Recycling or Strengthening In-PlaceMaterials
Project ConditionsThatAre SuitableFor In-PlaceRecycling
1. Cold In-PlaceRecycling (CIR) Recycling “Train”))
 Arterial streets, Collector streets, Highways, and Runways that total
180,000 SF or biggerin size.
 Asphaltsection only is deteriorating and needs to be partiallyor fully
replaced.
 Base or subgradeis in good stablecondition (isolated areas of dig-outs
are okay as long as they are a small proportion of total project/>25%)
 TypicallyCIR willsavea minimum of 30% and providea longerlife
cycle when compared to a grind and overlay(millandfill)type of
remove and replaceconstruction method.
 Instead of paying a contractor to remove and haul awayyour old
asphaltasset that is worth $25 to $45/ton, CIR willturn the old asphalt
asset that has alreadybeen paid for, into a new base course asphalt
section. This recycled base course section willsubsequentlybecapped
by a thinner virgin hot mix or rubberized hot mix asphaltsection.
 Typical cost to recycle old asphaltin to a new base course asphaltwith
(CIR) is $37/ton.
2. Cold Central PlantRecycling (CCPR)
 ParkingLots and Residential Streets that are inaccessibleto the (CIR)
“Train”that total 180,000SF or biggerin size.
 Asphaltsection only, or both asphaltsection and base/subgradesection
need to be reconstructed.
 If asphaltsection only need to be replaced, (CCPR)willsavea
minimum of 30% when comparedto a grind and overlaytype of remove
and replaceconstruction method.
 If there are subgradeor base failuresattributableto the pavement
failure, or the pavementsection needs to be increased because of
increased traffic loading-cementor limestabilization of the base
and/or subgradesection combined with(CCPR)to produce a new base
course asphaltsection willprovidecost savingsof 45% to 50% or more.
 Typical cost to recycle old asphaltintoa new base course asphalt
section with(CCPR)is $41-$45/ton.
3. Full Depth Reclamation (FDR)
 Parkinglots or streets of 20,000SF or biggerin size that need to be
fullyreconstructed (entire pavementsection inclusiveof asphalt, base
and/or subgradesection needs to be replaced).
 Instead of doing deep excavationsand removingthe entire existing
pavementsection, doing subgradepreparation, importingnew
aggregatebase, and paving a new asphaltsection- Removeonlywhatis
needed to makeroom for a new asphaltsection, then stabilizethe
remainingmaterialsin-placechemically(cementor lime), or
bituminously(asphaltemulsion, foamedasphalt)to providea stabilized
base section that has superior structural valuesto a ClassII aggregate
base.
 The stabilized layerwillbridgepotentiallyyieldingsubgradeconditions
that exist below and thatwould causeunforeseen costs/change orders
to remedy in a remove and replaceconstruction method.
 FDR willtakeup to half the timeto completecompared to a remove
and replaceconstruction method.
 FDR willminimizeimpacton utilitieswithminimizedexcavation
depths.
 FDR willsavea minimum of 30% or higher on the total project cost
compared to a removeand replace construction method.

More Related Content

What's hot

10 amarjeet benipal
10 amarjeet benipal10 amarjeet benipal
Ebenezer
EbenezerEbenezer
Item #5 ppt Cambridge Lighting & Parking Agreement
Item #5   ppt Cambridge Lighting & Parking AgreementItem #5   ppt Cambridge Lighting & Parking Agreement
Item #5 ppt Cambridge Lighting & Parking Agreement
ahcitycouncil
 
Greenbook Specification book for local agencies update
Greenbook Specification book for local agencies updateGreenbook Specification book for local agencies update
Greenbook Specification book for local agencies update
California Asphalt Pavement Association
 
Chimney Hill Applicant Presentation
Chimney Hill Applicant PresentationChimney Hill Applicant Presentation
Chimney Hill Applicant Presentation
City of College Station
 
Lid Stormwater Approach: Overcoming Barriers to Implementation
Lid Stormwater Approach: Overcoming Barriers to ImplementationLid Stormwater Approach: Overcoming Barriers to Implementation
Lid Stormwater Approach: Overcoming Barriers to Implementation
abroadsword
 
Psn resume
Psn   resume Psn   resume
Psn resume
PramodShankarNair
 
Birmingham New Street - Final Push
Birmingham New Street - Final PushBirmingham New Street - Final Push
Birmingham New Street - Final Push
Marc Johnson
 
120314 southpoint plaza zoning presentation final 4.23.12
120314 southpoint plaza zoning presentation final 4.23.12120314 southpoint plaza zoning presentation final 4.23.12
120314 southpoint plaza zoning presentation final 4.23.12
cityofevanston
 
