SlideShare a Scribd company logo
THIRUMURUGAN. B
Deputy Manager – Production
No: 67, Kotha Street,
Tharangampadi Road,
Mayiladuthurai.609001
Mobile: 0 99444 89504.
Email: murugan_alab@yahoo.co.in
Seekingchallengingassignmentsinthe domain of Production,Planning&Process with reputed organization in the
field of Wind turbine composites manufacturing.
 12+ yearsof industrial experience withB.E - ProductionEngg.AndMBA – ProjectManagement.
 Experience inCompositesproduction,PlanningandAssemblyLine.
 Experience in handlingProcess improvementprojectin8D & DMAIC (6σ) methodology
 A Dynamicand hardworkinggo-getterwithabilitiestoacceptnew challengesandtodeliverthe desiredresults in
a given time
 Capable of leading a group with an outstanding efficiency
 Abilitytoinnovate andadaptto newsituations.
Core Competencies:
1.Integrated Management System
10 years
2. FRP - Production (VARIM, Hand layup,RTM)
11 years
3.Production Planning& Control
11 years
4. Assembly Line
11 years
5.Lean management and implementation
5 years
6.Problem solvingmethodology (G8D & 6σ)
8 years
7.Six sigma and Lean projecthandling
5 years
8. Continual Improvement
5 years
9.Expertisein Lean and various analysisTools
5 years
Career Objective:
Profile Summary :
CURRICULUM VITAE
INDUTCH COMPOSITES PVT LTD:
Worked as a Deputy Manager - Production in Kitting-LM insourcing Unit for the above said organization
from Dec 2015 to till date.
Job Profile:
 Setup the Production line and gradually ramp up the productivity.
 Involved in the technical Recruitment and people enhancement through training
 Carry the optimized Resource Planning activity
 Responsible for Customer relationship management and Customer Audit management (i.e. Co-
ordinate in conduct customer Audit and getting the certification from customer)
 Carry the Plant Administration and the Accounts Function
 Handling the customer complaints and resolving complaints using structured approach - G8D
Methodology
 Achieving the delivery Commitment through Improve the Production performance
 Be change agent and foster team spirit among team members for achievement the cultural of
goal
Education Time Line :
MBA-Project Management B.E- Production Engg. Diploma in Mechanical
Engineering
AllagappaUniversity (Karaikudi) 74.3 % CGPA, Madurai Kamaraj
University (Madurai)
87.7% ,State Board of Technical
Education & Training , TN
2007-2009 2000-2003 1998-2000
Career Time Line :
Deputy. Manager -
Production
Asst. Manager -
Production
Senior Engineer -
Production
Planning & Control
Senior Engineer –
Production & PPC
Engineer -
Production
M/s Indutch
Composites Pvt.
Ltd
M/s Indocool
Composite Pvt. Ltd
M/s. Win Wind
Power Energy Ltd
M/s Suzlon Energy
Ltd
M/s colour drive textile
Machine Printer
Since Dec’15 Jan’14 - Nov'15 Dec’12 –Dec’13 Dec’04 - Dec‘12 Jan’04 - Dec‘04
Work Experience
 Responsible for 5S implementation and improve the Safety culture across the Plan.
 Preparing the work Instruction and standard operating procedures.
 Handling multiple projects and allocate the work in Statergical method to achieve the optimum
output.
INDO COOL COMPOSITES PVT LTD:
Worked as an Assistant manager - Production in Nacelle cover production Unit for the above said
organization from Jan 2014 to Nov 2015.
Job Profile:
 Develop and implement the work standardization procedure by inventorying existing process,
assessing gaps and opportunities for improvement in the Assembly Line.
 Drive improvement activities to meet/exceed the goals including design to mask 5s, Kaizen, 8D,
Lean management and Periodically review of corrective actions.
 Drive a problem solving mindset among the team through implementation of good culture.
 Set SMART goals, track & drive key performance indicators for entire upstream Production Team.
 Motivate, provide on-going technical/management training and career counseling to retain the
necessary professional staff required to support the Assembly / Production Functions and also
establish optimal staffing levels.
