Perancangan Mengajar
               FAKULTI KEJURUTERAAN ELEKTRONIK DAN KEJURUTERAAN KOMPUTER
                            UNIVERSITI TEKNIKAL MALAYSIA MELAKA



                                 ELEKTROMAGNETIK LANJUTAN


        BENT 3122                             SEMESTER 2                    SESSION 2011/2012



BENT 3122                               ADVANCED ELECTROMAGNETICS


Type of Subject : K


1.0    Learning Outcomes

       At the end of this subject, the students should be able to:

        1. explain the electromagnetic phenomena in transmission lines, wave                  [PO1, C2]
             guides, electromagnetic compatibility and electrostatic discharge.
        2.   display the capability to provide solutions to problems related to EMC           [PO3, P4]
             and ESD.
        3.   formulate and apply appropriate equations to solve problems in                   [PO4, C5]
             relations to transmission lines and waveguides
        4.   evaluate the principles and concepts on EMC and ESD with regards to              [PO5, C6]
             engineering design.
        5.   report and explain their assignments clearly                                  [PO7, PO10,
                                                                                                   A3]

2.0    Synopsis

       This course will discuss on:

       Transmission Lines: Line Parameters and Equations; Input Impedance, SWR, Power, Smith
       Chart, Matching and Impedance Measurements, Transient.
       Waveguides: TM and TE Modes, Wave Propagation, Power Transmission and attenuation,
       Waveguide current and Mode Excitation, Resonators.
       Electromagnetic Compatibility: EMC requirements for Electronic System, Emission and
       Susceptibility, Cross talk, Shielding, System Design, Grounding and Shielding, EMI diagnostic,
       EMC specifications, standard and measurements.
       Electrostatic Discharge: ESD Event, ESD effects in Electronic Equipment, ESD Facilities and
       Test Methods.


3.0    Pre-requisite

       Nil
4.0   Practical Application

      At the end of the semester, the students will be required to give an oral presentation on their
      assignment based on advanced electromagnetic applications.


5.0   References

      1. M.N.O. Sadiku, Elements of Electromagnetics, 4th. Edition, Oxford University Press, 2007.
      2. William H. Hayt, Jr., John A. Buck, Engineering Electromagnetics, 6th Ed., Mc Graw Hill,
           2001.
      3. G.S.N. Raju, Electromagnetic Field Theory and Transmission Lines, 2nd Impression, Pearson
           Education, 2008.
      4. Clayton R. Paul, Introduction to Electromagnetic Compatibility. 2nd Edition, John Wiley 2006.
      5. Steven H. Voldman, ESD: Circuit and Devices, John Wiley 2006
      6. Depak L. Sengupta, Valdis V. Liepa, Applied Electromagnetic and                Electromagnetic
           Compatibility, John Wiley 2005


6.0   Subject Implementations with Student Learning Time

                                                      Official          Self        Self       Student
                                                      Contact        Learning    Learning     Learning
                              Hrs   Freq    Week     Hours Per       Time Per    Time Per       Time
      No.      Session                                 Sem           Session       Sem        (SLT) Per
                                                       (Hrs)           (Hrs)       (Hrs)      Sem (Hrs)

                               a     b       c       d = a*b*c          e        f = e*b*c     g=d+f

       1     Lecture           1     2       14          28             1            28            56
       2     Tutorial          1     1        4           4             1             4            8
       3     Quiz              0     1        1           0             0             0            0
             Assignment
       4     (POPBL)           1     1       6           6              0            0             6
       6     Test              1     1       2           2              2            4             6
       7     Quiz              0     1       4           0              0            0             0
       8     Final Exam        2     1       1           2              6            6             8
             Total                                       42                          42            84



7.0   Course Evaluations

      4 Quizzes @ 2%                                           8%
      2 Tests @ 15%                                           30%
      Assignment based on POPBL @12%                          12%
      Final Exam                                              50%
      Total                                                   100%




8.0   Method of Assessments
Component          Knowledge    Competency       Attitude   Communication
            Tests                   √            -                √           √
            Assignments             √            -                √           √


