the unexpected revolution in underbridge access:
totally new method
for going Down & Under
SAIA Annual Convention, Montreal, 23-26 July 2017 1/18(author: Anna Meldner)
innovative, mobile, edge mounted, stabilized underbridge access platforms
What is currently available for inspection, maintenance and work to the
underside of bridges/structures:
(in a specific situation - lack of access from beneath)
2/18SAIA Annual Convention, Montreal, 23-26 July 2017
WORKING PHASE:
• Suspended counterweight moved off the bridge direction.
• Gravity induced pushing force transferred via bumpers.
Innovative Underbridge Access Platforms
(what is the point? – we will share it with you)
3/18
B
A
B
Bumpers
MOVING PHASE; FREE HANGING PLATFORM:
• Suspended counterweight moved towards the bridge.
• The bumpers do not touch the bridge.
A
Counterweight
The centre of gravity of the
whole suspended platform is
moved away from equilibrium
position to induce “pendulum
effect”
Centre of gravity od the whole
platform falls exactly under the
suspension point
(equilibrium position)
Nobody did it
THIS
way!
new practice and UNCHALLENGED SAFETY standard
SAIA Annual Convention, Montreal, 23-26 July 2017
If the ‘Safe working load’ is
exceeded the ‘fail safe’
position of the platform is to
hang freely from the structure.
It will not tip over and fall.
NO TIPPING OVER!
WORK COMFORT & NO RESTRICTIONS TO TRAFFIC:
• The platform is totally stable and safe
• Normal traffic on the bridge or other works in the same time
Innovative Stabilization Method of Rigid Suspended Platforms
New safety standard for work to the bridge underside!
4/18
D
C
D SAFETY
• It does not fall –even in extreme conditions or overloaded!
C
SAIA Annual Convention, Montreal, 23-26 July 2017
MINIMAL STRIP OF DECK NEEDED FOR MOUNTING:
• The mounting rail close to the deck edge.
Innovative Mobile Edge-Mounted Underbridge Access Platforms
( they are like a mounting trolleys – but without the trolley+ballast on the deck)
5/18
E
G INSTALLATION & WORK WITH NO ACCESS FROM BENEATH
E
Mounting
trolley with
ballast
No interference in
the bridge
structure F
NO INTERFERENCE IN THE BRIDGE STRUCTURE:
• The bumpers only touch the bridge underside
F
G
H LOW COST
SAIA Annual Convention, Montreal, 23-26 July 2017
Bridgetrafficis
unrestricted
Bridgetrafficis
restricted Different types of access for maintenance and work under the bridge
deck:
(specific for the lack of access from beneath)
6/18SAIA Annual Convention, Montreal, 23-26 July 2017
7/18
Scheme of
work
DANGER:
Scheme of
work
DANGER:
none
SAIA Annual Convention, Montreal, 23-26 July 2017
Different types of access for maintenance and work under the bridge
deck:
(specific for the lack of access from beneath)
SCHEME OF WORK – SAFETY ISSUES – MAIN DANGER
Different types of access for maintenance and work under the bridge
deck:
(specific for the lack of access from beneath)
Comparison: cost / self weight (C.W.) / work load (Q)
$$$ $$$ $$$ $$$ $$ $$$ $$$ $$$ $
C.W.
Q
32.00 T
0.30 T
32.00 T
0.30 T
25.00 T
0.20 T
6.00 T
0.10 T
6.00 T
0.10 T
6.00 T
0.25 T
8/18
$$$ $$$ $$$ $$$ $$$ $$$ $ $
C.W.
Q
8.00 T
0.15 T
4.00 T
0.10 T
3.00 T
3.00 T
3.00 T