 Facilitate the sharing of best practices from within and outside the organization and implement
them and drive performance benchmarking.
 Implementation of lean management by using Various lean tools such as 5s,Value Stream
Mapping , Kanban, Kaizen, TPM, SMED, Bottle Neck Analysis, Heijenka ,Just in Time, Jidoka.
 Perform engineering analysis to reduce downtime and outages.
WINWIND POWER ENERGY LTD:
Worked as a Sr.Engineer - Production-Assembly & Planning in Nacelle and Hub Unit for the above said
organization from Dec 2012 to Dec 2013.
Job Profile:
 Develop process improvements to effectively utilize equipment and materials to maximize
production.
 Prepare the Production plan & implement the plan on shop floor as per Business plan.
 Making of Purchase requisition for BOM, Consumables & Capital Materials.
 Prepare the Material coverage, shortage list & coordinate with SCM.
 Updating the production data in ERP system.
 Closing of shop orders and cost comparison with standard cost.
 Material Consumption study & updating the BOM.
 Control on operational cost with approved budget.
SUZLON ENERGY LTD:
Worked as a Sr.Engineer – Production & PPC in Nacelle Cover Assembly Unit for the above said
organization from Dec 2004 to Dec 2012.
Job Profile:
 Taking care of entire Nacelle cover and nose cone assembly functions.
 Implement the business plan on production shop floor.
 Planning of man power & material requirements for the completion of the production plan.
 Organizing daily meeting with all dept regarding daily production & dispatches and ensure 100%
adherence to customer schedules.
 Monitoring Plan Vs Actual on weekly basis & coordinating with Production & Purchase for
execution of Plan.
 Generating & analyzing of manpower & Consumables Consumed per unit on monthly basis.
 Generating production reports on daily and monthly basis.
 Converting the planned order to production orders as per Plan (SAP)
 Raising PR for Non BOM Material.
 Involves in Production & updating BOM Material master with concern dept.
 Work center creation/change
 Routing creation/change
COLOUR DRIVE TEXTILE MACHINE PRINTERS:
Worked as an Engineer - Production for the above said organization from Jan 2004 to Dec2004.
Job Profile:
 Allocation of Man Power to the respective Production areas.
 Effective utilization of available Man power in to required output.
 Weekly meeting conducted regarding quality issues with team leaders.
 Controlling and maintaining critical process parameters as per Specification.
 Maintaining the records of input and output ratio for every batch.
Achievements details:
 Reduction in inventories through sound and dynamic production planning with business plans.
 Fixing of metal & small FRP parts while Moulding instead of hand lamination.
 Cost data sheet preparation and project viability report preparation.
 Controlling material consumption according to Standard BOM.
 Achieved 93% of BOMaccuracy from 82% by consumption study/Audit.
 Application Package : MS-Office- XP
 Additional Skills : SAP R/3 version, IFS.
 Got SIX SIGMA training by corporate trainer (8D&DMAIC)
 Activity involved in effective implementation of 5S in production plant.
 Knowledge in ISO 9001/internal commercial audits.
 Knowledge in Team building, Time management & got trained by corporate trainer.
 Got safety training Program in Regional labor institute.
 Attended in Lead auditor training in OHSAS 18001
 Implementation of lean in production areas.
 Implementation& coordinator of SEP at plant level
 Co-operation with mould commissioning team for repair/Maintenance works
 Date of Birth : 31/05/1980
 Father’s Name : Mr. M.Balakrishnan
 Nationality : Indian
 Sex & Marital status : Male & Married
 Languages known : Tamil, English & spoken-Hindi
 Present Address : No37, Valliyammai Nagar
Koothapakkam-609701,
Cuddalore, Tamilnadu.
I here by affirm that the information in this document is accurate and true to the best of my knowledge
and belief.
Place:
Date: (B.THIRUMURUGAN)
SOFTWARE SKILLS
OTHER EXPOSURES
PERSONAL DETAILS
DECLARATION

