Company
Profile
Team
B. Anthony Sheen, Co-Founder, Managing Director & CEO
20 years experience across companies as Motorola, BPL
Mobile, Zenrin/Infotrack in Sales and Marketing covering
Telecom & Telematics Domain
Instrumental in Launching India’s First Motorola Digital
Trunk Technology (Procall) with inbuilt GPS
Sasikumar Arumugham, Co-Founder, CTO
15 years experience catering to Logistics sector as Car
Rentals in Telematics Technology; First to Design & Develop
a Taxi Dispatch System in India for Meru Cabs
Implemented Taxi Dispatch System in more than 25 Taxi
Companies Globally – TFS, Meru, Dubai Taxi, Nano Taxi,
Mega Cabs to name a few
Worked for HP and Zenrin/Infotrack
Kamalesh Sekhar, Strategy & Business Development
Corporate Finance in Asian Paints; Marketing & Business
Strategy for ArcelorMittal in Mexico – USD 6 Bn revenues
Last 7 years: Advising Indian Companies in Customer
acquisition/Market entry into Latin America, Capital raising
for Growth, M&A; Business Diligence & Portfolio
management for PE funds/Family Offices
Team
• 50 years of Cumulative experience across Commercial Freight, Taxi and
Cab Rental Business across Sales, Technology and Operations.
• First to develop the Technology in India.
2019
• A Team of 60
• Strong unit economics/PAT
positive for last three years with
24000 fleet in platform
Fleet Management
Product
• Locational Intelligence
• Fleet and Driver Analytics
• Management Information System
An innovative product to help the
unorganised logistics sector to
improve efficiency
2013
A team of 6 – SunFleet –
100% YoY growth
recorded for SaaS
Tracing our Journey
Our Products
Conventional Black Box
based Fleet Management
solutions.
Specialised for various
logistics verticals.
Integration with OBD and
fleet analytics.
NextGen Mobile based
product for unorganised
truck industry
Enable paperless
transaction.
Integration with various
Marketplaces
Our Clients
Addressable
TRUCK
Market size
9.5 Mn Trucks
Problem Definition – Freight Industry
Real Time Live Stream of Shipment
High Cost of Delivery
Driver
Management
Real Time
Analytics
Optimal Routing
Safety &
Compliance
Manpower
Intrinsic
Delayed
deliveries
Benefits of our solution
Driver Behavior
analytics provide
reduced accidents
& fuel costs
Increased customer
satisfaction index
Real Time tracking
helps prevent
delay in deliveries
Fuel Savings;
Adhering to safety &
compliance standards
Substantial
reduction in
manhours
Optimization of
routes resulting in
reduced cost of
deliveries
Benefits for Fleet Owners
Tracking
Track all vehicles on a
single screen
Jobs
Assign Job to drivers and Keep
track of job status
Analytics
Real time information on
speed, ETA etc.
Load Market
Improve capacity utilization of trucks
by improving order management and
delivery schedules
Consignee Tracking
The Consignee gets to track his
shipment as well
With our Compliance & Safety
management tool – we can pre-empt
renewal of Insurance and we have the
ability to get the best insurance rates given
our platform aggregation capabilities
Insurance
Benefits for Company Ferrying Goods
Tracking
Real time monitoring
of goods movement –
Helps in JIT in factory
and ensuring
customers are kept
updated on ETA
Utilization
Better utilization of
trucks resulting in
better negotiations
with fleet owners
for cost reduction
Time Spent
Faster in and out
of trucks –
enabling cost
saving
Routing &
scheduling
Optimal routing &
scheduling of trips
helps in reduced
kms thereby
reducing freight
costs
Goods Insurance
Company has the
ability to provide
Insurance for the
goods being
transported at
competitive prices
Sun Fleet
Freight
Operators
Integration
with various
Sensors
Web Portal &
Mobile App
for Feet
Management
Driving
Behaviour
OBD
Integration
Fuel
Management
Real Time
Analytics
Sun Fleet - Features
Integrated end to end logistics platform
Vital tracking functionalities
Powerful reporting suite for analysis
Route planning and trip monitoring
Real time sensor monitoring system
Delivery management system
Driver behavior analysis
Billing & cost management
Compliance management for your fleet.
