What is Cloud Computing? – Learning Objectives



1.  What is It and why has it suddenly become popular?

2.  Why should our company move to the cloud?

3.  As a financial or IT professional, why should I care about it?


4.  What should I fear about the cloud and what are my risks?

5.  What technical things do I need to know about it?

6.  How can I add value to my organization using the cloud?

7.  How do I use this as another tool in my tool box?

                                                                      2
Poll Question 




                      Poll Question 1



            Do you think cloud computing is
           all hype about another technology
               fad OR really here to stay?



                                               3
Table of Contents … 


 What Is Cloud Computing? – Basic Primer, Jargon and Technical details    7


 The Myths (and Potential Downsides) of Cloud Computing                  25 


 The Magic (and Potential Benefits) of Cloud Computing                   29 


 The Implications of the Cloud                                           35 


 How the Cloud is Revolutionizing the World of the Finance Executive     39 


 How You can Add Value to Your Organization Using the Cloud              42 


 Examples of Cloud Computing in Daily Life                               47 


 Conclusion and Key Takeaways                                            51 




© 2011 Predictive Dashboards LLC

  4
Poll Question 




                                        Poll Question 2



                          Do you care if your personal health
                          information is being stored at a on-
                             site premise or in the clouds?



© 2011 Predictive Dashboards LLC   5
Poll Question 




                       Poll Question 3



           Do you care if your organization’s
            information (accounts receivable)
           is being stored at a on-site premise
                     or in the clouds?


                                                  6
What is Cloud Computing? – Basic Primer, Jargon and 

                Technical Details





                         7
What is “the Cloud”? 


Ø  The term “cloud” is used as a metaphor for the Internet representing infrastructure

Ø  Originally, a cloud drawing was used to depict a telephone network; Currently it is
used to depict the infrastructure as the Internet on computer network diagrams




                                                                                          8
What is Cloud Computing? - Primer 


                       “Cloud computing is the delivery of computing 

                         as a service rather than a product, whereby

                        shared resources, software, and information 

                        are provided to computers and other devices

                         as a utility (like the electricity grid) over a 

                              network (typically the Internet).”



                      “A standardized IT capability (services, software, 

                           or infrastructure) delivered via Internet

                       technologies in a pay-per-use, self-service way”





                                                                         9
What is Cloud Computing? - Primer 


Ø  Cloud Computing (“CC”) is a broad term for delivering hosted services
    over the Internet by service providers

Ø  Cloud computing has a few unique characteristics which separates it
    from traditional hosting:

    Ø  Services are sold on a unit basis (e.g. per minute/hour) – similar to
        buying services from a utility (pay for what you use)

    Ø  Services can be purchased on an on-demand or as-needed basis and
        scalable to adjust to customer needs

    Ø  Services are offered and fully managed by a third-party



                                                                                10
What is Cloud Computing? – A Snapshot of Configurations





                                                           11
What is Cloud Computing? - Primer 


Ø  Cloud Computing has 3 main categories of service delivery:

   Ø  Software-as-a-Services (SaaS)

   Ø  Platform-as-a-Service (PaaS)

   Ø  Infrastructure-as-a-Service (IaaS)




                                                                 12
What is Cloud Computing? - SaaS

     Software-as-a-Service: A software (service) delivery model
     in which business applications and their data are hosted by a
      Cloud Provider in a cloud and accessed by users through a
                     thin client (web browser).
              Examples: Google Mail or Salesforce.com





                                                                     13
Example of SaaS – Salesforce.com





                                    14
What is Cloud Computing? - PaaS


      Platform-as-a-Service: A service delivery model in which a
     Cloud Provider allows customers to rent virtualized servers and
         associated services for running existing applications or
                    developing and testing new ones.
              Examples: Google Apps Engine or Force.com





                                                                       15
Example of PaaS – Google Apps Engine





                                        16
What is Cloud Computing? - IaaS

      Infrastructure-as-a-Service: A provisioning model in which 

        Cloud Provider supplies all of the infrastructure including, 

       offering the customer the ability to deploy and run software, 

      including OSs and applications. The Cloud Provider owns the

      equipment and is responsible for maintaining and operating it. 

