Abstract
Asset Management is more than a maintenance excellence program, Total Productive
Maintenance (TPM) is more than autonomous maintenance, and Lean Manufacturing is more
than waste reduction. Total Process Reliability is the integration of these systems, it brings
cultural transformation, cradle to grave accountability, and engages all levels of the organization
in improved asset reliability. Without this integration, you can only achieve pockets of
excellence and a hardy “I told you so” from manufacturing.
Introduction
When we started to develop our asset management system framework, we quickly realized that it
had to be more than a maintenance system. The first time we presented our framework to senior
leadership it was quickly noted, “Isn’t this just TPM?” After that, the team started looking at
asset management in a very different way; we started building an integrated asset management
system, not an asset maintenance system.
Journey of Discovery
We struggled with Total Productive Maintenance (TPM) implementation because we were
culturally unprepared and allowed the eight TPM pillars to become compartmentalized. (Figure
#1)
Figure #1 Total Productive Manufacturing Pillars
Based on the TPM pillars, we starting building our asset management framework in the same
format, but quickly discovered we were missing process interactions. We knew that process
interactions would break down our compartments. (Figure #2)
2 of 21
Figure #2 Total Process Reliability Pillars
At a standstill of how to visual build our framework we engage Operational Excellence, they
kindly suggested the swim lane process. This was a breakthrough not only because of the visual
concepts, but we engaged Operational Excellence in building our asset management system. If
we were to build a Total Process Reliability System it would require a cross functional team of
management, operational excellence, maintenance, manufacturing, and engineering.
The cross-functional team built the swim lanes by turning the eight pillars of TPM sideways.
(Figure #3)
Figure #3 Total Productive Maintenance Pillars
3 of 21
We combined the eight TPM pillars into four cross-functional tracks. (Figure #4)
1. Governance and administrative excellence and Craft and Operator Skills Enhancement
and Training became Organizational Excellence.
2. Quality Driven Maintenance, Safety, Health, and Environmental Excellence and Planned
Maintenance became Maintenance Excellence.
3. Autonomous Maintenance became Manufacturing Excellence.
4. Early Equipment Management became Engineering Excellence.
Improved Equipment Effectiveness and Root Cause Failure Analysis (RCFA) are in
themselves cross-functional teams of management, operational excellence, maintenance,
manufacturing, and engineering.
Figure #4 Four Cross Functional tracks
4 of 21
This led us to three fundamental concepts:
1. Adding the Asset Management System brought strategic focus. (Figure #5)
Figure #5 Asset Management Systems – Strategic Focus
2. We had always struggle with Total Production Maintenance (TPM) because of the “M”
word, “maintenance”. To implement Total Productive Maintenance effectively we
changed the name to Total Production Manufacturing (TPM).
3. The combination and interactions of all the four tracks we defined as Total Process
Reliability. (Figure #6)
4. Improved Equipment Effectiveness and Root Cause Failure Analysis (RCFA) are cross-
functional by nature.
In the process of developing an asset management system we discovered, Total Process
Reliability. We broke down our traditional chimneys and to transform our cultural, now we had
a single focus, Total Process Reliability.
5 of 21
Figure #6 Focused Total Process Reliability
System Development
Total Process Reliability is our systematic approach to engage our organization in true TPM.
With Total Process Reliability, each cross-functional team has responsibilities and interacts
directly through the Governance team.
1. Governance Team owns: Strategic Focus
2. Leadership and Operational Excellence: Organizational Excellence
3. Maintenance owns: Maintenance Excellence
4. Manufacturing owns: Manufacturing Excellence
5. Engineering owns: Engineering Excellence
Total Process Reliability brings the cultural transformation, cradle to grave accountability, and
responsibility with the goal of engaging all levels of the organization, leading to improved
overall equipment effectiveness.
6 of 21
Strategic Focus (figure 7)
Figure #7, Strategic Focus
Strategic focus defines:
 Governance, oversight, infrastructure, and management of the entire system
 Engages our leadership team, management, operations excellence, maintenance,
manufacturing, and engineering in strategic development and management
 Defines the critical assets we will focus on
 Defines our implementation strategy
We utilized ISO 55000 as a structural backbone to develop our asset management system.
(Figure #8)
7 of 21
Figure #8, Asset Management Structure
We defined our strategic focus though the Strategic Organizational Plans and Objectives.
The Executive Champion defined the Strategic Organizational Plans and Objectives as Goals,
and Objectives, with the focus on critical constraint asset.
The team cascaded the goals and objectives as Clear Line of Sight, Aligned Vision, Goals, and
Objectives vertically and horizontally to the Facility floor. (Figure #9)
Figure #9, Clear line of sight Goals, and Objectives
Through our Aligned Vision, Goals, and Objectives the team defined our Total Process
Reliability objectives as:
 Asset Management Policy and Vision
8 of 21
 Focused Strategic Asset Management Plans
 Focused Asset Management Objectives
Governance (oversight, infrastructure, and management team)
The Governance Team is “Accountable” for the oversight and implementation of the entire Asset
Management System.
Through Governance, we defined our asset management track strategies.
Organizational Excellence Strategy
The Organizational Excellence Strategy defines the Corporate and Site Champions roles
and responsibilities in developing and establishing the Asset Management System
through the Governance, oversight, and infrastructure cross-functional team.
Maintenance Excellence Strategy
The Maintenance Excellence Strategy defines the Maintenance Leadership’s roles and
responsibilities in developing and establishing maintenance mythologies, procedures, and
processes.
Manufacturing Excellence Strategy
The Manufacturing Excellence Strategy defines the Production Leadership’s roles and
responsibilities in developing, establishing and sustaining a culture of Total Productive
Manufacturing (TPM).
Engineering Excellence Strategy
The Engineering Excellence Strategy defines the Engineering Leadership’s roles and
responsibilities in the implementing Design for Reliability.
