Texas Rural
 Transportation
      Plan                                                                                                       haping the Future
     2035                                                                                                           of Rural Texas
CRITERIA QUESTIONNAIRE                                                                          Stakeholder Meeting #1: 2011
                                                                                                                     August 22 San Angelo

Please rate the overall importance of each of the following criteria for prioritization of rural highway projects:
                                                                                            How important is this criteria? (Circle One)
CRITERIA                                           Criteria Questions                       Less Important           >           More Important

Trunk System                     Is project on the Texas Trunk System?                      1   2    3       4   5       6   7      8    9   10

                                 Does the project fall between two segments of
System Gap                                                                                  1   2    3       4   5       6   7      8    9   10
                                 roadway with more lanes (a bottleneck)?
Truck Freight Movement:          How much TONNAGE of freight is generated in or
                                                                                            1   2    3       4   5       6   7      8    9   10
Tonnage                          shipped to the county
Truck Freight Movement:          How many DOLLARS of freight are generated in or
                                                                                            1   2    3       4   5       6   7      8    9   10
Dollars                          shipped to the county
                                 Compared to the other projects, how well does
Accessibility                                                                               1   2    3       4   5       6   7      8    9   10
                                 project connect people and jobs?
                                 Is the project on Hurricane Evacuation Route or does
Hurricane Evacuation Route                                                                  1   2    3       4   5       6   7      8    9   10
                                 the roadway route intersect one?
                                 Compared to other projects, how many people live
Population                                                                                  1   2    3       4   5       6   7      8    9   10
                                 within X miles of the project?
Cost Effectiveness (Cost per     How does the construction cost compare to the
                                                                                            1   2    3       4   5       6   7      8    9   10
future VMT)                      forecasted usage?
Existing Volume on Existing
                                 Is there existing congestion?                              1   2    3       4   5       6   7      8   9    10
Capacity (V/C Ratio)
Forecast Volume on Existing      Will there be congestion in the future if the project is
                                                                                            1   2    3       4   5       6   7      8   9    10
Capacity (V/C Ratio)             not built?
Forecast Volume on Future        How well does the project address future
                                                                                            1   2    3       4   5       6   7      8   9    10
Capacity (V/C Ratio)             congestion?
                                 What is the percentage of truck traffic to total traffic
Truck Percentage                                                                            1   2    3       4   5       6   7      8   9    10
                                 currently on the facility? (% trucks)
Existing Truck Traffic (trucks   How many trucks currently travel within the project
                                                                                            1   2    3       4   5       6   7      8   9    10
per day)                         limits? (# of trucks)
Forecast Truck Traffic (trucks How many trucks are forecast to be traveling within
                                                                                            1   2    3       4   5       6   7      8   9    10
per day)                       the project limits?
Existing Total Traffic           What is the current traffic volume within the project
                                                                                            1   2    3       4   5       6   7      8   9    10
(vehicles per day)               limits?
Forecast Total Traffic           What is the forecast traffic volume within the project
                                                                                            1   2    3       4   5       6   7      8   9    10
(vehicles per day)               limits?

Safe Passing Needs               Can you pass safely on the current highway?                1   2    3       4   5       6   7      8   9    10

                                                                                            How important is this criteria? (Circle One)
OTHER CRITERIA                                     Criteria Questions                       Less Important           >           More Important

                                                                                            1   2    3       4   5       6   7      8    9   10

                                                                                            1   2    3       4   5       6   7      8    9   10

Texas Rural Transportation Criteria

  • 1.
    Texas Rural Transportation Plan haping the Future 2035 of Rural Texas CRITERIA QUESTIONNAIRE Stakeholder Meeting #1: 2011 August 22 San Angelo Please rate the overall importance of each of the following criteria for prioritization of rural highway projects: How important is this criteria? (Circle One) CRITERIA Criteria Questions Less Important > More Important Trunk System Is project on the Texas Trunk System? 1 2 3 4 5 6 7 8 9 10 Does the project fall between two segments of System Gap 1 2 3 4 5 6 7 8 9 10 roadway with more lanes (a bottleneck)? Truck Freight Movement: How much TONNAGE of freight is generated in or 1 2 3 4 5 6 7 8 9 10 Tonnage shipped to the county Truck Freight Movement: How many DOLLARS of freight are generated in or 1 2 3 4 5 6 7 8 9 10 Dollars shipped to the county Compared to the other projects, how well does Accessibility 1 2 3 4 5 6 7 8 9 10 project connect people and jobs? Is the project on Hurricane Evacuation Route or does Hurricane Evacuation Route 1 2 3 4 5 6 7 8 9 10 the roadway route intersect one? Compared to other projects, how many people live Population 1 2 3 4 5 6 7 8 9 10 within X miles of the project? Cost Effectiveness (Cost per How does the construction cost compare to the 1 2 3 4 5 6 7 8 9 10 future VMT) forecasted usage? Existing Volume on Existing Is there existing congestion? 1 2 3 4 5 6 7 8 9 10 Capacity (V/C Ratio) Forecast Volume on Existing Will there be congestion in the future if the project is 1 2 3 4 5 6 7 8 9 10 Capacity (V/C Ratio) not built? Forecast Volume on Future How well does the project address future 1 2 3 4 5 6 7 8 9 10 Capacity (V/C Ratio) congestion? What is the percentage of truck traffic to total traffic Truck Percentage 1 2 3 4 5 6 7 8 9 10 currently on the facility? (% trucks) Existing Truck Traffic (trucks How many trucks currently travel within the project 1 2 3 4 5 6 7 8 9 10 per day) limits? (# of trucks) Forecast Truck Traffic (trucks How many trucks are forecast to be traveling within 1 2 3 4 5 6 7 8 9 10 per day) the project limits? Existing Total Traffic What is the current traffic volume within the project 1 2 3 4 5 6 7 8 9 10 (vehicles per day) limits? Forecast Total Traffic What is the forecast traffic volume within the project 1 2 3 4 5 6 7 8 9 10 (vehicles per day) limits? Safe Passing Needs Can you pass safely on the current highway? 1 2 3 4 5 6 7 8 9 10 How important is this criteria? (Circle One) OTHER CRITERIA Criteria Questions Less Important > More Important 1 2 3 4 5 6 7 8 9 10 1 2 3 4 5 6 7 8 9 10