9.0        Detailed Syllabus


 Week   Session                              Contents                    References
  1   Lecture (2) Transmission Lines: Line Parameters and Equations,       [1,2,3]
                  Distributed–Parameter Model,
      PBL (1)     Group Discussion 1 – Teamwork & Problem Based Learning
                  (PBL) as a requirement for Group Assignment (Grouping)
  2   Lecture (2) Transmission Lines: Input Impedance, SWR and Power       [1,2,3]

            Quiz 1       Transmission Lines
            Tutorial (1) Tutorial 1 - Questions on Transmission Lines
      3     Lecture (2)                                                                [1,2,3]
                         Transmission Lines: Smith Chart
            PBL (1)      Group Discussion 2 – Project assignment allocation and
                         discussion
      4     Lecture (2) Transmission Lines: Matching and Impedance Measurements,       [1,2,3]
                         Transient.
            Tutorial (1) Continuation of Tutorial 1
      5     Lecture (2) Waveguides: TM and TE Modes, Wave Propagation, Power           [1,2,3]
                         Transmission and attenuation, Waveguide current and Mode
                         Excitation, Resonators.
            PBL (1)      Progress Report
      6     Lecture (2) Waveguides: TM and TE Modes, Wave Propagation, Power          [1,2,3,4]
                         Transmission and attenuation, Waveguide current and Mode
                         Excitation, Resonators.
            Test 1       Transmission Lines and Waveguides
            Tutorial (1) Tutorial 2 - Questions on Waveguides
      7     Lecture (2) Waveguides: TM and TE Modes, Wave Propagation, Power [1,2,3,4]
                         Transmission and attenuation, Waveguide current and Mode
                         Excitation, Resonators.
            Quiz 2       Waveguides
            Tutorial (1) Continuation with Tutorial 2
      8                                   MID SEM BREAK (7-15/4/2012)
      9     Lecture (3) Electromagnetic Compatibility: EMC requirements for [1,2,3,4,5]
                         Electronic System, Emission and Susceptibility, Cross talk,
                         Shielding, System Design, Grounding and Shielding, EMI
                         diagnostic, EMC specifications, standard and measurements
            PBL (1)      Progress Report
      10    Lecture (3) Electromagnetic Compatibility: EMC requirements for
                         Electronic System, Emission and Susceptibility, Cross talk,
                         Shielding, System Design, Grounding and Shielding, EMI
                         diagnostic, EMC specifications, standard and measurements   [1,2,3,4,5]
            Tutorial (1) Tutorial 3 – Questions on Electromagnetic Compatibility
            Test 2       Waveguides and Electromagnetic Compatibility
      11    Lecture (3) Electromagnetic Compatibility: EMC requirements for
                         Electronic System, Emission and Susceptibility, Cross talk,
                         Shielding, System Design, Grounding and Shielding, EMI
                         diagnostic, EMC specifications, standard and measurements   [1,2,3,4,5]
Quiz 3       Electromagnetic Compatibility
      Tutorial (1) Continuation with Tutorial 3
 12   Lecture (2) Electromagnetic Compatibility: EMC requirements for
                   Electronic System, Emission and Susceptibility, Cross talk,
                   Shielding, System Design, Grounding and Shielding, EMI
                   diagnostic, EMC specifications, standard and measurements       [1,2,3,4,5]
      PBL (1)      Oral Presentation
 13   Lecture (2) Electrostatic Discharge: Introduction to ESD, Triboelectrics
                   Series, ESD Events; Discharge to device, Discharge from
                   device, Field-Inductio0n Discharge, Device Sensitivity,
                   Measurement of ESD Events.                                      [1,2,3,4,5]
      PBL (1)      Final Submission of Report and Product
 14   Lecture (2) Electrostatic Discharge: ESD effects in Electronic Equipment,
                   ESD Sensitivity, Human body Model, Machine Model, Charged
                   Device Model, ESD Damage and Failure, ESD Protection and
                   voltage analysis.                                               [1,2,3,4,5]
      Quiz 4       Electrostatic Discharge
      Tutorial (1) Tutorial 4 – Questions on Electrostatic Discharge
 15                Electrostatic Discharge: Preventing ESDE Entry, Shielding and
                   Enclosures, ESD Facilities and Test Methods, ESD Standards,
                   EIA/JEDEC, ESD
      Tutorial (1) Continuation of Tutorial 4
 16                                   Revision Week (2-10/6/2012)
17,18              Final Examination
10.0   Matrix of Learning Outcomes :