Development, Implementation and Optimization of Asset Management Plans
Through the cross-functional teams and strategies, we executed our Total Process Reliability
goals as actionable plan, process, and procedures:
 Focused Asset Management Plans
 Asset Management Plans and Processes implementation
 Optimized Asset Performance through Monitoring, Evaluation, Analysis and
Improvements (Plan, Do Check Adjust)
9 of 21
Tactical Roadmaps (Figure #10)
The Tactical Roadmap defines the implementation and optimization of Asset Management Plans
and Processes. (Figure #10)
Figure #10, Tactical Roadmap
Organizational Excellence (Figure # 11)
Figure # 11, Organizational Excellence Roadmap
Assessment and Roadmaps to Excellence
The Governance team developed an Assessment Tool to measure all the element of the asset
management system against best in class standards. (Figure #12)
10 of 21
Figure # 12, Assessment Tool
We translate the assessment gap into actionable items and manage them to completion
through Governance. (Figure 13)
Figure # 13, Assessment Action Plans
11 of 21
MRO Inventory Management
The Governance Team deployed Maximo (CMMS, Computerized maintenance
Management System) as the system of record to procure, managed and controlled all
MRO parts, stock, non-stock, and order on request.
Craft and Operator Skills Enhancement
The Governance Team maps its available resources to its planned activities to determine
any training and skills gaps. We used the Individual Development Process (IDP) to
bridge the gaps. We developed basic training standards and process. (Figure 14)
Figure #14, Basic Training Standards and Processes
Resources, Discipline and Compliance
The Governance Team defines the roles and responsibilities for everyone engaged in the
Asset Management System, management, operational excellence, maintenance,
manufacturing, and engineering.
12 of 21
Tactical Roadmaps
Maintenance Excellence (Figure #15)
Figure # 15, Maintenance Excellence Roadmap
Reliability Centered Maintenance (RCM/FMECA)
Maintenance Leadership defines the Reliability Centered Maintenance (RCM/FMECA)
methodology to complete a review of all Assets Management Plans focusing the analysis
process and implementation where a return on this investment is most profitable. (Figure
#16)
Figure #16, Reliability Centered Maintenance and Root Cause Failure Mythology
Tree
Root Cause Failure Analysis (RCFA)
Maintenance Leadership defines the Root Cause Failure Analysis (RCFA)
methodology to react immediately to a preventable failure occurrence. Root
cause failure analysis (RCFA) is highly interrelated with Maximo, and reliability
centered maintenance. Maximo is the system of record all asset and component
failures and their root cause. (Figure #16)
13 of 21
Failure Reporting & Corrective Action System (FRACAS)
Maintenance Leadership defines the Failure Reporting and Corrective Action
System (FRACAS) failure identification and prevention methodology. (Figure
#16)
FRACAS is highly interrelated with Maximo, root cause analysis and reliability
centered maintenance. Maximo is the system of record all asset and component
failures and their root cause.
Maximo Workorder Content, Planning, Scheduling, Execution, and Review
Maintenance Leadership defines and establishes the Maximo Workorder Content
Requirements
Maximo Workorder Planning and Scheduling
Maintenance Leadership defines the Planners and Schedulers roles and responsibilities
for the use, and management of Maximo to plan and schedule preventive (PM/PdM/Cal)
and corrective maintenance (CM) work activities.
Maximo Workorder Execution
Maintenance Leadership defines the roles and responsibilities for the planners/schedules,
managers, supervisors, maintenance technician, and operators for the execution of
Maximo workorders.
Maximo Workorder Review
Maintenance Leadership defines the roles and responsibilities for the planners/schedules,
managers, supervisor, maintenance technician and operators for the Post Mortem Review
of executed Maximo workorders.
Predictive (PdM) Maintenance
Maintenance Leadership defines the appropriate use and application of predictive
(condition based) maintenance methodologies.
Workflow Analytics and Value Stream Mapping
Maintenance Leadership conducts asset management system process flow or value stream
mapping exercises to identify process flow waste.
Maintenance Prevention (MP)
Maintenance Leadership defines the appropriate use and application of precision
maintenance (maintenance prevention) methodologies.
1) Precision maintenance
2) Precision lubrication
3) Lubricant Tribology (oil testing)
Precision Maintenance
Maintenance Leadership defines the maintenance technician’s roles and
responsibilities for the application and management of precision maintenance tools
14 of 21
and technologies. Precision maintenance is the proactive elimination the failures
caused by improper adjustment and component installations.
Lubrication Excellence
Maintenance Leadership defines the appropriate use and application of lubrication
excellence methodologies. Lubrication excellence includes:
 Lubrication visual factory color-code standards and procedures for
tagging/labeling of lubricants and lubrication points (Figure #17)
 Calculated lubrication volumes and frequency for every asset. The volumes and
frequencies are validated using ultrasound technology
 All asset are modified to include desiccant breathers, level gauges, sample ports,
quick disconnects, external lubrication (grease) lines, lubrication distribution
manifolds to allow lubrication and sampling to occur which the asset is operating
Figure #17, Lubrication Visual Factory Color-Code Standard
Lubricant Tribology (Oil Testing)
Maintenance Leadership defines the Lubrication Technicians roles, responsibilities
procedures, and process for the application and management of lubricant tribology.
Wrench Time Analysis and Optimization
Maintenance Leadership focuses on measuring and improving maintenance wrench time,
(maintenance labor utilization).
Reliability Improvement Kaizens
A cross functional team of management, operational excellence, maintenance
manufacturing and engineering identify and implement asset reliability kaizen events
focused on the elimination or mitigate the failure risk.
15 of 21
Tactical Roadmaps
Manufacturing Excellence (Figure #18)
Figure #18, Manufacturing Excellence Roadmap
Total Productive Manufacturing (TPM)
Note: The team rearranged the steps to support compliance with FDA regulations.
Senior Leadership engaged the entire facility, administration, front office, management,
manufacturing, operational excellence, maintenance, facilities and engineering in the first
three steps to TPM. This is in compliance with FDA (Food and Drug Administration),
cGMP (current, Good Manufacturing Practices) regulations.
