1
RESUME
Sunil Kumark v Email:sunil.kv1989@gmail.com
B.E in Mechanical MobileNo.:+91 9886501874
S/0 Vasanth Kumar, No 15, 2nd Floor, MadhuNivas, NarayanaReddy Layout,Electronic City, Bangalore
OBJECTIVES
Seeking to take up challenging position where I can utilize and grow my technical and
Managerial skill and effectively contribute in Mechanical engineering, in the role I can take
up.
Profile
 Qualified B.E., (Mechanical Engineering) from PES College of EngineeringVisvesaraya
Technological University. Accented with the latest trends and techniques of the Project
Management field, having an inborn quantitative aptitude & determined to carve a successful
and satisfying career in the HVAC industry
 Fast and Self Directed Learner and ability to adjust to the situation
 Self confident, Capable Of Decision Making & Executing
 Honesty, Time Conscious, Sense of Responsibility, hard worker and a good listener
 Ability to deal with People Management And Work Output
 Enthusiastic for Team Work and open to New and Creative Ideas
 Capable to foster a Stimulating Working Environment and provide the Work With
Commitment
 Adroit in using 3D software (CATIA-V5, SOLID EDGE),
 Proficient in reading AUTOCAD Drawings.
Experience Summary
4 YEAR & 6 Months WORK EXPERIEANCE IN HVAC PROJECT MANAGEMENT
Zamil Air Conditioners 2015 to Present
Designation: Sr Project Engineer - Turnkey Projects & Products
ABS Aircon Engineers Pvt ltd 2014 to 2015
Designation: Project Engineer – HVAC Project Engineer
LUWA India Pvt Ltd., Bangalore 2011 to 2013
Designation: Project Engineer – Project Management
Areas of Expertise
Admin
Project Management – Preparation of Work Schedules, Technical Submittal, attending meeting
With Consultants, Undertaking and Executing till final Hand over to Client’s.
Material Management - Documentary of Materials Used, to be Used and Shortage.
Client Interaction – Project Discussion, Execution and Completing, Problem Solving Vendor &
Contractor Management.
Technical
Supply & Exhaust Air Volume Calculations
Auto control type Humidification Plant through DIGI-5 & VFD.
Chillers, Dampers, Rotary Air Filters, Air Washers, Fan housing, Compactors, Rotary pre filters,
Radial & Axial fans, AHU’s, Plug type fans, Cassette units, VAV, VRF, PAC,FCU, VFD.
2
Achievement
Planning, Installation& Commissioning and Made Working of HUMUDIFICATION PLANT –
H-PLANT Control through DIGI-5 having capacity of 600000CMH for Samrudha
International ltd, Maharashtra– This is done in Switzerland by our company, in India I had
Applied in this Project Successfully.
Roles
 Planning, Execution, commissioning & Maintaining of Air Handling Units (AHU’s) or
Humidification plant
 Read the built Drawings & instructions, coordinating & discussing with Client Engineers &
designers.
 Preparation work schedules, technical submittals, attending meeting with consultants to acquire
approval.
 Study of Drawings &final understanding of the general analysis and all submittal drawings
 Coordinating with clients & contractors
 Material & Man power coordinating
 Preparing of work schedule as per project requirement
 Daily work progress reporting & Planning for every activity according site progress
 Manage installation of ducts for ventilation purposes.
 Chillers installations with necessary pump and pipe fittings.
 Sub-contractors finalization.
 To ensure minimum wastage of man, material time at site.
 Preparation of Variation Statement and NT Items as per site execution.
Projects Handled in Textile Industries
 Sitaram spinning ltd, Hyderabad, Andhra Pradesh
 NandanAxims Industries, Ahmadabad, Gujarat.
 Samrudha international ltd, Dhulia, Maharashtra
 Etco denim Pvt ltd, Bijapur, Karnataka
 FabtechPvt ltd, Sangola, Maharashtra
 Jaijyothi Pvt ltd, Rajapalayam, Tamilnadu
 Kallam Brothers Pvt ltd, Guntur, Andhra Pradesh
 Keihin fie Pvt ltd, Doddaballapur, Bangalore
 Mico Bosch, Bidadi, Bangalore
 Signature Club, Brigade, Bangalore
 Grand Mercure Brigade, Mysore
Software Used
 Solid Works & AutoCAD
 MS Office for Documentary
QUALIFICATION
QUALIFICATION INSTITUTION YEAR OF PASSING %
B.E in ME PESCE-VTU 2011 71.56
2nd P.U.C S.V.C-PU Board 2007 72.5
10th J.S.S-KSEEB 2005 85.76
PROJECTS
TECHNICAL SEMINAR ON:
“Run flat tyres Technology and Air inflation Technology”
PROJECT SEMINAR ON:
“Fabrication and testing of Polymeric composites with Natural fiber Reinforcement with
