TRANSITION OUT PLAN TEMPLATE
This Contract Transition Out Plan Template is free for you to copy
and use on your project and within your organization. We hope
that you find this template useful and welcome your comments.
Public distribution of this document is only permitted from the
Project Management Docs official website at:
www.ProjectManagementDocs.com
TRANSITION OUT PLAN TEMPLATE
<CONTRACT NAME>
COMPANY NAME
STREET ADDRESS
CITY, STATE ZIP CODE
DATE
Transition Out Plan Template
www.ProjectManagementDocs.com
TABLE OF CONTENTS
1.Executive Summary......................................................................................................................2
2.Transition Approach.....................................................................................................................2
3.Transition Team Organization......................................................................................................2
4.Workforce Transition....................................................................................................................3
5.Work Execution During Transition..............................................................................................4
6.Subcontracts .................................................................................................................................4
7.Property Transition.......................................................................................................................5
7.1.Government Furnished Equipment (GFE)............................................................................................................5
7.2.Incumbent Owned Equipment..............................................................................................................................5
7.3.Intellectual Property..............................................................................................................................................5
7.4.User Accounts and Passwords..............................................................................................................................6
8.Knowledge Transfer......................................................................................................................6
9.Schedule........................................................................................................................................7
10.Handover and Acceptance..........................................................................................................7
1
Transition Out Plan Template
www.ProjectManagementDocs.com
1. EXECUTIVE SUMMARY
The purpose of the executive summary is to describe the transition plan at a high level and
what the plan should accomplish. This section should include an overview and history of
the contract, who the contract is currently with, who it is transitioning to, and the
timeframe/period of transition.
This plan formally documents the process for the transition of the powers, duties, activities,
and functions of tasks and tools for the PayBase contract (Contract # 11-10159). It
describes the approach to transitioning work and employees from ABC Corporation
(incumbent contractor) to XYZ Inc. The PayBase contract is for the creation and
implementation of a new payroll database for Smith Consulting Group (SCG). This
database will allow SCG to integrate all payroll tracking and reporting into a consolidated
database. This contract is currently with ABC Corporation and will transition to XYZ Inc.
will be completed no later than 180 days after contract award. The period of performance is
from 1 January 20xx to 31 December 20xx. The value of the contract is $2,000,000.00.
2. TRANSITION APPROACH
This section of the contract transition out plan discusses the overall approach to the
transition. Some items which must be considered are: will you scale down your staff during
the transition or will you bring in additional staff to handle and manage the transition? How
long is the transition? What are your assumptions (i.e. the staff of the new contractor will
be available onsite to participate in the transition and receive knowledge transfer, etc.)?
For this transition, ABC Corporation will maintain its existing staff on-site throughout the
transition period. No additional staffing requirements are anticipated to complete the
transition to XYZ Inc. The transition is expected to take 60 days to complete. Immediately
prior to the transition, ABC Corporation will stand up its transition team in order to facilitate
the activities necessary for successful transition. It is assumed that XYZ Inc. will have its
staff on site at the beginning of the 60 day transition period and will establish a similar team
to work with ABC Corporation to coordinate the contract’s transition. It is also assumed
that SCG will provide adequate workspace for both contractors throughout the duration of
the transition. SCG should also designate a transition project manager to work with both
contractors throughout the transition.
3. TRANSITION TEAM ORGANIZATION
This section of the transition out plan should provide an organizational chart showing all
resources and their roles in the transition (i.e. Transition Project Manager, etc.). Key team
members should be from both the incumbent and new contractors as well as the customer.
The following chart illustrates the transition team members from SCG, ABC Corporation,
and XYZ Inc. as well as the roles and responsibilities of each team member.
2
Transition Out Plan Template
www.ProjectManagementDocs.com
Organization Title Roles/Responsibilities
SCG Transition Project Manager Coordinate activities between contractors
throughout transition; provide workspace for all
transition staff; facilitate transition meetings as
required
SCG Contracting Officer Responsible for overseeing all contract actions
and deliverables; responsible for ensuring
accountability on all funding and budget items
pertaining to the contract
ABC Corp. Transition Project Manager Work with SCG and XYZ PMs to coordinate
and schedule all transition activities; provide
weekly reporting on transition progress; ensure
all applicable property and tools are included as
part of transition
ABC Corp. IT Transition Lead Ensure all IT activities are completed during
transition; document all IT processes, tasks, and
activities for transition to XYZ
ABC Corp. Configuration Manager Ensure all training documentation is complete;
ensure completion of user and technical
manuals; ensure all documentation is in
accordance with SCG standards; ensure
proprietary materials are not part of transition
XYZ Inc. Transition Project Manager Work with SCG and ABC PMs; ensure all
transition deliverables are received and
understood; identify any gaps in transition
activities
XYZ Inc. IT Transition Lead Ensure continuity of all IT activities throughout
transition; ensure receipt of adequate IT
documentation of all processes, tasks, and
activities
XYZ Inc. Configuration Manager Ensure all training documentation received
addresses all planned training items; ensure
standardization of all transitioned
documentation
4. WORKFORCE TRANSITION
3
Transition Out Plan Template
www.ProjectManagementDocs.com
It is not uncommon for the workforce to transition from one contractor to another as part of
the contract transition. The workforce may stay in place with the client or customer and
simply “re-badge” from the incumbent to the new contractor. It is also common for the
incumbent workforce to leave the site once the transition is completed and approved. In
order to set expectations and allow for adequate transition planning, the workforce must be
determined and communicated ahead of time.
For this contract transition, all workforce members will remain with their current
organization. The incumbent (ABC Corp) workforce will remain on-site to perform their
transition activities until such time that the transition is completed and approved by all
parties. The new contractor (XYZ Inc.) will ensure its workforce is on site 60 days prior to
transition completion. This will allow adequate time to perform all transition activities.
SCG will provide additional temporary workspace for XYZ Inc. employees until transition
completion, at which time the workforce will occupy the vacated locations of the outgoing
ABC Corp workforce.
5. WORK EXECUTION DURING TRANSITION
Discuss the level of work which is to be performed during the transition period and the
impact of the transition on that work (i.e. system maintenance, software development,
support services, etc.).
Throughout the transition of this contract, work will continue to be performed by ABC Corp
in accordance with the approved project schedule and work breakdown structure (WBS) in
place. The transition management team will ensure that XYZ Inc. employees work
alongside their ABC Corp. counterparts; however, ABC will maintain all responsibility for
tasks and deliverables. At the end of the 60 day transition period, and upon transition
approval, XYZ Inc. will assume full responsibility for all tasks and deliverables.
6. SUBCONTRACTS
This section documents all the existing contracts and if/how they will be transitioned. It
should contain this information in a table format (subcontract agreements,
software/hardware maintenance contracts, etc.).
The following chart illustrates the subcontracts in place which are in support of SCG’s
PayBase activity. These subcontracts apply to third party tasks to ensure all required
cabling and facilities functionality is in place to support the PayBase project.
Subcontract # Awarded to Tasks
11-10010 CableQuest Perform cabling work within
datacenter to support PayBase
database functionality
11-10020 BuildTech Build out existing data center
facility to house additional
servers to ensure PayBase
database functionality
4
Transition Out Plan Template
www.ProjectManagementDocs.com
7. PROPERTY TRANSITION
7.1. Government Furnished Equipment (GFE)
This section of the plan describes the transition of any equipment for a scenario where
the customer is a government entity and provides the contractor with government
property. This property may include hardware such as laptops/PCs, software bundles or
