617 - 2,107 - - - 335,927 - (135,416)
19 - 189,287 - 2,019 - - - 335,927 - (148,659)
20 - 134,452 - 1,927 - - - 335,927 - (203,401)
21 - 158,698 - 1,831 - - - 335,927 - (179,060)
22 - 143,426 - 1,730 - - - 335,927 - (194,230)
23 - 127,384 - 1,624 - - - 335,927 - (210,166)
24 - 110,533 - 1,448 - - - 1,679,634 - (1,570,549)
-2000000
-1500000
-1000000
-500000
0
500000
1000000
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
Net CF
Year
Premium
Income
Gross
Interest
Income
Initial
Expenses
Renewal
Expenses
Initial
Commission
Renewal
Commission
Death
Claim
Survival
Benefit**
Surrender
Claims
Net CF
Increase in
Reserve
Gross
Surplus
1 500,000 15,843 160,700 613 148,250 - 10,144 - 20,923 175,212 237,862 (62,650)
2 423,449 35,658 - 4,630 - 21,172 9,521 - 44,704 379,079 358,996 20,082
3 379,565 56,812 - 4,409 - 7,591 9,393 - 28,341 386,643 365,418 21,224
4 358,985 77,351 - 4,431 - 7,180 9,726 - 35,724 379,275 353,574 25,701
5 339,377 97,241 - 4,455 - 6,788 10,019 - 42,197 373,159 342,795 30,365
6 320,699 135,548 - 4,476 - 6,414 10,279 - 47,828 387,250 316,062 71,187
7 302,912 163,594 - 4,495 - 6,058 10,501 - 53,734 391,719 303,941 87,778
8 285,977 192,719 - 4,514 - 5,720 10,697 - 66,470 391,296 288,519 102,778
9 269,856 222,536 - 4,532 - 5,397 10,877 - 77,759 393,827 274,354 119,472
10 254,510 243,072 - 4,548 - 5,090 11,048 - 89,016 387,879 260,457 127,422
11 239,902 262,527 - 4,563 - 4,798 11,220 - 104,672 377,176 244,320 132,856
12 225,995 210,974 - 4,574 - 4,520 11,383 - - 416,492 375,844 40,648
13 - 214,719 - 2,490 - - - 335,927 - (123,697) (149,039) 25,342
14 - 282,097 - 2,420 - - - 335,927 - (56,250) (156,558) 100,308
15 - 269,784 - 2,347 - - - 335,927 - (68,490) (164,456) 95,967
16 - 224,732 - 2,271 - - - 335,927 - (113,466) (172,753) 59,287
17 - 243,153 - 2,191 - - - 335,927 - (94,964) (181,469) 86,505
18 - 202,617 - 2,107 - - - 335,927 - (135,416) (190,625) 55,209
19 - 189,287 - 2,019 - - - 335,927 - (148,659) (200,243) 51,584
20 - 134,452 - 1,927 - - - 335,927 - (203,401) (210,347) 6,945
21 - 158,698 - 1,831 - - - 335,927 - (179,060) (220,960) 41,901
22 - 143,426 - 1,730 - - - 335,927 - (194,230) (232,110) 37,880
23 - 127,384 - 1,624 - - - 335,927 - (210,166) (243,823) 33,656
24 - 110,533 - 1,448 - - - 1,679,634 - (1,570,549) (1,599,759) 29,210
-100000
-50000
0
50000
100000
150000
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
Gross Surplus
Year 1 Reserves: INR 237,862
Purchase assets equal to the value of INR 237,862
Questions
How to purchase assets equivalent to INR 237,862:
► What will be the term of the Bonds?
► How much money you will be kept in short term assets to maintain liquidity ?
► What should be the optimal mix of assets?
Answers
Asset purchasing philosophy: Purchase assets in a manner that it matches the:
► Nature of Liability (Guaranteed, Discretionary, Linked),
► Term (Duration of assets = Duration of Liability), and;
► Currency of Liability (Invest in same currency as liability)
Organized by
UNICOM Trainings & Seminars Pvt. Ltd.
contact@unicomlearning.com
www.unicomseminars.org/Conference/Mumbai/2015/Treasury-and-Risk-Management-
Summit

More Related Content

What's hot

STRESS TESTING & FINANCIAL PERFORMANCE EVALUATION Of Mutual Trust Bank Limited
STRESS TESTING & FINANCIAL PERFORMANCE EVALUATION Of Mutual Trust Bank Limited STRESS TESTING & FINANCIAL PERFORMANCE EVALUATION Of Mutual Trust Bank Limited
STRESS TESTING & FINANCIAL PERFORMANCE EVALUATION Of Mutual Trust Bank Limited Pantho Sarker
 
Market outlook review and strategy
Market outlook review and strategyMarket outlook review and strategy
Market outlook review and strategyVijayGaba2
 
Flight Centre Travel Group (FLT:ASX)
Flight Centre Travel Group (FLT:ASX)Flight Centre Travel Group (FLT:ASX)
Flight Centre Travel Group (FLT:ASX)Som Ranga
 