        No.   Learning Outcome                             P01     P0   P0   P0   P0   P0   P0   P0   P0   P0   P0 Delivery         Assessment
                                                                    2    3    4    5    6    7    8    9   10   11
        1.    The ability to explain the electromagnetic    3       1    2    1    1    1    1    1    1    1    1 Lectures, Int.   Quiz, Test
              phenomena in transmission lines, wave                                                                Learning         & Exam
              guides, electromagnetic compatibility
              and electrostatic discharge.
                                                                                                                   and
                                                                                                                   Tutorials
        2.    The ability to display the capability to      2      1    3    2    1    1    1    1    1    1     1 Lectures, Int.   Quiz, Test
              provide solutions to problems related to                                                             Learning         & Exam
              EMC and ESD.
                                                                                                                   and
                                                                                                                   Tutorials
        3.    The ability to formulate and apply            2      1    3    3    1    1    1    1    1    1     1 Lectures, Int.   Quiz, Test
              appropriate equations to solve problems                                                              Learning         & Exam
              in relations to transmission lines and
              waveguides
                                                                                                                   and
                                                                                                                   Tutorials
        4.    The ability to evaluate the principles and    2      1    2    2    3    1    1    1    2    1     1 Lectures, Int.   Quiz, Test
              concepts on EMC and ESD with regards                                                                 Learning         & Exam
              to engineering design.
                                                                                                                   and
                                                                                                                   Tutorials
        5     The ability to report and explain their       1      1    2    1    1    1    1    3    1    1     1 POPBL            Presentation
              assignments clearly                                                                                  Assignment       &      Team
                                                                                                                   &                Rubric
                                                                                                                   Presentation

              1 = Light                2 = Medium                3 = Heavy
TEACHING PLAN APPROVAL
Prepared by :                          Approved by :

………………………………………………………………               ……………………………………………………………
Name :NAJMIAH RADIAH BINTI MOHAMAD     Dean/Deputy Dean(Academic)/ HOD

Stamp :                                Stamp :


Date      : _________________          Date : _____________________

                      TEACHING PLAN IMPLEMENTATION
                          (MID SEMESTER BREAK)
Comment :




Checked by :

…………………………………………………..…..
Dean/Deputy Dean(Academic)/ HOD
Stamp :                                      Date : __________________




                      TEACHING PLAN IMPLEMENTATION
                                (WEEK 16)
Comment :




Checked by :

…………………………………………….………..
Dean/Deputy Dean(Academic)/ HOD
Stamp :                                      Date : ______________________