More Related Content

What's hot

Abuthaheer- Curriculum vitae
Abuthaheer- Curriculum vitaeAbuthaheer- Curriculum vitae
Abuthaheer- Curriculum vitaeabutha
 
B,kannan resume
B,kannan resumeB,kannan resume
B,kannan resume
Balakrishnan Kannan
 
HL Lee Resume_2016 (LME)
HL Lee Resume_2016 (LME)HL Lee Resume_2016 (LME)
HL Lee Resume_2016 (LME)Lee Hang Li
 
DGM (OPERATIONS) Looking forward to challenging assignments in the field of ...
 DGM (OPERATIONS) Looking forward to challenging assignments in the field of ... DGM (OPERATIONS) Looking forward to challenging assignments in the field of ...
DGM (OPERATIONS) Looking forward to challenging assignments in the field of ...
ravikumar warad
 
Pradeep Rawat RESUME 2
Pradeep Rawat RESUME 2Pradeep Rawat RESUME 2
Pradeep Rawat RESUME 2Pradeep Rawat
 
Resume Divyesh B Patel
Resume Divyesh B PatelResume Divyesh B Patel
Resume Divyesh B Patel
DivyeshkumarPatel5
 
Resume ravikumar (4)
Resume ravikumar  (4)Resume ravikumar  (4)
Resume ravikumar (4)
ravikumar warad
 

What's hot (18)

Abuthaheer- Curriculum vitae
Abuthaheer- Curriculum vitaeAbuthaheer- Curriculum vitae
Abuthaheer- Curriculum vitae
 
B,kannan resume
B,kannan resumeB,kannan resume
B,kannan resume
 
HL Lee Resume_2016 (LME)
HL Lee Resume_2016 (LME)HL Lee Resume_2016 (LME)
HL Lee Resume_2016 (LME)
 
Sanchit Dubey CV.
Sanchit Dubey CV.Sanchit Dubey CV.
Sanchit Dubey CV.
 
Resume Giridhar
Resume GiridharResume Giridhar
Resume Giridhar
 
G28 dec8 ASR Resu
G28 dec8 ASR ResuG28 dec8 ASR Resu
G28 dec8 ASR Resu
 
DGM (OPERATIONS) Looking forward to challenging assignments in the field of ...
 DGM (OPERATIONS) Looking forward to challenging assignments in the field of ... DGM (OPERATIONS) Looking forward to challenging assignments in the field of ...
DGM (OPERATIONS) Looking forward to challenging assignments in the field of ...
 
LBG Updated CV-1
LBG Updated CV-1LBG Updated CV-1
LBG Updated CV-1
 
updated resume
updated resumeupdated resume
updated resume
 
New
NewNew
New
 
Bhagvati Mishra_cv 1May2016
Bhagvati Mishra_cv 1May2016Bhagvati Mishra_cv 1May2016
Bhagvati Mishra_cv 1May2016
 
Pradeep Rawat RESUME 2
Pradeep Rawat RESUME 2Pradeep Rawat RESUME 2
Pradeep Rawat RESUME 2
 
CV
CVCV
CV
 
RR CV
RR CVRR CV
RR CV
 
Gaurav J Resume
Gaurav J ResumeGaurav J Resume
Gaurav J Resume
 
Resume Divyesh B Patel
Resume Divyesh B PatelResume Divyesh B Patel
Resume Divyesh B Patel
 
Resume ravikumar (4)
Resume ravikumar  (4)Resume ravikumar  (4)
Resume ravikumar (4)
 
CV
CVCV
CV
 

Similar to Thiru CV 15 02 2016-FRP

Vittal Resume 22.07.2015.2
Vittal Resume 22.07.2015.2Vittal Resume 22.07.2015.2
Vittal Resume 22.07.2015.2Vittal B
 
