Kiran Telgaonkar
B-07, Anandvan Heritage, +919665770384,
Anandnagar Pune 411051 kiran.telgaonkar@gmail.com +91-20-24356709
Page 1 of 4
CTO / Vice President of Engineering
Innovative, hands-on experience with record of leading design and development of high technology products
(Hardware & Software), improving processes and procedures to drive revenue, efficiency, and market share.
Summary: Dynamic leader known for jump-starting Product Development (Hardware &
Software), resolving manufacturing issues and increasing revenues, Problem solving abilities,
Creativity & Innovation, Pro-Activeness & Crisis Management, Stress Resistance,
Key Strengths:
Requirements Definition,
Enterprise Software Systems
Integration,
Product Design &
Development
Software Architecture,
Development and
Implementation
Strategic Technology Planning Budget Development &
Cost Control
Turn Key Project Execution,
Process Re-engineering &
Continuous Process
Improvement
QMS – ISO, EMS, Vendor Selection /
Management
Skills & Achievements:
 Development & Implement Transformer Design software, (Input: Electrical Specs and Output:
Data sheets, Bill of materials and Drawings)
 Development & Implement Production Planning and Tracking software, Output MIS: Monthly
Order booking, Production and invoicing week-wise and category-wise.
 Development of 3D Models of Transformer & Rectifier Assembly using Solid-works 3D
software with parametric linking and automatic drawings creation
 Setting-up workflows in Solid-works to Document Planning, Issue, Review, Monitor and
Control.
 The On time and Error-less Delivery performance for Engineering Output (From 40% to @ 90%
On Time Delivery and from 92% Errors to 43 % Errors within 6 months): This has been achieved
by reorganizing the department, Using Software for Documentation and Product Standardization.
 Development of Transformer Rectifiers with compact windings & reduction of @ 10% in
material cost
 Development of Design software for Transformers using MS Excel, AutoCAD Inventor & Auto
Lisp - Design calculations time reduced from 16 Hours to 10 Minutes / Optimized Designs &
Manufacturing documents along with cost estimation for export TR sets is the output.
 Project Execution for Turnkey projects in Electro-chlorination, Hydrogen generation, Hard
chrome plating Rectifiers, ESP rectifiers and auxiliaries—projects involving Transformer,
Rectifiers, Reactors, Chokes, Bus-duct systems, Harmonic Filters, Scada and PLC systems,
Resource Planning and outsourcing, Identifying shortfalls and critical items.
 Hire, train, motivate, evaluate and develop the people
Kiran Telgaonkar
B-07, Anandvan Heritage, +919665770384,
Anandnagar Pune 411051 kiran.telgaonkar@gmail.com +91-20-24356709
Page 2 of 4
Professional Experience of > 32 years
Since Apr’16, Vice President (BU) at M/s. Herco Transformers Limited, Pune India.
{HERCO specializes in a wide variety of HV & LV Power Transformers for various industries}.
# Heading All Manufacturing operations, Planning and Execution of orders, Achieve monthly production
targets, Infrastructural development, Addition of manufacturing facilities, Addition of Testing facilities,
# Daily Tracking of Order Booking, Production Value and Invoicing Value and compare with Targets, Decide
targets for the Month.
# Monitor Engineering Team and Process -Creating SOP and Implementing. Monitor CAD output with 2D /
3D with software like Auto-CAD and Solid Works.
# Monitor Purchase / Stores Team – Material Planning and Execution, Sourcing from New Vendors,
Inventory Management with Min and Max Levels; Vendor development,
# Monitor Production Team with focus to Daily Output wrt to Monthly and Weekly Production Plan and
targets, Process validations,
# Monitor and Develop outsourced manufacturing processes,
# Support Marketing for Quotations, Cost Estimations, Technical Discussions, Drawing Approvals & Exports
# Delayed delivery Analysis, Rework Data and Analysis, Monitoring Appraisal process, Interviews for New
Recruitments, Resource Planning,
Jun’ 15 – Mar’ 16, Head-Engineering at M/s. Uni-tech Automation Pvt. Ltd. Pune India
(UNI-TECH Automation was established in the year 1996 as partnership firm and was elevated to ‘Private
Limited Company’ in 2006. Reputation as Dependable Manufacturer of control panels and wiring harnesses.