Teaching plan

  • 1.
    Perancangan Mengajar FAKULTI KEJURUTERAAN ELEKTRONIK DAN KEJURUTERAAN KOMPUTER UNIVERSITI TEKNIKAL MALAYSIA MELAKA ELEKTROMAGNETIK LANJUTAN BENT 3122 SEMESTER 2 SESSION 2011/2012 BENT 3122 ADVANCED ELECTROMAGNETICS Type of Subject : K 1.0 Learning Outcomes At the end of this subject, the students should be able to: 1. explain the electromagnetic phenomena in transmission lines, wave [PO1, C2] guides, electromagnetic compatibility and electrostatic discharge. 2. display the capability to provide solutions to problems related to EMC [PO3, P4] and ESD. 3. formulate and apply appropriate equations to solve problems in [PO4, C5] relations to transmission lines and waveguides 4. evaluate the principles and concepts on EMC and ESD with regards to [PO5, C6] engineering design. 5. report and explain their assignments clearly [PO7, PO10, A3] 2.0 Synopsis This course will discuss on: Transmission Lines: Line Parameters and Equations; Input Impedance, SWR, Power, Smith Chart, Matching and Impedance Measurements, Transient. Waveguides: TM and TE Modes, Wave Propagation, Power Transmission and attenuation, Waveguide current and Mode Excitation, Resonators. Electromagnetic Compatibility: EMC requirements for Electronic System, Emission and Susceptibility, Cross talk, Shielding, System Design, Grounding and Shielding, EMI diagnostic, EMC specifications, standard and measurements. Electrostatic Discharge: ESD Event, ESD effects in Electronic Equipment, ESD Facilities and Test Methods. 3.0 Pre-requisite Nil
  • 2.
    4.0 Practical Application At the end of the semester, the students will be required to give an oral presentation on their assignment based on advanced electromagnetic applications. 5.0 References 1. M.N.O. Sadiku, Elements of Electromagnetics, 4th. Edition, Oxford University Press, 2007. 2. William H. Hayt, Jr., John A. Buck, Engineering Electromagnetics, 6th Ed., Mc Graw Hill, 2001. 3. G.S.N. Raju, Electromagnetic Field Theory and Transmission Lines, 2nd Impression, Pearson Education, 2008. 4. Clayton R. Paul, Introduction to Electromagnetic Compatibility. 2nd Edition, John Wiley 2006. 5. Steven H. Voldman, ESD: Circuit and Devices, John Wiley 2006 6. Depak L. Sengupta, Valdis V. Liepa, Applied Electromagnetic and Electromagnetic Compatibility, John Wiley 2005 6.0 Subject Implementations with Student Learning Time Official Self Self Student Contact Learning Learning Learning Hrs Freq Week Hours Per Time Per Time Per Time No. Session Sem Session Sem (SLT) Per (Hrs) (Hrs) (Hrs) Sem (Hrs) a b c d = a*b*c e f = e*b*c g=d+f 1 Lecture 1 2 14 28 1 28 56 2 Tutorial 1 1 4 4 1 4 8 3 Quiz 0 1 1 0 0 0 0 Assignment 4 (POPBL) 1 1 6 6 0 0 6 6 Test 1 1 2 2 2 4 6 7 Quiz 0 1 4 0 0 0 0 8 Final Exam 2 1 1 2 6 6 8 Total 42 42 84 7.0 Course Evaluations 4 Quizzes @ 2% 8% 2 Tests @ 15% 30% Assignment based on POPBL @12% 12% Final Exam 50% Total 100% 8.0 Method of Assessments
  • 3.
    Component Knowledge Competency Attitude Communication Tests √ - √ √ Assignments √ - √ √ 9.0 Detailed Syllabus Week Session Contents References 1 Lecture (2) Transmission Lines: Line Parameters and Equations, [1,2,3] Distributed–Parameter Model, PBL (1) Group Discussion 1 – Teamwork & Problem Based Learning (PBL) as a requirement for Group Assignment (Grouping) 2 Lecture (2) Transmission Lines: Input Impedance, SWR and Power [1,2,3] Quiz 1 Transmission Lines Tutorial (1) Tutorial 1 - Questions on Transmission Lines 3 Lecture (2) [1,2,3] Transmission Lines: Smith Chart PBL (1) Group Discussion 2 – Project assignment allocation and discussion 4 Lecture (2) Transmission Lines: Matching and Impedance Measurements, [1,2,3] Transient. Tutorial (1) Continuation of Tutorial 1 5 Lecture (2) Waveguides: TM and TE Modes, Wave Propagation, Power [1,2,3] Transmission and attenuation, Waveguide current and Mode Excitation, Resonators. PBL (1) Progress Report 6 Lecture (2) Waveguides: TM and TE Modes, Wave Propagation, Power [1,2,3,4] Transmission and attenuation, Waveguide current and Mode Excitation, Resonators. Test 1 Transmission Lines