Step 1: Develop Strategy, Standards, and Expectations (rules before tools)
Step 2: Training to the Strategy, Standards, and Exceptions
Step 3: Implement Workplace Organization, Housekeeping, and visual factory visual
controls
Manufacturing Leadership engaged the front line supervisor and operators, with the
support from maintenance and engineering in TPM steps 4 and 5. We started the process
on the critical constraint assets with the objective to bring the asset back to a
maintainable state.
Step 4: Conduct deep Cleaning to Inspection
Step 5: Eliminate Sources of Contamination, Defects, Abnormalities, and Inaccessible
Areas (repairs and design modification)
The front line supervisors are accountable for the implementation and sustainability for
the process with support from the Governance Team.
Advance Total Productive Manufacturing (TPM); Operator led Reliability (OLR)
Manufacturing Leadership engages the supervisors and operators in advanced TPM on
strategically applicable assets, the critical few.
TPM teams independently (fully autonomous) optimizing asset reliability through data
collection, and continuous improvements, with the focus being the elimination or
mitigation of the six major losses. (Figure #19)
16 of 21
Figure #19, Six Major Losses
TPM teams have implemented the basic TPM steps 1- 5, and now add the Operator Led
Reliability TPM Steps 6 and 7.
Step 6: Operator Led Setups, Adjustments, Inspections and Repairs
 Asset setups, adjustments, and basic troubleshooting/repairs are performed by
the operators through Maximo with limited support by maintenance
Step 7, Total Process Reliability, Optimized Asset Performance
 Operators are performing or supporting root cause failure analysis on
triggered events
 Operators are engaged in reliability improvement Kaizens
 The teams are using appropriate data collection tools to optimize asset
performance
17 of 21
Tactical Roadmaps
Engineering Excellence (Figure #19)
Figure #19, Engineering Excellence Roadmap
Early Equipment Management
Engineering Leadership establish a cross functional team of management, operational
excellence, maintenance, manufacturing, project engineering, reliability and maintenance
engineering, early in the project initiation phase with the objective to design and install
new or rebuilt assets with high levels of performance.
The team is responsible acquiring, and installing new asset that deliver exceptional levels
of performance, availability >95%.
Life Cycle Analysis
Engineering Leadership utilizes Life Cycle Cost or Total Cost of Ownership (TCO) in all
phases of the assets life cycle. We based our assets selection on total cost of ownership:
availability, reliability, maintenance, operating cost and energy efficiency.
Reliability, Availability, Maintainability and Safety (RAMS)
Engineering Leadership utilizes the Reliability, Availability, Maintainability, and Safety
(RAMS) process to establish a symbiotic relationship between the OEM supplier and the
facility. The relationships built upon maintenance and operating proven best practices,
data and data sharing, and trust.
We strategically deploy the process where there is a symbiotic relationship between a
long-term OEM supplier and the facility. The objective is to optimize asset reliability
from design generation to generation.
The RAMS process develops and optimizes, operations, maintenance and reliability
strategies with strategic suppliers.
18 of 21
Implementation Strategy
We vetted our asset management system, strategic focus, and tactical roadmaps, then began the
process of developing our corporate and facility level implementation strategy.
We determined the corporate implementation strategy based on facility size, maintenance spend,
criticality to the business and overall maintenance performance. (Figure #20)
Figure # 20, Corporate Rollout Strategy
The overall maintenance performance, key performance indicators used to rank the facilities
were:
1. % Preventative Maintenance Completed to Schedule
2. % Calibration Completed to Schedule
3. % Reactive (schedule break-in) by labor
4. % Preventative Maintenance Yield (related CM workorders)
The facility implementation strategy focused on four process phases. (Figure #21)
Figure #21, Facility Implementation Phases
Focus Plant
May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr
1 Plant 1 56% 27-May 13-Jul
1 Plant 2 89% 27-May 24-Aug
1 Plant 3 94% 11-May 22-Jun
1 Plant 4 1% 26-May 15-Jun
1 Plant 5 98%
1 Plant 6
1 Plant 7 83%
1 Plant 8 18%
1 Plant 9 71%
3 Plant 10
3 Plant 11
3 Plant 12
3 Plant 13
2 Plant 14 100% 4-May 8-Jun
2 Plant 15 100% 11-Jun
2 Plant 16 94% New Mgr
2 Plant 17 98% 11-May
2 Plant 18 95% New Mgr
2 Plant 19 100%
2 Plant 20 99%
2 Plant 21 100% New Mgr
2 Plant 22 100%
2 Plant 23 100% 11-May
2 Plant 24 100%
FY16
19 of 21
Summary
We have started this journey to build a sustainable framework for our Asset Management
System. We struggled with building our frameworks until we realized five fundamental points.
1 Organizational Excellence engages management and operational excellence in building a
sustainable system foundation.
 Breakdowns cultural barriers through cross-functional teams and system
interactions
 We engage our stakeholders to build and sustain the system
2 Maintenance Excellence engages maintenance, maintenance engineering and reliability
engineering is optimizing asset reliability.
3 Manufacturing Excellence engages operators and frontline supervisors in optimizing
asset reliability.
 Total production Maintenance was and still is the original asset management
system
4 Early Equipment Management engages engineering in design for reliability and
optimizing asset reliability.
5 Improved Equipment Effectiveness engages the entire facility as a cross functional team
focused on optimizing asset reliability.
With the engaged cross-functional teams and a strong stakeholder partnerships, we built best in
class process that have resulted in:
 Increase Overall Equipment Effectiveness (OEE) (Figure #22)
 Reduced unscheduled downtime (Figure #23)
 Reduced scrap rate (Figure #23)
 Improved maintenance resource utilization
 MRO Part spend and inventory reduction (Figure #24 & 25)
Figure #22, Overall Equipment Effectiveness
20 of 21
Figure #23, Unscheduled Downtime
Figure #24 Scrap Rate
Figure #24 MRO Part Send Reduction
21 of 21
Figure #25 MRO Inventory Reductions
The end state is a cultural transformation where the entire enterprise is accountable and
responsible to achieve best in class maintenance and reliability performance.
Contact information:
Dale Uitto, CMRP, REC, PMP, dale.uitto@yahoo.com
Key Words: asset management, autonomous maintenance, culture change, critical equipment,
governance, TPM, roadmap, tactical, strategy, vision, reliability centered maintenance

