TECHOPACK provides Consulting & Technical Services to Corrugated Box Packaging Manufacturing
Organizations and Users.
CONSULTING SERVICES SOLUTIONS
Lean Packaging Plant Testing Spare Parts Management
Packaging Cost Reduction Installation & Commissioning Development
Plant Design Training & Guiding Process Enhancement
Operations Management Maintenance Technology Up gradation
Project Management Repairs & Automation Packaging Trouble Shooting
NEW CORRUGATED BOX PACKAGING PLANT
TECHOPACK has nearly 17 years of experience in installation, commissioning and operations management of
printing and packaging units.
 Plant Layout & Design Based on LEAN Manufacturing System
 Machinery Selection / Foundation Work
 Steam, Air, Water And Glue Lines
 HT/LT Connection & Electrical Power Line
 Installation & Commissioning
 Production Start Up And Training
 Establish Management System Of Entire Plant
 Project Management, Commissioning, Installation And Testing Of Packaging Machines
 Operations Management, Maintenance, Spares Management, Cost Savings, Profitability Of Packaging
/ Corrugation Plants
 Technology Up Gradation And Developments
 Lean Packaging Plant
HANDS ON EXPERIENCE AND DEEP EXPERTISE IN INDIAN & FOREIGN MACHINES LIKE SUNUP, NATRAJ,
MICRO, SURJEET, DARSAN, PETERS CORRUGATOR, JS CHINA, TCY TAIWAN, BOBST MACHINES LIKE SP AND
SPO DIECUTTER, DOMINO AND MEDIA FOLDER GLUER MACHINE, FLEXO PROCESS PRINTING MACHINE,
MARTIN MACHINES LIKE 616 AND 1224 RSC BOX MAKING M/C, BOA WASTE HANDLING M/C, MOSCA
STRAPPING M/C, FLEXO PLATE MAKING MACHINES AND ALL UTILITIES.
PACKAGING USER MANUFACTURER
Email: techopack@techopack.com M: +91 987 987 9554
CONSULTING – SERVICES – SOLUTIONS – SPARES – SUPPORT – DEVELOPMENT
CORRUGATED BOX MANUFACTURING PACKAGING PLANT
 Training & Implementation of Manufacturing System of Corrugated Packaging Plant
 Designing & Execution of Organization Structure
 Professionally run Box manufacturing plant with High Profitability
 Design schedules, Formats for entire Packaging Plant related to Manufacturing
 Basic and Advanced Training to entire Production Team to Improve Manufacturing System up to
bottom level
 Training & Implementation of Maintenance systems of Corrugation & Converting Machines
 Making dailly / weekly / monthly / quartely maintenance schedules for each machine
 Schedules will be separate for mechanical / electrical / hydraulics
 Maintenance Records Maintenance – log books / Analysis of maintenance problems
 TPM
 Basic and Advanced Training to entire Maintenance Team
 Training on mechanical / electrical / hydraulics / pneumatic aspects of maintenance
 Study of drawings and Hands / Training on each machine
 Spares & Tools Management
 Establishing Min / Max stock levels of critical / major / minor spares
 Stores Management / Developing Toolings for maintenance
The focus will be on creating model and visual Box Manufacturing Plant with High
Profitability.
REDUCE YOUR PACKAGING COST (PACKAGING USER)
 Lean Packaging
 Right Packaging based on fundamental calculation
 Creative design of Packaging to Reduce Cost
 Innovation, Sustainability, Re Engineering & New Development (Packaging)
 Quality of packaging with Product Safety
 Optimize production by analyzing processes and identifying process conditions to improve
Throughput
 Identify, Reduce & Eliminate muda (waste) from all stages at packaging
 Audit present packaging & do necessary changes in packaging to reduce cost, packing time, damages,
transportation etc.
 Analyze and make changes in packaging to optimize cost, material etc.
 Lean inventory management of packaging
 Organize your packaging system
HEMAL SHAH
Packaging Specialist