3.00 T
3.00 T
3.00 T
0.50 T
0.10 T
SAIA Annual Convention, Montreal, 23-26 July 2017
Innovative Method of Stabilizing the Suspended Underbridge Platforms
This method could be applied to the most of the existing types of plants
9/18
Mobile Free Hanging Stabilized by movable suspended counterweight
SAIA Annual Convention, Montreal, 23-26 July 2017
10/18
Innovative, suspended, mobile, edge-mounted underbridge access platform
SSS – EAP2
sample general technical specification
SAIA Annual Convention, Montreal, 23-26 July 2017
11/18
A
B
A
B
STABILIZED WORKING POSITION:
• Suspended counterweight displaced to push the platform against
the bridge.
• Gravity pushing force induced by moving the center of gravity off
the equilibrium position.
• The bumpers transfer the pushing force onto the bridge structure.
Suspended movable counterweight
Bumpers
MOVEMENT PHASE, FREE HANGING PLATFORM:
• Suspended counterweight is placed in the position to swing
the platform away from the bridge structure.
• The bumpers do not touch the bridge.
SAIA Annual Convention, Montreal, 23-26 July 2017
Innovative, suspended, mobile, edge-mounted underbridge access platform
SSS – EAP2
this mode of work could be applied to other rigid suspended structures
Can we use such platforms when doing other phases of refurb or
concrete work?
12/18SAIA Annual Convention, Montreal, 23-26 July 2017
Can we... ?
Yes, we can.
13/18
steel „stools” –to be moved
alongside the rail segments
Platform’s trolley
Segments of the movement
rail are raised above the
reinforcement bars
As you see, there is a possibility of placing the platform movement rail above the reinforcement – if needed
SAIA Annual Convention, Montreal, 23-26 July 2017
Small and simple, movable platform for bridge edge access
SSS – EAP1
(maintenance, repair, inspection, construction)
14/18SAIA Annual Convention, Montreal, 23-26 July 2017
Mobile Free Hanging Stabilized by movable suspended counterweight
Mobile, deck-edge mounted, movable, high load platform
SSS – TR3
this big platform-transporter is able to deliver 2 tons of load (pot bearing) directly
under bridge from the deck
15/18SAIA Annual Convention, Montreal, 23-26 July 2017
Mobile Free Hanging Stabilized by movable suspended counterweight
Innovative, Mobile, Edge-Mounted, Underside Access Platform with
counterweight stabilization
SSS –UAP2 (underside access platform)
The swinging support arms allow the whole platform to pass the pillars without disassembling
16/18SAIA Annual Convention, Montreal, 23-26 July 2017
Mobile Free Hanging Stabilized by movable suspended counterweight
The happy construction works coordinator using SSS-platform.
Would YOU share YOUR views and opinions with us?
17/18SAIA Annual Convention, Montreal, 23-26 July 2017
innovative, mobile, edge mounted, stabilized, underbridge access platforms
(patented worldwide)
18/18(author: Anna Meldner)
Contact:
Ideas-Creative Solutions Ltd.
Address: Woodbury House, Green Lane, Exton, Exeter, Devon EX3 0PW, Great Britain.
Tel: +44 1395 268 796 Mobile: +44 7401 079 805 email: office@sss-scaffolding.com
www.sss-scaffolding.com
SAIA Annual Convention, Montreal, 23-26 July 2017