              Examples: Rackspace, Amazon Web Services





                                                                         17
Example of IaaS – Amazon Web Services





                                         18
Why has the Cloud suddenly become so popular?

                          Outsourcing
        Robust Apps &
        User Interfaces                   Services-based
                                            Economy
                          Critical Mass
     Shrinking IT                          Shared Services
       Budgets


                                                      Distributed
   Weak Economy                                       Computing

             Cheap
           Pervasive         Increased            Rising
           Broadband        Computing         Licensing Costs
                              Speeds
                                                                    19
What is Cloud Computing? – Types of Clouds

Ø  Cloud Computing has only one Internet but three deployment
    methods:

   Ø  Private – “Single tenant” – it is cloud infrastructure operated solely for a single
       organization (i.e. you), whether managed internally or by a third-party and
       hosted internally or externally. (e.g. Your Company Cloud)

   Ø  Public – “Many tenant” – An offering from a service provider to many clients
       who share the cloud processing power concurrently. The service provider’s
       public cloud clients share applications, processing power and data storage
       space communally. Client data are commingled, but segregation is provided
       through the use of metatags

   Ø  Hybrid – “Many tenant” is cloud infrastructure composed of two or more
       clouds, private or public, that remain unique entities but are bound together by
       standardized technology that enables data and application portability

                                                                                         20
What is Cloud Computing? – Types of Clouds

Ø  Other Cloud Computing deployment methods:

   Ø  Virtual Private Cloud – is a private cloud existing within a shared or
       public cloud (e.g. Amazon Web Services)

   Ø  Community Clouds – A private-public cloud with users having a common
       connection or affiliation, such as a trade association, the same industry or
       a common locality. The community cloud business model allows a CSP to
       provide cloud tools and applications specific to the needs of the
       community. When the community is in a PaaS cloud, the SOA applets can
       be specific to communal requirements, e.g., business-process-specific,
       industry-specific. (e.g. )

   Ø  Variety of Other Cloud Solutions in progress




                                                                                      21
What is Cloud Computing? – Attributes Defining Clouds




           Source: ISACA – IT Control Objectives for Cloud Computing

                                                                       22
What is Cloud Computing? – A Visual of a Private Cloud




                                 Data Center

  Internet
                                  Private Cloud




   Your Enterprise
                                                         23
Quick Comparison between Private vs. Public Clouds


                 Public Cloud                                  Private Cloud




                Public Cloud                                      Private Cloud


 •  Hosted at Service Provider Site                •  Hosted at an Enterprise or Service
                                                   Provider Site
 •  Supports Multiple Customers
                                                   •  Supports only one Customer
 •  Often utilizes shared infrastructure
                                                   •  Does not utilize shared infrastructure
 •  Supports connectivity over the Internet
                                                   •  Supports connectivity over private
 •  Suited for information that is not sensitive
                                                   network or the Internet
 •  Can be cheaper than private cloud
                                                   •  Suited for information that is sensitive
                                                   and demands high security




                                                                                                 24
The Myths (and the Potential Downsides) of Cloud Computing




                             25
The Myths (and Potential Downsides) of Cloud Computing
Are the following Myths or Truth?

1.  CC can t handle my environment s security & privacy requirements

2.  Migrating our work environment to the Cloud is just too hard

3.  CC is too expensive and or potential savings is too good to be true

4.  CC is an IT project & has no real business value

5.  CC does not integrate well with on-premise or other clouds solutions

All of these concerns have some level of validity but …

      Without doing your home work, the myth becomes reality!
                                                                          26
Debunking Myth 1
 Cloud Computing can t handle my security and privacy requirements

Facts
Ø  50% or more of traditional security breaches are perpetrated by internal personnel

Ø  Not all cloud solutions are equally secure or insecure (reason for hybrids)

Ø  Some security risks are very real and some are perceived


Overcoming the Myths – Your responsibility
Ø  Perform a security analysis

Ø  Use encryption technologies

Ø  Use federated identity management systems
                                                                                         27
Debunking Myth 2
      Migrating our work environment to the Cloud is just too hard

Facts
Ø  The decision regarding which applications, infrastructure and data to migrate will
be one of the biggest technological hurdles not to mention latency and interoperability

Ø  Not all cloud provider do migration well, migration is still your responsibility

Ø  Integration points are opportunities for failure – missing links (UI, data, functional)


Overcoming the Myths – Your responsibility
Ø  There are many ways to migrate: virtual machines, web-interfaces or porting to a
cloud platform but figure out how you will do this and by whom

Ø  Have your own migration plan and very solid back up plan
                                                                                              28
The Magic and the Benefits of Cloud Computing




                      29
The Magic and Benefits of Cloud Computing

Are the following Magic or just Illusions?