More Related Content

What's hot

How an integrated management system (IMS) helps companies to remain competitive
How an integrated management system (IMS) helps companies to remain competitive How an integrated management system (IMS) helps companies to remain competitive
How an integrated management system (IMS) helps companies to remain competitive
Etienne Venter
 
[Eng1]tpm guidebook(1 4)v1-sample_hd_trien_khai-tpm
[Eng1]tpm guidebook(1 4)v1-sample_hd_trien_khai-tpm[Eng1]tpm guidebook(1 4)v1-sample_hd_trien_khai-tpm
[Eng1]tpm guidebook(1 4)v1-sample_hd_trien_khai-tpm
truongngv
 
Implementing a Business Continuity Management System in Telecoms
Implementing a Business Continuity Management System in TelecomsImplementing a Business Continuity Management System in Telecoms
Implementing a Business Continuity Management System in Telecoms
Global Risk Forum GRFDavos
 
Contemporary management practices
Contemporary management practicesContemporary management practices
Contemporary management practices
VVS PRASAD ANAPARTHI
 
Management systems
Management systemsManagement systems
Management systemsmelynch
 
Airport processes improvement
Airport processes improvementAirport processes improvement
Airport processes improvement
Jatinder Singh
 
Top 10 Imperatives for Leading a Successful IT Improvement Program
Top 10 Imperatives for Leading a Successful IT Improvement ProgramTop 10 Imperatives for Leading a Successful IT Improvement Program
Top 10 Imperatives for Leading a Successful IT Improvement Program
Cognizant
 
Review Paper On: Total Productive Maintenance
Review Paper On: Total Productive MaintenanceReview Paper On: Total Productive Maintenance
Review Paper On: Total Productive Maintenance
IJARIIT
 
Integrating Board Policy with Outcomes
Integrating Board Policy with OutcomesIntegrating Board Policy with Outcomes
Integrating Board Policy with Outcomes
alan masterton
 
IRJET- A Review of Performance Management Systems in Manufacturing Indust...
IRJET-  	  A Review of Performance Management Systems in Manufacturing Indust...IRJET-  	  A Review of Performance Management Systems in Manufacturing Indust...
IRJET- A Review of Performance Management Systems in Manufacturing Indust...
IRJET Journal
 
A Decision Support System Based on RCM Approach to Define Maintenance Strategies
A Decision Support System Based on RCM Approach to Define Maintenance StrategiesA Decision Support System Based on RCM Approach to Define Maintenance Strategies
A Decision Support System Based on RCM Approach to Define Maintenance StrategiesCONFENIS 2012
 
Is Your Supply Chain Talent Ready for Growth?
Is Your Supply Chain Talent Ready for Growth? Is Your Supply Chain Talent Ready for Growth?
Is Your Supply Chain Talent Ready for Growth?
Andy Green
 
CBS IM56 March 2011
CBS IM56 March 2011CBS IM56 March 2011
CBS IM56 March 2011mcschlichter
 
Is Your Supply Chain Talent Ready For Growth[1]
Is Your Supply Chain Talent Ready For Growth[1]Is Your Supply Chain Talent Ready For Growth[1]
Is Your Supply Chain Talent Ready For Growth[1]
cjazh
 
Managing OEE o optimize factory performance
Managing OEE o optimize factory performanceManaging OEE o optimize factory performance
Managing OEE o optimize factory performance
Yasmin AbdelAziz
 
Wcm4
Wcm4Wcm4
PRCA: In-house CMS booklet
PRCA: In-house CMS bookletPRCA: In-house CMS booklet
PRCA: In-house CMS booklet
PRmoment
 
CMMI with Digité Universal Process Framework
CMMI with Digité Universal Process FrameworkCMMI with Digité Universal Process Framework
CMMI with Digité Universal Process Framework
Digite Inc
 

What's hot (20)

How an integrated management system (IMS) helps companies to remain competitive
How an integrated management system (IMS) helps companies to remain competitive How an integrated management system (IMS) helps companies to remain competitive
How an integrated management system (IMS) helps companies to remain competitive
 
[Eng1]tpm guidebook(1 4)v1-sample_hd_trien_khai-tpm
[Eng1]tpm guidebook(1 4)v1-sample_hd_trien_khai-tpm[Eng1]tpm guidebook(1 4)v1-sample_hd_trien_khai-tpm
[Eng1]tpm guidebook(1 4)v1-sample_hd_trien_khai-tpm
 
Implementing a Business Continuity Management System in Telecoms
Implementing a Business Continuity Management System in TelecomsImplementing a Business Continuity Management System in Telecoms
Implementing a Business Continuity Management System in Telecoms
 
Contemporary management practices
Contemporary management practicesContemporary management practices
Contemporary management practices
 
Management systems
Management systemsManagement systems
Management systems
 
Airport processes improvement
Airport processes improvementAirport processes improvement
Airport processes improvement
 
Top 10 Imperatives for Leading a Successful IT Improvement Program
Top 10 Imperatives for Leading a Successful IT Improvement ProgramTop 10 Imperatives for Leading a Successful IT Improvement Program
Top 10 Imperatives for Leading a Successful IT Improvement Program
 
Review Paper On: Total Productive Maintenance
Review Paper On: Total Productive MaintenanceReview Paper On: Total Productive Maintenance
Review Paper On: Total Productive Maintenance
 
Integrating Board Policy with Outcomes
Integrating Board Policy with OutcomesIntegrating Board Policy with Outcomes
Integrating Board Policy with Outcomes
 
Risk Intelligence
Risk IntelligenceRisk Intelligence
Risk Intelligence
 
IRJET- A Review of Performance Management Systems in Manufacturing Indust...
IRJET-  	  A Review of Performance Management Systems in Manufacturing Indust...IRJET-  	  A Review of Performance Management Systems in Manufacturing Indust...
IRJET- A Review of Performance Management Systems in Manufacturing Indust...
 
A Decision Support System Based on RCM Approach to Define Maintenance Strategies
A Decision Support System Based on RCM Approach to Define Maintenance StrategiesA Decision Support System Based on RCM Approach to Define Maintenance Strategies
A Decision Support System Based on RCM Approach to Define Maintenance Strategies
 
Is Your Supply Chain Talent Ready for Growth?
Is Your Supply Chain Talent Ready for Growth? Is Your Supply Chain Talent Ready for Growth?
Is Your Supply Chain Talent Ready for Growth?
 