UNI-TECH Now aims to be known as solution provider in the field of Automation. Turn Over – 62 CR.)
# Support Marketing Team for New Business Development
# Prepare JD and Develop resources. Define KRA and Carry out performance Appraisal.
# Responsible for developing competencies & building top talent for succession planning.
# Contract Review, Feasibility Study & Business Risk Analysis for New products.
# Assign Work to D&D Managers & Monitor them.
# Represent D&D in Cross Functional Teams. Participate in Technical / Commercial discussions
# Prepare and present Product Development Plan
# Co-ordination with Purchase & Vendors for Development of New items.
# Review 3D layouts of Prototypes. Verify and approve process flow charts and conduct PFMEA along with
CFT. Approve Proto files
# Follow up for Tool Developments with Purchase & Production Teams.
# Coordination with the customer for feedback on Proto
# Follow up for PPAP production lot. Prepare TGW/TGR report with D&D and CFT.
# Skill Analysis of Sub ordinates and Identify Training Needs Impart Training.
# Approve and Monitor Vendors for outsourcing of Engineering Services
# Monitor NCR & Root Cause Analysis and Deploy CAPA & implement the same.
# Approve & Track Engineering Change Notes (ECN’s)
# Develop cost structure for RM / FG and Labor.
# Responsibility of Improvement / Development projects
Kiran Telgaonkar
B-07, Anandvan Heritage, +919665770384,
Anandnagar Pune 411051 kiran.telgaonkar@gmail.com +91-20-24356709
Page 3 of 4
Nov’13– May’15, Vice President (BU) at M/s. Herco Transformers Limited, Pune India
(HERCO Transformers Limited specialize in manufacturing Ignition transformers, tan-delta transformers, Oil
BDV test set transformers for HV testers. HERCO's range of Ignition Transformers, Power Transformers,
Tan-Delta Transformers, other High Voltage Transformers categorized by industry: Burners & Boilers; Air &
Oil Filtration; Instrumentation Automatic Bowl Feeders Power Transformers)
# Setting up Engineering Team and Process -Creating SOP and Implementing.
# Setting up CAD facilities with 2D / 3D with software like Auto-CAD and Solid Works.
# Support marketing for cost estimations; technical discussions, Drawing approvals & Exports
# Manufacturing operations, Achieve monthly production targets, Vendor development, Process validations,
Infrastructural development, Addition of manufacturing facilities, addition of testing facilities,
Oct' 10 – Oct’ 13, Vice President (Engineering) at M/s. KraftPowercon India Pvt. Ltd.
Pune India (A global company with production facilities in Sweden, China and India offering innovative
solutions, products and services within industrial power supply equipment’s making processes secure, reliable,
as efficient as possible and improves availability)
# Setting up Engineering Team and Process -Creating SOP and Implementing.
# Setting up CAD facilities with 2D / 3D with software like Auto-CAD and Solid Works.
# Execution of contract (@ 50 mn Rs.) in record time of 6 months for 5 sets of Rectifier system for Hydrogen
generation for EXPORT.
# The On time and Error-less Delivery performance for Engineering output (From 40% to @ 90% On Time
Delivery and from 92% Errors to 43 % Errors within 6 months)
# Execution of contract (Rs. 20 mn) for Electro Chlorination consisting Air cooled Rectifier 12 pulse, Cast
Resin Transformer, Harmonic filter.