Ratings | Protective Life Investor Relations
Ratings | Protective Life Investor RelationsRatings | Protective Life Investor Relations
Ratings | Protective Life Investor Relationsinsurance5f49
 
Weekly Reversal Levels for January 10, 2015
Weekly Reversal Levels for January 10, 2015Weekly Reversal Levels for January 10, 2015
Weekly Reversal Levels for January 10, 2015LunaticTrader
 
Weekly Reversal Levels for February 7, 2015
Weekly Reversal Levels for February 7, 2015Weekly Reversal Levels for February 7, 2015
Weekly Reversal Levels for February 7, 2015LunaticTrader
 
Investment PowerPoint Presentation Slides
Investment PowerPoint Presentation SlidesInvestment PowerPoint Presentation Slides
Investment PowerPoint Presentation SlidesSlideTeam
 
Investor Meetings - March-April 2017
Investor Meetings - March-April 2017Investor Meetings - March-April 2017
Investor Meetings - March-April 2017EMC_Investor
 
Steve Ray - Moving With the Times 2011
Steve Ray - Moving With the Times 2011Steve Ray - Moving With the Times 2011
Steve Ray - Moving With the Times 2011Lawyer Checker
 
Alinta Ltd (AAN) -Scheme Proposal recommendation
Alinta Ltd (AAN) -Scheme Proposal recommendationAlinta Ltd (AAN) -Scheme Proposal recommendation
Alinta Ltd (AAN) -Scheme Proposal recommendationWILBUR TONG
 
HVS - Hotel Contracts To Lease or Not to Lease
HVS - Hotel Contracts To Lease or Not to LeaseHVS - Hotel Contracts To Lease or Not to Lease
HVS - Hotel Contracts To Lease or Not to LeaseLiliana Ielacqua
 
Pension Risk to the Corporate Sponsor
Pension Risk to the Corporate SponsorPension Risk to the Corporate Sponsor
Pension Risk to the Corporate SponsorRedington
 
erie insurance group 2006-second-quarter-report
erie insurance group 2006-second-quarter-reporterie insurance group 2006-second-quarter-report
erie insurance group 2006-second-quarter-reportfinance49
 
Chapter 14 collateralization debt obligations
Chapter 14   collateralization debt obligationsChapter 14   collateralization debt obligations
Chapter 14 collateralization debt obligationsQuan Risk
 

What's hot (20)

STRESS TESTING & FINANCIAL PERFORMANCE EVALUATION Of Mutual Trust Bank Limited
STRESS TESTING & FINANCIAL PERFORMANCE EVALUATION Of Mutual Trust Bank Limited STRESS TESTING & FINANCIAL PERFORMANCE EVALUATION Of Mutual Trust Bank Limited
STRESS TESTING & FINANCIAL PERFORMANCE EVALUATION Of Mutual Trust Bank Limited
 
Gsk
GskGsk
Gsk
 
Market outlook review and strategy
Market outlook review and strategyMarket outlook review and strategy
Market outlook review and strategy
 
ATS Company Reports: Sundram fastners ltd.
ATS Company Reports: Sundram fastners ltd.ATS Company Reports: Sundram fastners ltd.
ATS Company Reports: Sundram fastners ltd.
 
Flight Centre Travel Group (FLT:ASX)
Flight Centre Travel Group (FLT:ASX)Flight Centre Travel Group (FLT:ASX)
Flight Centre Travel Group (FLT:ASX)
 
Ratings | Protective Life Investor Relations
Ratings | Protective Life Investor RelationsRatings | Protective Life Investor Relations
Ratings | Protective Life Investor Relations
 
Weekly Reversal Levels for January 10, 2015
Weekly Reversal Levels for January 10, 2015Weekly Reversal Levels for January 10, 2015
Weekly Reversal Levels for January 10, 2015
 
Weekly Reversal Levels for February 7, 2015
Weekly Reversal Levels for February 7, 2015Weekly Reversal Levels for February 7, 2015
Weekly Reversal Levels for February 7, 2015
 
American Eagle presentation
American Eagle presentationAmerican Eagle presentation
American Eagle presentation
 
Balance sheet
Balance sheetBalance sheet
Balance sheet
 
Investment PowerPoint Presentation Slides
Investment PowerPoint Presentation SlidesInvestment PowerPoint Presentation Slides
Investment PowerPoint Presentation Slides
 
Investor Meetings - March-April 2017
Investor Meetings - March-April 2017Investor Meetings - March-April 2017
Investor Meetings - March-April 2017
 
Larsen & toubro.ppt_25
Larsen & toubro.ppt_25Larsen & toubro.ppt_25
Larsen & toubro.ppt_25
 
Steve Ray - Moving With the Times 2011
Steve Ray - Moving With the Times 2011Steve Ray - Moving With the Times 2011
Steve Ray - Moving With the Times 2011
 
Alinta Ltd (AAN) -Scheme Proposal recommendation
Alinta Ltd (AAN) -Scheme Proposal recommendationAlinta Ltd (AAN) -Scheme Proposal recommendation
Alinta Ltd (AAN) -Scheme Proposal recommendation
 