CBS IM56 March 2011
CBS IM56 March 2011CBS IM56 March 2011
CBS IM56 March 2011
 
Is Your Supply Chain Talent Ready For Growth[1]
Is Your Supply Chain Talent Ready For Growth[1]Is Your Supply Chain Talent Ready For Growth[1]
Is Your Supply Chain Talent Ready For Growth[1]
 
Managing OEE o optimize factory performance
Managing OEE o optimize factory performanceManaging OEE o optimize factory performance
Managing OEE o optimize factory performance
 
CMAS - Flyer
CMAS - FlyerCMAS - Flyer
CMAS - Flyer
 
Wcm4
Wcm4Wcm4
Wcm4
 
PRCA: In-house CMS booklet
PRCA: In-house CMS bookletPRCA: In-house CMS booklet
PRCA: In-house CMS booklet
 
CMMI with Digité Universal Process Framework
CMMI with Digité Universal Process FrameworkCMMI with Digité Universal Process Framework
CMMI with Digité Universal Process Framework
 

Similar to Track 4 Dale Uitto 2015 Paper

World Class Maintenance_DurgaPrasadMishra
World Class Maintenance_DurgaPrasadMishraWorld Class Maintenance_DurgaPrasadMishra
World Class Maintenance_DurgaPrasadMishraDurga Prasad Mishra
 
reliability-based-asset-management.ppt
reliability-based-asset-management.pptreliability-based-asset-management.ppt
reliability-based-asset-management.ppt
ssuseraf1d6a
 
Total Productive Maintenance: Everything You Need to Know About TPM
Total Productive Maintenance: Everything You Need to Know About TPMTotal Productive Maintenance: Everything You Need to Know About TPM
Total Productive Maintenance: Everything You Need to Know About TPM
CryotosCMMSSoftware
 
Basic concepts of Total Quality Management
Basic concepts of Total Quality Management Basic concepts of Total Quality Management
Basic concepts of Total Quality Management
Dr.Raja R
 
The Beginner’s Guide to a Planned Maintenance System Boosting Efficiency and ...
The Beginner’s Guide to a Planned Maintenance System Boosting Efficiency and ...The Beginner’s Guide to a Planned Maintenance System Boosting Efficiency and ...
The Beginner’s Guide to a Planned Maintenance System Boosting Efficiency and ...
TeroTAM
 
ERP 04
ERP 04ERP 04
Module 4 Analysis of the Srengths and Weaknesses of PANELCO III
Module 4 Analysis of the Srengths and Weaknesses of PANELCO IIIModule 4 Analysis of the Srengths and Weaknesses of PANELCO III
Module 4 Analysis of the Srengths and Weaknesses of PANELCO III
Jo Balucanag - Bitonio
 
What is Lean Maintenance
What is Lean MaintenanceWhat is Lean Maintenance
What is Lean Maintenance
Ricky Smith CMRP, CMRT
 
Maintenance management
Maintenance managementMaintenance management
Maintenance managementramduttkholia
 
Tools and Techniques in Total Quality Management Implementation
Tools and Techniques in Total Quality Management ImplementationTools and Techniques in Total Quality Management Implementation
Tools and Techniques in Total Quality Management Implementation
colisaoariane28
 
SYSTEM_ANALYSIS_AND_DESIGN_PRESENTATION_SLIDES.pptx
SYSTEM_ANALYSIS_AND_DESIGN_PRESENTATION_SLIDES.pptxSYSTEM_ANALYSIS_AND_DESIGN_PRESENTATION_SLIDES.pptx
SYSTEM_ANALYSIS_AND_DESIGN_PRESENTATION_SLIDES.pptx
OkianWarner
 
Performance management and development system
Performance management and development systemPerformance management and development system
Performance management and development system
eismintukey
 
Total Quality Management (TQM)
Total Quality Management (TQM)Total Quality Management (TQM)
Total Quality Management (TQM)
Sheetal Wagh
 
Performance Management Systems Software for Small Company
Performance Management Systems Software for Small CompanyPerformance Management Systems Software for Small Company
Performance Management Systems Software for Small Company
NYGGS Automation Suite
 
‏‏‏‏Supply Chain Management = 3 = .pdf
‏‏‏‏Supply Chain Management = 3 =   .pdf‏‏‏‏Supply Chain Management = 3 =   .pdf
‏‏‏‏Supply Chain Management = 3 = .pdf
MarwanAhmed849151
 
Scm awareness
Scm awarenessScm awareness
Scm awareness
Thyagarajan Krishnan
 
Understanding the impact of Enterprise Asset Management
Understanding the impact of Enterprise Asset ManagementUnderstanding the impact of Enterprise Asset Management
Understanding the impact of Enterprise Asset Management
Alok Chander
 

Similar to Track 4 Dale Uitto 2015 Paper (20)

Track 4_Dale Uitto_2014 Paper
Track 4_Dale Uitto_2014 PaperTrack 4_Dale Uitto_2014 Paper
Track 4_Dale Uitto_2014 Paper
 
World Class Maintenance_DurgaPrasadMishra
World Class Maintenance_DurgaPrasadMishraWorld Class Maintenance_DurgaPrasadMishra
World Class Maintenance_DurgaPrasadMishra
 
reliability-based-asset-management.ppt
reliability-based-asset-management.pptreliability-based-asset-management.ppt
reliability-based-asset-management.ppt
 
Total Productive Maintenance: Everything You Need to Know About TPM
Total Productive Maintenance: Everything You Need to Know About TPMTotal Productive Maintenance: Everything You Need to Know About TPM
Total Productive Maintenance: Everything You Need to Know About TPM
 
Basic concepts of Total Quality Management
Basic concepts of Total Quality Management Basic concepts of Total Quality Management
Basic concepts of Total Quality Management
 
The Beginner’s Guide to a Planned Maintenance System Boosting Efficiency and ...
The Beginner’s Guide to a Planned Maintenance System Boosting Efficiency and ...The Beginner’s Guide to a Planned Maintenance System Boosting Efficiency and ...
The Beginner’s Guide to a Planned Maintenance System Boosting Efficiency and ...
 
ERP 04
ERP 04ERP 04
ERP 04
 
Module 4 Analysis of the Srengths and Weaknesses of PANELCO III
Module 4 Analysis of the Srengths and Weaknesses of PANELCO IIIModule 4 Analysis of the Srengths and Weaknesses of PANELCO III
Module 4 Analysis of the Srengths and Weaknesses of PANELCO III
 
Meridium_PAS_55
Meridium_PAS_55Meridium_PAS_55
Meridium_PAS_55
 
What is Lean Maintenance
What is Lean MaintenanceWhat is Lean Maintenance
What is Lean Maintenance
 
Maintenance management
Maintenance managementMaintenance management
Maintenance management
 
Tools and Techniques in Total Quality Management Implementation
Tools and Techniques in Total Quality Management ImplementationTools and Techniques in Total Quality Management Implementation
Tools and Techniques in Total Quality Management Implementation
 
SYSTEM_ANALYSIS_AND_DESIGN_PRESENTATION_SLIDES.pptx
SYSTEM_ANALYSIS_AND_DESIGN_PRESENTATION_SLIDES.pptxSYSTEM_ANALYSIS_AND_DESIGN_PRESENTATION_SLIDES.pptx
SYSTEM_ANALYSIS_AND_DESIGN_PRESENTATION_SLIDES.pptx
 