CV_AVINASH B. WADASKAR-2016-08-23
CV_AVINASH B. WADASKAR-2016-08-23CV_AVINASH B. WADASKAR-2016-08-23
CV_AVINASH B. WADASKAR-2016-08-23Avinash Wadaskar
 
Rakesh burman resume
Rakesh burman resume Rakesh burman resume
Rakesh burman resume Rakesh burman
 
Rsume
RsumeRsume
Sathishbabu
SathishbabuSathishbabu
Sathishbabu
sathish babu
 
JITENDRA P DHOLE RESUME Updated 05042016
JITENDRA P DHOLE  RESUME Updated 05042016JITENDRA P DHOLE  RESUME Updated 05042016
JITENDRA P DHOLE RESUME Updated 05042016JITENDRA DHOLE
 
2015 Ezzat Sammour CV
2015 Ezzat Sammour CV2015 Ezzat Sammour CV
2015 Ezzat Sammour CVEzzat Sammour
 
GNB LATEST
GNB LATESTGNB LATEST
GNB LATEST
Gopinath Bhowmik
 
Prakasha_CM__CV_[2]
Prakasha_CM__CV_[2]Prakasha_CM__CV_[2]
Prakasha_CM__CV_[2]Prakash CM
 
Resume Assistant Manager Industrial Engineering with 8yrs Experience
Resume Assistant Manager Industrial Engineering with 8yrs ExperienceResume Assistant Manager Industrial Engineering with 8yrs Experience
Resume Assistant Manager Industrial Engineering with 8yrs Experience
Shubham Singh
 

Similar to Thiru CV 15 02 2016-FRP (20)

Vittal Resume 22.07.2015.2
Vittal Resume 22.07.2015.2Vittal Resume 22.07.2015.2
Vittal Resume 22.07.2015.2
 
CV_AVINASH B. WADASKAR-2016-08-23
CV_AVINASH B. WADASKAR-2016-08-23CV_AVINASH B. WADASKAR-2016-08-23
CV_AVINASH B. WADASKAR-2016-08-23
 
Rakesh burman resume
Rakesh burman resume Rakesh burman resume
Rakesh burman resume
 
12
1212
12
 
Resume new
Resume newResume new
Resume new
 
Rsume
RsumeRsume
Rsume
 
sandeep sisodia rspl cv
sandeep sisodia rspl cvsandeep sisodia rspl cv
sandeep sisodia rspl cv
 
Sathishbabu
SathishbabuSathishbabu
Sathishbabu
 
JITENDRA P DHOLE RESUME Updated 05042016
JITENDRA P DHOLE  RESUME Updated 05042016JITENDRA P DHOLE  RESUME Updated 05042016
JITENDRA P DHOLE RESUME Updated 05042016
 
2015 Ezzat Sammour CV
2015 Ezzat Sammour CV2015 Ezzat Sammour CV
2015 Ezzat Sammour CV
 
GNB LATEST
GNB LATESTGNB LATEST
GNB LATEST
 
GNB LATEST
GNB LATESTGNB LATEST
GNB LATEST
 
Mr L Mazimba CV
Mr L Mazimba CVMr L Mazimba CV
Mr L Mazimba CV
 
DVA CV
DVA CVDVA CV
DVA CV
 
Prakasha_CM__CV_[2]
Prakasha_CM__CV_[2]Prakasha_CM__CV_[2]
Prakasha_CM__CV_[2]
 
Purush_16Yrs and 8months Exp.
Purush_16Yrs and 8months Exp.Purush_16Yrs and 8months Exp.
Purush_16Yrs and 8months Exp.
 
Resume Assistant Manager Industrial Engineering with 8yrs Experience
Resume Assistant Manager Industrial Engineering with 8yrs ExperienceResume Assistant Manager Industrial Engineering with 8yrs Experience
Resume Assistant Manager Industrial Engineering with 8yrs Experience
 
Abhimanyu Katoch Cv.
Abhimanyu Katoch Cv.Abhimanyu Katoch Cv.
Abhimanyu Katoch Cv.
 