1.  Cloud computing will provide dramatic savings in IT costs

2.  Our organization will be able to execute strategies faster

3.  Cloud computing will free up internal resources for strategic tasks

4.  Cloud Computing will enhance performance and stability

5.  Cloud computing will enhance our flexibility and usage of resources




                                                                          30
The Magic of Cloud Computing – Lucky Rabbit's Foot
        Cloud Computing will provide dramatic savings in IT costs

Facts
Ø  Cost Savings are as good as your projected usage. Minimum costs and hidden
charges need to be considered.

Ø  Need to consider intangible costs of moving infrastructure and people s time

Ø  Need to consider how you are going to save on what IT costs (hardware, software,
etc.)

Validating the Magic – Your responsibility
Ø  Due diligence through adequate planning and up front discussions with cloud
provider is necessary to realize benefits.

Ø  Develop a road map of workloads to be migrated and cost out the savings


                                                                                       31
Accounting for IT Investments using Cloud Economics




       Source: Forrester Research, Inc. – Talking to your CFO About Cloud Computing


                                                                                      32
Accounting for IT Investments using Cloud Economics




        Source: Forrester Research, Inc. – Talking to your CFO About Cloud Computing

                                                                                       33
Accounting for IT Investments using Cloud Economics




        Source: Forrester Research, Inc. – Talking to your CFO About Cloud Computing

                                                                                       34
The Implications of the Cloud




              35
Poll Question



                      Poll Question 4



           Do you think the average business
              person cares if his business
             information is in the clouds?



                                               36
The Implications of Cloud Computing – Who Cares?


              Yeah!                I m Concerned
                                                         Whatever!?!




  Some CIOs        Some CIOs              General Business Person
      And              And                          Or
   IT Geeks       Corp Attorneys            Hip 20 Something


               Conversations @ Work

                                                                       37
The Implications of the Cloud
Ø  To Cloud or Not to Cloud – Dealing with fear or lagging behind the curve

Ø  Organization structure and legal boundaries

Ø  Strategy and competitive advantage considerations

Ø  Talent and People aspects

Ø  Cost considerations including Service Level Agreements SLAs,

Ø  Trusted vendors? – Standards to fall back on?

Ø  Security, risks and business continuity considerations (What-if there is a breach?)

Ø  Work-Life Balance considerations – Being On



                                                                                          38
How the Cloud is Revolutionizing the World of the
               Finance Executive




                        39
CC is Revolutionizing the World of the Finance Executive
CC impacts us in a variety of ways …

Ø  Decision making about how the organization delivers its products and services to
internal customers will change

Ø  The focus of Auditing and Accounting will move to the digital era

Ø  Business Models will be in flux especially in the area of variable and overhead costs

Ø  Risk & Reputation Management will take precedence in the short-term

Ø  Talent & Knowledge – The CC Department?

Ø  Success Metrics – Its working! Really?

Ø  Outsource or Not Outsource – Impacts on you and your customers

Ø  Work-Life Balance – Being On 24/7
                                                                                        40
CC is Revolutionizing the World of the Finance Executive
Ø  Accounting for IT investments will be dramatically simplified

Ø  The Financial Executive will shift focus to a monitoring and benchmarking focus

Ø  The finance function will be scrutinizing the value of internal IT resources and costs
versus outsourcing IT activities from the cloud.