Performance management and development system
Performance management and development systemPerformance management and development system
Performance management and development system
 
10.1.1.87.8236
10.1.1.87.823610.1.1.87.8236
10.1.1.87.8236
 
Total Quality Management (TQM)
Total Quality Management (TQM)Total Quality Management (TQM)
Total Quality Management (TQM)
 
Performance Management Systems Software for Small Company
Performance Management Systems Software for Small CompanyPerformance Management Systems Software for Small Company
Performance Management Systems Software for Small Company
 
‏‏‏‏Supply Chain Management = 3 = .pdf
‏‏‏‏Supply Chain Management = 3 =   .pdf‏‏‏‏Supply Chain Management = 3 =   .pdf
‏‏‏‏Supply Chain Management = 3 = .pdf
 
Scm awareness
Scm awarenessScm awareness
Scm awareness
 
Understanding the impact of Enterprise Asset Management
Understanding the impact of Enterprise Asset ManagementUnderstanding the impact of Enterprise Asset Management
Understanding the impact of Enterprise Asset Management
 

Track 4 Dale Uitto 2015 Paper

  • 1. 1 of 21 True TPM, a Total Process Reliability Centered Asset Management Machine Dale Uitto, CMRP, REC, PMP, Maintenance Excellence Manager, Medtronic Track 4: Organization and Leadership Abstract Asset Management is more than a maintenance excellence program, Total Productive Maintenance (TPM) is more than autonomous maintenance, and Lean Manufacturing is more than waste reduction. Total Process Reliability is the integration of these systems, it brings cultural transformation, cradle to grave accountability, and engages all levels of the organization in improved asset reliability. Without this integration, you can only achieve pockets of excellence and a hardy “I told you so” from manufacturing. Introduction When we started to develop our asset management system framework, we quickly realized that it had to be more than a maintenance system. The first time we presented our framework to senior leadership it was quickly noted, “Isn’t this just TPM?” After that, the team started looking at asset management in a very different way; we started building an integrated asset management system, not an asset maintenance system. Journey of Discovery We struggled with Total Productive Maintenance (TPM) implementation because we were culturally unprepared and allowed the eight TPM pillars to become compartmentalized. (Figure #1) Figure #1 Total Productive Manufacturing Pillars Based on the TPM pillars, we starting building our asset management framework in the same format, but quickly discovered we were missing process interactions. We knew that process interactions would break down our compartments. (Figure #2)
  • 2. 2 of 21 Figure #2 Total Process Reliability Pillars At a standstill of how to visual build our framework we engage Operational Excellence, they kindly suggested the swim lane process. This was a breakthrough not only because of the visual concepts, but we engaged Operational Excellence in building our asset management system. If we were to build a Total Process Reliability System it would require a cross functional team of management, operational excellence, maintenance, manufacturing, and engineering. The cross-functional team built the swim lanes by turning the eight pillars of TPM sideways. (Figure #3) Figure #3 Total Productive Maintenance Pillars
  • 3. 3 of 21 We combined the eight TPM pillars into four cross-functional tracks. (Figure #4) 1. Governance and administrative excellence and Craft and Operator Skills Enhancement and Training became Organizational Excellence. 2. Quality Driven Maintenance, Safety, Health, and Environmental Excellence and Planned Maintenance became Maintenance Excellence. 3. Autonomous Maintenance became Manufacturing Excellence. 4. Early Equipment Management became Engineering Excellence. Improved Equipment Effectiveness and Root Cause Failure Analysis (RCFA) are in themselves cross-functional teams of management, operational excellence, maintenance, manufacturing, and engineering. Figure #4 Four Cross Functional tracks
  • 4. 4 of 21 This led us to three fundamental concepts: 1. Adding the Asset Management System brought strategic focus. (Figure #5) Figure #5 Asset Management Systems – Strategic Focus 2. We had always struggle with Total Production Maintenance (TPM) because of the “M” word, “maintenance”. To implement Total Productive Maintenance effectively we changed the name to Total Production Manufacturing (TPM). 3. The combination and interactions of all the four tracks we defined as Total Process Reliability. (Figure #6) 4. Improved Equipment Effectiveness and Root Cause Failure Analysis (RCFA) are cross- functional by nature. In the process of developing an asset management system we discovered, Total Process Reliability. We broke down our traditional chimneys and to transform our cultural, now we had a single focus, Total Process Reliability.
  • 5. 5 of 21 Figure #6 Focused Total Process Reliability System Development Total Process Reliability is our systematic approach to engage our organization in true TPM. With Total Process Reliability, each cross-functional team has responsibilities and interacts directly through the Governance team. 1. Governance Team owns: Strategic Focus 2. Leadership and Operational Excellence: Organizational Excellence 3. Maintenance owns: Maintenance Excellence 4. Manufacturing owns: Manufacturing Excellence 5. Engineering owns: Engineering Excellence Total Process Reliability brings the cultural transformation, cradle to grave accountability, and responsibility with the goal of engaging all levels of the organization, leading to improved overall equipment effectiveness.
  • 6. 6 of 21 Strategic Focus (figure 7) Figure #7, Strategic Focus Strategic focus defines:  Governance, oversight, infrastructure, and management of the entire system  Engages our leadership team, management, operations excellence, maintenance, manufacturing, and engineering in strategic development and management  Defines the critical assets we will focus on  Defines our implementation strategy We utilized ISO 55000 as a structural backbone to develop our asset management system. (Figure #8)
  • 7. 7 of 21 Figure #8, Asset Management Structure We defined our strategic focus though the Strategic Organizational Plans and Objectives. The Executive Champion defined the Strategic Organizational Plans and Objectives as Goals, and Objectives, with the focus on critical constraint asset. The team cascaded the goals and objectives as Clear Line of Sight, Aligned Vision, Goals, and Objectives vertically and horizontally to the Facility floor. (Figure #9) Figure #9, Clear line of sight Goals, and Objectives Through our Aligned Vision, Goals, and Objectives the team defined our Total Process Reliability objectives as:  Asset Management Policy and Vision