add-ons, portable electronic devices (PEDs), and security badges. Typically, GFE will
be turned back over to the government customer during a transition and may or may not
be re-issued to the new contractor.
As part of this transition, all GFE provided to ABC Corp under the PayBase contract
will be turned in to the government upon completion and approval of the transition
phase. GFE includes laptop computers, all PEDs, flash and external hard drives, and
employee ID badges. All electronic devices will be re-imaged by government IT
personnel and re-issued to appropriate XYZ Inc. employees.
7.2. Incumbent Owned Equipment
Equipment owned by the incumbent contractor will usually remain with them when they
transition off of the contract. However, there may be instances where incumbent owned
equipment supports customer applications and services. This section should state that
incumbent owned equipment will remain with the incumbent - and identify options
where this equipment may be available for purchase by the new contractor or customer
for their use (i.e. application server and application for helpdesk, etc.).
All incumbent owned equipment will remain with the incumbent upon completion and
approval of the transition. This equipment includes incumbent-issues laptops and PEDs,
organizational tools, organizational process maps, and company ID badges. If it is
determined that any incumbent owned equipment is required to stay with the customer
to ensure successful completion of the contract, the customer and incumbent contracting
officer representatives will coordinate procurement of the equipment through the
customer’s established procurement management process.
7.3. Intellectual Property
Here the transition out plan should describe how intellectual property will be handled as
part of the transfer process. Intellectual property may include various documentation,
supplier and subcontractor information, service agreements, or original designs or plans.
Intellectual property generates many legal considerations and may include the
completion of non-disclosure agreements (NDAs) between the incumbent and the
customer. Intellectual property may be transferred, sold, or retained by the incumbent
depending on the contractual agreements in place.
5
Transition Out Plan Template
www.ProjectManagementDocs.com
Per the PayBase contract, all intellectual property which is a direct result of work on the
contract deliverables will be transitioned to the new contractor in order to ensure the
successful completion of the project. The contract pricing takes intellectual property
into consideration and as such, any resulting intellectual property will be owned by the
customer.
7.4. User Accounts and Passwords
This section of the transition plan should discuss how any accounts will be transitioned,
who they will be transitioned to (i.e. system administrator accounts). Provide a table of
all user accounts to be transitioned/disabled.
As part of the contract transition, various user account accesses and authorizations must
be created and disabled. Currently ABC personnel listed in the chart below possess the
user accounts and access necessary for contract deliverables. The listed XYZ Inc.
employees will be granted access on the first day of the contract transition phase. Once
transition is complete and approved, all ABC Corp personnel’s user accounts will be
disabled.
User Account ABC Corp. XYZ Inc.
SAP Master User IT Transition Lead and
Configuration Manager
IT Transition Lead and
Configuration Manager
Database Administrator IT Transition Lead IT Transition Lead
Customer Intranet Master
User
Transition PM and IT
Transition Lead
Transition PM and IT
Transition Lead
8. KNOWLEDGE TRANSFER
This section should discuss how knowledge will be transferred from the incumbent staff to
the staff of the new contractor (documentation/instruction manuals including as-built
documents, formal training classes, one-on-one training/knowledge transfer, etc.). This is
an important consideration as the transfer of knowledge is what provides continuity for the
contract.
For this transition, knowledge transfer will occur over the entirety of the 60 day transition
period. The knowledge transfer will take place via various methods. The incumbent PM
will coordinate two formal classroom training sessions to be conducted by the incumbent IT
Transition Lead. These sessions will focus on the specific IT concerns related to the
database tasks and activities. The incumbent PM will also coordinate two formal classroom
sessions to be conducted by the incumbent Configuration Manager. These sessions will
cover documentation requirements and organizational processes and assets. These sessions
will be completed no later than 15 days prior to the end of the 60 day transition period.
Additionally, all XYZ Inc. staff will work alongside their ABC Corp counterparts
throughout the 60 day period in order to gain familiarity with the database, tools, processes,
and organizational assets. The PMs from ABC Corp., XYZ, Inc., and the customer will
meet no later than 10 days prior to transition completion in order to determine if any further
training or knowledge transfer is required.
6
Transition Out Plan Template
www.ProjectManagementDocs.com
9. SCHEDULE
This section of the transition plan should contain a GANTT chart schedule of the transition.
The complexity of the transition will dictate the level of detail required in the schedule.
However, all major milestones as well as transition start and completion dates should be
included at a minimum.
The following GANTT chart illustrates the schedule for transition of the PayBase contract
from ABC Corp. to XYZ Inc. Any changes to this schedule will require review and
approval from the customer and all other parties.
ID Task Name Duration Start Finish
1 PayBase Transition Begins 0 days Mon 4/4/11 Mon 4/4/11
2 XYZ Staff arrive on Site 0 days Mon 4/4/11 Mon 4/4/11
3 Knowledge Transfer 59 days Mon 4/4/11 Thu 6/23/11
4 Knowledge Transfer Complete 0 days Thu 6/23/11 Thu 6/23/11
5 ABC User Accounts Disabled 1 day Fri 6/24/11 Fri 6/24/11
6 Transfer Complete/Approval 0 days Fri 6/24/11 Fri 6/24/11
4/4
4/4
6/23
6/24
4/3 4/10 4/17 4/24 5/1 5/8 5/15 5/22 5/29 6/5 6/12 6/19 6/26 7/3 7/10 7/17
April May June July
10. HANDOVER AND ACCEPTANCE
This section of the contract transition out plan should discuss how the customer will
formally accept the handover at the end of the transition. This may include whether or not
there’s a checklist for acceptance or formal sign-off. There are typically several people who
need to accept the handover (i.e. security office for all badges, IT Manager for system
accounts, Contracts Manager, etc.).
The customer will make the determination of when transition is completed and will provide
formal acceptance indicating such. To do this, the customer’s transition PM will utilize the
established transition checklist in order to determine that all activities associated with the
transition have been completed. The customer’s transition PM will also meet with the
transition PMs from each contractor to ensure that all concerns and issues have been met
and addressed appropriately. Once the customer’s transition PM has formally accepted the
transition, the checklist and supporting documentation will be signed and accepted by the
customer’s project sponsor and the company’s human resources director. The last step is
the formal acceptance and signature of the customer’s contracting officer representative. It
is only after all of these approvals and signatures are in place that the transition will be
considered complete.
This free Contract Transition Out Plan Template is brought to you by www.ProjectManagementDocs.com
7
Transition Out Plan Template
www.ProjectManagementDocs.com
9. SCHEDULE
This section of the transition plan should contain a GANTT chart schedule of the transition.
The complexity of the transition will dictate the level of detail required in the schedule.
However, all major milestones as well as transition start and completion dates should be
included at a minimum.
The following GANTT chart illustrates the schedule for transition of the PayBase contract
from ABC Corp. to XYZ Inc. Any changes to this schedule will require review and
approval from the customer and all other parties.
ID Task Name Duration Start Finish
1 PayBase Transition Begins 0 days Mon 4/4/11 Mon 4/4/11
2 XYZ Staff arrive on Site 0 days Mon 4/4/11 Mon 4/4/11
3 Knowledge Transfer 59 days Mon 4/4/11 Thu 6/23/11
4 Knowledge Transfer Complete 0 days Thu 6/23/11 Thu 6/23/11
5 ABC User Accounts Disabled 1 day Fri 6/24/11 Fri 6/24/11
6 Transfer Complete/Approval 0 days Fri 6/24/11 Fri 6/24/11
4/4
4/4
6/23
6/24
4/3 4/10 4/17 4/24 5/1 5/8 5/15 5/22 5/29 6/5 6/12 6/19 6/26 7/3 7/10 7/17
April May June July
10. HANDOVER AND ACCEPTANCE
This section of the contract transition out plan should discuss how the customer will
formally accept the handover at the end of the transition. This may include whether or not
there’s a checklist for acceptance or formal sign-off. There are typically several people who
need to accept the handover (i.e. security office for all badges, IT Manager for system
accounts, Contracts Manager, etc.).
The customer will make the determination of when transition is completed and will provide
formal acceptance indicating such. To do this, the customer’s transition PM will utilize the
established transition checklist in order to determine that all activities associated with the
transition have been completed. The customer’s transition PM will also meet with the
transition PMs from each contractor to ensure that all concerns and issues have been met
and addressed appropriately. Once the customer’s transition PM has formally accepted the
transition, the checklist and supporting documentation will be signed and accepted by the
customer’s project sponsor and the company’s human resources director. The last step is
the formal acceptance and signature of the customer’s contracting officer representative. It
is only after all of these approvals and signatures are in place that the transition will be
considered complete.
This free Contract Transition Out Plan Template is brought to you by www.ProjectManagementDocs.com
7