Ø  The finance team will be responsible for negotiating subscription fees instead of
license fees

Ø  Cloud providers will have to justify and quantify their value in terms of security,
compliance, service levels, compared to the marketplace

Ø  Finance department will be monitoring: subscription fees/per-user fees, resource
usage and direct costs



                                                                                          41
How You can Add Value to your Organization




                    42
How You can Add Value to your Organization

                         Educational Perspective
Ø  Educate your personnel of what the cloud is – Host a “Lunch & Learn” for your
team to understand the technical, administrative, value-adds/detracts details

Ø  Research specific cloud offerings specifically to your industry or niche –
Remember Caveat emptor – Buyer beware – Not all cloud services are equal

Ø  Understand the contractual arrangements i.e. Service Level Agreement ( SLA )
and identify the gotchas for people involved with purchasing the service

Ø  Understand how your IT audit function will audit the Cloud – Review the latest
requirements from ISACA

Ø  If considering cloud adoption, understand and develop a road map for
implementation and migration of applications used in your function


                                                                                     43
How You can Add Value to your Organization

              Administrative/Contractual Perspective
Ø  Perform a Risk and Cost/Benefit Analyses on Cloud Computing for your
situation

Ø  Understand the contractual arrangements i.e. Service Level Agreement ( SLA )
and identify the gotchas for people involved with purchasing the service

Ø  Assist in the development of the project plan to migrate to cloud if you own the
financial applications

Ø  Improve your budget - Stop paying for services that you may use for free

Ø  Find out what your recourse would be if cloud computing isn t for you – i.e.
what things do you own (e.g. data, applications, etc.) and how to move off from that
cloud provider


                                                                                       44
How You can Add Value to your Organization

               Security and Technological Perspective
Ø  Review and update your IT governance and IT change management processes
with new cloud policies and practices into your Sox and compliance requirements

Ø  Perform and hire capable professionals to advise, develop and test cloud security
regardless of the delivery model you utilized

Ø  Incorporate potential cloud failures into your business continuity and disaster
recovery planning requirements

Ø  Keep abreast of changes through governance committees including cloud
computing issues and identify a resource for providing regular briefings

Ø  Attend security and technological conferences, webinars and user groups to
ensure your business and IT personnel are competent in this domain

Ø  Get familiar about costs to maintain an appropriate level of security – see it as an
investment not an expense
                                                                                           45
How You can Add Value to your Organization

       Business Process and Internal Controls Perspective
Ø  Understand how your business processes will change and affect financial reporting

Ø  Understand how your IT audit function will audit the Cloud – Review the latest
requirements from ISACA

Ø  Identify and incorporate into your Enterprise Risk Assessments the new risks
resulting from using cloud computing

Ø  Discuss with your Audit Firm how changes will affect your audit




                                                                                        46
Examples of Cloud Computing in Daily Life




                    47
Case Study: The New Start-Up (Cloud Computing Start-Up)

Ø  A next-generation start-up that nearly used all cloud services to begin its operations




48
Examples of Cloud Computing that we may be familiar with




                                                           49
Case Study: Business Intelligence (BI) in the Clouds




                                                       50
Case Study: Business Intelligence (BI) in the Clouds

Challenges Predictive Dashboards had to Overcome:
Ø  Choosing an infrastructure provider was challenging
Ø  Understanding the jargon, technologies and the varied offerings was overwhelming
Ø  Defining the minimum and appropriate standards was vexing

Actions Taken:
Ø  Talked to as many providers and other SaaS-based Cloud Providers to make sense of
and compared the offerings and figured out the Do’s and Don’ts
Ø  Punted on the standards issue and felt we could wait a while but ensured ourselves
the minimum amount of security
Results:
Ø  Learned not only the technology issues and but also the business issues of the cloud
Ø  Learned that technology constantly evolves and you’re always in development mode
                                                                                           51
Conclusion & Key Takeaways




            52
Conclusion & Key Takeaways

              Conclusion: Cloud computing has the potential for
              revolutionizing the ways businesses and individuals operate.
              However, be a skeptic! At its core, CC is another outsourcing
              mechanism and must be monitored. Don t forget, it’s still your
              responsibility.

              Takeaway: Cloud Computing has many positives but the
              learning curve can be steep both technologically and
              administratively. The benefits can far outweigh risks. There
              are huge opportunities and potential for financial
              professionals to add value to this area and to your
              organization
              Takeaway: Cloud computing is not without risk. Do your due
              diligence. Unforeseen disasters may await you including
              security breaches, cost overruns, technological challenges,
              privacy issues, etc.

                                                                             53
Poll Question



                     Poll Question 5



          Now, do you think cloud computing
                  is Myth or Magic?




