Long Range Master Plan  Steering Committee Meeting December 4, 2006 Welcome Finance, Enrollment, and Facilities Grade Configuration  Process versus Product Summary of Community Forum 1 & Focus Groups Community Dialogue: TAG and Montessori (Site Location) School Size and Evaluating Facility Usage Grade Configuration
Long Range Master Plan  Steering Committee Meeting December 4, 2006 Welcome Finance, Enrollment, and Facilities Grade Configuration  Process versus Product Summary of Community Forum 1 & Focus Groups Community Dialogue: TAG and Montessori (Site Location) School size and Evaluating Facility Usage Grade Configuration
Financial Information
Scenario 1 –  Best Case – Budget Projections 2.23% 6.04% 9.27% 12.05% 13.36% Fund Balance as % of GF Expenses 2,008,998 5,299,977 7,923,092 9,997,066 11,409,563 Fund Balance  June 30 -3,290,979 -2,623,115 -2,073,975 -1,412,497 -1,492,778 Annual Surplus(Deficit) 90,183,701 87,764,474 85,462,677 82,982,216 80,438,466 Expenditures $86,892,722 $85,141,359 $83,388,703 $81,569,719 $78,945,688 Revenues 2009-2010 2008-2009 2007-2008 Current  2006-2007 Prior  2005-2006
Recent Statewide Information Recent reports from the State Senate and House Fiscal agencies indicate that the school aid fund may be $300 million short of projections which equates to approximately $180 per pupil. Governor Granholm said that she would deal with this crisis in January and February, after the books are closed. 83 68 43 Fund Balance Under 5% 41 30 19 Fund Balance Under 2% 20 14 10 In Deficit 2005-2006 2004-2005 2003-2004 Public School Districts…
Scenario 2 – Modifies Best Case  by Adjusting Current Year Revenues  Down by $180/Pupil -6.31% -0.56% 4.74% 9.71% 13.36% Fund Balance as % of GF Expenses -5,692,796 -489,827 4,054,222 8,058,518 11,409,563 Fund Balance June 30 -5,202,969 -4,544,049 -4,004,296 -3,351,045 -1,492,778 Annual Surplus(Deficit) 90,183,701 87,764,474 85,462,677 82,982,216 80,438,466 Expenditures $84,980,732 $83,220,425 $81,458,381 $79,631,171 $78,945,688 Revenues 2009-2010 2008-2009 2007-2008 Current  2006-2007 Prior  2005-2006
TCAPS Fund Balance
 
Enrollment Slides by TCAPS go here.
Enrollment Slides by TCAPS go here.
Traverse City Area Public Schools 2006 Glenn  Loomis  Courtade ES Westwood ES Long Lake ES Interlochen Community School Willow Hill ES East JHS West SHS West JHS Traverse City HS Traverse Heights ES Blair ES Old Mission Peninsula School Norris ES Bertha Vos Elementary Central HS Eastern ES Central Grade School Silver Lake ES Cherry Knoll ES
Elementary Schools
 
 
 