More Related Content

What's hot

Project Dashboard Ppt Model
Project Dashboard Ppt ModelProject Dashboard Ppt Model
Project Dashboard Ppt Model
SlideTeam
 
Comelite IT Solutions Company Profile - 2015
Comelite IT Solutions Company Profile - 2015Comelite IT Solutions Company Profile - 2015
Comelite IT Solutions Company Profile - 2015
Tanja Weber
 
MANPOWER PROVIDING PRESENTATION
MANPOWER PROVIDING PRESENTATIONMANPOWER PROVIDING PRESENTATION
MANPOWER PROVIDING PRESENTATION
Murat Cengiz
 
Exquisite Software Development, LLC - 2015 Brochure
Exquisite Software Development, LLC - 2015 BrochureExquisite Software Development, LLC - 2015 Brochure
Exquisite Software Development, LLC - 2015 Brochure
Exquisite Software, Inc.
 
DevOps: What, who, why and how?
DevOps: What, who, why and how?DevOps: What, who, why and how?
DevOps: What, who, why and how?
Red Gate Software
 
Offshore development center (odc) setup up by faichi solutions - Case Study
Offshore development center (odc) setup up by faichi solutions - Case StudyOffshore development center (odc) setup up by faichi solutions - Case Study
Offshore development center (odc) setup up by faichi solutions - Case Study
Faichi Solutions
 
Global staffing (rpo) business proposal
Global staffing (rpo) business proposalGlobal staffing (rpo) business proposal
Global staffing (rpo) business proposal
Ajay Tripathi
 
JFS 2021 - The Process Automation Map
JFS 2021 - The Process Automation MapJFS 2021 - The Process Automation Map
JFS 2021 - The Process Automation Map
Bernd Ruecker
 
Project Planning Implementation Timeline Powerpoint Layout
Project Planning Implementation Timeline Powerpoint LayoutProject Planning Implementation Timeline Powerpoint Layout
Project Planning Implementation Timeline Powerpoint Layout
SlideTeam
 
MuleSoft Surat Meetup#54 - MuleSoft Automation
MuleSoft Surat Meetup#54 - MuleSoft AutomationMuleSoft Surat Meetup#54 - MuleSoft Automation
MuleSoft Surat Meetup#54 - MuleSoft Automation
Jitendra Bafna
 
Arsblue Company Profile
Arsblue Company ProfileArsblue Company Profile
Arsblue Company Profile
Bassilichi S.p.A.
 