                                              54
Sources, References, and Trademarks
Ø  Forrester Research, Inc. – Talking to your CFO About Cloud Computing

Ø  ISACA – IT Control Objectives

Ø  The Lego Minifigure is a trademark of The Lego Group




                                                                           55
The Myths and Magic of Cloud Computing and
    How it is Revolutionizing the World

         Jay Roy, Chief Strategy Officer

          www.PredictiveDashboards.com
         Jay.Roy@PredictiveDashboards.com
                 T: 214-621-7612



                         56

The Myths And Magic Of Cloud Computing

  • 1.
    The Myths andMagic of Cloud Computing and How it is Revolutionizing the World Jay Roy Chief Executive Officer “Practical Intelligence for Ensuring Profitability” IMA DFW - Fall 2011 | Dallas, TX
  • 2.
    Cloud Computing Confusionat its Best… vs. 1
  • 3.
    What is CloudComputing? – Learning Objectives 1.  What is It and why has it suddenly become popular? 2.  Why should our company move to the cloud? 3.  As a financial or IT professional, why should I care about it? 4.  What should I fear about the cloud and what are my risks? 5.  What technical things do I need to know about it? 6.  How can I add value to my organization using the cloud? 7.  How do I use this as another tool in my tool box? 2
  • 4.
    Poll Question Poll Question 1 Do you think cloud computing is all hype about another technology fad OR really here to stay? 3
  • 5.
    Table of Contents… What Is Cloud Computing? – Basic Primer, Jargon and Technical details 7 The Myths (and Potential Downsides) of Cloud Computing 25 The Magic (and Potential Benefits) of Cloud Computing 29 The Implications of the Cloud 35 How the Cloud is Revolutionizing the World of the Finance Executive 39 How You can Add Value to Your Organization Using the Cloud 42 Examples of Cloud Computing in Daily Life 47 Conclusion and Key Takeaways 51 © 2011 Predictive Dashboards LLC 4
  • 6.
    Poll Question Poll Question 2 Do you care if your personal health information is being stored at a on- site premise or in the clouds? © 2011 Predictive Dashboards LLC 5
  • 7.
    Poll Question Poll Question 3 Do you care if your organization’s information (accounts receivable) is being stored at a on-site premise or in the clouds? 6
  • 8.
    What is CloudComputing? – Basic Primer, Jargon and Technical Details 7
  • 9.
    What is “theCloud”? Ø  The term “cloud” is used as a metaphor for the Internet representing infrastructure Ø  Originally, a cloud drawing was used to depict a telephone network; Currently it is used to depict the infrastructure as the Internet on computer network diagrams 8
  • 10.
    What is CloudComputing? - Primer “Cloud computing is the delivery of computing as a service rather than a product, whereby shared resources, software, and information are provided to computers and other devices as a utility (like the electricity grid) over a network (typically the Internet).” “A standardized IT capability (services, software, or infrastructure) delivered via Internet technologies in a pay-per-use, self-service way” 9
  • 11.
    What is CloudComputing? - Primer Ø  Cloud Computing (“CC”) is a broad term for delivering hosted services over the Internet by service providers Ø  Cloud computing has a few unique characteristics which separates it from traditional hosting: Ø  Services are sold on a unit basis (e.g. per minute/hour) – similar to buying services from a utility (pay for what you use) Ø  Services can be purchased on an on-demand or as-needed basis and scalable to adjust to customer needs Ø  Services are offered and fully managed by a third-party 10
  • 12.
    What is CloudComputing? – A Snapshot of Configurations 11
  • 13.
    What is CloudComputing? - Primer Ø  Cloud Computing has 3 main categories of service delivery: Ø  Software-as-a-Services (SaaS) Ø  Platform-as-a-Service (PaaS) Ø  Infrastructure-as-a-Service (IaaS) 12
  • 14.
    What is CloudComputing? - SaaS Software-as-a-Service: A software (service) delivery model in which business applications and their data are hosted by a Cloud Provider in a cloud and accessed by users through a thin client (web browser). Examples: Google Mail or Salesforce.com 13
  • 15.
    Example of SaaS– Salesforce.com 14
  • 16.
    What is CloudComputing? - PaaS Platform-as-a-Service: A service delivery model in which a Cloud Provider allows customers to rent virtualized servers and associated services for running existing applications or developing and testing new ones. Examples: Google Apps Engine or Force.com 15
  • 17.
    Example of PaaS– Google Apps Engine 16
  • 18.