HVS - Hotel Contracts To Lease or Not to Lease
HVS - Hotel Contracts To Lease or Not to LeaseHVS - Hotel Contracts To Lease or Not to Lease
HVS - Hotel Contracts To Lease or Not to Lease
 
Pension Risk to the Corporate Sponsor
Pension Risk to the Corporate SponsorPension Risk to the Corporate Sponsor
Pension Risk to the Corporate Sponsor
 
erie insurance group 2006-second-quarter-report
erie insurance group 2006-second-quarter-reporterie insurance group 2006-second-quarter-report
erie insurance group 2006-second-quarter-report
 
Equity daily report-9-may
Equity daily report-9-mayEquity daily report-9-may
Equity daily report-9-may
 
Chapter 14 collateralization debt obligations
Chapter 14   collateralization debt obligationsChapter 14   collateralization debt obligations
Chapter 14 collateralization debt obligations
 

Viewers also liked

Tresauris Overview
Tresauris OverviewTresauris Overview
Tresauris Overviewjaquesd
 
Uel Risk Mgmt Bus Ins Pres July 13 2010 Final
Uel Risk Mgmt Bus Ins Pres July 13 2010 FinalUel Risk Mgmt Bus Ins Pres July 13 2010 Final
Uel Risk Mgmt Bus Ins Pres July 13 2010 Finaltodd6063
 
Treasury risks www.mobilemoviesite.com
Treasury risks www.mobilemoviesite.comTreasury risks www.mobilemoviesite.com
Treasury risks www.mobilemoviesite.comYasir Butt
 
Treasury and-financial-risk-management
Treasury and-financial-risk-managementTreasury and-financial-risk-management
Treasury and-financial-risk-managementpadmakar123
 
Liquidity and liquidity risks
Liquidity and liquidity risksLiquidity and liquidity risks
Liquidity and liquidity risksStudsPlanet.com
 
insurance and Risk management ppt
insurance and Risk management pptinsurance and Risk management ppt
insurance and Risk management pptprathimap
 
Insurance And Risk
Insurance And RiskInsurance And Risk
Insurance And Riskdaryl10
 
Concept Of Treasury And Treasury Management
Concept Of Treasury And Treasury ManagementConcept Of Treasury And Treasury Management
Concept Of Treasury And Treasury ManagementSVS College
 
Risk & Risk Management
Risk & Risk ManagementRisk & Risk Management
Risk & Risk Managementansula
 
Risk Management and Insurance
Risk Management and InsuranceRisk Management and Insurance
Risk Management and InsuranceJohn Daniel
 
Risk Management
Risk ManagementRisk Management
Risk Managementcgeorgeo
 

Viewers also liked (19)

Treasury
TreasuryTreasury
Treasury
 
Tresauris Overview
Tresauris OverviewTresauris Overview
Tresauris Overview
 
Uel Risk Mgmt Bus Ins Pres July 13 2010 Final
Uel Risk Mgmt Bus Ins Pres July 13 2010 FinalUel Risk Mgmt Bus Ins Pres July 13 2010 Final
Uel Risk Mgmt Bus Ins Pres July 13 2010 Final
 
Treasury risks www.mobilemoviesite.com
Treasury risks www.mobilemoviesite.comTreasury risks www.mobilemoviesite.com
Treasury risks www.mobilemoviesite.com
 
Treasury and-financial-risk-management
Treasury and-financial-risk-managementTreasury and-financial-risk-management
Treasury and-financial-risk-management
 
Treasury
TreasuryTreasury
Treasury
 
Liquidity and liquidity risks
Liquidity and liquidity risksLiquidity and liquidity risks
Liquidity and liquidity risks
 
Treasury Risk Management by Dr. Emmanuel Moore ABOLO
Treasury Risk Management by Dr. Emmanuel Moore ABOLOTreasury Risk Management by Dr. Emmanuel Moore ABOLO
Treasury Risk Management by Dr. Emmanuel Moore ABOLO
 
Types of insurance
Types of insuranceTypes of insurance
Types of insurance
 
insurance and Risk management ppt
insurance and Risk management pptinsurance and Risk management ppt
insurance and Risk management ppt
 
Insurance And Risk
Insurance And RiskInsurance And Risk
Insurance And Risk
 
Concept Of Treasury And Treasury Management
Concept Of Treasury And Treasury ManagementConcept Of Treasury And Treasury Management
Concept Of Treasury And Treasury Management
 
Risk & Risk Management
Risk & Risk ManagementRisk & Risk Management
Risk & Risk Management
 
Risk management
Risk managementRisk management
Risk management
 
Risk Management and Insurance
Risk Management and InsuranceRisk Management and Insurance
Risk Management and Insurance
 
Risk Management
Risk ManagementRisk Management
Risk Management
 
The Purpose And Goals Of Risk Management
The Purpose And Goals Of Risk ManagementThe Purpose And Goals Of Risk Management
The Purpose And Goals Of Risk Management
 