  • 8. 8 of 21  Focused Strategic Asset Management Plans  Focused Asset Management Objectives Governance (oversight, infrastructure, and management team) The Governance Team is “Accountable” for the oversight and implementation of the entire Asset Management System. Through Governance, we defined our asset management track strategies. Organizational Excellence Strategy The Organizational Excellence Strategy defines the Corporate and Site Champions roles and responsibilities in developing and establishing the Asset Management System through the Governance, oversight, and infrastructure cross-functional team. Maintenance Excellence Strategy The Maintenance Excellence Strategy defines the Maintenance Leadership’s roles and responsibilities in developing and establishing maintenance mythologies, procedures, and processes. Manufacturing Excellence Strategy The Manufacturing Excellence Strategy defines the Production Leadership’s roles and responsibilities in developing, establishing and sustaining a culture of Total Productive Manufacturing (TPM). Engineering Excellence Strategy The Engineering Excellence Strategy defines the Engineering Leadership’s roles and responsibilities in the implementing Design for Reliability. Development, Implementation and Optimization of Asset Management Plans Through the cross-functional teams and strategies, we executed our Total Process Reliability goals as actionable plan, process, and procedures:  Focused Asset Management Plans  Asset Management Plans and Processes implementation  Optimized Asset Performance through Monitoring, Evaluation, Analysis and Improvements (Plan, Do Check Adjust)
  • 9. 9 of 21 Tactical Roadmaps (Figure #10) The Tactical Roadmap defines the implementation and optimization of Asset Management Plans and Processes. (Figure #10) Figure #10, Tactical Roadmap Organizational Excellence (Figure # 11) Figure # 11, Organizational Excellence Roadmap Assessment and Roadmaps to Excellence The Governance team developed an Assessment Tool to measure all the element of the asset management system against best in class standards. (Figure #12)
  • 10. 10 of 21 Figure # 12, Assessment Tool We translate the assessment gap into actionable items and manage them to completion through Governance. (Figure 13) Figure # 13, Assessment Action Plans
  • 11. 11 of 21 MRO Inventory Management The Governance Team deployed Maximo (CMMS, Computerized maintenance Management System) as the system of record to procure, managed and controlled all MRO parts, stock, non-stock, and order on request. Craft and Operator Skills Enhancement The Governance Team maps its available resources to its planned activities to determine any training and skills gaps. We used the Individual Development Process (IDP) to bridge the gaps. We developed basic training standards and process. (Figure 14) Figure #14, Basic Training Standards and Processes Resources, Discipline and Compliance The Governance Team defines the roles and responsibilities for everyone engaged in the Asset Management System, management, operational excellence, maintenance, manufacturing, and engineering.
  • 12. 12 of 21 Tactical Roadmaps Maintenance Excellence (Figure #15) Figure # 15, Maintenance Excellence Roadmap Reliability Centered Maintenance (RCM/FMECA) Maintenance Leadership defines the Reliability Centered Maintenance (RCM/FMECA) methodology to complete a review of all Assets Management Plans focusing the analysis process and implementation where a return on this investment is most profitable. (Figure #16) Figure #16, Reliability Centered Maintenance and Root Cause Failure Mythology Tree Root Cause Failure Analysis (RCFA) Maintenance Leadership defines the Root Cause Failure Analysis (RCFA) methodology to react immediately to a preventable failure occurrence. Root cause failure analysis (RCFA) is highly interrelated with Maximo, and reliability centered maintenance. Maximo is the system of record all asset and component failures and their root cause. (Figure #16)
  • 13. 13 of 21 Failure Reporting & Corrective Action System (FRACAS) Maintenance Leadership defines the Failure Reporting and Corrective Action System (FRACAS) failure identification and prevention methodology. (Figure #16) FRACAS is highly interrelated with Maximo, root cause analysis and reliability centered maintenance. Maximo is the system of record all asset and component failures and their root cause. Maximo Workorder Content, Planning, Scheduling, Execution, and Review Maintenance Leadership defines and establishes the Maximo Workorder Content Requirements Maximo Workorder Planning and Scheduling Maintenance Leadership defines the Planners and Schedulers roles and responsibilities for the use, and management of Maximo to plan and schedule preventive (PM/PdM/Cal) and corrective maintenance (CM) work activities. Maximo Workorder Execution Maintenance Leadership defines the roles and responsibilities for the planners/schedules, managers, supervisors, maintenance technician, and operators for the execution of Maximo workorders. Maximo Workorder Review Maintenance Leadership defines the roles and responsibilities for the planners/schedules, managers, supervisor, maintenance technician and operators for the Post Mortem Review of executed Maximo workorders. Predictive (PdM) Maintenance Maintenance Leadership defines the appropriate use and application of predictive (condition based) maintenance methodologies. Workflow Analytics and Value Stream Mapping Maintenance Leadership conducts asset management system process flow or value stream mapping exercises to identify process flow waste. Maintenance Prevention (MP) Maintenance Leadership defines the appropriate use and application of precision maintenance (maintenance prevention) methodologies. 1) Precision maintenance 2) Precision lubrication 3) Lubricant Tribology (oil testing) Precision Maintenance Maintenance Leadership defines the maintenance technician’s roles and responsibilities for the application and management of precision maintenance tools
  • 14. 14 of 21 and technologies. Precision maintenance is the proactive elimination the failures caused by improper adjustment and component installations. Lubrication Excellence Maintenance Leadership defines the appropriate use and application of lubrication excellence methodologies. Lubrication excellence includes:  Lubrication visual factory color-code standards and procedures for tagging/labeling of lubricants and lubrication points (Figure #17)  Calculated lubrication volumes and frequency for every asset. The volumes and frequencies are validated using ultrasound technology  All asset are modified to include desiccant breathers, level gauges, sample ports, quick disconnects, external lubrication (grease) lines, lubrication distribution manifolds to allow lubrication and sampling to occur which the asset is operating Figure #17, Lubrication Visual Factory Color-Code Standard Lubricant Tribology (Oil Testing) Maintenance Leadership defines the Lubrication Technicians roles, responsibilities procedures, and process for the application and management of lubricant tribology. Wrench Time Analysis and Optimization Maintenance Leadership focuses on measuring and improving maintenance wrench time, (maintenance labor utilization). Reliability Improvement Kaizens A cross functional team of management, operational excellence, maintenance manufacturing and engineering identify and implement asset reliability kaizen events focused on the elimination or mitigate the failure risk.