# Support for cost estimation; technical discussions, Drawing approvals & communication with global clients.
# Design of Oil cooled transformers up to 5 MVA, 33000 volts, Convertor application, 12 pulse force air
cooled rectifier systems upto 12000 Amps; 12 pulse water cooled rectifier systems up to 10000 Amps;
# Harmonic Analysis and Design for Passive Harmonic filters
2006—2010 AGM (R &D) and MR for QMS M/s. Ador Powertron Limited, PUNE, India
(Ador is the world’s leading manufacturer & complete power solution provider for HV TR Sets, Customized
High Current AC / DC Power Source, Telecoms Power Supplies and UPS)
# Achieving Business Plan, Annual Quality Plan in various aspects like Technological excellence, Customer
satisfaction, continual improvement through cost reduction.
# Resource Planning, outsourcing & Provide necessary resources
# Deployment of projects Weekly review for Project status, breaking organizational goals into small targets,
deploy and review the status
# Implementation of ISO 9001, 2008 for the organization being MR of the organization
# Development of IGBT based HV power source.
# Development of TR with compact windings and reduction of @ 10% in material cost
# Development of 3 phase HV TR set & control panel for ESP application.
# Development of Compact TR sets of silicon fluid. Saved about Rs. 8.8 Million
# Design of 2 MVA, 70 KV DC, 22 Amp Power supply, for high power microwave tubes.
# Standardization of TR sets 80 - 150 KV, 100 - 3000 mA for >10% saving in material cost
# Quality system Auditor for various departments’
Kiran Telgaonkar
B-07, Anandvan Heritage, +919665770384,
Anandnagar Pune 411051 kiran.telgaonkar@gmail.com +91-20-24356709
Page 4 of 4
2005—2006 Manager (Electrical) M/s. ThyssenKrupp Industries India Ltd. PUNE, India
Electrical system design for Coal handling Plant which includes -
# MV and LV switchgear,
# Transformers up to 10 MVA,
# Conveyor drives, Cable schedules and cable routing
# Scada and PLC automation, Local control stations, Control room designs
# Execution and Monitoring of Project
2004–2005 Chief Manager (Projects-Electrical) M/s. Flat Products Ltd. MUMBAI, India
# Technical discussions with clients and attending kick-off meetings / status review meetings
# Freezing technical specifications of MV & LV Motors/ Drives/ PLC/ Scada/ MCC / Control Desks / HT
transformers/ Rectifiers/ Switchboard/ PDB/ CCTV/ PA systems / Instruments / Cables etc.
# Load calculations / Short circuit analysis / Sizing of transformers & Motors / Switchgear co-ordination /
SLD’s / Configuration Diagrams / Flow Sheet / Flow diagrams / Load lists
# Preparing Project Layout, Cable schedules, Cable terminal diagrams / Foundation GA, Earthing layout, I/O
lists etc.
1992 – 2004 Manager (Design & Dev), M/s. Ador Powertron Limited, PUNE, India
# Design software for Transformers using Spreadsheet, AutoCAD Inventor and Auto Lisp -Design
calculations time reduced from 16 Hours to 10 Minutes / Optimized design along with cost estimation is
available
# Development of Hermetically sealed transformer rectifier units required for ESP application first time in
India in collaboration with a German company.
# Developed Manual / Motorized High Voltage Disconnect or Grounding switches
# Development of Special rectifier stacks. (Customer specific design in compact size)
# Development of Silicon Oil filled transformer rectifier units first time in India.
# Worked out solutions / preventive measures for various field failures like paint peeling /rusting of hardware
/ labels fading out etc.
1991 – 1992 Project Engineer, M/s. Thermon Heat Tracers, PUNE, India
1990 – 1991 Electrical Engineer,M/s. Eagle Flask Industries Ltd. PUNE, India
1984 – 1990 Senior Engineer, M/s. Advani Oerlikon Ltd. PUNE, India
Education (Academic and Professional): Certified Energy Auditor & Energy Manager, Entitled to practice as
Energy Auditor under the Energy conservation Act 2001.
Energy Auditor Bureau of Energy
Efficiency
72% First class and Distinction 2009
B.E. (Electrical) COEP
(Pune University)
71% First class & Distinction 1984
Trainings:
Advance Auto CAD, Auto LISP, C and C++, Visual Basic, Various Managerial Effectiveness courses like
Leadership, Communication Skills, Lean Management,
Personal Profile
Date of Birth: 13th January 1962
Proficiency in Languages: English, Hindi & Marathi, Read/Write/Speak
Married: Yes

T. Kiran

  • 1.