Jumbo CC-S Elevator Buckets
Jumbo CC-S Elevator BucketsJumbo CC-S Elevator Buckets
Jumbo CC-S Elevator Buckets
4B Braime Components
 
Runway resurfacing ppt
Runway resurfacing ppt Runway resurfacing ppt
Runway resurfacing ppt
Faiz Ahmed
 
Eglinton Crosstown LRT - Public Notice
Eglinton Crosstown LRT - Public NoticeEglinton Crosstown LRT - Public Notice
Eglinton Crosstown LRT - Public Notice
Bonnie Byford Real Estate Ltd., Brokerage
 

What's hot (12)

10 amarjeet benipal
10 amarjeet benipal10 amarjeet benipal
10 amarjeet benipal
 
Ebenezer
EbenezerEbenezer
Ebenezer
 
Item #5 ppt Cambridge Lighting & Parking Agreement
Item #5   ppt Cambridge Lighting & Parking AgreementItem #5   ppt Cambridge Lighting & Parking Agreement
Item #5 ppt Cambridge Lighting & Parking Agreement
 
Greenbook Specification book for local agencies update
Greenbook Specification book for local agencies updateGreenbook Specification book for local agencies update
Greenbook Specification book for local agencies update
 
Chimney Hill Applicant Presentation
Chimney Hill Applicant PresentationChimney Hill Applicant Presentation
Chimney Hill Applicant Presentation
 
Lid Stormwater Approach: Overcoming Barriers to Implementation
Lid Stormwater Approach: Overcoming Barriers to ImplementationLid Stormwater Approach: Overcoming Barriers to Implementation
Lid Stormwater Approach: Overcoming Barriers to Implementation
 
Psn resume
Psn   resume Psn   resume
Psn resume
 
Birmingham New Street - Final Push
Birmingham New Street - Final PushBirmingham New Street - Final Push
Birmingham New Street - Final Push
 
120314 southpoint plaza zoning presentation final 4.23.12
120314 southpoint plaza zoning presentation final 4.23.12120314 southpoint plaza zoning presentation final 4.23.12
120314 southpoint plaza zoning presentation final 4.23.12
 
Jumbo CC-S Elevator Buckets
Jumbo CC-S Elevator BucketsJumbo CC-S Elevator Buckets
Jumbo CC-S Elevator Buckets
 
Runway resurfacing ppt
Runway resurfacing ppt Runway resurfacing ppt
Runway resurfacing ppt
 
Eglinton Crosstown LRT - Public Notice
Eglinton Crosstown LRT - Public NoticeEglinton Crosstown LRT - Public Notice
Eglinton Crosstown LRT - Public Notice
 

Viewers also liked

Lugares turisticos
Lugares turisticosLugares turisticos
Lugares turisticos
Jerson Farias
 
UAS Excellence at CSU Channel Islands
UAS Excellence at CSU Channel IslandsUAS Excellence at CSU Channel Islands
UAS Excellence at CSU Channel Islands
Jason Miller
 
Diseño adaptable o sensible
Diseño adaptable o sensibleDiseño adaptable o sensible
Diseño adaptable o sensible
dispersium
 
File45414
File45414File45414
File45414
Phi Phi
 
ESL Class #4 Basic
ESL Class #4 BasicESL Class #4 Basic
ESL Class #4 Basic
Héctor Polo
 
Search the World
Search the WorldSearch the World
Search the World
George Yfantis
 
Lesson 4
Lesson 4Lesson 4
Lesson 4
Gicheru Onesmus
 
Regla 7 la biblia no es de interpretación personal
Regla 7 la biblia no es de interpretación personalRegla 7 la biblia no es de interpretación personal
Regla 7 la biblia no es de interpretación personal
Héctor Polo
 
Introduction to-employability-skills for musicians & SWOT analysis
Introduction to-employability-skills for musicians & SWOT analysisIntroduction to-employability-skills for musicians & SWOT analysis
Introduction to-employability-skills for musicians & SWOT analysis
Christopher Baker
 
El carnero y el macho cabrio
El carnero y el macho cabrioEl carnero y el macho cabrio
El carnero y el macho cabrio
Marilyn Santiago Vargas
 
Obdii y pruebas de emisiones
Obdii y pruebas de emisionesObdii y pruebas de emisiones
Obdii y pruebas de emisiones
gustavo saravia
 