and Waveguides Tutorial (1) Tutorial 2 - Questions on Waveguides 7 Lecture (2) Waveguides: TM and TE Modes, Wave Propagation, Power [1,2,3,4] Transmission and attenuation, Waveguide current and Mode Excitation, Resonators. Quiz 2 Waveguides Tutorial (1) Continuation with Tutorial 2 8 MID SEM BREAK (7-15/4/2012) 9 Lecture (3) Electromagnetic Compatibility: EMC requirements for [1,2,3,4,5] Electronic System, Emission and Susceptibility, Cross talk, Shielding, System Design, Grounding and Shielding, EMI diagnostic, EMC specifications, standard and measurements PBL (1) Progress Report 10 Lecture (3) Electromagnetic Compatibility: EMC requirements for Electronic System, Emission and Susceptibility, Cross talk, Shielding, System Design, Grounding and Shielding, EMI diagnostic, EMC specifications, standard and measurements [1,2,3,4,5] Tutorial (1) Tutorial 3 – Questions on Electromagnetic Compatibility Test 2 Waveguides and Electromagnetic Compatibility 11 Lecture (3) Electromagnetic Compatibility: EMC requirements for Electronic System, Emission and Susceptibility, Cross talk, Shielding, System Design, Grounding and Shielding, EMI diagnostic, EMC specifications, standard and measurements [1,2,3,4,5]
  • 4.
    Quiz 3 Electromagnetic Compatibility Tutorial (1) Continuation with Tutorial 3 12 Lecture (2) Electromagnetic Compatibility: EMC requirements for Electronic System, Emission and Susceptibility, Cross talk, Shielding, System Design, Grounding and Shielding, EMI diagnostic, EMC specifications, standard and measurements [1,2,3,4,5] PBL (1) Oral Presentation 13 Lecture (2) Electrostatic Discharge: Introduction to ESD, Triboelectrics Series, ESD Events; Discharge to device, Discharge from device, Field-Inductio0n Discharge, Device Sensitivity, Measurement of ESD Events. [1,2,3,4,5] PBL (1) Final Submission of Report and Product 14 Lecture (2) Electrostatic Discharge: ESD effects in Electronic Equipment, ESD Sensitivity, Human body Model, Machine Model, Charged Device Model, ESD Damage and Failure, ESD Protection and voltage analysis. [1,2,3,4,5] Quiz 4 Electrostatic Discharge Tutorial (1) Tutorial 4 – Questions on Electrostatic Discharge 15 Electrostatic Discharge: Preventing ESDE Entry, Shielding and Enclosures, ESD Facilities and Test Methods, ESD Standards, EIA/JEDEC, ESD Tutorial (1) Continuation of Tutorial 4 16 Revision Week (2-10/6/2012) 17,18 Final Examination
  • 5.
    10.0 Matrix of Learning Outcomes : No. Learning Outcome P01 P0 P0 P0 P0 P0 P0 P0 P0 P0 P0 Delivery Assessment 2 3 4 5 6 7 8 9 10 11 1. The ability to explain the electromagnetic 3 1 2 1 1 1 1 1 1 1 1 Lectures, Int. Quiz, Test phenomena in transmission lines, wave Learning & Exam guides, electromagnetic compatibility and electrostatic discharge. and Tutorials 2. The ability to display the capability to 2 1 3 2 1 1 1 1 1 1 1 Lectures, Int. Quiz, Test provide solutions to problems related to Learning & Exam EMC and ESD. and Tutorials 3. The ability to formulate and apply 2 1 3 3 1 1 1 1 1 1 1 Lectures, Int. Quiz, Test appropriate equations to solve problems Learning & Exam in relations to transmission lines and waveguides and Tutorials 4. The ability to evaluate the principles and 2 1 2 2 3 1 1 1 2 1 1 Lectures, Int. Quiz, Test concepts on EMC and ESD with regards Learning & Exam to engineering design. and Tutorials 5 The ability to report and explain their 1 1 2 1 1 1 1 3 1 1 1 POPBL Presentation assignments clearly Assignment & Team & Rubric Presentation 1 = Light 2 = Medium 3 = Heavy
  • 6.
    TEACHING PLAN APPROVAL Preparedby : Approved by : ……………………………………………………………… …………………………………………………………… Name :NAJMIAH RADIAH BINTI MOHAMAD Dean/Deputy Dean(Academic)/ HOD Stamp : Stamp : Date : _________________ Date : _____________________ TEACHING PLAN IMPLEMENTATION (MID SEMESTER BREAK) Comment : Checked by : …………………………………………………..….. Dean/Deputy Dean(Academic)/ HOD Stamp : Date : __________________ TEACHING PLAN IMPLEMENTATION (WEEK 16) Comment : Checked by : …………………………………………….……….. Dean/Deputy Dean(Academic)/ HOD Stamp : Date : ______________________