Treasury management
Treasury managementTreasury management
Treasury management
 
Risk Management Framework
Risk Management FrameworkRisk Management Framework
Risk Management Framework
 

Similar to Treasury Risk Management_Summit_Sonjai Kumar_ALM Life Ins_v2

Dave Larkins, Corporate Asset Transfer Strategy
Dave Larkins, Corporate Asset Transfer StrategyDave Larkins, Corporate Asset Transfer Strategy
Dave Larkins, Corporate Asset Transfer StrategyCora Price
 
optimal asset allocation under SAM
optimal asset allocation under SAMoptimal asset allocation under SAM
optimal asset allocation under SAMParamesan Mathen
 
Article on analysis of sbi life insurance ipo
Article on analysis of sbi life  insurance ipoArticle on analysis of sbi life  insurance ipo
Article on analysis of sbi life insurance ipoRaghuram Mogallapu
 
Blx webcast presentation 3 q19
Blx webcast presentation 3 q19Blx webcast presentation 3 q19
Blx webcast presentation 3 q19Bladex
 
Emperor asset management introduction: Robert Falcon Scott Fund
Emperor asset management introduction: Robert Falcon Scott FundEmperor asset management introduction: Robert Falcon Scott Fund
Emperor asset management introduction: Robert Falcon Scott FundEmperor Asset Management
 
Zurich Vista Understanding your clients
Zurich Vista Understanding your clientsZurich Vista Understanding your clients
Zurich Vista Understanding your clientsSofia Watson
 
2Q23_EN.pdf
2Q23_EN.pdf2Q23_EN.pdf
2Q23_EN.pdfirhcs
 
2023년 2분기_EN.pdf
2023년 2분기_EN.pdf2023년 2분기_EN.pdf
2023년 2분기_EN.pdfirhcs
 
Hci실적발표 3 q14_eng
Hci실적발표 3 q14_engHci실적발표 3 q14_eng
Hci실적발표 3 q14_engHyundai Finance
 
Value based management of Union pacific corp and UPS
Value based management of Union pacific corp and UPSValue based management of Union pacific corp and UPS
Value based management of Union pacific corp and UPSSayedSadullahSadat
 
DSP Arbitrage Fund Presentation April 2023
DSP Arbitrage Fund Presentation April 2023DSP Arbitrage Fund Presentation April 2023
DSP Arbitrage Fund Presentation April 2023DSP Mutual Fund
 
Non-Life Insurance Companies Analysis, Pakistan - December 2016
Non-Life Insurance Companies Analysis, Pakistan - December 2016Non-Life Insurance Companies Analysis, Pakistan - December 2016
Non-Life Insurance Companies Analysis, Pakistan - December 2016Junaid Akram
 
Conference Call 1Q16
 Conference Call 1Q16 Conference Call 1Q16
Conference Call 1Q16ItauRI
 

Similar to Treasury Risk Management_Summit_Sonjai Kumar_ALM Life Ins_v2 (20)

Dave Larkins, Corporate Asset Transfer Strategy
Dave Larkins, Corporate Asset Transfer StrategyDave Larkins, Corporate Asset Transfer Strategy
Dave Larkins, Corporate Asset Transfer Strategy
 
Life Insurance Industry Analysis- August 2019
Life Insurance Industry Analysis- August  2019Life Insurance Industry Analysis- August  2019
Life Insurance Industry Analysis- August 2019
 
optimal asset allocation under SAM
optimal asset allocation under SAMoptimal asset allocation under SAM
optimal asset allocation under SAM
 
Article on analysis of sbi life insurance ipo
Article on analysis of sbi life  insurance ipoArticle on analysis of sbi life  insurance ipo
Article on analysis of sbi life insurance ipo
 
Blx webcast presentation 3 q19
Blx webcast presentation 3 q19Blx webcast presentation 3 q19
Blx webcast presentation 3 q19
 
Emperor asset management introduction: Robert Falcon Scott Fund
Emperor asset management introduction: Robert Falcon Scott FundEmperor asset management introduction: Robert Falcon Scott Fund
Emperor asset management introduction: Robert Falcon Scott Fund
 
Zurich Vista Understanding your clients
Zurich Vista Understanding your clientsZurich Vista Understanding your clients
Zurich Vista Understanding your clients
 
2Q23_EN.pdf
2Q23_EN.pdf2Q23_EN.pdf
2Q23_EN.pdf
 
2023년 2분기_EN.pdf
2023년 2분기_EN.pdf2023년 2분기_EN.pdf
2023년 2분기_EN.pdf
 
Hci실적발표 3 q14_eng
Hci실적발표 3 q14_engHci실적발표 3 q14_eng
Hci실적발표 3 q14_eng
 
Value based management of Union pacific corp and UPS
Value based management of Union pacific corp and UPSValue based management of Union pacific corp and UPS
Value based management of Union pacific corp and UPS
 
1 h13 hcc_ir_eng
1 h13 hcc_ir_eng1 h13 hcc_ir_eng
1 h13 hcc_ir_eng
 
Hcc 1 q13_ir_eng
Hcc 1 q13_ir_engHcc 1 q13_ir_eng
Hcc 1 q13_ir_eng
 
DSP Arbitrage Fund Presentation April 2023
DSP Arbitrage Fund Presentation April 2023DSP Arbitrage Fund Presentation April 2023
DSP Arbitrage Fund Presentation April 2023
 