Design sprint | Sketch
Design sprint  | SketchDesign sprint  | Sketch
Design sprint | Sketch
Ruthy Lichtenstein
 
Service Delivery Model Flow
Service Delivery Model FlowService Delivery Model Flow
Service Delivery Model Flow
SlideTeam
 
Roadmap Powerpoint Slide
Roadmap Powerpoint SlideRoadmap Powerpoint Slide
Roadmap Powerpoint Slide
SlideTeam
 
Amazon Connect Rethink Your Contact Center with CloudHesive.pptx
Amazon Connect Rethink Your Contact Center with CloudHesive.pptxAmazon Connect Rethink Your Contact Center with CloudHesive.pptx
Amazon Connect Rethink Your Contact Center with CloudHesive.pptx
CloudHesive
 
Boomi Molecule Migration to the Cloud: Top 5 Strategies Revealed
Boomi Molecule Migration to the Cloud: Top 5 Strategies RevealedBoomi Molecule Migration to the Cloud: Top 5 Strategies Revealed
Boomi Molecule Migration to the Cloud: Top 5 Strategies Revealed
Kellton Tech Solutions Ltd
 
People Process Technology PowerPoint Presentation Slides
People Process Technology PowerPoint Presentation SlidesPeople Process Technology PowerPoint Presentation Slides
People Process Technology PowerPoint Presentation Slides
SlideTeam
 
Transform experiences with automation and conversational AI
Transform experiences with automation and conversational AITransform experiences with automation and conversational AI
Transform experiences with automation and conversational AI
Vibhor Shrivastava
 
Corporate Recruitment Agency Proposal PowerPoint Presentation Slides
Corporate Recruitment Agency Proposal PowerPoint Presentation SlidesCorporate Recruitment Agency Proposal PowerPoint Presentation Slides
Corporate Recruitment Agency Proposal PowerPoint Presentation Slides
SlideTeam
 

What's hot (20)

Project Dashboard Ppt Model
Project Dashboard Ppt ModelProject Dashboard Ppt Model
Project Dashboard Ppt Model
 
Comelite IT Solutions Company Profile - 2015
Comelite IT Solutions Company Profile - 2015Comelite IT Solutions Company Profile - 2015
Comelite IT Solutions Company Profile - 2015
 
MANPOWER PROVIDING PRESENTATION
MANPOWER PROVIDING PRESENTATIONMANPOWER PROVIDING PRESENTATION
MANPOWER PROVIDING PRESENTATION
 
Exquisite Software Development, LLC - 2015 Brochure
Exquisite Software Development, LLC - 2015 BrochureExquisite Software Development, LLC - 2015 Brochure
Exquisite Software Development, LLC - 2015 Brochure
 
DevOps: What, who, why and how?
DevOps: What, who, why and how?DevOps: What, who, why and how?
DevOps: What, who, why and how?
 
Offshore development center (odc) setup up by faichi solutions - Case Study
Offshore development center (odc) setup up by faichi solutions - Case StudyOffshore development center (odc) setup up by faichi solutions - Case Study
Offshore development center (odc) setup up by faichi solutions - Case Study
 
Global staffing (rpo) business proposal
Global staffing (rpo) business proposalGlobal staffing (rpo) business proposal
Global staffing (rpo) business proposal
 
JFS 2021 - The Process Automation Map
JFS 2021 - The Process Automation MapJFS 2021 - The Process Automation Map
JFS 2021 - The Process Automation Map
 
Project Planning Implementation Timeline Powerpoint Layout
Project Planning Implementation Timeline Powerpoint LayoutProject Planning Implementation Timeline Powerpoint Layout
Project Planning Implementation Timeline Powerpoint Layout
 
MuleSoft Surat Meetup#54 - MuleSoft Automation
MuleSoft Surat Meetup#54 - MuleSoft AutomationMuleSoft Surat Meetup#54 - MuleSoft Automation
MuleSoft Surat Meetup#54 - MuleSoft Automation
 
Arsblue Company Profile
Arsblue Company ProfileArsblue Company Profile
Arsblue Company Profile
 
Design sprint | Sketch
Design sprint  | SketchDesign sprint  | Sketch
Design sprint | Sketch
 
Kampbell Staffing
Kampbell StaffingKampbell Staffing
Kampbell Staffing
 
Service Delivery Model Flow
Service Delivery Model FlowService Delivery Model Flow
Service Delivery Model Flow
 
Roadmap Powerpoint Slide
Roadmap Powerpoint SlideRoadmap Powerpoint Slide
Roadmap Powerpoint Slide
 
Amazon Connect Rethink Your Contact Center with CloudHesive.pptx
Amazon Connect Rethink Your Contact Center with CloudHesive.pptxAmazon Connect Rethink Your Contact Center with CloudHesive.pptx
Amazon Connect Rethink Your Contact Center with CloudHesive.pptx
 
Boomi Molecule Migration to the Cloud: Top 5 Strategies Revealed
Boomi Molecule Migration to the Cloud: Top 5 Strategies RevealedBoomi Molecule Migration to the Cloud: Top 5 Strategies Revealed
Boomi Molecule Migration to the Cloud: Top 5 Strategies Revealed
 
People Process Technology PowerPoint Presentation Slides
People Process Technology PowerPoint Presentation SlidesPeople Process Technology PowerPoint Presentation Slides
People Process Technology PowerPoint Presentation Slides
 
Transform experiences with automation and conversational AI
Transform experiences with automation and conversational AITransform experiences with automation and conversational AI
Transform experiences with automation and conversational AI
 
Corporate Recruitment Agency Proposal PowerPoint Presentation Slides
Corporate Recruitment Agency Proposal PowerPoint Presentation SlidesCorporate Recruitment Agency Proposal PowerPoint Presentation Slides
Corporate Recruitment Agency Proposal PowerPoint Presentation Slides
 

Similar to Transition out-plan

Project Management Plan Templatewww.ProjectManagementDocs.com.docx
Project Management Plan Templatewww.ProjectManagementDocs.com.docxProject Management Plan Templatewww.ProjectManagementDocs.com.docx
Project Management Plan Templatewww.ProjectManagementDocs.com.docx
wkyra78
 
Project management-plan
Project management-planProject management-plan
Project management-planTran Tien
 
project management plan.pptx
project management plan.pptxproject management plan.pptx
project management plan.pptx
Nimra zaman
 
PROJECT MANAGEMENT PLAN TEMPLATE This Project Mana.docx
PROJECT MANAGEMENT PLAN TEMPLATE This Project Mana.docxPROJECT MANAGEMENT PLAN TEMPLATE This Project Mana.docx
PROJECT MANAGEMENT PLAN TEMPLATE This Project Mana.docx
wkyra78
 
Project management-plan template
Project management-plan templateProject management-plan template
Project management-plan template
Vivek Srivastava
 
INK Statement of work_template
INK Statement of work_templateINK Statement of work_template
INK Statement of work_template
Jason Obler
 
Project Management Plan Templatewww.ProjectManagementDocs.com.docx
Project Management Plan Templatewww.ProjectManagementDocs.com.docxProject Management Plan Templatewww.ProjectManagementDocs.com.docx
Project Management Plan Templatewww.ProjectManagementDocs.com.docx
briancrawford30935
 