More Related Content

Similar to The unexpected revolution in the underbridge access

ottobre 2016 - articolo Saipem bollettino SPE
ottobre 2016 - articolo  Saipem bollettino SPEottobre 2016 - articolo  Saipem bollettino SPE
ottobre 2016 - articolo Saipem bollettino SPE
Andrea Intieri
 
Suportes E Catwalks
Suportes E CatwalksSuportes E Catwalks
Suportes E Catwalks
guest91efda
 

Similar to The unexpected revolution in the underbridge access (20)

Design, Simulation & Optimization of Gravity Spiral Roller Conveyer with Auto...
Design, Simulation & Optimization of Gravity Spiral Roller Conveyer with Auto...Design, Simulation & Optimization of Gravity Spiral Roller Conveyer with Auto...
Design, Simulation & Optimization of Gravity Spiral Roller Conveyer with Auto...
 
Vht vb-en
Vht vb-enVht vb-en
Vht vb-en
 
LVT
LVTLVT
LVT
 
MULTI PURPOSE WORKING STAND IN METRO WORKSHOP
MULTI PURPOSE WORKING STAND IN METRO WORKSHOPMULTI PURPOSE WORKING STAND IN METRO WORKSHOP
MULTI PURPOSE WORKING STAND IN METRO WORKSHOP
 
BARGE UNLOADING ON THE VAST EUROPEAN RIVER NETWORK
BARGE UNLOADING ON THE VAST EUROPEAN RIVER NETWORKBARGE UNLOADING ON THE VAST EUROPEAN RIVER NETWORK
BARGE UNLOADING ON THE VAST EUROPEAN RIVER NETWORK
 
5
55
5
 
hydraulic car lift | scissor lift | eot crane | hoist
hydraulic car lift | scissor lift | eot crane | hoisthydraulic car lift | scissor lift | eot crane | hoist
hydraulic car lift | scissor lift | eot crane | hoist
 
ottobre 2016 - articolo Saipem bollettino SPE
ottobre 2016 - articolo  Saipem bollettino SPEottobre 2016 - articolo  Saipem bollettino SPE
ottobre 2016 - articolo Saipem bollettino SPE
 
Lifting equipment - A complete guide
Lifting equipment  - A complete guideLifting equipment  - A complete guide
Lifting equipment - A complete guide
 
Scaffolding2. CO3.ppt
Scaffolding2. CO3.pptScaffolding2. CO3.ppt
Scaffolding2. CO3.ppt
 
Pile Foundation Associated to Metro Rail Hyderabad
Pile Foundation Associated to Metro Rail HyderabadPile Foundation Associated to Metro Rail Hyderabad
Pile Foundation Associated to Metro Rail Hyderabad
 
IRJET- Comparative Study of Usage of Outrigger and B-ELT Truss System for Hig...
IRJET- Comparative Study of Usage of Outrigger and B-ELT Truss System for Hig...IRJET- Comparative Study of Usage of Outrigger and B-ELT Truss System for Hig...
IRJET- Comparative Study of Usage of Outrigger and B-ELT Truss System for Hig...
 
ANALYTICAL STUDY OF STEEL ARCH BRIDGE
ANALYTICAL STUDY OF STEEL ARCH BRIDGEANALYTICAL STUDY OF STEEL ARCH BRIDGE
ANALYTICAL STUDY OF STEEL ARCH BRIDGE
 
Parametric Comparison of Rectangular and Trapezoidal Box Girder Bridge Deck S...
Parametric Comparison of Rectangular and Trapezoidal Box Girder Bridge Deck S...Parametric Comparison of Rectangular and Trapezoidal Box Girder Bridge Deck S...
Parametric Comparison of Rectangular and Trapezoidal Box Girder Bridge Deck S...
 
Suportes E Catwalks
Suportes E CatwalksSuportes E Catwalks
Suportes E Catwalks
 
Charis Ntontoros (Dodoros) presentation at ANSYS Convergence Conference 2016
Charis Ntontoros (Dodoros) presentation at ANSYS Convergence Conference 2016Charis Ntontoros (Dodoros) presentation at ANSYS Convergence Conference 2016
Charis Ntontoros (Dodoros) presentation at ANSYS Convergence Conference 2016
 
Reverse stacking of containers
Reverse stacking of containersReverse stacking of containers
Reverse stacking of containers
 
ConcreteMasonry.ppt
ConcreteMasonry.pptConcreteMasonry.ppt
ConcreteMasonry.ppt
 
ConcreteMasonry.ppt
ConcreteMasonry.pptConcreteMasonry.ppt
ConcreteMasonry.ppt
 
Scs heavy brochure
Scs heavy brochureScs heavy brochure
Scs heavy brochure
 

Recently uploaded

Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Kandungan 087776558899
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
MsecMca
 
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
dharasingh5698
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
dharasingh5698
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
Neometrix_Engineering_Pvt_Ltd
 

Recently uploaded (20)

Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak HamilCara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
Cara Menggugurkan Sperma Yang Masuk Rahim Biyar Tidak Hamil
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoorTop Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
Top Rated Call Girls In chittoor 📱 {7001035870} VIP Escorts chittoor
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Integrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - NeometrixIntegrated Test Rig For HTFE-25 - Neometrix
Integrated Test Rig For HTFE-25 - Neometrix
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...Bhosari ( Call Girls ) Pune  6297143586  Hot Model With Sexy Bhabi Ready For ...
Bhosari ( Call Girls ) Pune 6297143586 Hot Model With Sexy Bhabi Ready For ...
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
A Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna MunicipalityA Study of Urban Area Plan for Pabna Municipality
A Study of Urban Area Plan for Pabna Municipality
 
Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024Water Industry Process Automation & Control Monthly - April 2024
Water Industry Process Automation & Control Monthly - April 2024
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
Block diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.pptBlock diagram reduction techniques in control systems.ppt
Block diagram reduction techniques in control systems.ppt
 
Design For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the startDesign For Accessibility: Getting it right from the start
Design For Accessibility: Getting it right from the start
 
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
Navigating Complexity: The Role of Trusted Partners and VIAS3D in Dassault Sy...
 

The unexpected revolution in the underbridge access

  • 1. the unexpected revolution in underbridge access: totally new method for going Down & Under SAIA Annual Convention, Montreal, 23-26 July 2017 1/18(author: Anna Meldner) innovative, mobile, edge mounted, stabilized underbridge access platforms
  • 2. What is currently available for inspection, maintenance and work to the underside of bridges/structures: (in a specific situation - lack of access from beneath) 2/18SAIA Annual Convention, Montreal, 23-26 July 2017
  • 3. WORKING PHASE: • Suspended counterweight moved off the bridge direction. • Gravity induced pushing force transferred via bumpers. Innovative Underbridge Access Platforms (what is the point? – we will share it with you) 3/18 B A B Bumpers MOVING PHASE; FREE HANGING PLATFORM: • Suspended counterweight moved towards the bridge. • The bumpers do not touch the bridge. A Counterweight The centre of gravity of the whole suspended platform is moved away from equilibrium position to induce “pendulum effect” Centre of gravity od the whole platform falls exactly under the suspension point (equilibrium position) Nobody did it THIS way! new practice and UNCHALLENGED SAFETY standard SAIA Annual Convention, Montreal, 23-26 July 2017
  • 4. If the ‘Safe working load’ is exceeded the ‘fail safe’ position of the platform is to hang freely from the structure. It will not tip over and fall. NO TIPPING OVER! WORK COMFORT & NO RESTRICTIONS TO TRAFFIC: • The platform is totally stable and safe • Normal traffic on the bridge or other works in the same time Innovative Stabilization Method of Rigid Suspended Platforms New safety standard for work to the bridge underside! 4/18 D C D SAFETY • It does not fall –even in extreme conditions or overloaded! C SAIA Annual Convention, Montreal, 23-26 July 2017
  • 5. MINIMAL STRIP OF DECK NEEDED FOR MOUNTING: • The mounting rail close to the deck edge. Innovative Mobile Edge-Mounted Underbridge Access Platforms ( they are like a mounting trolleys – but without the trolley+ballast on the deck) 5/18 E G INSTALLATION & WORK WITH NO ACCESS FROM BENEATH E Mounting trolley with ballast No interference in the bridge structure F NO INTERFERENCE IN THE BRIDGE STRUCTURE: • The bumpers only touch the bridge underside F G H LOW COST SAIA Annual Convention, Montreal, 23-26 July 2017