DSP Arbitrage Fund
DSP Arbitrage FundDSP Arbitrage Fund
DSP Arbitrage Fund
 
Equity Valuations
Equity ValuationsEquity Valuations
Equity Valuations
 
Equity Valuation
Equity ValuationEquity Valuation
Equity Valuation
 
Equity Valuation
Equity ValuationEquity Valuation
Equity Valuation
 
Non-Life Insurance Companies Analysis, Pakistan - December 2016
Non-Life Insurance Companies Analysis, Pakistan - December 2016Non-Life Insurance Companies Analysis, Pakistan - December 2016
Non-Life Insurance Companies Analysis, Pakistan - December 2016
 
Conference Call 1Q16
 Conference Call 1Q16 Conference Call 1Q16
Conference Call 1Q16
 

More from Sonjai Kumar, SIRM

Importance of strategic risk management in corportae success
Importance of strategic risk management in corportae successImportance of strategic risk management in corportae success
Importance of strategic risk management in corportae successSonjai Kumar, SIRM
 
2nd ERM Leadership Summit Jan 2017
2nd ERM Leadership Summit Jan 20172nd ERM Leadership Summit Jan 2017
2nd ERM Leadership Summit Jan 2017Sonjai Kumar, SIRM
 
Importance of Enterprise Risk Management in Life Insurance Sector
Importance of Enterprise Risk Management in Life Insurance SectorImportance of Enterprise Risk Management in Life Insurance Sector
Importance of Enterprise Risk Management in Life Insurance SectorSonjai Kumar, SIRM
 
Business Management Symposium 2016, 26th August
Business Management Symposium 2016, 26th AugustBusiness Management Symposium 2016, 26th August
Business Management Symposium 2016, 26th AugustSonjai Kumar, SIRM
 
Application of Enterprise Risk Management
Application of Enterprise Risk ManagementApplication of Enterprise Risk Management
Application of Enterprise Risk ManagementSonjai Kumar, SIRM
 
3rd Asia Conference on risk based capital (Manila 29 30 March-17)
3rd Asia Conference on risk based capital (Manila 29 30 March-17)3rd Asia Conference on risk based capital (Manila 29 30 March-17)
3rd Asia Conference on risk based capital (Manila 29 30 March-17)Sonjai Kumar, SIRM
 
Risk Based Capital- Issues, Challenges and Opportunities
Risk Based Capital- Issues, Challenges and OpportunitiesRisk Based Capital- Issues, Challenges and Opportunities
Risk Based Capital- Issues, Challenges and OpportunitiesSonjai Kumar, SIRM
 
Moving towards RBC- in the context of Indian Insurance Market
Moving towards RBC- in the context of Indian Insurance MarketMoving towards RBC- in the context of Indian Insurance Market
Moving towards RBC- in the context of Indian Insurance MarketSonjai Kumar, SIRM
 
Role of Enterprise Risk Management in Risk Based Capital
Role of Enterprise Risk Management in Risk Based CapitalRole of Enterprise Risk Management in Risk Based Capital
Role of Enterprise Risk Management in Risk Based CapitalSonjai Kumar, SIRM
 
Finance and EconomicsConference_Sonjai Kumar (Aviva)
Finance and EconomicsConference_Sonjai Kumar (Aviva)Finance and EconomicsConference_Sonjai Kumar (Aviva)
Finance and EconomicsConference_Sonjai Kumar (Aviva)Sonjai Kumar, SIRM
 
Application of Stress Testing November2016
Application of Stress Testing November2016Application of Stress Testing November2016
Application of Stress Testing November2016Sonjai Kumar, SIRM
 
BMS_Petroleum Mgt_Sonjai Kumar (Aviva)
BMS_Petroleum Mgt_Sonjai Kumar (Aviva)BMS_Petroleum Mgt_Sonjai Kumar (Aviva)
BMS_Petroleum Mgt_Sonjai Kumar (Aviva)Sonjai Kumar, SIRM
 
Book Review ( Actuaries in Micro Insurance)
Book Review ( Actuaries in Micro Insurance)Book Review ( Actuaries in Micro Insurance)
Book Review ( Actuaries in Micro Insurance)Sonjai Kumar, SIRM
 
Insurance Times December 2015 _Sonjai-2 (2)
Insurance Times December 2015 _Sonjai-2 (2)Insurance Times December 2015 _Sonjai-2 (2)
Insurance Times December 2015 _Sonjai-2 (2)Sonjai Kumar, SIRM
 
Risk Management in Life Insurance
Risk Management in Life InsuranceRisk Management in Life Insurance
Risk Management in Life InsuranceSonjai Kumar, SIRM
 
Impact on Insurance due to Global Risk
Impact on Insurance due to Global RiskImpact on Insurance due to Global Risk
Impact on Insurance due to Global RiskSonjai Kumar, SIRM
 