  • 15. 15 of 21 Tactical Roadmaps Manufacturing Excellence (Figure #18) Figure #18, Manufacturing Excellence Roadmap Total Productive Manufacturing (TPM) Note: The team rearranged the steps to support compliance with FDA regulations. Senior Leadership engaged the entire facility, administration, front office, management, manufacturing, operational excellence, maintenance, facilities and engineering in the first three steps to TPM. This is in compliance with FDA (Food and Drug Administration), cGMP (current, Good Manufacturing Practices) regulations. Step 1: Develop Strategy, Standards, and Expectations (rules before tools) Step 2: Training to the Strategy, Standards, and Exceptions Step 3: Implement Workplace Organization, Housekeeping, and visual factory visual controls Manufacturing Leadership engaged the front line supervisor and operators, with the support from maintenance and engineering in TPM steps 4 and 5. We started the process on the critical constraint assets with the objective to bring the asset back to a maintainable state. Step 4: Conduct deep Cleaning to Inspection Step 5: Eliminate Sources of Contamination, Defects, Abnormalities, and Inaccessible Areas (repairs and design modification) The front line supervisors are accountable for the implementation and sustainability for the process with support from the Governance Team. Advance Total Productive Manufacturing (TPM); Operator led Reliability (OLR) Manufacturing Leadership engages the supervisors and operators in advanced TPM on strategically applicable assets, the critical few. TPM teams independently (fully autonomous) optimizing asset reliability through data collection, and continuous improvements, with the focus being the elimination or mitigation of the six major losses. (Figure #19)
  • 16. 16 of 21 Figure #19, Six Major Losses TPM teams have implemented the basic TPM steps 1- 5, and now add the Operator Led Reliability TPM Steps 6 and 7. Step 6: Operator Led Setups, Adjustments, Inspections and Repairs  Asset setups, adjustments, and basic troubleshooting/repairs are performed by the operators through Maximo with limited support by maintenance Step 7, Total Process Reliability, Optimized Asset Performance  Operators are performing or supporting root cause failure analysis on triggered events  Operators are engaged in reliability improvement Kaizens  The teams are using appropriate data collection tools to optimize asset performance
  • 17. 17 of 21 Tactical Roadmaps Engineering Excellence (Figure #19) Figure #19, Engineering Excellence Roadmap Early Equipment Management Engineering Leadership establish a cross functional team of management, operational excellence, maintenance, manufacturing, project engineering, reliability and maintenance engineering, early in the project initiation phase with the objective to design and install new or rebuilt assets with high levels of performance. The team is responsible acquiring, and installing new asset that deliver exceptional levels of performance, availability >95%. Life Cycle Analysis Engineering Leadership utilizes Life Cycle Cost or Total Cost of Ownership (TCO) in all phases of the assets life cycle. We based our assets selection on total cost of ownership: availability, reliability, maintenance, operating cost and energy efficiency. Reliability, Availability, Maintainability and Safety (RAMS) Engineering Leadership utilizes the Reliability, Availability, Maintainability, and Safety (RAMS) process to establish a symbiotic relationship between the OEM supplier and the facility. The relationships built upon maintenance and operating proven best practices, data and data sharing, and trust. We strategically deploy the process where there is a symbiotic relationship between a long-term OEM supplier and the facility. The objective is to optimize asset reliability from design generation to generation. The RAMS process develops and optimizes, operations, maintenance and reliability strategies with strategic suppliers.
  • 18. 18 of 21 Implementation Strategy We vetted our asset management system, strategic focus, and tactical roadmaps, then began the process of developing our corporate and facility level implementation strategy. We determined the corporate implementation strategy based on facility size, maintenance spend, criticality to the business and overall maintenance performance. (Figure #20) Figure # 20, Corporate Rollout Strategy The overall maintenance performance, key performance indicators used to rank the facilities were: 1. % Preventative Maintenance Completed to Schedule 2. % Calibration Completed to Schedule 3. % Reactive (schedule break-in) by labor 4. % Preventative Maintenance Yield (related CM workorders) The facility implementation strategy focused on four process phases. (Figure #21) Figure #21, Facility Implementation Phases Focus Plant May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr 1 Plant 1 56% 27-May 13-Jul 1 Plant 2 89% 27-May 24-Aug 1 Plant 3 94% 11-May 22-Jun 1 Plant 4 1% 26-May 15-Jun 1 Plant 5 98% 1 Plant 6 1 Plant 7 83% 1 Plant 8 18% 1 Plant 9 71% 3 Plant 10 3 Plant 11 3 Plant 12 3 Plant 13 2 Plant 14 100% 4-May 8-Jun 2 Plant 15 100% 11-Jun 2 Plant 16 94% New Mgr 2 Plant 17 98% 11-May 2 Plant 18 95% New Mgr 2 Plant 19 100% 2 Plant 20 99% 2 Plant 21 100% New Mgr 2 Plant 22 100% 2 Plant 23 100% 11-May 2 Plant 24 100% FY16
  • 19. 19 of 21 Summary We have started this journey to build a sustainable framework for our Asset Management System. We struggled with building our frameworks until we realized five fundamental points. 1 Organizational Excellence engages management and operational excellence in building a sustainable system foundation.  Breakdowns cultural barriers through cross-functional teams and system interactions  We engage our stakeholders to build and sustain the system 2 Maintenance Excellence engages maintenance, maintenance engineering and reliability engineering is optimizing asset reliability. 3 Manufacturing Excellence engages operators and frontline supervisors in optimizing asset reliability.  Total production Maintenance was and still is the original asset management system 4 Early Equipment Management engages engineering in design for reliability and optimizing asset reliability. 5 Improved Equipment Effectiveness engages the entire facility as a cross functional team focused on optimizing asset reliability. With the engaged cross-functional teams and a strong stakeholder partnerships, we built best in class process that have resulted in:  Increase Overall Equipment Effectiveness (OEE) (Figure #22)  Reduced unscheduled downtime (Figure #23)  Reduced scrap rate (Figure #23)  Improved maintenance resource utilization  MRO Part spend and inventory reduction (Figure #24 & 25) Figure #22, Overall Equipment Effectiveness
  • 20. 20 of 21 Figure #23, Unscheduled Downtime Figure #24 Scrap Rate Figure #24 MRO Part Send Reduction
  • 21. 21 of 21 Figure #25 MRO Inventory Reductions The end state is a cultural transformation where the entire enterprise is accountable and responsible to achieve best in class maintenance and reliability performance. Contact information: Dale Uitto, CMRP, REC, PMP, dale.uitto@yahoo.com Key Words: asset management, autonomous maintenance, culture change, critical equipment, governance, TPM, roadmap, tactical, strategy, vision, reliability centered maintenance