    Kiran Telgaonkar B-07, AnandvanHeritage, +919665770384, Anandnagar Pune 411051 kiran.telgaonkar@gmail.com +91-20-24356709 Page 1 of 4 CTO / Vice President of Engineering Innovative, hands-on experience with record of leading design and development of high technology products (Hardware & Software), improving processes and procedures to drive revenue, efficiency, and market share. Summary: Dynamic leader known for jump-starting Product Development (Hardware & Software), resolving manufacturing issues and increasing revenues, Problem solving abilities, Creativity & Innovation, Pro-Activeness & Crisis Management, Stress Resistance, Key Strengths: Requirements Definition, Enterprise Software Systems Integration, Product Design & Development Software Architecture, Development and Implementation Strategic Technology Planning Budget Development & Cost Control Turn Key Project Execution, Process Re-engineering & Continuous Process Improvement QMS – ISO, EMS, Vendor Selection / Management Skills & Achievements:  Development & Implement Transformer Design software, (Input: Electrical Specs and Output: Data sheets, Bill of materials and Drawings)  Development & Implement Production Planning and Tracking software, Output MIS: Monthly Order booking, Production and invoicing week-wise and category-wise.  Development of 3D Models of Transformer & Rectifier Assembly using Solid-works 3D software with parametric linking and automatic drawings creation  Setting-up workflows in Solid-works to Document Planning, Issue, Review, Monitor and Control.  The On time and Error-less Delivery performance for Engineering Output (From 40% to @ 90% On Time Delivery and from 92% Errors to 43 % Errors within 6 months): This has been achieved by reorganizing the department, Using Software for Documentation and Product Standardization.  Development of Transformer Rectifiers with compact windings & reduction of @ 10% in material cost  Development of Design software for Transformers using MS Excel, AutoCAD Inventor & Auto Lisp - Design calculations time reduced from 16 Hours to 10 Minutes / Optimized Designs & Manufacturing documents along with cost estimation for export TR sets is the output.  Project Execution for Turnkey projects in Electro-chlorination, Hydrogen generation, Hard chrome plating Rectifiers, ESP rectifiers and auxiliaries—projects involving Transformer, Rectifiers, Reactors, Chokes, Bus-duct systems, Harmonic Filters, Scada and PLC systems, Resource Planning and outsourcing, Identifying shortfalls and critical items.  Hire, train, motivate, evaluate and develop the people
  • 2.
    Kiran Telgaonkar B-07, AnandvanHeritage, +919665770384, Anandnagar Pune 411051 kiran.telgaonkar@gmail.com +91-20-24356709 Page 2 of 4 Professional Experience of > 32 years Since Apr’16, Vice President (BU) at M/s. Herco Transformers Limited, Pune India. {HERCO specializes in a wide variety of HV & LV Power Transformers for various industries}. # Heading All Manufacturing operations, Planning and Execution of orders, Achieve monthly production targets, Infrastructural development, Addition of manufacturing facilities, Addition of Testing facilities, # Daily Tracking of Order Booking, Production Value and Invoicing Value and compare with Targets, Decide targets for the Month. # Monitor Engineering Team and Process -Creating SOP and Implementing. Monitor CAD output with 2D / 3D with software like Auto-CAD and Solid Works. # Monitor Purchase / Stores Team – Material Planning and Execution, Sourcing from New Vendors, Inventory Management with Min and Max Levels; Vendor development, # Monitor Production Team with focus to Daily Output wrt to Monthly and Weekly Production Plan and targets, Process validations, # Monitor and Develop outsourced manufacturing processes, # Support Marketing for Quotations, Cost Estimations, Technical Discussions, Drawing Approvals & Exports # Delayed delivery Analysis, Rework Data and Analysis, Monitoring Appraisal process, Interviews for New Recruitments, Resource Planning, Jun’ 15 – Mar’ 16, Head-Engineering at M/s. Uni-tech Automation Pvt. Ltd. Pune India (UNI-TECH Automation was established in the year 1996 as partnership firm and was elevated to ‘Private Limited Company’ in 2006. Reputation as Dependable Manufacturer of control panels and wiring harnesses. UNI-TECH Now aims to be known as solution provider in the field of Automation. Turn Over – 62 CR.) # Support Marketing Team for New Business Development # Prepare JD and Develop resources. Define KRA and Carry out performance Appraisal. # Responsible for developing competencies & building top talent for succession