Critical illness in India_Sonjai Kumar.PDF
Critical illness in India_Sonjai Kumar.PDFCritical illness in India_Sonjai Kumar.PDF
Critical illness in India_Sonjai Kumar.PDFSonjai Kumar, SIRM
 

More from Sonjai Kumar, SIRM (20)

Importance of strategic risk management in corportae success
Importance of strategic risk management in corportae successImportance of strategic risk management in corportae success
Importance of strategic risk management in corportae success
 
2nd ERM Leadership Summit Jan 2017
2nd ERM Leadership Summit Jan 20172nd ERM Leadership Summit Jan 2017
2nd ERM Leadership Summit Jan 2017
 
Importance of Enterprise Risk Management in Life Insurance Sector
Importance of Enterprise Risk Management in Life Insurance SectorImportance of Enterprise Risk Management in Life Insurance Sector
Importance of Enterprise Risk Management in Life Insurance Sector
 
Business Management Symposium 2016, 26th August
Business Management Symposium 2016, 26th AugustBusiness Management Symposium 2016, 26th August
Business Management Symposium 2016, 26th August
 
Application of Enterprise Risk Management
Application of Enterprise Risk ManagementApplication of Enterprise Risk Management
Application of Enterprise Risk Management
 
3rd Asia Conference on risk based capital (Manila 29 30 March-17)
3rd Asia Conference on risk based capital (Manila 29 30 March-17)3rd Asia Conference on risk based capital (Manila 29 30 March-17)
3rd Asia Conference on risk based capital (Manila 29 30 March-17)
 
Risk Based Capital- Issues, Challenges and Opportunities
Risk Based Capital- Issues, Challenges and OpportunitiesRisk Based Capital- Issues, Challenges and Opportunities
Risk Based Capital- Issues, Challenges and Opportunities
 
Moving towards RBC- in the context of Indian Insurance Market
Moving towards RBC- in the context of Indian Insurance MarketMoving towards RBC- in the context of Indian Insurance Market
Moving towards RBC- in the context of Indian Insurance Market
 
Role of Enterprise Risk Management in Risk Based Capital
Role of Enterprise Risk Management in Risk Based CapitalRole of Enterprise Risk Management in Risk Based Capital
Role of Enterprise Risk Management in Risk Based Capital
 
Finance and EconomicsConference_Sonjai Kumar (Aviva)
Finance and EconomicsConference_Sonjai Kumar (Aviva)Finance and EconomicsConference_Sonjai Kumar (Aviva)
Finance and EconomicsConference_Sonjai Kumar (Aviva)
 
Application of Stress Testing November2016
Application of Stress Testing November2016Application of Stress Testing November2016
Application of Stress Testing November2016
 
BMS_Petroleum Mgt_Sonjai Kumar (Aviva)
BMS_Petroleum Mgt_Sonjai Kumar (Aviva)BMS_Petroleum Mgt_Sonjai Kumar (Aviva)
BMS_Petroleum Mgt_Sonjai Kumar (Aviva)
 
Book Review ( Actuaries in Micro Insurance)
Book Review ( Actuaries in Micro Insurance)Book Review ( Actuaries in Micro Insurance)
Book Review ( Actuaries in Micro Insurance)
 
Insurance Times December 2015 _Sonjai-2 (2)
Insurance Times December 2015 _Sonjai-2 (2)Insurance Times December 2015 _Sonjai-2 (2)
Insurance Times December 2015 _Sonjai-2 (2)
 
Risk Management in Life Insurance
Risk Management in Life InsuranceRisk Management in Life Insurance
Risk Management in Life Insurance
 
Impact on Insurance due to Global Risk
Impact on Insurance due to Global RiskImpact on Insurance due to Global Risk
Impact on Insurance due to Global Risk
 
Lessons from Economic Crisis
Lessons from Economic CrisisLessons from Economic Crisis
Lessons from Economic Crisis
 
isn-2006-iss39-rana
isn-2006-iss39-ranaisn-2006-iss39-rana
isn-2006-iss39-rana
 
Critical illness in India_Sonjai Kumar.PDF
Critical illness in India_Sonjai Kumar.PDFCritical illness in India_Sonjai Kumar.PDF
Critical illness in India_Sonjai Kumar.PDF
 
Motor Premium Rating
Motor Premium RatingMotor Premium Rating
Motor Premium Rating
 