    What is CloudComputing? - IaaS Infrastructure-as-a-Service: A provisioning model in which Cloud Provider supplies all of the infrastructure including, offering the customer the ability to deploy and run software, including OSs and applications. The Cloud Provider owns the equipment and is responsible for maintaining and operating it. Examples: Rackspace, Amazon Web Services 17
  • 19.
    Example of IaaS– Amazon Web Services 18
  • 20.
    Why has theCloud suddenly become so popular? Outsourcing Robust Apps & User Interfaces Services-based Economy Critical Mass Shrinking IT Shared Services Budgets Distributed Weak Economy Computing Cheap Pervasive Increased Rising Broadband Computing Licensing Costs Speeds 19
  • 21.
    What is CloudComputing? – Types of Clouds Ø  Cloud Computing has only one Internet but three deployment methods: Ø  Private – “Single tenant” – it is cloud infrastructure operated solely for a single organization (i.e. you), whether managed internally or by a third-party and hosted internally or externally. (e.g. Your Company Cloud) Ø  Public – “Many tenant” – An offering from a service provider to many clients who share the cloud processing power concurrently. The service provider’s public cloud clients share applications, processing power and data storage space communally. Client data are commingled, but segregation is provided through the use of metatags Ø  Hybrid – “Many tenant” is cloud infrastructure composed of two or more clouds, private or public, that remain unique entities but are bound together by standardized technology that enables data and application portability 20
  • 22.
    What is CloudComputing? – Types of Clouds Ø  Other Cloud Computing deployment methods: Ø  Virtual Private Cloud – is a private cloud existing within a shared or public cloud (e.g. Amazon Web Services) Ø  Community Clouds – A private-public cloud with users having a common connection or affiliation, such as a trade association, the same industry or a common locality. The community cloud business model allows a CSP to provide cloud tools and applications specific to the needs of the community. When the community is in a PaaS cloud, the SOA applets can be specific to communal requirements, e.g., business-process-specific, industry-specific. (e.g. ) Ø  Variety of Other Cloud Solutions in progress 21
  • 23.
    What is CloudComputing? – Attributes Defining Clouds Source: ISACA – IT Control Objectives for Cloud Computing 22
  • 24.
    What is CloudComputing? – A Visual of a Private Cloud Data Center Internet Private Cloud Your Enterprise 23
  • 25.
    Quick Comparison betweenPrivate vs. Public Clouds Public Cloud Private Cloud Public Cloud Private Cloud •  Hosted at Service Provider Site •  Hosted at an Enterprise or Service Provider Site •  Supports Multiple Customers •  Supports only one Customer •  Often utilizes shared infrastructure •  Does not utilize shared infrastructure •  Supports connectivity over the Internet •  Supports connectivity over private •  Suited for information that is not sensitive network or the Internet •  Can be cheaper than private cloud •  Suited for information that is sensitive and demands high security 24
  • 26.
    The Myths (andthe Potential Downsides) of Cloud Computing 25
  • 27.
    The Myths (andPotential Downsides) of Cloud Computing Are the following Myths or Truth? 1.  CC can t handle my environment s security & privacy requirements 2.  Migrating our work environment to the Cloud is just too hard 3.  CC is too expensive and or potential savings is too good to be true 4.  CC is an IT project & has no real business value 5.  CC does not integrate well with on-premise or other clouds solutions All of these concerns have some level of validity but … Without doing your home work, the myth becomes reality! 26
  • 28.
    Debunking Myth 1 Cloud Computing can t handle my security and privacy requirements Facts Ø  50% or more of traditional security breaches are perpetrated by internal personnel Ø  Not all cloud solutions are equally secure or insecure (reason for hybrids) Ø  Some security risks are very real and some are perceived Overcoming the Myths – Your responsibility Ø  Perform a security analysis Ø  Use encryption technologies Ø  Use federated identity management systems 27
  • 29.
    Debunking Myth 2 Migrating our work environment to the Cloud is just too hard Facts Ø  The decision regarding which applications, infrastructure and data to migrate will be one of the biggest technological hurdles not to mention latency and interoperability Ø  Not all cloud provider do migration well, migration is still your responsibility Ø  Integration points are opportunities for failure – missing links (UI, data, functional) Overcoming the Myths – Your responsibility Ø  There are many ways to migrate: virtual machines, web-interfaces or porting to a cloud platform but figure out how you will do this and by whom Ø  Have your own migration plan and very solid back up plan 28