planning. # Contract Review, Feasibility Study & Business Risk Analysis for New products. # Assign Work to D&D Managers & Monitor them. # Represent D&D in Cross Functional Teams. Participate in Technical / Commercial discussions # Prepare and present Product Development Plan # Co-ordination with Purchase & Vendors for Development of New items. # Review 3D layouts of Prototypes. Verify and approve process flow charts and conduct PFMEA along with CFT. Approve Proto files # Follow up for Tool Developments with Purchase & Production Teams. # Coordination with the customer for feedback on Proto # Follow up for PPAP production lot. Prepare TGW/TGR report with D&D and CFT. # Skill Analysis of Sub ordinates and Identify Training Needs Impart Training. # Approve and Monitor Vendors for outsourcing of Engineering Services # Monitor NCR & Root Cause Analysis and Deploy CAPA & implement the same. # Approve & Track Engineering Change Notes (ECN’s) # Develop cost structure for RM / FG and Labor. # Responsibility of Improvement / Development projects
  • 3.
    Kiran Telgaonkar B-07, AnandvanHeritage, +919665770384, Anandnagar Pune 411051 kiran.telgaonkar@gmail.com +91-20-24356709 Page 3 of 4 Nov’13– May’15, Vice President (BU) at M/s. Herco Transformers Limited, Pune India (HERCO Transformers Limited specialize in manufacturing Ignition transformers, tan-delta transformers, Oil BDV test set transformers for HV testers. HERCO's range of Ignition Transformers, Power Transformers, Tan-Delta Transformers, other High Voltage Transformers categorized by industry: Burners & Boilers; Air & Oil Filtration; Instrumentation Automatic Bowl Feeders Power Transformers) # Setting up Engineering Team and Process -Creating SOP and Implementing. # Setting up CAD facilities with 2D / 3D with software like Auto-CAD and Solid Works. # Support marketing for cost estimations; technical discussions, Drawing approvals & Exports # Manufacturing operations, Achieve monthly production targets, Vendor development, Process validations, Infrastructural development, Addition of manufacturing facilities, addition of testing facilities, Oct' 10 – Oct’ 13, Vice President (Engineering) at M/s. KraftPowercon India Pvt. Ltd. Pune India (A global company with production facilities in Sweden, China and India offering innovative solutions, products and services within industrial power supply equipment’s making processes secure, reliable, as efficient as possible and improves availability) # Setting up Engineering Team and Process -Creating SOP and Implementing. # Setting up CAD facilities with 2D / 3D with software like Auto-CAD and Solid Works. # Execution of contract (@ 50 mn Rs.) in record time of 6 months for 5 sets of Rectifier system for Hydrogen generation for EXPORT. # The On time and Error-less Delivery performance for Engineering output (From 40% to @ 90% On Time Delivery and from 92% Errors to 43 % Errors within 6 months) # Execution of contract (Rs. 20 mn) for Electro Chlorination consisting Air cooled Rectifier 12 pulse, Cast Resin Transformer, Harmonic filter. # Support for cost estimation; technical discussions, Drawing approvals & communication with global clients. # Design of Oil cooled transformers up to 5 MVA, 33000 volts, Convertor application, 12 pulse force air cooled rectifier systems upto 12000 Amps; 12 pulse water cooled rectifier systems up to 10000 Amps; # Harmonic Analysis and Design for Passive Harmonic filters 2006—2010 AGM (R &D) and MR for QMS M/s. Ador Powertron Limited, PUNE, India (Ador is the world’s leading manufacturer & complete power solution provider for HV TR Sets, Customized High Current AC / DC Power Source, Telecoms Power Supplies and UPS) # Achieving Business Plan, Annual Quality Plan in various aspects like Technological excellence, Customer satisfaction, continual improvement through cost reduction. # Resource Planning, outsourcing & Provide necessary resources # Deployment of projects Weekly review for Project status, breaking organizational goals into small targets, deploy and review the status # Implementation of ISO 9001, 2008 for the organization being MR of the organization # Development of IGBT based HV power source. # Development of TR with compact windings and reduction of @ 10% in material cost # Development of 3 phase HV TR set & control panel for ESP application. # Development of Compact TR sets of silicon fluid. Saved about Rs. 8.8 Million # Design of 2 MVA, 70 KV DC, 22 Amp Power supply, for high power microwave tubes. # Standardization of TR sets 80 - 150 KV, 100 - 3000 mA for >10% saving in material cost # Quality system Auditor for various departments’
  • 4.