Las personas mayores en la ficcion televisiva el caso de hospital central
Las personas mayores en la ficcion televisiva el caso de hospital centralLas personas mayores en la ficcion televisiva el caso de hospital central
Las personas mayores en la ficcion televisiva el caso de hospital central
Jose F. Mancebo
 
Indian IT industry analysis: wipro, tcs,infosys
Indian IT industry analysis: wipro, tcs,infosysIndian IT industry analysis: wipro, tcs,infosys
Indian IT industry analysis: wipro, tcs,infosys
Neelutpal Saha
 

Viewers also liked (15)

Lugares turisticos
Lugares turisticosLugares turisticos
Lugares turisticos
 
UAS Excellence at CSU Channel Islands
UAS Excellence at CSU Channel IslandsUAS Excellence at CSU Channel Islands
UAS Excellence at CSU Channel Islands
 
Diseño adaptable o sensible
Diseño adaptable o sensibleDiseño adaptable o sensible
Diseño adaptable o sensible
 
File45414
File45414File45414
File45414
 
ESL Class #4 Basic
ESL Class #4 BasicESL Class #4 Basic
ESL Class #4 Basic
 
Search the World
Search the WorldSearch the World
Search the World
 
BACK
BACKBACK
BACK
 
Keek androd
Keek androdKeek androd
Keek androd
 
Lesson 4
Lesson 4Lesson 4
Lesson 4
 
Regla 7 la biblia no es de interpretación personal
Regla 7 la biblia no es de interpretación personalRegla 7 la biblia no es de interpretación personal
Regla 7 la biblia no es de interpretación personal
 
Introduction to-employability-skills for musicians & SWOT analysis
Introduction to-employability-skills for musicians & SWOT analysisIntroduction to-employability-skills for musicians & SWOT analysis
Introduction to-employability-skills for musicians & SWOT analysis
 
El carnero y el macho cabrio
El carnero y el macho cabrioEl carnero y el macho cabrio
El carnero y el macho cabrio
 
Obdii y pruebas de emisiones
Obdii y pruebas de emisionesObdii y pruebas de emisiones
Obdii y pruebas de emisiones
 
Las personas mayores en la ficcion televisiva el caso de hospital central
Las personas mayores en la ficcion televisiva el caso de hospital centralLas personas mayores en la ficcion televisiva el caso de hospital central
Las personas mayores en la ficcion televisiva el caso de hospital central
 
Indian IT industry analysis: wipro, tcs,infosys
Indian IT industry analysis: wipro, tcs,infosysIndian IT industry analysis: wipro, tcs,infosys
Indian IT industry analysis: wipro, tcs,infosys
 

Similar to Synopsis of Projects Suitable For In-Place Recycling

Stop Don't R&R Contractors Flyer
Stop Don't R&R Contractors FlyerStop Don't R&R Contractors Flyer
Stop Don't R&R Contractors Flyer
Craig Harrington
 
Runway resurfacing and repairing using modern materials and
Runway resurfacing and repairing using modern materials andRunway resurfacing and repairing using modern materials and
Runway resurfacing and repairing using modern materials and
Aglaia Connect
 
Village networking ppt
Village networking pptVillage networking ppt
Village networking ppt
Patel Tapan
 
Stormwater Guidebook_Permeable Pavement Systems.pdf
Stormwater Guidebook_Permeable Pavement Systems.pdfStormwater Guidebook_Permeable Pavement Systems.pdf
Stormwater Guidebook_Permeable Pavement Systems.pdf
ShielaSorino1
 
Level crossings tech note august 2017
Level crossings tech note august 2017Level crossings tech note august 2017
Level crossings tech note august 2017
Nykilde Frø - Grønne tage - Vegetation - Grøn teknik
 
Anchois 1- Oil&Gas Field
Anchois 1- Oil&Gas FieldAnchois 1- Oil&Gas Field
Anchois 1- Oil&Gas Field
Jose V.Taboada
 
CON E 430 FALL 2012CASE STUDYHossein Hemati Jona.docx
CON E 430 FALL 2012CASE STUDYHossein Hemati Jona.docxCON E 430 FALL 2012CASE STUDYHossein Hemati Jona.docx
CON E 430 FALL 2012CASE STUDYHossein Hemati Jona.docx
donnajames55
 
Sector Summary - Subsea
Sector Summary - SubseaSector Summary - Subsea
Sector Summary - Subsea
Thomas Burke
 
Roads & bridges
Roads & bridgesRoads & bridges
Roads & bridges
Monu Prashar
 
Ijciet 10 02_094
Ijciet 10 02_094Ijciet 10 02_094
Ijciet 10 02_094
IAEME Publication
 