  • 30.
    The Magic andthe Benefits of Cloud Computing 29
  • 31.
    The Magic andBenefits of Cloud Computing Are the following Magic or just Illusions? 1.  Cloud computing will provide dramatic savings in IT costs 2.  Our organization will be able to execute strategies faster 3.  Cloud computing will free up internal resources for strategic tasks 4.  Cloud Computing will enhance performance and stability 5.  Cloud computing will enhance our flexibility and usage of resources 30
  • 32.
    The Magic ofCloud Computing – Lucky Rabbit's Foot Cloud Computing will provide dramatic savings in IT costs Facts Ø  Cost Savings are as good as your projected usage. Minimum costs and hidden charges need to be considered. Ø  Need to consider intangible costs of moving infrastructure and people s time Ø  Need to consider how you are going to save on what IT costs (hardware, software, etc.) Validating the Magic – Your responsibility Ø  Due diligence through adequate planning and up front discussions with cloud provider is necessary to realize benefits. Ø  Develop a road map of workloads to be migrated and cost out the savings 31
  • 33.
    Accounting for ITInvestments using Cloud Economics Source: Forrester Research, Inc. – Talking to your CFO About Cloud Computing 32
  • 34.
    Accounting for ITInvestments using Cloud Economics Source: Forrester Research, Inc. – Talking to your CFO About Cloud Computing 33
  • 35.
    Accounting for ITInvestments using Cloud Economics Source: Forrester Research, Inc. – Talking to your CFO About Cloud Computing 34
  • 36.
    The Implications ofthe Cloud 35
  • 37.
    Poll Question Poll Question 4 Do you think the average business person cares if his business information is in the clouds? 36
  • 38.
    The Implications ofCloud Computing – Who Cares? Yeah! I m Concerned Whatever!?! Some CIOs Some CIOs General Business Person And And Or IT Geeks Corp Attorneys Hip 20 Something Conversations @ Work 37
  • 39.
    The Implications ofthe Cloud Ø  To Cloud or Not to Cloud – Dealing with fear or lagging behind the curve Ø  Organization structure and legal boundaries Ø  Strategy and competitive advantage considerations Ø  Talent and People aspects Ø  Cost considerations including Service Level Agreements SLAs, Ø  Trusted vendors? – Standards to fall back on? Ø  Security, risks and business continuity considerations (What-if there is a breach?) Ø  Work-Life Balance considerations – Being On 38
  • 40.
    How the Cloudis Revolutionizing the World of the Finance Executive 39
  • 41.
    CC is Revolutionizingthe World of the Finance Executive CC impacts us in a variety of ways … Ø  Decision making about how the organization delivers its products and services to internal customers will change Ø  The focus of Auditing and Accounting will move to the digital era Ø  Business Models will be in flux especially in the area of variable and overhead costs Ø  Risk & Reputation Management will take precedence in the short-term Ø  Talent & Knowledge – The CC Department? Ø  Success Metrics – Its working! Really? Ø  Outsource or Not Outsource – Impacts on you and your customers Ø  Work-Life Balance – Being On 24/7 40
  • 42.
    CC is Revolutionizingthe World of the Finance Executive Ø  Accounting for IT investments will be dramatically simplified Ø  The Financial Executive will shift focus to a monitoring and benchmarking focus Ø  The finance function will be scrutinizing the value of internal IT resources and costs versus outsourcing IT activities from the cloud. Ø  The finance team will be responsible for negotiating subscription fees instead of license fees Ø  Cloud providers will have to justify and quantify their value in terms of security, compliance, service levels, compared to the marketplace Ø  Finance department will be monitoring: subscription fees/per-user fees, resource usage and direct costs 41
  • 43.
    How You canAdd Value to your Organization 42
  • 44.
    How You canAdd Value to your Organization Educational Perspective Ø  Educate your personnel of what the cloud is – Host a “Lunch & Learn” for your team to understand the technical, administrative, value-adds/detracts details Ø  Research specific cloud offerings specifically to your industry or niche – Remember Caveat emptor – Buyer beware – Not all cloud services are equal Ø  Understand the contractual arrangements i.e. Service Level Agreement ( SLA ) and identify the gotchas for people involved with purchasing the service Ø  Understand how your IT audit function will audit the Cloud – Review the latest requirements from ISACA Ø  If considering cloud adoption, understand and develop a road map for implementation and migration of applications used in your function 43