Contract management plan (4156v2)
Contract management plan (4156v2)Contract management plan (4156v2)
Contract management plan (4156v2)SPeters13
 
Scope management term paper
Scope management term paperScope management term paper
Scope management term paper
Muhammad Umar
 
BMIS 325CMS Project – Phase I Grading RubricNote Screenshots .docx
BMIS 325CMS Project – Phase I Grading RubricNote Screenshots .docxBMIS 325CMS Project – Phase I Grading RubricNote Screenshots .docx
BMIS 325CMS Project – Phase I Grading RubricNote Screenshots .docx
hartrobert670
 
Validating conversions[5]
Validating conversions[5]Validating conversions[5]
Validating conversions[5]
David Pedreno
 
Equipment finance system conversions
Equipment finance system conversionsEquipment finance system conversions
Equipment finance system conversions
David Pedreno
 
Equipment finance system conversion
Equipment finance system conversionEquipment finance system conversion
Equipment finance system conversion
David Pedreno
 
Configuration management-plan template
Configuration management-plan templateConfiguration management-plan template
Configuration management-plan template
Vivek Srivastava
 
Contract management procedure
Contract management procedureContract management procedure
Contract management procedure
Self-employed
 
Project management
Project managementProject management
Project management
ervinod
 
Agile Delivery Methods And Leadership
Agile Delivery Methods And LeadershipAgile Delivery Methods And Leadership
Agile Delivery Methods And Leadership
Ranjith Varghese
 
1 Project Management Plan Disclaimer The inform
1    Project Management Plan  Disclaimer The inform1    Project Management Plan  Disclaimer The inform
1 Project Management Plan Disclaimer The inform
SilvaGraf83
 
1 Project Management Plan Disclaimer The inform
1    Project Management Plan  Disclaimer The inform1    Project Management Plan  Disclaimer The inform
1 Project Management Plan Disclaimer The inform
MartineMccracken314
 

Similar to Transition out-plan (20)

Project Management Plan Templatewww.ProjectManagementDocs.com.docx
Project Management Plan Templatewww.ProjectManagementDocs.com.docxProject Management Plan Templatewww.ProjectManagementDocs.com.docx
Project Management Plan Templatewww.ProjectManagementDocs.com.docx
 
Project management-plan
Project management-planProject management-plan
Project management-plan
 
project management plan.pptx
project management plan.pptxproject management plan.pptx
project management plan.pptx
 
PROJECT MANAGEMENT PLAN TEMPLATE This Project Mana.docx
PROJECT MANAGEMENT PLAN TEMPLATE This Project Mana.docxPROJECT MANAGEMENT PLAN TEMPLATE This Project Mana.docx
PROJECT MANAGEMENT PLAN TEMPLATE This Project Mana.docx
 
Project management-plan template
Project management-plan templateProject management-plan template
Project management-plan template
 
INK Statement of work_template
INK Statement of work_templateINK Statement of work_template
INK Statement of work_template
 
Statement of-work
Statement of-workStatement of-work
Statement of-work
 
Project Management Plan Templatewww.ProjectManagementDocs.com.docx
Project Management Plan Templatewww.ProjectManagementDocs.com.docxProject Management Plan Templatewww.ProjectManagementDocs.com.docx
Project Management Plan Templatewww.ProjectManagementDocs.com.docx
 
Contract management plan (4156v2)
Contract management plan (4156v2)Contract management plan (4156v2)
Contract management plan (4156v2)
 
Scope management term paper
Scope management term paperScope management term paper
Scope management term paper
 
BMIS 325CMS Project – Phase I Grading RubricNote Screenshots .docx
BMIS 325CMS Project – Phase I Grading RubricNote Screenshots .docxBMIS 325CMS Project – Phase I Grading RubricNote Screenshots .docx
BMIS 325CMS Project – Phase I Grading RubricNote Screenshots .docx
 
Validating conversions[5]
Validating conversions[5]Validating conversions[5]
Validating conversions[5]
 
Equipment finance system conversions
Equipment finance system conversionsEquipment finance system conversions
Equipment finance system conversions
 
Equipment finance system conversion
Equipment finance system conversionEquipment finance system conversion
Equipment finance system conversion
 
Configuration management-plan template
Configuration management-plan templateConfiguration management-plan template
Configuration management-plan template
 
Contract management procedure
Contract management procedureContract management procedure
Contract management procedure
 
Project management
Project managementProject management
Project management
 
Agile Delivery Methods And Leadership
Agile Delivery Methods And LeadershipAgile Delivery Methods And Leadership
Agile Delivery Methods And Leadership
 
1 Project Management Plan Disclaimer The inform
1    Project Management Plan  Disclaimer The inform1    Project Management Plan  Disclaimer The inform
1 Project Management Plan Disclaimer The inform
 
1 Project Management Plan Disclaimer The inform
1    Project Management Plan  Disclaimer The inform1    Project Management Plan  Disclaimer The inform
1 Project Management Plan Disclaimer The inform
 

Recently uploaded

Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdfMeas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
dylandmeas
 
Exploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social DreamingExploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social Dreaming
Nicola Wreford-Howard
 
Premium MEAN Stack Development Solutions for Modern Businesses
Premium MEAN Stack Development Solutions for Modern BusinessesPremium MEAN Stack Development Solutions for Modern Businesses
Premium MEAN Stack Development Solutions for Modern Businesses
SynapseIndia
 
FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134
LR1709MUSIC
 
-- June 2024 is National Volunteer Month --
-- June 2024 is National Volunteer Month ---- June 2024 is National Volunteer Month --
-- June 2024 is National Volunteer Month --
NZSG
 
The-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic managementThe-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic management
Bojamma2
 
What is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdfWhat is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdf
seoforlegalpillers
 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptx
Cynthia Clay
 
Mastering B2B Payments Webinar from BlueSnap
Mastering B2B Payments Webinar from BlueSnapMastering B2B Payments Webinar from BlueSnap
Mastering B2B Payments Webinar from BlueSnap
Norma Mushkat Gaffin
 
Affordable Stationery Printing Services in Jaipur | Navpack n Print
Affordable Stationery Printing Services in Jaipur | Navpack n PrintAffordable Stationery Printing Services in Jaipur | Navpack n Print
Affordable Stationery Printing Services in Jaipur | Navpack n Print
Navpack & Print
 