Secondary Schools
 
 
Long Range Master Plan  Steering Committee Meeting December 4, 2006 Welcome Finance, Enrollment, and Facilities Grade Configuration   Process versus Product Summary of Community Forum 1 & Focus Groups Community Dialogue: TAG and Montessori (Site Location) School size and Evaluating Facility Usage Grade Configuration
Grade Configuration K-6, 7-9, 10-12 K-5, 6-8, 9-12 K-2, 3-5, 6-8, 9-12 K-8, 9-12
K-6, 7-9, 10-12 Current Grade Configuration Requires two transitions Used by 3 districts in Michigan 10 districts use 7-9 junior high schools Excess Enrollment Capacity in Elementary Facilities No new construction required to accommodate capacity.
Requires two transitions Used by 170 districts in Michigan Used by 70% of districts of comparable size. Increases Excess Capacity in Elementary Facilities New construction  may  be required at Central, West Senior High and Traverse City HS K-5, 6-8, 9-12
Requires three transitions Used by 29 districts in Michigan Allows focus on age appropriate curriculum Increases transportation costs Increases staffing savings (split support) K-2, 3-5, 6-8, 9-12
Increases Excess Capacity in Elementary Facilities New construction  may  be required at Central, West Senior High and Traverse City HS K-2, 3-5, 6-8, 9-12
Requires one transition K-8 used by 29 districts in Michigan Most elementary schools can be converted to K-8 schools EJH and WJH become K-8 schools with 1350 students each. Extensive facility changes required New construction  may  be required at Central, West Senior High and Traverse City HS K-8, 9-12
Long Range Master Plan  Steering Committee Meeting December 4, 2006 Welcome Finance, Enrollment, and Facilities Grade Configuration  Process versus Product Summary of Community Forum 1 & Focus Groups Community Dialogue: TAG and Montessori (Site Location) School size and Evaluating Facility Usage Grade Configuration
Expectations for the Steering Committee and its Members Thoroughly study the different issues confronting TCAPS at this time.
Develop an understanding of the variables and help the general public to also understand. Expectations for the Steering Committee and its Members
Create viable options to address the issues confronting the system. Expectations for the Steering Committee and its Members
Gather public input on the possible options. Expectations for the Steering Committee and its Members
Make recommendations to the Superintendent within 6 to 9 months for improving our schools. Expectations for the Steering Committee and its Members
Process versus Product
Process versus Product
Process versus Product
The Charge from the  Board of Education Analyze operation of schools with different grade configurations,  due to changing graduation requirements and other factors
The Charge from the  Board of Education Develop long-term facility and capacity plans to support demographic and program changes
The Charge from the  Board of Education Analyze efficiency and effectiveness of buildings relative to enrollment, programs, and resources
The Charge from the  Board of Education Re-examine the order and scope of elementary school bond reconstruction plan relative to new findings
The Charge from the  Board of Education Identify and plan for  other factors impacting education in Traverse City.
Long Range Master Plan  Steering Committee Meeting January 11, 2007 Welcome Committee Work:  Create Options for Community Forum 2 Programming Options Grade Configuration Options School Size Options and Facility Options Report Out Committee Work: Refine Options
Long Range Master Plan  Steering Committee Meeting December 4, 2006 Welcome Finance, Enrollment, and Facilities Grade Configuration  Process versus Product Summary of Community Forum 1 & Focus Groups Community Dialogue: TAG and Montessori (Site Location) School size and Evaluating Facility Usage Grade Configuration
Curriculum Funding Class Size Grade Configuration Graduation Requirements Montessori/TAG Community Forum Question #1 Most discussed topics 198 77 63 62 54 54
Keep class sizes small Elementary class sizes are too large Comments noted most  Often: Community Forum Question #2
Programming Funding Facilities Grade Configuration Graduation Requirements 70 69 68 64 60 Prioritized Topics Community Forum Question #2
Offer multiple options to meet the needs of all students: Traditional, Montessori, Looping,  Multi-age, Way to Grow, TAG Provide all day kindergarten Programming Community Forum Question #2
Equity in State funding Efficiency of operations “ How can we cut $ without taking from our children?” Funding Community Forum Question #2
Efficiency-keep what TCAPS can afford to maintain and close all schools at the same time. Keep walkable neighborhood schools Montessori and TAG should not expand  at the expense of Central Grade School Consolidate small elem. schools – many benefits to larger schools as long class size stays small Magnet Schools Facilities Community Forum Question #2
K-5, 6-8, 9-12 Don’t base decision on financial concerns, but what is best educationally and socially Grade Configuration Community Forum Question #2
Preserve electives Maintain breadth and depth of curriculum and still meet requirements Graduation Requirements Community Forum Question #2
TAG and Montessori School size and Facility Options Grade Configuration Community Forum #2 Topics for Community Forum 2 There are financial implications to all these  options
Long Range Master Plan  Steering Committee Meeting January 11, 2007 Welcome Committee Work:  Create Options for Community Forum 2 TAG and Montessori (Site Locations) Grade Configuration Options School Size Options and Facility Options Report Out Committee Work: Refine Options
Long Range Master Plan  Steering Committee Meeting December 4, 2006 Welcome Finance, Enrollment, and Facilities Grade Configuration  Process versus Product Summary of Community Forum 1 & Focus Groups Community Dialogue: TAG and Montessori (Site Location) School size and Evaluating Facility Usage Grade Configuration
M A S T E R  P L A N N I N G
Elementary Schools
15 Schools + Capacities 325 325 350 375 350 425 325 375 375 825 375 350 425 475 350
Secondary Schools
5 Secondary Schools + Capacity 1440 1620 360 1440 1665
K-8 - 6828 in 2010 225 450 225 450 450 675 450 450 450 450 1350 1350
Elementary Schools by  Facility  Score 3.49 3.76 3.49 6.86 6.91 3.40 3.87 6.93 3.63 2.79 8.73 8.55 3.47 8.89 3.05
Elementary Schools by Size of Site 5.0 45.0 12.0 13.5 15.0 6.0 10.0 16.0 13.5 4.4 16.1 9.0 5.3 14.0 4.6
Elementary Schools by Excess Capacity 26% 21% -2% 8% -2% 12% 4% 25% -2% 14% 16% 37% 22% 52% 23%
K-6 Enrollment in 2007 - 5038 350 325 375 425 350 325 375 475 350 325 375 825 375 350 425
K-6 Enrollment in 2010 - 5278 525 525 525 525 525 525 525 525 525 525 28 525 525 525 525 28
K-5 Enrollment in 2007 - 4363 350 325 375 425 350 325 375 475 350 325 375 825 375 350 425
K-5 Enrollment in 2010 - 4556 525 525 356 525 525 525 525 525 525 525 525 525 525 525 525
K-5 Enrollment in 2010 - 4556 450 450 450 525 450 450 450 525 450 450 56 525 450 450 525 56
XXXXXXXX 525 525 525 525 525 525 525 525 525 525 525 525 525 525 525
0  450 475 450 0 350 1440 1440 1620 360 450 450 325 0 0 1665 325 450 450 450 Traverse City Area Public Schools 2007 K-5, 4363 enrollment, 450 Capacity Schools
 