    Kiran Telgaonkar B-07, AnandvanHeritage, +919665770384, Anandnagar Pune 411051 kiran.telgaonkar@gmail.com +91-20-24356709 Page 4 of 4 2005—2006 Manager (Electrical) M/s. ThyssenKrupp Industries India Ltd. PUNE, India Electrical system design for Coal handling Plant which includes - # MV and LV switchgear, # Transformers up to 10 MVA, # Conveyor drives, Cable schedules and cable routing # Scada and PLC automation, Local control stations, Control room designs # Execution and Monitoring of Project 2004–2005 Chief Manager (Projects-Electrical) M/s. Flat Products Ltd. MUMBAI, India # Technical discussions with clients and attending kick-off meetings / status review meetings # Freezing technical specifications of MV & LV Motors/ Drives/ PLC/ Scada/ MCC / Control Desks / HT transformers/ Rectifiers/ Switchboard/ PDB/ CCTV/ PA systems / Instruments / Cables etc. # Load calculations / Short circuit analysis / Sizing of transformers & Motors / Switchgear co-ordination / SLD’s / Configuration Diagrams / Flow Sheet / Flow diagrams / Load lists # Preparing Project Layout, Cable schedules, Cable terminal diagrams / Foundation GA, Earthing layout, I/O lists etc. 1992 – 2004 Manager (Design & Dev), M/s. Ador Powertron Limited, PUNE, India # Design software for Transformers using Spreadsheet, AutoCAD Inventor and Auto Lisp -Design calculations time reduced from 16 Hours to 10 Minutes / Optimized design along with cost estimation is available # Development of Hermetically sealed transformer rectifier units required for ESP application first time in India in collaboration with a German company. # Developed Manual / Motorized High Voltage Disconnect or Grounding switches # Development of Special rectifier stacks. (Customer specific design in compact size) # Development of Silicon Oil filled transformer rectifier units first time in India. # Worked out solutions / preventive measures for various field failures like paint peeling /rusting of hardware / labels fading out etc. 1991 – 1992 Project Engineer, M/s. Thermon Heat Tracers, PUNE, India 1990 – 1991 Electrical Engineer,M/s. Eagle Flask Industries Ltd. PUNE, India 1984 – 1990 Senior Engineer, M/s. Advani Oerlikon Ltd. PUNE, India Education (Academic and Professional): Certified Energy Auditor & Energy Manager, Entitled to practice as Energy Auditor under the Energy conservation Act 2001. Energy Auditor Bureau of Energy Efficiency 72% First class and Distinction 2009 B.E. (Electrical) COEP (Pune University) 71% First class & Distinction 1984 Trainings: Advance Auto CAD, Auto LISP, C and C++, Visual Basic, Various Managerial Effectiveness courses like Leadership, Communication Skills, Lean Management, Personal Profile Date of Birth: 13th January 1962 Proficiency in Languages: English, Hindi & Marathi, Read/Write/Speak Married: Yes