Outline
 Introduction
 History of Indian railways
 Other “Giants wheels” of Indian Railways
 Train18 introduction
 ICF Chennai
 Components of train18
 Other facts about this engineering marvel
 Proud Moment for India
 Future of train18
11/21/2022 1
INTRODUCTION
11/21/2022 2
 Indian Railways (IR) is India's
national railway system operated by
the Ministry of Railways.
 Routes are electrified with 25 kV AC
electric traction while thirty three
percent of them are double or multi-
tracked.
 Vande Bharat Express , also known as Train
18,is an Indian semi-high speed intercity
electric multiple unit.
 It was designed and built by Integral Coach
Factory (ICF) Chennai under the Indian
government's Make in India initiative over a
span of 18 months.
HISTORY OF INDIAN RAILWAYS
11/21/2022 3
 1853-1869: Launching passenger rail services.
 1869-1900: Famine and economic growth.
 1901-1925: Moves towards centralisation.
 1925-till date: Electrification and new technology
enhancements
OTHER GIANTS OF INDIAN
RAILWAYS
11/21/2022 4
WAP 1(3760 HP) WAP 4(6350 HP) WAP 5(5450 HP)
WAP 7(6350 HP) WAG 9(6000-6350 HP)
11/21/2022 5
Train18 Introduction
 The self-propelled train set, comprising 16 air-conditioned coaches, was built at a cost of
₹100 crore, about half the cost of importing such a rake, with about 80% indigenous
components in alignment with the Prime Minister’s call for ‘Make in India’.
ICF Chennai
11/21/2022 6
 The Integral Coach Factory is one of the
earliest production units of independent India.
It was inaugurated by the first Prime Minister
of India Pt. Jawaharlal Nehru on 2nd October,
1955.
 Later the Furnishing Division was inaugurated
on 2nd October, 1962 and the production of
fully furnished coaches steadily increased over
the years.
 Spread over nearly 511 acres, it has about
10,408 employees to turnout more than 2000
coaches every year which includes
conventional and self propelled coaches.
Components of Train18
11/21/2022 7
Car body construction Steel
Train length 376.64 metres (1,235.7 ft)
Width 3.24 metres (10.6 ft)
Doors Automatic
Articulated sections N/A
Maximum speed 180 km/h (110 mph) (highest speed reached)[2]
130 km/h (81 mph) (highest operating speed)[3]
200 km/h (120 mph) (theoretical max speed)[4]
Weight 39.5 Tonnes - Trailer coach
Power output 8000 kW (10700 hp) (= 32 motors, each of 250 kW)
Acceleration 0.7 meters per second squared (2.3 ft/s2)[5]
Auxiliaries 415 V 3 phase 50 Hz
Power supply 25 kV 50 Hz AC 1-phase
UIC classification (2'-2' + Bo-Bo + 2'-2' + Bo-Bo) for each basic unit
Bogies Indigenous
Braking system(s) electropneumatic braking
Coupling system CBC, semi-permanent type
Track gauge 1676 mm (5 ft 6 in) broad gauge(Indian gauge)
DETAILINGS OF THE MOTORS
11/21/2022 8
11/21/2022 9
11/21/2022 10
11/21/2022 11
11/21/2022 12
11/21/2022 13
11/21/2022 14
11/21/2022 15
11/21/2022 16
11/21/2022 17
11/21/2022 18
11/21/2022 19
11/21/2022 20

T18.pptx

  • 1.
    Outline  Introduction  Historyof Indian railways  Other “Giants wheels” of Indian Railways  Train18 introduction  ICF Chennai  Components of train18  Other facts about this engineering marvel  Proud Moment for India  Future of train18 11/21/2022 1
  • 2.
    INTRODUCTION 11/21/2022 2  IndianRailways (IR) is India's national railway system operated by the Ministry of Railways.  Routes are electrified with 25 kV AC electric traction while thirty three percent of them are double or multi- tracked.  Vande Bharat Express , also known as Train 18,is an Indian semi-high speed intercity electric multiple unit.  It was designed and built by Integral Coach Factory (ICF) Chennai under the Indian government's Make in India initiative over a span of 18 months.
  • 3.
    HISTORY OF INDIANRAILWAYS 11/21/2022 3  1853-1869: Launching passenger rail services.  1869-1900: Famine and economic growth.  1901-1925: Moves towards centralisation.  1925-till date: Electrification and new technology enhancements
  • 4.
    OTHER GIANTS OFINDIAN RAILWAYS 11/21/2022 4 WAP 1(3760 HP) WAP 4(6350 HP) WAP 5(5450 HP) WAP 7(6350 HP) WAG 9(6000-6350 HP)
  • 5.
    11/21/2022 5 Train18 Introduction The self-propelled train set, comprising 16 air-conditioned coaches, was built at a cost of ₹100 crore, about half the cost of importing such a rake, with about 80% indigenous components in alignment with the Prime Minister’s call for ‘Make in India’.
  • 6.
    ICF Chennai 11/21/2022 6 The Integral Coach Factory is one of the earliest production units of independent India. It was inaugurated by the first Prime Minister of India Pt. Jawaharlal Nehru on 2nd October, 1955.  Later the Furnishing Division was inaugurated on 2nd October, 1962 and the production of fully furnished coaches steadily increased over the years.  Spread over nearly 511 acres, it has about 10,408 employees to turnout more than 2000 coaches every year which includes conventional and self propelled coaches.
  • 7.
    Components of Train18 11/21/20227 Car body construction Steel Train length 376.64 metres (1,235.7 ft) Width 3.24 metres (10.6 ft) Doors Automatic Articulated sections N/A Maximum speed 180 km/h (110 mph) (highest speed reached)[2] 130 km/h (81 mph) (highest operating speed)[3] 200 km/h (120 mph) (theoretical max speed)[4] Weight 39.5 Tonnes - Trailer coach Power output 8000 kW (10700 hp) (= 32 motors, each of 250 kW) Acceleration 0.7 meters per second squared (2.3 ft/s2)[5] Auxiliaries 415 V 3 phase 50 Hz Power supply 25 kV 50 Hz AC 1-phase UIC classification (2'-2' + Bo-Bo + 2'-2' + Bo-Bo) for each basic unit Bogies Indigenous Braking system(s) electropneumatic braking Coupling system CBC, semi-permanent type Track gauge 1676 mm (5 ft 6 in) broad gauge(Indian gauge)
  • 8.
    DETAILINGS OF THEMOTORS 11/21/2022 8
  • 9.
  • 10.
  • 11.
  • 12.
  • 13.
  • 14.
  • 15.
  • 16.
  • 17.
  • 18.
  • 19.
  • 20.