More Related Content

What's hot

Use of technology in warehousing
Use of technology in warehousingUse of technology in warehousing
Use of technology in warehousingssuser58cd6d
 
An introduction to total productive maintenance (tpm
An introduction to total productive maintenance (tpmAn introduction to total productive maintenance (tpm
An introduction to total productive maintenance (tpmarpitmishra
 
Supply Chain Management Basics: Labor Management Slotting
Supply Chain Management Basics: Labor Management SlottingSupply Chain Management Basics: Labor Management Slotting
Supply Chain Management Basics: Labor Management SlottingAngela Carver
 
Boost DC Performance & Solve DIM Challenges: Use Cubing and Dimensioning Tech...
Boost DC Performance & Solve DIM Challenges: Use Cubing and Dimensioning Tech...Boost DC Performance & Solve DIM Challenges: Use Cubing and Dimensioning Tech...
Boost DC Performance & Solve DIM Challenges: Use Cubing and Dimensioning Tech...Angela Carver
 
Total Productive Maintenance - TPM
Total Productive Maintenance - TPM Total Productive Maintenance - TPM
Total Productive Maintenance - TPM Achuthan Rajagopal
 
tpm (total productive maintenance)
tpm (total productive maintenance)tpm (total productive maintenance)
tpm (total productive maintenance)Shreya Chaudhary
 
TPM - Total Productive Maintenance
TPM - Total Productive MaintenanceTPM - Total Productive Maintenance
TPM - Total Productive MaintenanceRAHMAT EIE
 
Om0015 maintenance management
Om0015 maintenance managementOm0015 maintenance management
Om0015 maintenance managementconsult4solutions
 
Leaning The Warehouse
Leaning The WarehouseLeaning The Warehouse
Leaning The WarehouseJim Malone
 
Metrics Suck...Converting the Warehouse from a Cost Center to a Profit Center
Metrics Suck...Converting the Warehouse from a Cost Center to a Profit CenterMetrics Suck...Converting the Warehouse from a Cost Center to a Profit Center
Metrics Suck...Converting the Warehouse from a Cost Center to a Profit CenterIntegrated Systems Design - ISD
 
Total Productive Maintenance (TPM)
Total Productive Maintenance (TPM)Total Productive Maintenance (TPM)
Total Productive Maintenance (TPM)Akhil Yelisetti
 
5-Common-Mistakes-LiquidChemicalSCM_v3
5-Common-Mistakes-LiquidChemicalSCM_v35-Common-Mistakes-LiquidChemicalSCM_v3
5-Common-Mistakes-LiquidChemicalSCM_v3Ian Kaw
 
Inventory Controller_SAP Cataloguer
Inventory Controller_SAP CataloguerInventory Controller_SAP Cataloguer
Inventory Controller_SAP CataloguerStephen Ghisyawan
 

What's hot (20)

Use of technology in warehousing
Use of technology in warehousingUse of technology in warehousing
Use of technology in warehousing
 
An introduction to total productive maintenance (tpm
An introduction to total productive maintenance (tpmAn introduction to total productive maintenance (tpm
An introduction to total productive maintenance (tpm
 
Supply Chain Management Basics: Labor Management Slotting
Supply Chain Management Basics: Labor Management SlottingSupply Chain Management Basics: Labor Management Slotting
Supply Chain Management Basics: Labor Management Slotting
 
Boost DC Performance & Solve DIM Challenges: Use Cubing and Dimensioning Tech...
Boost DC Performance & Solve DIM Challenges: Use Cubing and Dimensioning Tech...Boost DC Performance & Solve DIM Challenges: Use Cubing and Dimensioning Tech...
Boost DC Performance & Solve DIM Challenges: Use Cubing and Dimensioning Tech...
 