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdfSearch Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Arihant Webtech Pvt. Ltd
 
amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05
marketing317746
 
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
BBPMedia1
 
Creative Web Design Company in Singapore
Creative Web Design Company in SingaporeCreative Web Design Company in Singapore
Creative Web Design Company in Singapore
techboxsqauremedia
 
Call 7735293663 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...
Call 7735293663 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...Call 7735293663 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...
Call 7735293663 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...
bosssp10
 
Authentically Social Presented by Corey Perlman
Authentically Social Presented by Corey PerlmanAuthentically Social Presented by Corey Perlman
Authentically Social Presented by Corey Perlman
Corey Perlman, Social Media Speaker and Consultant
 
Sustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & EconomySustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & Economy
Operational Excellence Consulting
 
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBdCree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
creerey
 
Recruiting in the Digital Age: A Social Media Masterclass
Recruiting in the Digital Age: A Social Media MasterclassRecruiting in the Digital Age: A Social Media Masterclass
Recruiting in the Digital Age: A Social Media Masterclass
LuanWise
 
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdfikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
agatadrynko
 

Recently uploaded (20)

Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdfMeas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
 
Exploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social DreamingExploring Patterns of Connection with Social Dreaming
Exploring Patterns of Connection with Social Dreaming
 
Premium MEAN Stack Development Solutions for Modern Businesses
Premium MEAN Stack Development Solutions for Modern BusinessesPremium MEAN Stack Development Solutions for Modern Businesses
Premium MEAN Stack Development Solutions for Modern Businesses
 
FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134
 
-- June 2024 is National Volunteer Month --
-- June 2024 is National Volunteer Month ---- June 2024 is National Volunteer Month --
-- June 2024 is National Volunteer Month --
 
The-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic managementThe-McKinsey-7S-Framework. strategic management
The-McKinsey-7S-Framework. strategic management
 
What is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdfWhat is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdf
 
Putting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptxPutting the SPARK into Virtual Training.pptx
Putting the SPARK into Virtual Training.pptx
 
Mastering B2B Payments Webinar from BlueSnap
Mastering B2B Payments Webinar from BlueSnapMastering B2B Payments Webinar from BlueSnap
Mastering B2B Payments Webinar from BlueSnap
 
Affordable Stationery Printing Services in Jaipur | Navpack n Print
Affordable Stationery Printing Services in Jaipur | Navpack n PrintAffordable Stationery Printing Services in Jaipur | Navpack n Print
Affordable Stationery Printing Services in Jaipur | Navpack n Print
 
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdfSearch Disrupted Google’s Leaked Documents Rock the SEO World.pdf
Search Disrupted Google’s Leaked Documents Rock the SEO World.pdf
 
amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05
 
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
RMD24 | Retail media: hoe zet je dit in als je geen AH of Unilever bent? Heid...
 
Creative Web Design Company in Singapore
Creative Web Design Company in SingaporeCreative Web Design Company in Singapore
Creative Web Design Company in Singapore
 
Call 7735293663 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...
Call 7735293663 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...Call 7735293663 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...
Call 7735293663 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...
 
Authentically Social Presented by Corey Perlman
Authentically Social Presented by Corey PerlmanAuthentically Social Presented by Corey Perlman
Authentically Social Presented by Corey Perlman
 
Sustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & EconomySustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & Economy
 
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBdCree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
 
Recruiting in the Digital Age: A Social Media Masterclass
Recruiting in the Digital Age: A Social Media MasterclassRecruiting in the Digital Age: A Social Media Masterclass
Recruiting in the Digital Age: A Social Media Masterclass
 
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdfikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
 