Treasury Risk Management_Summit_Sonjai Kumar_ALM Life Ins_v2

  • 1. Speaker : SONJAI KUMAR Company : AVIVA LIFE INSURANCE
  • 2. AGENDA ► Why is Assets and Liability Management (ALM) necessary in the life insurance business for its financial health and what are the implications? ► How assets and liability management is performed in the life insurance business? ► What are the factors affecting the ALM? ► What are the issues and challenges in the Indian market in managing the ALM risk? ► What are the simple measures used in managing the ALM risk?
  • 3.  To manage Change in interest rate risk? Assets Liability Longer in term ShorterinTerm Change in Liability Change in Assets Change in Assets minus Liability Risk= Exposure*Duration Gap Impact the bottom line Delta “I” (ALM)
  • 4.  Nature of Liability- types of Products Unit Linked Products Non-Participating Product in Profit Participating Product in Profit Maturity depends on Market Value Guaranteed Liability on Maturity Guaranteed + Discretionary Benefit No ALM Risk High ALM Risk Medium ALM Risk Increasing Guarantees with term through bonus additions
  • 5. 2001-2010 2010 Post 2010 Pre-dominantly ULIP were sold IRDA-SEBI Spat on ULIP products and subsequent restrictions on charges by IRDA Market moved to Traditional Products Indian Product Market Scenario Par Non-Par Many Players Selling Par Many Players Selling Term product with only death benefit Some players are selling products with maturity guarantee X
  • 6. Par Non-Par Guaranteed Sum Assured (GSA)- Small in Amount Bonus (B) every year that becomes guaranteed on maturity and Death Death Benefit = GSA + B Bonus declared up to time of death Maturity = GSA+B+TB TB= Terminal Bonus Guaranteed Sum Assured (GSA) Bonus = NIL Death Benefit = GSA Maturity = GSA Total Pay out Rs.500,000/- Total Bonus= 300,000 Similar to fixed and floating interest rate GSA = 200,000
  • 8. Par Non-Par Increasing Guarantee but has a slow increasing Guarantee Interest rate risk is medium/low ALM is important Maturity = GSA+B+TB TB= Terminal Bonus Has Guarantee at the on set Interest rate risk is very high ALM is very important Current risk in the Indian Market is from fall in future interest rate Focus Point
  • 9. Lets look at a simple example: ► An insurance company collects premium from customers and provides a guaranteed return of 6% over the policy period (which is say 20 years); ► Further, the premium collected from customers is invested in Corporate Bonds/Govt Securities at a return of 8%. 6 months later, the interest rate falls to 5%. What’s the impact on the insurance company: ► Insurance company faces the risk of reinvestment of future premium at lower interest rates. Incase fall in interest rate is permanent, the company may have to pay from its pocket as the returns are guaranteed for the customer. In the above scenario, what would be the risk if interest rates were to fall to 7% in place of 5%? ► Profit Margins will get compressed as the Insurer will earn less return on the investment. So an insurer has a risk of ‘falling’ interest rate.
  • 10. Reinvestment Risk Liability Duration at times has absurd value Liquidity Risk In the event of fall in interest rate future premium will be invested at higher price Due to the nature of the liability cash flows, duration value is assured For a long term products such as whole life product, maximum term of assets could be around 30 years or so Hedging instrument Shorter Asset Term Indian Regulator has just allowed using interest rate derivatives to hedge the risk. Initial days In case of mass surrender, risk of liquidity
  • 11. Assets Longer than Liability Liability Longer than Assets Rise in Interest rate is a risk Assets to be sold @ cheaper price on liability maturity Example- General Insurance and Health Insurance Products Shareholder’s Fund Fall in interest rate is a risk Reinvestment risk of future premium Typical Life Insurance long term products Maturity = GSA Invest Short term Invest longer term
  • 12. Duration Matching Cash flow matching Regulatory minimum requirement Some players are matching duration of assets and liability Project Assets and Liability cash flow into future and invest assets based on the visual gap Calculate exposure on change in interest rate by 1 bps Strategic Assets Allocation It has its own challenges Simple, but lack quantification PVBP Some may be using Allocate Assets on criteria such as profit, keeping risk within appetite and stay within constraints ?
  • 13. Change in Liability Assets Optimization Constraints Performance indicator Risk Indicator Policyholder Shareholder Risk Appetite/Tolerance Duration Regulatory Overall Match by “Nature”, “Term & "Currency” of Liability