 
 
 
Average Score: 3.40 out of 10 Scores Building and Site only. This number does not score the Staff or the Program
 
 
 
K-5 – 4553 in 2010 300 450 450 300 450 450 600 450 450 450 450

TCAPS Steering Comm. 120406

  • 1.
    M A ST E R P L A N N I N G
  • 2.
    Long Range MasterPlan Steering Committee Meeting December 4, 2006 Welcome Finance, Enrollment, and Facilities Grade Configuration Process versus Product Summary of Community Forum 1 & Focus Groups Community Dialogue: TAG and Montessori (Site Location) School Size and Evaluating Facility Usage Grade Configuration
  • 3.
    Long Range MasterPlan Steering Committee Meeting December 4, 2006 Welcome Finance, Enrollment, and Facilities Grade Configuration Process versus Product Summary of Community Forum 1 & Focus Groups Community Dialogue: TAG and Montessori (Site Location) School size and Evaluating Facility Usage Grade Configuration
  • 4.
  • 5.
    Scenario 1 – Best Case – Budget Projections 2.23% 6.04% 9.27% 12.05% 13.36% Fund Balance as % of GF Expenses 2,008,998 5,299,977 7,923,092 9,997,066 11,409,563 Fund Balance June 30 -3,290,979 -2,623,115 -2,073,975 -1,412,497 -1,492,778 Annual Surplus(Deficit) 90,183,701 87,764,474 85,462,677 82,982,216 80,438,466 Expenditures $86,892,722 $85,141,359 $83,388,703 $81,569,719 $78,945,688 Revenues 2009-2010 2008-2009 2007-2008 Current 2006-2007 Prior 2005-2006
  • 6.
    Recent Statewide InformationRecent reports from the State Senate and House Fiscal agencies indicate that the school aid fund may be $300 million short of projections which equates to approximately $180 per pupil. Governor Granholm said that she would deal with this crisis in January and February, after the books are closed. 83 68 43 Fund Balance Under 5% 41 30 19 Fund Balance Under 2% 20 14 10 In Deficit 2005-2006 2004-2005 2003-2004 Public School Districts…
  • 7.
    Scenario 2 –Modifies Best Case by Adjusting Current Year Revenues Down by $180/Pupil -6.31% -0.56% 4.74% 9.71% 13.36% Fund Balance as % of GF Expenses -5,692,796 -489,827 4,054,222 8,058,518 11,409,563 Fund Balance June 30 -5,202,969 -4,544,049 -4,004,296 -3,351,045 -1,492,778 Annual Surplus(Deficit) 90,183,701 87,764,474 85,462,677 82,982,216 80,438,466 Expenditures $84,980,732 $83,220,425 $81,458,381 $79,631,171 $78,945,688 Revenues 2009-2010 2008-2009 2007-2008 Current 2006-2007 Prior 2005-2006
  • 8.
  • 9.
  • 10.
    Enrollment Slides byTCAPS go here.
  • 11.
    Enrollment Slides byTCAPS go here.
  • 12.
    Traverse City AreaPublic Schools 2006 Glenn Loomis Courtade ES Westwood ES Long Lake ES Interlochen Community School Willow Hill ES East JHS West SHS West JHS Traverse City HS Traverse Heights ES Blair ES Old Mission Peninsula School Norris ES Bertha Vos Elementary Central HS Eastern ES Central Grade School Silver Lake ES Cherry Knoll ES
  • 13.
  • 14.
  • 15.
  • 16.
  • 17.
  • 18.
  • 19.
  • 20.
    Long Range MasterPlan Steering Committee Meeting December 4, 2006 Welcome Finance, Enrollment, and Facilities Grade Configuration Process versus Product Summary of Community Forum 1 & Focus Groups Community Dialogue: TAG and Montessori (Site Location) School size and Evaluating Facility Usage Grade Configuration
  • 21.
    Grade Configuration K-6,7-9, 10-12 K-5, 6-8, 9-12 K-2, 3-5, 6-8, 9-12 K-8, 9-12
  • 22.
    K-6, 7-9, 10-12Current Grade Configuration Requires two transitions Used by 3 districts in Michigan 10 districts use 7-9 junior high schools Excess Enrollment Capacity in Elementary Facilities No new construction required to accommodate capacity.
  • 23.