different Heating periods
3
JobResponsibilities
1. Inspection/Documentation/Planning of work for the Materials received at the site.
2. Preparation of work schedules as per projects, preparation of reports and schedules.
3. Follow up with Design, Works and others departments for daily activities.
4. Follow-up with Vendor Development & Purchase department for material status.
5. Installation of HVAC Humidification Products & Commissioning of that Product.
6. Modification Of Materials, Design according to Site Situation
7. Planning and executing the project according to the site situation
8. Monitoring & reporting on automated test runs.
9. Project inspection involves civil works, Air duct installations, Piping installations &
Electrical Cabling for panel &Motors.
10. Site clearances checking where there is safety to work.
11. Supervising planning and scheduling, progress Monitoring, QC, Monitoring activities of
Contractors & Sub Contractors.
12. Preparation of BOQ, Variation Statement and Tracking of Bill of Material from isometric
drawings.
13. Preparation of Check list For installation, testing, Commissioning.
14. The Equipment Erection& Assembly involves – Installing Chillers, radial blowers, axial
fans, Diff types of fans, Spray bank, structural work of AHU, piping, welding, PAC, Air
washer, Cassette Units, Duct able Ac, Diff types of Dampers, CU Piping, Insulation Work, Hi
wall units, including electrical and instrumentation job such as cabling and instrumentation.
Hobbies
 Playing cricket, badminton, carom & chess
 Listening to film songs.
PERSONALPROFILE
Name : Sunil Kumar K V
Father’s Name : Vasanth Kumar
Date of birth : 01-11-1989
Gender : Male
Marital Status : Single
Nationality : Indian
Languages Known : English (Read, Write & Speak)
Kannada (Read, Write & Speak)
Hindi (Read, Write& Speak)
Telugu, Tamil (Learning)
Permanent Address : No #414b C Block,Manandavadi Road, Mahadevapura, Mysore
Mysore-570008, Karnataka
DECLARATION
I hereby declare that the aboveinformation furnished is true to the best of my knowledge and
belief.
Place : Bangalore
Date :
(Sunil KumarK V)

Sunil Kumar K V- Mechanical Resume

  • 1.
    1 RESUME Sunil Kumark vEmail:sunil.kv1989@gmail.com B.E in Mechanical MobileNo.:+91 9886501874 S/0 Vasanth Kumar, No 15, 2nd Floor, MadhuNivas, NarayanaReddy Layout,Electronic City, Bangalore OBJECTIVES Seeking to take up challenging position where I can utilize and grow my technical and Managerial skill and effectively contribute in Mechanical engineering, in the role I can take up. Profile  Qualified B.E., (Mechanical Engineering) from PES College of EngineeringVisvesaraya Technological University. Accented with the latest trends and techniques of the Project Management field, having an inborn quantitative aptitude & determined to carve a successful and satisfying career in the HVAC industry  Fast and Self Directed Learner and ability to adjust to the situation  Self confident, Capable Of Decision Making & Executing  Honesty, Time Conscious, Sense of Responsibility, hard worker and a good listener  Ability to deal with People Management And Work Output  Enthusiastic for Team Work and open to New and Creative Ideas  Capable to foster a Stimulating Working Environment and provide the Work With Commitment  Adroit in using 3D software (CATIA-V5, SOLID EDGE),  Proficient in reading AUTOCAD Drawings. Experience Summary 4 YEAR & 6 Months WORK EXPERIEANCE IN HVAC PROJECT MANAGEMENT Zamil Air Conditioners 2015 to Present Designation: Sr Project Engineer - Turnkey Projects & Products ABS Aircon Engineers Pvt ltd 2014 to 2015 Designation: Project Engineer – HVAC Project Engineer LUWA India Pvt Ltd., Bangalore 2011 to 2013 Designation: Project Engineer – Project Management Areas of Expertise Admin Project Management – Preparation of Work Schedules, Technical Submittal, attending meeting With Consultants, Undertaking and Executing till final Hand over to Client’s. Material Management - Documentary of Materials Used, to be Used and Shortage. Client Interaction – Project Discussion, Execution and Completing, Problem Solving Vendor & Contractor Management. Technical Supply & Exhaust Air Volume Calculations Auto control type Humidification Plant through DIGI-5 & VFD. Chillers, Dampers, Rotary Air Filters, Air Washers, Fan housing, Compactors, Rotary pre filters, Radial & Axial fans, AHU’s, Plug type fans, Cassette units, VAV, VRF, PAC,FCU, VFD.