  • 45.
    How You canAdd Value to your Organization Administrative/Contractual Perspective Ø  Perform a Risk and Cost/Benefit Analyses on Cloud Computing for your situation Ø  Understand the contractual arrangements i.e. Service Level Agreement ( SLA ) and identify the gotchas for people involved with purchasing the service Ø  Assist in the development of the project plan to migrate to cloud if you own the financial applications Ø  Improve your budget - Stop paying for services that you may use for free Ø  Find out what your recourse would be if cloud computing isn t for you – i.e. what things do you own (e.g. data, applications, etc.) and how to move off from that cloud provider 44
  • 46.
    How You canAdd Value to your Organization Security and Technological Perspective Ø  Review and update your IT governance and IT change management processes with new cloud policies and practices into your Sox and compliance requirements Ø  Perform and hire capable professionals to advise, develop and test cloud security regardless of the delivery model you utilized Ø  Incorporate potential cloud failures into your business continuity and disaster recovery planning requirements Ø  Keep abreast of changes through governance committees including cloud computing issues and identify a resource for providing regular briefings Ø  Attend security and technological conferences, webinars and user groups to ensure your business and IT personnel are competent in this domain Ø  Get familiar about costs to maintain an appropriate level of security – see it as an investment not an expense 45
  • 47.
    How You canAdd Value to your Organization Business Process and Internal Controls Perspective Ø  Understand how your business processes will change and affect financial reporting Ø  Understand how your IT audit function will audit the Cloud – Review the latest requirements from ISACA Ø  Identify and incorporate into your Enterprise Risk Assessments the new risks resulting from using cloud computing Ø  Discuss with your Audit Firm how changes will affect your audit 46
  • 48.
    Examples of CloudComputing in Daily Life 47
  • 49.
    Case Study: TheNew Start-Up (Cloud Computing Start-Up) Ø  A next-generation start-up that nearly used all cloud services to begin its operations 48
  • 50.
    Examples of CloudComputing that we may be familiar with 49
  • 51.
    Case Study: BusinessIntelligence (BI) in the Clouds 50
  • 52.
    Case Study: BusinessIntelligence (BI) in the Clouds Challenges Predictive Dashboards had to Overcome: Ø  Choosing an infrastructure provider was challenging Ø  Understanding the jargon, technologies and the varied offerings was overwhelming Ø  Defining the minimum and appropriate standards was vexing Actions Taken: Ø  Talked to as many providers and other SaaS-based Cloud Providers to make sense of and compared the offerings and figured out the Do’s and Don’ts Ø  Punted on the standards issue and felt we could wait a while but ensured ourselves the minimum amount of security Results: Ø  Learned not only the technology issues and but also the business issues of the cloud Ø  Learned that technology constantly evolves and you’re always in development mode 51
  • 53.
    Conclusion & KeyTakeaways 52
  • 54.
    Conclusion & KeyTakeaways Conclusion: Cloud computing has the potential for revolutionizing the ways businesses and individuals operate. However, be a skeptic! At its core, CC is another outsourcing mechanism and must be monitored. Don t forget, it’s still your responsibility. Takeaway: Cloud Computing has many positives but the learning curve can be steep both technologically and administratively. The benefits can far outweigh risks. There are huge opportunities and potential for financial professionals to add value to this area and to your organization Takeaway: Cloud computing is not without risk. Do your due diligence. Unforeseen disasters may await you including security breaches, cost overruns, technological challenges, privacy issues, etc. 53
  • 55.
    Poll Question Poll Question 5 Now, do you think cloud computing is Myth or Magic? 54
  • 56.
    Sources, References, andTrademarks Ø  Forrester Research, Inc. – Talking to your CFO About Cloud Computing Ø  ISACA – IT Control Objectives Ø  The Lego Minifigure is a trademark of The Lego Group 55
  • 57.
    The Myths andMagic of Cloud Computing and How it is Revolutionizing the World Jay Roy, Chief Strategy Officer www.PredictiveDashboards.com Jay.Roy@PredictiveDashboards.com T: 214-621-7612 56