Transition out-plan

  • 1. TRANSITION OUT PLAN TEMPLATE This Contract Transition Out Plan Template is free for you to copy and use on your project and within your organization. We hope that you find this template useful and welcome your comments. Public distribution of this document is only permitted from the Project Management Docs official website at: www.ProjectManagementDocs.com TRANSITION OUT PLAN TEMPLATE <CONTRACT NAME> COMPANY NAME STREET ADDRESS CITY, STATE ZIP CODE DATE
  • 2. Transition Out Plan Template www.ProjectManagementDocs.com TABLE OF CONTENTS 1.Executive Summary......................................................................................................................2 2.Transition Approach.....................................................................................................................2 3.Transition Team Organization......................................................................................................2 4.Workforce Transition....................................................................................................................3 5.Work Execution During Transition..............................................................................................4 6.Subcontracts .................................................................................................................................4 7.Property Transition.......................................................................................................................5 7.1.Government Furnished Equipment (GFE)............................................................................................................5 7.2.Incumbent Owned Equipment..............................................................................................................................5 7.3.Intellectual Property..............................................................................................................................................5 7.4.User Accounts and Passwords..............................................................................................................................6 8.Knowledge Transfer......................................................................................................................6 9.Schedule........................................................................................................................................7 10.Handover and Acceptance..........................................................................................................7 1
  • 3. Transition Out Plan Template www.ProjectManagementDocs.com 1. EXECUTIVE SUMMARY The purpose of the executive summary is to describe the transition plan at a high level and what the plan should accomplish. This section should include an overview and history of the contract, who the contract is currently with, who it is transitioning to, and the timeframe/period of transition. This plan formally documents the process for the transition of the powers, duties, activities, and functions of tasks and tools for the PayBase contract (Contract # 11-10159). It describes the approach to transitioning work and employees from ABC Corporation (incumbent contractor) to XYZ Inc. The PayBase contract is for the creation and implementation of a new payroll database for Smith Consulting Group (SCG). This database will allow SCG to integrate all payroll tracking and reporting into a consolidated database. This contract is currently with ABC Corporation and will transition to XYZ Inc. will be completed no later than 180 days after contract award. The period of performance is from 1 January 20xx to 31 December 20xx. The value of the contract is $2,000,000.00. 2. TRANSITION APPROACH This section of the contract transition out plan discusses the overall approach to the transition. Some items which must be considered are: will you scale down your staff during the transition or will you bring in additional staff to handle and manage the transition? How long is the transition? What are your assumptions (i.e. the staff of the new contractor will be available onsite to participate in the transition and receive knowledge transfer, etc.)? For this transition, ABC Corporation will maintain its existing staff on-site throughout the transition period. No additional staffing requirements are anticipated to complete the transition to XYZ Inc. The transition is expected to take 60 days to complete. Immediately prior to the transition, ABC Corporation will stand up its transition team in order to facilitate the activities necessary for successful transition. It is assumed that XYZ Inc. will have its staff on site at the beginning of the 60 day transition period and will establish a similar team to work with ABC Corporation to coordinate the contract’s transition. It is also assumed that SCG will provide adequate workspace for both contractors throughout the duration of the transition. SCG should also designate a transition project manager to work with both contractors throughout the transition. 3. TRANSITION TEAM ORGANIZATION This section of the transition out plan should provide an organizational chart showing all resources and their roles in the transition (i.e. Transition Project Manager, etc.). Key team members should be from both the incumbent and new contractors as well as the customer. The following chart illustrates the transition team members from SCG, ABC Corporation, and XYZ Inc. as well as the roles and responsibilities of each team member. 2
  • 4. Transition Out Plan Template www.ProjectManagementDocs.com Organization Title Roles/Responsibilities SCG Transition Project Manager Coordinate activities between contractors throughout transition; provide workspace for all transition staff; facilitate transition meetings as required SCG Contracting Officer Responsible for overseeing all contract actions and deliverables; responsible for ensuring accountability on all funding and budget items pertaining to the contract ABC Corp. Transition Project Manager Work with SCG and XYZ PMs to coordinate and schedule all transition activities; provide weekly reporting on transition progress; ensure all applicable property and tools are included as part of transition ABC Corp. IT Transition Lead Ensure all IT activities are completed during transition; document all IT processes, tasks, and activities for transition to XYZ ABC Corp. Configuration Manager Ensure all training documentation is complete; ensure completion of user and technical manuals; ensure all documentation is in accordance with SCG standards; ensure proprietary materials are not part of transition XYZ Inc. Transition Project Manager Work with SCG and ABC PMs; ensure all transition deliverables are received and understood; identify any gaps in transition activities XYZ Inc. IT Transition Lead Ensure continuity of all IT activities throughout transition; ensure receipt of adequate IT documentation of all processes, tasks, and activities XYZ Inc. Configuration Manager Ensure all training documentation received addresses all planned training items; ensure standardization of all transitioned documentation 4. WORKFORCE TRANSITION 3
  • 5. Transition Out Plan Template www.ProjectManagementDocs.com It is not uncommon for the workforce to transition from one contractor to another as part of the contract transition. The workforce may stay in place with the client or customer and simply “re-badge” from the incumbent to the new contractor. It is also common for the incumbent workforce to leave the site once the transition is completed and approved. In order to set expectations and allow for adequate transition planning, the workforce must be determined and communicated ahead of time. For this contract transition, all workforce members will remain with their current organization. The incumbent (ABC Corp) workforce will remain on-site to perform their transition activities until such time that the transition is completed and approved by all parties. The new contractor (XYZ Inc.) will ensure its workforce is on site 60 days prior to transition completion. This will allow adequate time to perform all transition activities. SCG will provide additional temporary workspace for XYZ Inc. employees until transition completion, at which time the workforce will occupy the vacated locations of the outgoing ABC Corp workforce. 5. WORK EXECUTION DURING TRANSITION Discuss the level of work which is to be performed during the transition period and the impact of the transition on that work (i.e. system maintenance, software development, support services, etc.). Throughout the transition of this contract, work will continue to be performed by ABC Corp in accordance with the approved project schedule and work breakdown structure (WBS) in place. The transition management team will ensure that XYZ Inc. employees work alongside their ABC Corp. counterparts; however, ABC will maintain all responsibility for tasks and deliverables. At the end of the 60 day transition period, and upon transition approval, XYZ Inc. will assume full responsibility for all tasks and deliverables. 6. SUBCONTRACTS This section documents all the existing contracts and if/how they will be transitioned. It should contain this information in a table format (subcontract agreements, software/hardware maintenance contracts, etc.). The following chart illustrates the subcontracts in place which are in support of SCG’s PayBase activity. These subcontracts apply to third party tasks to ensure all required cabling and facilities functionality is in place to support the PayBase project. Subcontract # Awarded to Tasks 11-10010 CableQuest Perform cabling work within datacenter to support PayBase database functionality 11-10020 BuildTech Build out existing data center facility to house additional servers to ensure PayBase database functionality 4