  • 2.
    2 Achievement Planning, Installation& Commissioningand Made Working of HUMUDIFICATION PLANT – H-PLANT Control through DIGI-5 having capacity of 600000CMH for Samrudha International ltd, Maharashtra– This is done in Switzerland by our company, in India I had Applied in this Project Successfully. Roles  Planning, Execution, commissioning & Maintaining of Air Handling Units (AHU’s) or Humidification plant  Read the built Drawings & instructions, coordinating & discussing with Client Engineers & designers.  Preparation work schedules, technical submittals, attending meeting with consultants to acquire approval.  Study of Drawings &final understanding of the general analysis and all submittal drawings  Coordinating with clients & contractors  Material & Man power coordinating  Preparing of work schedule as per project requirement  Daily work progress reporting & Planning for every activity according site progress  Manage installation of ducts for ventilation purposes.  Chillers installations with necessary pump and pipe fittings.  Sub-contractors finalization.  To ensure minimum wastage of man, material time at site.  Preparation of Variation Statement and NT Items as per site execution. Projects Handled in Textile Industries  Sitaram spinning ltd, Hyderabad, Andhra Pradesh  NandanAxims Industries, Ahmadabad, Gujarat.  Samrudha international ltd, Dhulia, Maharashtra  Etco denim Pvt ltd, Bijapur, Karnataka  FabtechPvt ltd, Sangola, Maharashtra  Jaijyothi Pvt ltd, Rajapalayam, Tamilnadu  Kallam Brothers Pvt ltd, Guntur, Andhra Pradesh  Keihin fie Pvt ltd, Doddaballapur, Bangalore  Mico Bosch, Bidadi, Bangalore  Signature Club, Brigade, Bangalore  Grand Mercure Brigade, Mysore Software Used  Solid Works & AutoCAD  MS Office for Documentary QUALIFICATION QUALIFICATION INSTITUTION YEAR OF PASSING % B.E in ME PESCE-VTU 2011 71.56 2nd P.U.C S.V.C-PU Board 2007 72.5 10th J.S.S-KSEEB 2005 85.76 PROJECTS TECHNICAL SEMINAR ON: “Run flat tyres Technology and Air inflation Technology” PROJECT SEMINAR ON: “Fabrication and testing of Polymeric composites with Natural fiber Reinforcement with different Heating periods
  • 3.
    3 JobResponsibilities 1. Inspection/Documentation/Planning ofwork for the Materials received at the site. 2. Preparation of work schedules as per projects, preparation of reports and schedules. 3. Follow up with Design, Works and others departments for daily activities. 4. Follow-up with Vendor Development & Purchase department for material status. 5. Installation of HVAC Humidification Products & Commissioning of that Product. 6. Modification Of Materials, Design according to Site Situation 7. Planning and executing the project according to the site situation 8. Monitoring & reporting on automated test runs. 9. Project inspection involves civil works, Air duct installations, Piping installations & Electrical Cabling for panel &Motors. 10. Site clearances checking where there is safety to work. 11. Supervising planning and scheduling, progress Monitoring, QC, Monitoring activities of Contractors & Sub Contractors. 12. Preparation of BOQ, Variation Statement and Tracking of Bill of Material from isometric drawings. 13. Preparation of Check list For installation, testing, Commissioning. 14. The Equipment Erection& Assembly involves – Installing Chillers, radial blowers, axial fans, Diff types of fans, Spray bank, structural work of AHU, piping, welding, PAC, Air washer, Cassette Units, Duct able Ac, Diff types of Dampers, CU Piping, Insulation Work, Hi wall units, including electrical and instrumentation job such as cabling and instrumentation. Hobbies  Playing cricket, badminton, carom & chess  Listening to film songs. PERSONALPROFILE Name : Sunil Kumar K V Father’s Name : Vasanth Kumar Date of birth : 01-11-1989 Gender : Male Marital Status : Single Nationality : Indian Languages Known : English (Read, Write & Speak) Kannada (Read, Write & Speak) Hindi (Read, Write& Speak) Telugu, Tamil (Learning) Permanent Address : No #414b C Block,Manandavadi Road, Mahadevapura, Mysore Mysore-570008, Karnataka DECLARATION I hereby declare that the aboveinformation furnished is true to the best of my knowledge and belief. Place : Bangalore Date : (Sunil KumarK V)