  • 6. Bridgetrafficis unrestricted Bridgetrafficis restricted Different types of access for maintenance and work under the bridge deck: (specific for the lack of access from beneath) 6/18SAIA Annual Convention, Montreal, 23-26 July 2017
  • 7. 7/18 Scheme of work DANGER: Scheme of work DANGER: none SAIA Annual Convention, Montreal, 23-26 July 2017 Different types of access for maintenance and work under the bridge deck: (specific for the lack of access from beneath) SCHEME OF WORK – SAFETY ISSUES – MAIN DANGER
  • 8. Different types of access for maintenance and work under the bridge deck: (specific for the lack of access from beneath) Comparison: cost / self weight (C.W.) / work load (Q) $$$ $$$ $$$ $$$ $$ $$$ $$$ $$$ $ C.W. Q 32.00 T 0.30 T 32.00 T 0.30 T 25.00 T 0.20 T 6.00 T 0.10 T 6.00 T 0.10 T 6.00 T 0.25 T 8/18 $$$ $$$ $$$ $$$ $$$ $$$ $ $ C.W. Q 8.00 T 0.15 T 4.00 T 0.10 T 3.00 T 3.00 T 3.00 T 3.00 T 3.00 T 3.00 T 0.50 T 0.10 T SAIA Annual Convention, Montreal, 23-26 July 2017
  • 9. Innovative Method of Stabilizing the Suspended Underbridge Platforms This method could be applied to the most of the existing types of plants 9/18 Mobile Free Hanging Stabilized by movable suspended counterweight SAIA Annual Convention, Montreal, 23-26 July 2017
  • 10. 10/18 Innovative, suspended, mobile, edge-mounted underbridge access platform SSS – EAP2 sample general technical specification SAIA Annual Convention, Montreal, 23-26 July 2017
  • 11. 11/18 A B A B STABILIZED WORKING POSITION: • Suspended counterweight displaced to push the platform against the bridge. • Gravity pushing force induced by moving the center of gravity off the equilibrium position. • The bumpers transfer the pushing force onto the bridge structure. Suspended movable counterweight Bumpers MOVEMENT PHASE, FREE HANGING PLATFORM: • Suspended counterweight is placed in the position to swing the platform away from the bridge structure. • The bumpers do not touch the bridge. SAIA Annual Convention, Montreal, 23-26 July 2017 Innovative, suspended, mobile, edge-mounted underbridge access platform SSS – EAP2 this mode of work could be applied to other rigid suspended structures
  • 12. Can we use such platforms when doing other phases of refurb or concrete work? 12/18SAIA Annual Convention, Montreal, 23-26 July 2017
  • 13. Can we... ? Yes, we can. 13/18 steel „stools” –to be moved alongside the rail segments Platform’s trolley Segments of the movement rail are raised above the reinforcement bars As you see, there is a possibility of placing the platform movement rail above the reinforcement – if needed SAIA Annual Convention, Montreal, 23-26 July 2017
  • 14. Small and simple, movable platform for bridge edge access SSS – EAP1 (maintenance, repair, inspection, construction) 14/18SAIA Annual Convention, Montreal, 23-26 July 2017 Mobile Free Hanging Stabilized by movable suspended counterweight
  • 15. Mobile, deck-edge mounted, movable, high load platform SSS – TR3 this big platform-transporter is able to deliver 2 tons of load (pot bearing) directly under bridge from the deck 15/18SAIA Annual Convention, Montreal, 23-26 July 2017 Mobile Free Hanging Stabilized by movable suspended counterweight
  • 16. Innovative, Mobile, Edge-Mounted, Underside Access Platform with counterweight stabilization SSS –UAP2 (underside access platform) The swinging support arms allow the whole platform to pass the pillars without disassembling 16/18SAIA Annual Convention, Montreal, 23-26 July 2017 Mobile Free Hanging Stabilized by movable suspended counterweight
  • 17. The happy construction works coordinator using SSS-platform. Would YOU share YOUR views and opinions with us? 17/18SAIA Annual Convention, Montreal, 23-26 July 2017
  • 18. innovative, mobile, edge mounted, stabilized, underbridge access platforms (patented worldwide) 18/18(author: Anna Meldner) Contact: Ideas-Creative Solutions Ltd. Address: Woodbury House, Green Lane, Exton, Exeter, Devon EX3 0PW, Great Britain. Tel: +44 1395 268 796 Mobile: +44 7401 079 805 email: office@sss-scaffolding.com www.sss-scaffolding.com SAIA Annual Convention, Montreal, 23-26 July 2017