Pavement Design Methods 2 (Flexible and Rigid).pdf
Pavement Design Methods 2 (Flexible and Rigid).pdfPavement Design Methods 2 (Flexible and Rigid).pdf
Pavement Design Methods 2 (Flexible and Rigid).pdf
MohammadKabirHossain4
 
dragline-operation.ppt
dragline-operation.pptdragline-operation.ppt
dragline-operation.ppt
DagmawiGenanaw
 
dragline-operation.ppt
dragline-operation.pptdragline-operation.ppt
dragline-operation.ppt
HARIDASSC0788
 
Design of flexible pavements as per IRC37
Design of flexible pavements as per IRC37 Design of flexible pavements as per IRC37
Design of flexible pavements as per IRC37
SupriyaPal10
 
Updated combined transportation_facility_report.pdf 2
Updated combined transportation_facility_report.pdf 2Updated combined transportation_facility_report.pdf 2
Updated combined transportation_facility_report.pdf 2
Kenneth Hogge Sr
 
Accurate Measurement of Runway Pavement Geometries
Accurate Measurement of Runway Pavement GeometriesAccurate Measurement of Runway Pavement Geometries
Accurate Measurement of Runway Pavement Geometries
Johan Granlund
 
presentation on road pavement (zeeshan)
presentation on road pavement (zeeshan)presentation on road pavement (zeeshan)
presentation on road pavement (zeeshan)
alamrintu
 
Cost optimization of using geogrids vs piles in the foundation of interchange...
Cost optimization of using geogrids vs piles in the foundation of interchange...Cost optimization of using geogrids vs piles in the foundation of interchange...
Cost optimization of using geogrids vs piles in the foundation of interchange...
IAEME Publication
 
Gis substation
Gis substationGis substation
Gis substation
Asif Eqbal
 
"The Load Capacity of Driven Cast-In-Situ Piles Derived from Installation Par...
"The Load Capacity of Driven Cast-In-Situ Piles Derived from Installation Par..."The Load Capacity of Driven Cast-In-Situ Piles Derived from Installation Par...
"The Load Capacity of Driven Cast-In-Situ Piles Derived from Installation Par...
Remedy Geotechnics Ltd
 

Similar to Synopsis of Projects Suitable For In-Place Recycling (20)

Stop Don't R&R Contractors Flyer
Stop Don't R&R Contractors FlyerStop Don't R&R Contractors Flyer
Stop Don't R&R Contractors Flyer
 
Runway resurfacing and repairing using modern materials and
Runway resurfacing and repairing using modern materials andRunway resurfacing and repairing using modern materials and
Runway resurfacing and repairing using modern materials and
 
Village networking ppt
Village networking pptVillage networking ppt
Village networking ppt
 
Stormwater Guidebook_Permeable Pavement Systems.pdf
Stormwater Guidebook_Permeable Pavement Systems.pdfStormwater Guidebook_Permeable Pavement Systems.pdf
Stormwater Guidebook_Permeable Pavement Systems.pdf
 
Level crossings tech note august 2017
Level crossings tech note august 2017Level crossings tech note august 2017
Level crossings tech note august 2017
 
Anchois 1- Oil&Gas Field
Anchois 1- Oil&Gas FieldAnchois 1- Oil&Gas Field
Anchois 1- Oil&Gas Field
 
CON E 430 FALL 2012CASE STUDYHossein Hemati Jona.docx
CON E 430 FALL 2012CASE STUDYHossein Hemati Jona.docxCON E 430 FALL 2012CASE STUDYHossein Hemati Jona.docx
CON E 430 FALL 2012CASE STUDYHossein Hemati Jona.docx
 
Sector Summary - Subsea
Sector Summary - SubseaSector Summary - Subsea
Sector Summary - Subsea
 
Roads & bridges
Roads & bridgesRoads & bridges
Roads & bridges
 
Ijciet 10 02_094
Ijciet 10 02_094Ijciet 10 02_094
Ijciet 10 02_094
 
Pavement Design Methods 2 (Flexible and Rigid).pdf
Pavement Design Methods 2 (Flexible and Rigid).pdfPavement Design Methods 2 (Flexible and Rigid).pdf
Pavement Design Methods 2 (Flexible and Rigid).pdf
 
dragline-operation.ppt
dragline-operation.pptdragline-operation.ppt
dragline-operation.ppt
 
dragline-operation.ppt
dragline-operation.pptdragline-operation.ppt
dragline-operation.ppt
 
Design of flexible pavements as per IRC37
Design of flexible pavements as per IRC37 Design of flexible pavements as per IRC37
Design of flexible pavements as per IRC37
 