LinggamResume2015M
LinggamResume2015MLinggamResume2015M
LinggamResume2015M
 
PBS Resume
PBS ResumePBS Resume
PBS Resume
 

Thiru CV 15 02 2016-FRP

  • 1. THIRUMURUGAN. B Deputy Manager – Production No: 67, Kotha Street, Tharangampadi Road, Mayiladuthurai.609001 Mobile: 0 99444 89504. Email: murugan_alab@yahoo.co.in Seekingchallengingassignmentsinthe domain of Production,Planning&Process with reputed organization in the field of Wind turbine composites manufacturing.  12+ yearsof industrial experience withB.E - ProductionEngg.AndMBA – ProjectManagement.  Experience inCompositesproduction,PlanningandAssemblyLine.  Experience in handlingProcess improvementprojectin8D & DMAIC (6σ) methodology  A Dynamicand hardworkinggo-getterwithabilitiestoacceptnew challengesandtodeliverthe desiredresults in a given time  Capable of leading a group with an outstanding efficiency  Abilitytoinnovate andadaptto newsituations. Core Competencies: 1.Integrated Management System 10 years 2. FRP - Production (VARIM, Hand layup,RTM) 11 years 3.Production Planning& Control 11 years 4. Assembly Line 11 years 5.Lean management and implementation 5 years 6.Problem solvingmethodology (G8D & 6σ) 8 years 7.Six sigma and Lean projecthandling 5 years 8. Continual Improvement 5 years 9.Expertisein Lean and various analysisTools 5 years Career Objective: Profile Summary : CURRICULUM VITAE
  • 2. INDUTCH COMPOSITES PVT LTD: Worked as a Deputy Manager - Production in Kitting-LM insourcing Unit for the above said organization from Dec 2015 to till date. Job Profile:  Setup the Production line and gradually ramp up the productivity.  Involved in the technical Recruitment and people enhancement through training  Carry the optimized Resource Planning activity  Responsible for Customer relationship management and Customer Audit management (i.e. Co- ordinate in conduct customer Audit and getting the certification from customer)  Carry the Plant Administration and the Accounts Function  Handling the customer complaints and resolving complaints using structured approach - G8D Methodology  Achieving the delivery Commitment through Improve the Production performance  Be change agent and foster team spirit among team members for achievement the cultural of goal Education Time Line : MBA-Project Management B.E- Production Engg. Diploma in Mechanical Engineering AllagappaUniversity (Karaikudi) 74.3 % CGPA, Madurai Kamaraj University (Madurai) 87.7% ,State Board of Technical Education & Training , TN 2007-2009 2000-2003 1998-2000 Career Time Line : Deputy. Manager - Production Asst. Manager - Production Senior Engineer - Production Planning & Control Senior Engineer – Production & PPC Engineer - Production M/s Indutch Composites Pvt. Ltd M/s Indocool Composite Pvt. Ltd M/s. Win Wind Power Energy Ltd M/s Suzlon Energy Ltd M/s colour drive textile Machine Printer Since Dec’15 Jan’14 - Nov'15 Dec’12 –Dec’13 Dec’04 - Dec‘12 Jan’04 - Dec‘04 Work Experience
  • 3.  Responsible for 5S implementation and improve the Safety culture across the Plan.  Preparing the work Instruction and standard operating procedures.  Handling multiple projects and allocate the work in Statergical method to achieve the optimum output. INDO COOL COMPOSITES PVT LTD: Worked as an Assistant manager - Production in Nacelle cover production Unit for the above said organization from Jan 2014 to Nov 2015. Job Profile:  Develop and implement the work standardization procedure by inventorying existing process, assessing gaps and opportunities for improvement in the Assembly Line.  Drive improvement activities to meet/exceed the goals including design to mask 5s, Kaizen, 8D, Lean management and Periodically review of corrective actions.  Drive a problem solving mindset among the team through implementation of good culture.  Set SMART goals, track & drive key performance indicators for entire upstream Production Team.  Motivate, provide on-going technical/management training and career counseling to retain the necessary professional staff required to support the Assembly / Production Functions and also establish optimal staffing levels.  