C 7 1
C 7 1C 7 1
C 7 1
 
Terotechnology
TerotechnologyTerotechnology
Terotechnology
 
Total Productive Maintenance - TPM
Total Productive Maintenance - TPM Total Productive Maintenance - TPM
Total Productive Maintenance - TPM
 
How to improve order picking efficiency
How to improve order picking efficiencyHow to improve order picking efficiency
How to improve order picking efficiency
 
tpm (total productive maintenance)
tpm (total productive maintenance)tpm (total productive maintenance)
tpm (total productive maintenance)
 
TPM - Total Productive Maintenance
TPM - Total Productive MaintenanceTPM - Total Productive Maintenance
TPM - Total Productive Maintenance
 
Production mgmt
Production mgmtProduction mgmt
Production mgmt
 
Om0015 maintenance management
Om0015 maintenance managementOm0015 maintenance management
Om0015 maintenance management
 
Leaning The Warehouse
Leaning The WarehouseLeaning The Warehouse
Leaning The Warehouse
 
Metrics Suck...Converting the Warehouse from a Cost Center to a Profit Center
Metrics Suck...Converting the Warehouse from a Cost Center to a Profit CenterMetrics Suck...Converting the Warehouse from a Cost Center to a Profit Center
Metrics Suck...Converting the Warehouse from a Cost Center to a Profit Center
 
Total Productive Maintenance (TPM)
Total Productive Maintenance (TPM)Total Productive Maintenance (TPM)
Total Productive Maintenance (TPM)
 
Total productive maintenance
Total productive maintenanceTotal productive maintenance
Total productive maintenance
 
Lean logistics
Lean logisticsLean logistics
Lean logistics
 
Lean Warehousing
Lean WarehousingLean Warehousing
Lean Warehousing
 
5-Common-Mistakes-LiquidChemicalSCM_v3
5-Common-Mistakes-LiquidChemicalSCM_v35-Common-Mistakes-LiquidChemicalSCM_v3
5-Common-Mistakes-LiquidChemicalSCM_v3
 
Inventory Controller_SAP Cataloguer
Inventory Controller_SAP CataloguerInventory Controller_SAP Cataloguer
Inventory Controller_SAP Cataloguer
 

Similar to Techopack Intro

Eng. Mohamed Ali cv2015
Eng. Mohamed Ali cv2015Eng. Mohamed Ali cv2015
Eng. Mohamed Ali cv2015Mohamed Ali
 
Guidelines for Safe Pre-commissioning, Commissioning, and Operation of Proces...
Guidelines for Safe Pre-commissioning, Commissioning, and Operation of Proces...Guidelines for Safe Pre-commissioning, Commissioning, and Operation of Proces...
Guidelines for Safe Pre-commissioning, Commissioning, and Operation of Proces...Karl Kolmetz
 
Refining Process Equipment Troubleshooting
Refining Process Equipment Troubleshooting Refining Process Equipment Troubleshooting
Refining Process Equipment Troubleshooting Karl Kolmetz
 
Optimizing and Troubleshooting Process Equipment Advanced Training Course
Optimizing and Troubleshooting Process Equipment Advanced Training CourseOptimizing and Troubleshooting Process Equipment Advanced Training Course
Optimizing and Troubleshooting Process Equipment Advanced Training CourseKarl Kolmetz
 
Kraft Heinz_Maintenance Supervisor_Job Description
Kraft Heinz_Maintenance Supervisor_Job DescriptionKraft Heinz_Maintenance Supervisor_Job Description
Kraft Heinz_Maintenance Supervisor_Job DescriptionMichael Villasenor
 
Blaine G Kriebel Professional Profile
Blaine G Kriebel Professional Profile  Blaine G Kriebel Professional Profile
Blaine G Kriebel Professional Profile Blaine Kriebel
 
Total Productive Maintenance
Total Productive MaintenanceTotal Productive Maintenance
Total Productive MaintenanceAnand Subramaniam
 
Bradley_Butler_Linkedin_Resume
Bradley_Butler_Linkedin_ResumeBradley_Butler_Linkedin_Resume
Bradley_Butler_Linkedin_ResumeBrad Butler
 