  • 6. Transition Out Plan Template www.ProjectManagementDocs.com 7. PROPERTY TRANSITION 7.1. Government Furnished Equipment (GFE) This section of the plan describes the transition of any equipment for a scenario where the customer is a government entity and provides the contractor with government property. This property may include hardware such as laptops/PCs, software bundles or add-ons, portable electronic devices (PEDs), and security badges. Typically, GFE will be turned back over to the government customer during a transition and may or may not be re-issued to the new contractor. As part of this transition, all GFE provided to ABC Corp under the PayBase contract will be turned in to the government upon completion and approval of the transition phase. GFE includes laptop computers, all PEDs, flash and external hard drives, and employee ID badges. All electronic devices will be re-imaged by government IT personnel and re-issued to appropriate XYZ Inc. employees. 7.2. Incumbent Owned Equipment Equipment owned by the incumbent contractor will usually remain with them when they transition off of the contract. However, there may be instances where incumbent owned equipment supports customer applications and services. This section should state that incumbent owned equipment will remain with the incumbent - and identify options where this equipment may be available for purchase by the new contractor or customer for their use (i.e. application server and application for helpdesk, etc.). All incumbent owned equipment will remain with the incumbent upon completion and approval of the transition. This equipment includes incumbent-issues laptops and PEDs, organizational tools, organizational process maps, and company ID badges. If it is determined that any incumbent owned equipment is required to stay with the customer to ensure successful completion of the contract, the customer and incumbent contracting officer representatives will coordinate procurement of the equipment through the customer’s established procurement management process. 7.3. Intellectual Property Here the transition out plan should describe how intellectual property will be handled as part of the transfer process. Intellectual property may include various documentation, supplier and subcontractor information, service agreements, or original designs or plans. Intellectual property generates many legal considerations and may include the completion of non-disclosure agreements (NDAs) between the incumbent and the customer. Intellectual property may be transferred, sold, or retained by the incumbent depending on the contractual agreements in place. 5
  • 7. Transition Out Plan Template www.ProjectManagementDocs.com Per the PayBase contract, all intellectual property which is a direct result of work on the contract deliverables will be transitioned to the new contractor in order to ensure the successful completion of the project. The contract pricing takes intellectual property into consideration and as such, any resulting intellectual property will be owned by the customer. 7.4. User Accounts and Passwords This section of the transition plan should discuss how any accounts will be transitioned, who they will be transitioned to (i.e. system administrator accounts). Provide a table of all user accounts to be transitioned/disabled. As part of the contract transition, various user account accesses and authorizations must be created and disabled. Currently ABC personnel listed in the chart below possess the user accounts and access necessary for contract deliverables. The listed XYZ Inc. employees will be granted access on the first day of the contract transition phase. Once transition is complete and approved, all ABC Corp personnel’s user accounts will be disabled. User Account ABC Corp. XYZ Inc. SAP Master User IT Transition Lead and Configuration Manager IT Transition Lead and Configuration Manager Database Administrator IT Transition Lead IT Transition Lead Customer Intranet Master User Transition PM and IT Transition Lead Transition PM and IT Transition Lead 8. KNOWLEDGE TRANSFER This section should discuss how knowledge will be transferred from the incumbent staff to the staff of the new contractor (documentation/instruction manuals including as-built documents, formal training classes, one-on-one training/knowledge transfer, etc.). This is an important consideration as the transfer of knowledge is what provides continuity for the contract. For this transition, knowledge transfer will occur over the entirety of the 60 day transition period. The knowledge transfer will take place via various methods. The incumbent PM will coordinate two formal classroom training sessions to be conducted by the incumbent IT Transition Lead. These sessions will focus on the specific IT concerns related to the database tasks and activities. The incumbent PM will also coordinate two formal classroom sessions to be conducted by the incumbent Configuration Manager. These sessions will cover documentation requirements and organizational processes and assets. These sessions will be completed no later than 15 days prior to the end of the 60 day transition period. Additionally, all XYZ Inc. staff will work alongside their ABC Corp counterparts throughout the 60 day period in order to gain familiarity with the database, tools, processes, and organizational assets. The PMs from ABC Corp., XYZ, Inc., and the customer will meet no later than 10 days prior to transition completion in order to determine if any further training or knowledge transfer is required. 6
  • 8. Transition Out Plan Template www.ProjectManagementDocs.com 9. SCHEDULE This section of the transition plan should contain a GANTT chart schedule of the transition. The complexity of the transition will dictate the level of detail required in the schedule. However, all major milestones as well as transition start and completion dates should be included at a minimum. The following GANTT chart illustrates the schedule for transition of the PayBase contract from ABC Corp. to XYZ Inc. Any changes to this schedule will require review and approval from the customer and all other parties. ID Task Name Duration Start Finish 1 PayBase Transition Begins 0 days Mon 4/4/11 Mon 4/4/11 2 XYZ Staff arrive on Site 0 days Mon 4/4/11 Mon 4/4/11 3 Knowledge Transfer 59 days Mon 4/4/11 Thu 6/23/11 4 Knowledge Transfer Complete 0 days Thu 6/23/11 Thu 6/23/11 5 ABC User Accounts Disabled 1 day Fri 6/24/11 Fri 6/24/11 6 Transfer Complete/Approval 0 days Fri 6/24/11 Fri 6/24/11 4/4 4/4 6/23 6/24 4/3 4/10 4/17 4/24 5/1 5/8 5/15 5/22 5/29 6/5 6/12 6/19 6/26 7/3 7/10 7/17 April May June July 10. HANDOVER AND ACCEPTANCE This section of the contract transition out plan should discuss how the customer will formally accept the handover at the end of the transition. This may include whether or not there’s a checklist for acceptance or formal sign-off. There are typically several people who need to accept the handover (i.e. security office for all badges, IT Manager for system accounts, Contracts Manager, etc.). The customer will make the determination of when transition is completed and will provide formal acceptance indicating such. To do this, the customer’s transition PM will utilize the established transition checklist in order to determine that all activities associated with the transition have been completed. The customer’s transition PM will also meet with the transition PMs from each contractor to ensure that all concerns and issues have been met and addressed appropriately. Once the customer’s transition PM has formally accepted the transition, the checklist and supporting documentation will be signed and accepted by the customer’s project sponsor and the company’s human resources director. The last step is the formal acceptance and signature of the customer’s contracting officer representative. It is only after all of these approvals and signatures are in place that the transition will be considered complete. This free Contract Transition Out Plan Template is brought to you by www.ProjectManagementDocs.com 7
  • 9. Transition Out Plan Template www.ProjectManagementDocs.com 9. SCHEDULE This section of the transition plan should contain a GANTT chart schedule of the transition. The complexity of the transition will dictate the level of detail required in the schedule. However, all major milestones as well as transition start and completion dates should be included at a minimum. The following GANTT chart illustrates the schedule for transition of the PayBase contract from ABC Corp. to XYZ Inc. Any changes to this schedule will require review and approval from the customer and all other parties. ID Task Name Duration Start Finish 1 PayBase Transition Begins 0 days Mon 4/4/11 Mon 4/4/11 2 XYZ Staff arrive on Site 0 days Mon 4/4/11 Mon 4/4/11 3 Knowledge Transfer 59 days Mon 4/4/11 Thu 6/23/11 4 Knowledge Transfer Complete 0 days Thu 6/23/11 Thu 6/23/11 5 ABC User Accounts Disabled 1 day Fri 6/24/11 Fri 6/24/11 6 Transfer Complete/Approval 0 days Fri 6/24/11 Fri 6/24/11 4/4 4/4 6/23 6/24 4/3 4/10 4/17 4/24 5/1 5/8 5/15 5/22 5/29 6/5 6/12 6/19 6/26 7/3 7/10 7/17 April May June July 10. HANDOVER AND ACCEPTANCE This section of the contract transition out plan should discuss how the customer will formally accept the handover at the end of the transition. This may include whether or not there’s a checklist for acceptance or formal sign-off. There are typically several people who need to accept the handover (i.e. security office for all badges, IT Manager for system accounts, Contracts Manager, etc.). The customer will make the determination of when transition is completed and will provide formal acceptance indicating such. To do this, the customer’s transition PM will utilize the established transition checklist in order to determine that all activities associated with the transition have been completed. The customer’s transition PM will also meet with the transition PMs from each contractor to ensure that all concerns and issues have been met and addressed appropriately. Once the customer’s transition PM has formally accepted the transition, the checklist and supporting documentation will be signed and accepted by the customer’s project sponsor and the company’s human resources director. The last step is the formal acceptance and signature of the customer’s contracting officer representative. It is only after all of these approvals and signatures are in place that the transition will be considered complete. This free Contract Transition Out Plan Template is brought to you by www.ProjectManagementDocs.com 7