Facilitate the sharing of best practices from within and outside the organization and implement them and drive performance benchmarking.  Implementation of lean management by using Various lean tools such as 5s,Value Stream Mapping , Kanban, Kaizen, TPM, SMED, Bottle Neck Analysis, Heijenka ,Just in Time, Jidoka.  Perform engineering analysis to reduce downtime and outages. WINWIND POWER ENERGY LTD: Worked as a Sr.Engineer - Production-Assembly & Planning in Nacelle and Hub Unit for the above said organization from Dec 2012 to Dec 2013. Job Profile:  Develop process improvements to effectively utilize equipment and materials to maximize production.  Prepare the Production plan & implement the plan on shop floor as per Business plan.  Making of Purchase requisition for BOM, Consumables & Capital Materials.  Prepare the Material coverage, shortage list & coordinate with SCM.  Updating the production data in ERP system.
  • 4.  Closing of shop orders and cost comparison with standard cost.  Material Consumption study & updating the BOM.  Control on operational cost with approved budget. SUZLON ENERGY LTD: Worked as a Sr.Engineer – Production & PPC in Nacelle Cover Assembly Unit for the above said organization from Dec 2004 to Dec 2012. Job Profile:  Taking care of entire Nacelle cover and nose cone assembly functions.  Implement the business plan on production shop floor.  Planning of man power & material requirements for the completion of the production plan.  Organizing daily meeting with all dept regarding daily production & dispatches and ensure 100% adherence to customer schedules.  Monitoring Plan Vs Actual on weekly basis & coordinating with Production & Purchase for execution of Plan.  Generating & analyzing of manpower & Consumables Consumed per unit on monthly basis.  Generating production reports on daily and monthly basis.  Converting the planned order to production orders as per Plan (SAP)  Raising PR for Non BOM Material.  Involves in Production & updating BOM Material master with concern dept.  Work center creation/change  Routing creation/change COLOUR DRIVE TEXTILE MACHINE PRINTERS: Worked as an Engineer - Production for the above said organization from Jan 2004 to Dec2004. Job Profile:  Allocation of Man Power to the respective Production areas.  Effective utilization of available Man power in to required output.  Weekly meeting conducted regarding quality issues with team leaders.  Controlling and maintaining critical process parameters as per Specification.  Maintaining the records of input and output ratio for every batch. Achievements details:  Reduction in inventories through sound and dynamic production planning with business plans.  Fixing of metal & small FRP parts while Moulding instead of hand lamination.  Cost data sheet preparation and project viability report preparation.  Controlling material consumption according to Standard BOM.  Achieved 93% of BOMaccuracy from 82% by consumption study/Audit.
  • 5.  Application Package : MS-Office- XP  Additional Skills : SAP R/3 version, IFS.  Got SIX SIGMA training by corporate trainer (8D&DMAIC)  Activity involved in effective implementation of 5S in production plant.  Knowledge in ISO 9001/internal commercial audits.  Knowledge in Team building, Time management & got trained by corporate trainer.  Got safety training Program in Regional labor institute.  Attended in Lead auditor training in OHSAS 18001  Implementation of lean in production areas.  Implementation& coordinator of SEP at plant level  Co-operation with mould commissioning team for repair/Maintenance works  Date of Birth : 31/05/1980  Father’s Name : Mr. M.Balakrishnan  Nationality : Indian  Sex & Marital status : Male & Married  Languages known : Tamil, English & spoken-Hindi  Present Address : No37, Valliyammai Nagar Koothapakkam-609701, Cuddalore, Tamilnadu. I here by affirm that the information in this document is accurate and true to the best of my knowledge and belief. Place: Date: (B.THIRUMURUGAN) SOFTWARE SKILLS OTHER EXPOSURES PERSONAL DETAILS DECLARATION