  • 14. Assets Liability Default Assets are Longer- Loans Liabilities are shorter- Deposits Liquidity risk is more prominent ProductsLiquidity What can be learnt ? Assets are Shorter Liabilities are Longer Liquidity risk is less prominent Par and Non- Par Floating and Fixed Rates Premium Lapse EMI Default Banking Life Insurance
  • 15. Level Premium Increasing Benefits in a probabilistic sense Shorter Tenure of Assets Liability are due to the customer and Cannot be adjusted ALM focus on Optimizing assets portfolio given the liability Match Assets by “Nature”, “Term & "Currency” of Liability
  • 16. Year Premium Income Gross Interest Income Initial Expenses Renewal Expenses Initial Commission Renewal Commission Death Claim Survival Benefit** Surrender Claims Net CF 1 500,000 15,843 160,700 613 148,250 - 10,144 - 20,923 175,212 2 423,449 35,658 - 4,630 - 21,172 9,521 - 44,704 379,079 3 379,565 56,812 - 4,409 - 7,591 9,393 - 28,341 386,643 4 358,985 77,351 - 4,431 - 7,180 9,726 - 35,724 379,275 5 339,377 97,241 - 4,455 - 6,788 10,019 - 42,197 373,159 6 320,699 135,548 - 4,476 - 6,414 10,279 - 47,828 387,250 7 302,912 163,594 - 4,495 - 6,058 10,501 - 53,734 391,719 8 285,977 192,719 - 4,514 - 5,720 10,697 - 66,470 391,296 9 269,856 222,536 - 4,532 - 5,397 10,877 - 77,759 393,827 10 254,510 243,072 - 4,548 - 5,090 11,048 - 89,016 387,879 11 239,902 262,527 - 4,563 - 4,798 11,220 - 104,672 377,176 12 225,995 210,974 - 4,574 - 4,520 11,383 - - 416,492 13 - 214,719 - 2,490 - - - 335,927 - (123,697) 14 - 282,097 - 2,420 - - - 335,927 - (56,250) 15 - 269,784 - 2,347 - - - 335,927 - (68,490) 16 - 224,732 - 2,271 - - - 335,927 - (113,466) 17 - 243,153 - 2,191 - - - 335,927 - (94,964) 18 - 202,617 - 2,107 - - - 335,927 - (135,416) 19 - 189,287 - 2,019 - - - 335,927 - (148,659) 20 - 134,452 - 1,927 - - - 335,927 - (203,401) 21 - 158,698 - 1,831 - - - 335,927 - (179,060) 22 - 143,426 - 1,730 - - - 335,927 - (194,230) 23 - 127,384 - 1,624 - - - 335,927 - (210,166) 24 - 110,533 - 1,448 - - - 1,679,634 - (1,570,549)
  • 17. -2000000 -1500000 -1000000 -500000 0 500000 1000000 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Net CF
  • 18. Year Premium Income Gross Interest Income Initial Expenses Renewal Expenses Initial Commission Renewal Commission Death Claim Survival Benefit** Surrender Claims Net CF Increase in Reserve Gross Surplus 1 500,000 15,843 160,700 613 148,250 - 10,144 - 20,923 175,212 237,862 (62,650) 2 423,449 35,658 - 4,630 - 21,172 9,521 - 44,704 379,079 358,996 20,082 3 379,565 56,812 - 4,409 - 7,591 9,393 - 28,341 386,643 365,418 21,224 4 358,985 77,351 - 4,431 - 7,180 9,726 - 35,724 379,275 353,574 25,701 5 339,377 97,241 - 4,455 - 6,788 10,019 - 42,197 373,159 342,795 30,365 6 320,699 135,548 - 4,476 - 6,414 10,279 - 47,828 387,250 316,062 71,187 7 302,912 163,594 - 4,495 - 6,058 10,501 - 53,734 391,719 303,941 87,778 8 285,977 192,719 - 4,514 - 5,720 10,697 - 66,470 391,296 288,519 102,778 9 269,856 222,536 - 4,532 - 5,397 10,877 - 77,759 393,827 274,354 119,472 10 254,510 243,072 - 4,548 - 5,090 11,048 - 89,016 387,879 260,457 127,422 11 239,902 262,527 - 4,563 - 4,798 11,220 - 104,672 377,176 244,320 132,856 12 225,995 210,974 - 4,574 - 4,520 11,383 - - 416,492 375,844 40,648 13 - 214,719 - 2,490 - - - 335,927 - (123,697) (149,039) 25,342 14 - 282,097 - 2,420 - - - 335,927 - (56,250) (156,558) 100,308 15 - 269,784 - 2,347 - - - 335,927 - (68,490) (164,456) 95,967 16 - 224,732 - 2,271 - - - 335,927 - (113,466) (172,753) 59,287 17 - 243,153 - 2,191 - - - 335,927 - (94,964) (181,469) 86,505 18 - 202,617 - 2,107 - - - 335,927 - (135,416) (190,625) 55,209 19 - 189,287 - 2,019 - - - 335,927 - (148,659) (200,243) 51,584 20 - 134,452 - 1,927 - - - 335,927 - (203,401) (210,347) 6,945 21 - 158,698 - 1,831 - - - 335,927 - (179,060) (220,960) 41,901 22 - 143,426 - 1,730 - - - 335,927 - (194,230) (232,110) 37,880 23 - 127,384 - 1,624 - - - 335,927 - (210,166) (243,823) 33,656 24 - 110,533 - 1,448 - - - 1,679,634 - (1,570,549) (1,599,759) 29,210
  • 19. -100000 -50000 0 50000 100000 150000 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 Gross Surplus
  • 20. Year 1 Reserves: INR 237,862 Purchase assets equal to the value of INR 237,862 Questions How to purchase assets equivalent to INR 237,862: ► What will be the term of the Bonds? ► How much money you will be kept in short term assets to maintain liquidity ? ► What should be the optimal mix of assets? Answers Asset purchasing philosophy: Purchase assets in a manner that it matches the: ► Nature of Liability (Guaranteed, Discretionary, Linked), ► Term (Duration of assets = Duration of Liability), and; ► Currency of Liability (Invest in same currency as liability)
  • 21. Organized by UNICOM Trainings & Seminars Pvt. Ltd. contact@unicomlearning.com www.unicomseminars.org/Conference/Mumbai/2015/Treasury-and-Risk-Management- Summit