    Requires two transitionsUsed by 170 districts in Michigan Used by 70% of districts of comparable size. Increases Excess Capacity in Elementary Facilities New construction may be required at Central, West Senior High and Traverse City HS K-5, 6-8, 9-12
  • 24.
    Requires three transitionsUsed by 29 districts in Michigan Allows focus on age appropriate curriculum Increases transportation costs Increases staffing savings (split support) K-2, 3-5, 6-8, 9-12
  • 25.
    Increases Excess Capacityin Elementary Facilities New construction may be required at Central, West Senior High and Traverse City HS K-2, 3-5, 6-8, 9-12
  • 26.
    Requires one transitionK-8 used by 29 districts in Michigan Most elementary schools can be converted to K-8 schools EJH and WJH become K-8 schools with 1350 students each. Extensive facility changes required New construction may be required at Central, West Senior High and Traverse City HS K-8, 9-12
  • 27.
    Long Range MasterPlan Steering Committee Meeting December 4, 2006 Welcome Finance, Enrollment, and Facilities Grade Configuration Process versus Product Summary of Community Forum 1 & Focus Groups Community Dialogue: TAG and Montessori (Site Location) School size and Evaluating Facility Usage Grade Configuration
  • 28.
    Expectations for theSteering Committee and its Members Thoroughly study the different issues confronting TCAPS at this time.
  • 29.
    Develop an understandingof the variables and help the general public to also understand. Expectations for the Steering Committee and its Members
  • 30.
    Create viable optionsto address the issues confronting the system. Expectations for the Steering Committee and its Members
  • 31.
    Gather public inputon the possible options. Expectations for the Steering Committee and its Members
  • 32.
    Make recommendations tothe Superintendent within 6 to 9 months for improving our schools. Expectations for the Steering Committee and its Members
  • 33.
  • 34.
  • 35.
  • 36.
    The Charge fromthe Board of Education Analyze operation of schools with different grade configurations, due to changing graduation requirements and other factors
  • 37.
    The Charge fromthe Board of Education Develop long-term facility and capacity plans to support demographic and program changes
  • 38.
    The Charge fromthe Board of Education Analyze efficiency and effectiveness of buildings relative to enrollment, programs, and resources
  • 39.
    The Charge fromthe Board of Education Re-examine the order and scope of elementary school bond reconstruction plan relative to new findings
  • 40.
    The Charge fromthe Board of Education Identify and plan for other factors impacting education in Traverse City.
  • 41.
    Long Range MasterPlan Steering Committee Meeting January 11, 2007 Welcome Committee Work: Create Options for Community Forum 2 Programming Options Grade Configuration Options School Size Options and Facility Options Report Out Committee Work: Refine Options
  • 42.
    Long Range MasterPlan Steering Committee Meeting December 4, 2006 Welcome Finance, Enrollment, and Facilities Grade Configuration Process versus Product Summary of Community Forum 1 & Focus Groups Community Dialogue: TAG and Montessori (Site Location) School size and Evaluating Facility Usage Grade Configuration
  • 43.
    Curriculum Funding ClassSize Grade Configuration Graduation Requirements Montessori/TAG Community Forum Question #1 Most discussed topics 198 77 63 62 54 54
  • 44.
    Keep class sizessmall Elementary class sizes are too large Comments noted most Often: Community Forum Question #2
  • 45.