Updated combined transportation_facility_report.pdf 2
Updated combined transportation_facility_report.pdf 2Updated combined transportation_facility_report.pdf 2
Updated combined transportation_facility_report.pdf 2
 
Accurate Measurement of Runway Pavement Geometries
Accurate Measurement of Runway Pavement GeometriesAccurate Measurement of Runway Pavement Geometries
Accurate Measurement of Runway Pavement Geometries
 
presentation on road pavement (zeeshan)
presentation on road pavement (zeeshan)presentation on road pavement (zeeshan)
presentation on road pavement (zeeshan)
 
Cost optimization of using geogrids vs piles in the foundation of interchange...
Cost optimization of using geogrids vs piles in the foundation of interchange...Cost optimization of using geogrids vs piles in the foundation of interchange...
Cost optimization of using geogrids vs piles in the foundation of interchange...
 
Gis substation
Gis substationGis substation
Gis substation
 
"The Load Capacity of Driven Cast-In-Situ Piles Derived from Installation Par...
"The Load Capacity of Driven Cast-In-Situ Piles Derived from Installation Par..."The Load Capacity of Driven Cast-In-Situ Piles Derived from Installation Par...
"The Load Capacity of Driven Cast-In-Situ Piles Derived from Installation Par...
 

Synopsis of Projects Suitable For In-Place Recycling

  • 1. 1 0 2 4 0 S A N S E V A I N E W A Y , J U R U P A V A L L E Y , C A 9 1 7 5 2 PHONE: (951) 682-1091 - FAX: (951) 682.1094 ________________________________________________________________________________________________________________________________ Recycling or Strengthening In-PlaceMaterials Project ConditionsThatAre SuitableFor In-PlaceRecycling 1. Cold In-PlaceRecycling (CIR) Recycling “Train”))  Arterial streets, Collector streets, Highways, and Runways that total 180,000 SF or biggerin size.  Asphaltsection only is deteriorating and needs to be partiallyor fully replaced.  Base or subgradeis in good stablecondition (isolated areas of dig-outs are okay as long as they are a small proportion of total project/>25%)  TypicallyCIR willsavea minimum of 30% and providea longerlife cycle when compared to a grind and overlay(millandfill)type of remove and replaceconstruction method.  Instead of paying a contractor to remove and haul awayyour old asphaltasset that is worth $25 to $45/ton, CIR willturn the old asphalt asset that has alreadybeen paid for, into a new base course asphalt section. This recycled base course section willsubsequentlybecapped by a thinner virgin hot mix or rubberized hot mix asphaltsection.  Typical cost to recycle old asphaltin to a new base course asphaltwith (CIR) is $37/ton. 2. Cold Central PlantRecycling (CCPR)  ParkingLots and Residential Streets that are inaccessibleto the (CIR) “Train”that total 180,000SF or biggerin size.  Asphaltsection only, or both asphaltsection and base/subgradesection need to be reconstructed.  If asphaltsection only need to be replaced, (CCPR)willsavea minimum of 30% when comparedto a grind and overlaytype of remove and replaceconstruction method.  If there are subgradeor base failuresattributableto the pavement failure, or the pavementsection needs to be increased because of increased traffic loading-cementor limestabilization of the base and/or subgradesection combined with(CCPR)to produce a new base course asphaltsection willprovidecost savingsof 45% to 50% or more.
  • 2.  Typical cost to recycle old asphaltintoa new base course asphalt section with(CCPR)is $41-$45/ton. 3. Full Depth Reclamation (FDR)  Parkinglots or streets of 20,000SF or biggerin size that need to be fullyreconstructed (entire pavementsection inclusiveof asphalt, base and/or subgradesection needs to be replaced).  Instead of doing deep excavationsand removingthe entire existing pavementsection, doing subgradepreparation, importingnew aggregatebase, and paving a new asphaltsection- Removeonlywhatis needed to makeroom for a new asphaltsection, then stabilizethe remainingmaterialsin-placechemically(cementor lime), or bituminously(asphaltemulsion, foamedasphalt)to providea stabilized base section that has superior structural valuesto a ClassII aggregate base.  The stabilized layerwillbridgepotentiallyyieldingsubgradeconditions that exist below and thatwould causeunforeseen costs/change orders to remedy in a remove and replaceconstruction method.  FDR willtakeup to half the timeto completecompared to a remove and replaceconstruction method.  FDR willminimizeimpacton utilitieswithminimizedexcavation depths.  FDR willsavea minimum of 30% or higher on the total project cost compared to a removeand replace construction method.