Maintenance and Projects 16+ Yrs in Automotive Industry
Maintenance and Projects 16+ Yrs in Automotive IndustryMaintenance and Projects 16+ Yrs in Automotive Industry
Maintenance and Projects 16+ Yrs in Automotive IndustryNishant Patil
 
TPM the effective maintenance (2)
TPM the effective maintenance (2)TPM the effective maintenance (2)
TPM the effective maintenance (2)Timothy Wooi
 
Paul Philips Praneshkumar Paul Devanbu - Resume Final
Paul Philips Praneshkumar Paul Devanbu  - Resume FinalPaul Philips Praneshkumar Paul Devanbu  - Resume Final
Paul Philips Praneshkumar Paul Devanbu - Resume FinalPhilips Pranesh
 
April 2016 CV_1
April 2016 CV_1April 2016 CV_1
April 2016 CV_15Asdfghjkl
 

Similar to Techopack Intro (20)

Eng. Mohamed Ali cv2015
Eng. Mohamed Ali cv2015Eng. Mohamed Ali cv2015
Eng. Mohamed Ali cv2015
 
Rsume
RsumeRsume
Rsume
 
praveen
praveenpraveen
praveen
 
Guidelines for Safe Pre-commissioning, Commissioning, and Operation of Proces...
Guidelines for Safe Pre-commissioning, Commissioning, and Operation of Proces...Guidelines for Safe Pre-commissioning, Commissioning, and Operation of Proces...
Guidelines for Safe Pre-commissioning, Commissioning, and Operation of Proces...
 
New Updated CV
New Updated CVNew Updated CV
New Updated CV
 
Refining Process Equipment Troubleshooting
Refining Process Equipment Troubleshooting Refining Process Equipment Troubleshooting
Refining Process Equipment Troubleshooting
 
Optimizing and Troubleshooting Process Equipment Advanced Training Course
Optimizing and Troubleshooting Process Equipment Advanced Training CourseOptimizing and Troubleshooting Process Equipment Advanced Training Course
Optimizing and Troubleshooting Process Equipment Advanced Training Course
 
Production-
Production-Production-
Production-
 
Kraft Heinz_Maintenance Supervisor_Job Description
Kraft Heinz_Maintenance Supervisor_Job DescriptionKraft Heinz_Maintenance Supervisor_Job Description
Kraft Heinz_Maintenance Supervisor_Job Description
 
Blaine G Kriebel Professional Profile
Blaine G Kriebel Professional Profile  Blaine G Kriebel Professional Profile
Blaine G Kriebel Professional Profile
 
Krishna Resume
Krishna ResumeKrishna Resume
Krishna Resume
 
Total Productive Maintenance
Total Productive MaintenanceTotal Productive Maintenance
Total Productive Maintenance
 
Bradley_Butler_Linkedin_Resume
Bradley_Butler_Linkedin_ResumeBradley_Butler_Linkedin_Resume
Bradley_Butler_Linkedin_Resume
 
Maintenance and Projects 16+ Yrs in Automotive Industry
Maintenance and Projects 16+ Yrs in Automotive IndustryMaintenance and Projects 16+ Yrs in Automotive Industry
Maintenance and Projects 16+ Yrs in Automotive Industry
 
Yusuff- CV
Yusuff- CVYusuff- CV
Yusuff- CV
 
TPM the effective maintenance (2)
TPM the effective maintenance (2)TPM the effective maintenance (2)
TPM the effective maintenance (2)
 
Resume
ResumeResume
Resume
 
TPM 8 Pillars
TPM 8 PillarsTPM 8 Pillars
TPM 8 Pillars
 
Paul Philips Praneshkumar Paul Devanbu - Resume Final
Paul Philips Praneshkumar Paul Devanbu  - Resume FinalPaul Philips Praneshkumar Paul Devanbu  - Resume Final
Paul Philips Praneshkumar Paul Devanbu - Resume Final
 