    Programming Funding FacilitiesGrade Configuration Graduation Requirements 70 69 68 64 60 Prioritized Topics Community Forum Question #2
  • 46.
    Offer multiple optionsto meet the needs of all students: Traditional, Montessori, Looping, Multi-age, Way to Grow, TAG Provide all day kindergarten Programming Community Forum Question #2
  • 47.
    Equity in Statefunding Efficiency of operations “ How can we cut $ without taking from our children?” Funding Community Forum Question #2
  • 48.
    Efficiency-keep what TCAPScan afford to maintain and close all schools at the same time. Keep walkable neighborhood schools Montessori and TAG should not expand at the expense of Central Grade School Consolidate small elem. schools – many benefits to larger schools as long class size stays small Magnet Schools Facilities Community Forum Question #2
  • 49.
    K-5, 6-8, 9-12Don’t base decision on financial concerns, but what is best educationally and socially Grade Configuration Community Forum Question #2
  • 50.
    Preserve electives Maintainbreadth and depth of curriculum and still meet requirements Graduation Requirements Community Forum Question #2
  • 51.
    TAG and MontessoriSchool size and Facility Options Grade Configuration Community Forum #2 Topics for Community Forum 2 There are financial implications to all these options
  • 52.
    Long Range MasterPlan Steering Committee Meeting January 11, 2007 Welcome Committee Work: Create Options for Community Forum 2 TAG and Montessori (Site Locations) Grade Configuration Options School Size Options and Facility Options Report Out Committee Work: Refine Options
  • 53.
    Long Range MasterPlan Steering Committee Meeting December 4, 2006 Welcome Finance, Enrollment, and Facilities Grade Configuration Process versus Product Summary of Community Forum 1 & Focus Groups Community Dialogue: TAG and Montessori (Site Location) School size and Evaluating Facility Usage Grade Configuration
  • 54.
    M A ST E R P L A N N I N G
  • 55.
  • 56.
    15 Schools +Capacities 325 325 350 375 350 425 325 375 375 825 375 350 425 475 350
  • 57.
  • 58.
    5 Secondary Schools+ Capacity 1440 1620 360 1440 1665
  • 59.
    K-8 - 6828in 2010 225 450 225 450 450 675 450 450 450 450 1350 1350
  • 60.
    Elementary Schools by Facility Score 3.49 3.76 3.49 6.86 6.91 3.40 3.87 6.93 3.63 2.79 8.73 8.55 3.47 8.89 3.05
  • 61.
    Elementary Schools bySize of Site 5.0 45.0 12.0 13.5 15.0 6.0 10.0 16.0 13.5 4.4 16.1 9.0 5.3 14.0 4.6
  • 62.
    Elementary Schools byExcess Capacity 26% 21% -2% 8% -2% 12% 4% 25% -2% 14% 16% 37% 22% 52% 23%
  • 63.
    K-6 Enrollment in2007 - 5038 350 325 375 425 350 325 375 475 350 325 375 825 375 350 425
  • 64.
    K-6 Enrollment in2010 - 5278 525 525 525 525 525 525 525 525 525 525 28 525 525 525 525 28
  • 65.
    K-5 Enrollment in2007 - 4363 350 325 375 425 350 325 375 475 350 325 375 825 375 350 425
  • 66.
    K-5 Enrollment in2010 - 4556 525 525 356 525 525 525 525 525 525 525 525 525 525 525 525
  • 67.
    K-5 Enrollment in2010 - 4556 450 450 450 525 450 450 450 525 450 450 56 525 450 450 525 56
  • 68.
    XXXXXXXX 525 525525 525 525 525 525 525 525 525 525 525 525 525 525
  • 69.
    0 450475 450 0 350 1440 1440 1620 360 450 450 325 0 0 1665 325 450 450 450 Traverse City Area Public Schools 2007 K-5, 4363 enrollment, 450 Capacity Schools
  • 70.
  • 71.
  • 72.
  • 73.
  • 74.
    Average Score: 3.40out of 10 Scores Building and Site only. This number does not score the Staff or the Program
  • 75.
  • 76.
  • 77.
  • 78.
    K-5 – 4553in 2010 300 450 450 300 450 450 600 450 450 450 450