April 2016 CV_1
April 2016 CV_1April 2016 CV_1
April 2016 CV_1
 

Techopack Intro

  • 1. Email: techopack@techopack.com M: +91 987 987 9554 CONSULTING – SERVICES – SOLUTIONS – SPARES – SUPPORT – DEVELOPMENT TECHOPACK provides Consulting & Technical Services to Corrugated Box Packaging Manufacturing Organizations and Users. CONSULTING SERVICES SOLUTIONS Lean Packaging Plant Testing Spare Parts Management Packaging Cost Reduction Installation & Commissioning Development Plant Design Training & Guiding Process Enhancement Operations Management Maintenance Technology Up gradation Project Management Repairs & Automation Packaging Trouble Shooting NEW CORRUGATED BOX PACKAGING PLANT TECHOPACK has nearly 17 years of experience in installation, commissioning and operations management of printing and packaging units.  Plant Layout & Design Based on LEAN Manufacturing System  Machinery Selection / Foundation Work  Steam, Air, Water And Glue Lines  HT/LT Connection & Electrical Power Line  Installation & Commissioning  Production Start Up And Training  Establish Management System Of Entire Plant  Project Management, Commissioning, Installation And Testing Of Packaging Machines  Operations Management, Maintenance, Spares Management, Cost Savings, Profitability Of Packaging / Corrugation Plants  Technology Up Gradation And Developments  Lean Packaging Plant HANDS ON EXPERIENCE AND DEEP EXPERTISE IN INDIAN & FOREIGN MACHINES LIKE SUNUP, NATRAJ, MICRO, SURJEET, DARSAN, PETERS CORRUGATOR, JS CHINA, TCY TAIWAN, BOBST MACHINES LIKE SP AND SPO DIECUTTER, DOMINO AND MEDIA FOLDER GLUER MACHINE, FLEXO PROCESS PRINTING MACHINE, MARTIN MACHINES LIKE 616 AND 1224 RSC BOX MAKING M/C, BOA WASTE HANDLING M/C, MOSCA STRAPPING M/C, FLEXO PLATE MAKING MACHINES AND ALL UTILITIES. PACKAGING USER MANUFACTURER
  • 2. Email: techopack@techopack.com M: +91 987 987 9554 CONSULTING – SERVICES – SOLUTIONS – SPARES – SUPPORT – DEVELOPMENT CORRUGATED BOX MANUFACTURING PACKAGING PLANT  Training & Implementation of Manufacturing System of Corrugated Packaging Plant  Designing & Execution of Organization Structure  Professionally run Box manufacturing plant with High Profitability  Design schedules, Formats for entire Packaging Plant related to Manufacturing  Basic and Advanced Training to entire Production Team to Improve Manufacturing System up to bottom level  Training & Implementation of Maintenance systems of Corrugation & Converting Machines  Making dailly / weekly / monthly / quartely maintenance schedules for each machine  Schedules will be separate for mechanical / electrical / hydraulics  Maintenance Records Maintenance – log books / Analysis of maintenance problems  TPM  Basic and Advanced Training to entire Maintenance Team  Training on mechanical / electrical / hydraulics / pneumatic aspects of maintenance  Study of drawings and Hands / Training on each machine  Spares & Tools Management  Establishing Min / Max stock levels of critical / major / minor spares  Stores Management / Developing Toolings for maintenance The focus will be on creating model and visual Box Manufacturing Plant with High Profitability. REDUCE YOUR PACKAGING COST (PACKAGING USER)  Lean Packaging  Right Packaging based on fundamental calculation  Creative design of Packaging to Reduce Cost  Innovation, Sustainability, Re Engineering & New Development (Packaging)  Quality of packaging with Product Safety  Optimize production by analyzing processes and identifying process conditions to improve Throughput  Identify, Reduce & Eliminate muda (waste) from all stages at packaging  Audit present packaging & do necessary changes in packaging to reduce cost, packing time, damages, transportation etc.  Analyze and make changes in packaging to optimize cost, material etc.  Lean inventory management of packaging  Organize your packaging system HEMAL SHAH Packaging Specialist