Safety management for Fleet & Driver
Tracking Management
Real Time Tracking of fleet
/individual vehicle on Google
Map
Live traffic data and nearby
vehicles
History tracking of individual
vehicles
Live summary of individual
vehicle
Live information relating to
speed, driving direction, ignition
status, driving violations, past
trips and more.
Live information on driver & his
driving efficiency
1
2
3
4
5
6
Reports & Alerts
Custom Reports
Reports include movement,
location, trip and utilization
reports, as well as driver scoring,
fuel, event violations and cost
analysis reports.
Analytics
The solution’s robust reporting
capability enables data to be
reviewed and analyzed in detail as
well as in dynamic and customizable
formats.
Routing and Trip Management
Optimization of routes
based on time,
distance, traffic data,
etc. for lesser delivery
schedules
Geofencing Routes
and providing
deviations alert
E-trip sheet & e-trip
authentication of
delivery & pickup
ETA to planned trip
stops can be
monitored live
Our Routing & scheduling
tool helps companies to
optimize routes and
inventory-based
scheduling
Sensor Management
Temperature
Sensor
• Front/Rear
Side of Truck
temperature
monitoring
• Cabin
Temperature
Monitoring
Sleep Sensor
• Anti Sleep Alarm for
Drivers
Fuel Sensor
• Location based fuel
consumption
analytics
• Fuel Pilferage alert &
report
• Fuel refill report &
alert
OBD Sensor
• All available
on-board
diagnostics
Delivery Management System
ETA of planned delivery stops can be monitored
E-Delivery authentication
Deviations of ETA can be monitored live for corrective actions
Share live feed with customers/buyers.
Driver Behavior Management
POOR GOOD
Poor
Good
Great
Excellent
Fair
Driving Pattern
Analysis in terms of
Speed, Acceleration,
braking etc
Driver Ranking
system based on
analysis
Duration of driving
and providing alert
based on accepted
hours of driving/day
Pre & Post
accident
analysis
Billing & Cost Management
0
5
10
Category 1 Category 2 Category 3 Category 4
Chart Title
Series 1 Series 2 Series 3
On Completion of Trip automated Invoice
can be generated based on customer-wise
contractual data.
Trip-wise/Vehicle-wise Profitability can be
generated .
Trip Expenses or cost of delivery monitoring
Integration with legacy system
Compliance Management
All Vehicle/Driver statutory
compliances can be monitored
Proactive alerts are given before
expiry of any compliances
Vehicles/Driver not adhering to
compliances will not be scheduled
Safety Management
Various alert mechanisms like
Overspeed/idle/Aircondition/Seat Belt/
Unplanned Deviations etc
SOS distress button is available for driver
Email & SMS based alerts can be made
available.
Closure of any deviations on portal is made
available
Sun Fleet – Last Mile Logistics Solution
• Solution Provided:
– Web Application
– Hassle-free booking
– Type of Booking - Contractual and Regular/On-demand
• Solution Benefits:
– Optimal solution for Last mile logistics
– Estimate total cost of goods movement
– Validation of vendors and customers based on scores
– Track your truck
– Smart Navigation
– Monthly invoice generation for both vendors and customers
– Multi-model Payment options
– GCN (Goods Consignment Note)
– POD (Proof of delivery)
– Digital Signature
Case Studies – Thermo king
for Ingersoll Rand
Our white labelled product to Thermo King developed fully by Sun
Telematics has the following features:
• Milkrun and long-haul integration with Customer ERP
• Integration with Thermo king reefer which is achieved by an iBox
designed and developed by Sun Team and Ingersoll Team.
• Using this integration, remotely monitor and control:
• Temperature monitoring and control in front side, centre and
rear side of the reefer given different temperature
requirements;
• Identify remotely which side of the door is open or closed
• Alert the supervisor and the client on the Temperature
increase/door open and close
• Ability to set remotely different temperatures for different type
of goods either through our Web app or Mobile app.
• A Real time MIS on the Temperature readings
• External fuel sensors and pilferage alerts
• Speed alerts
• Harsh driving alerts and sensitive tracking
• Video:
https://www.thermoking.com/na/en/road/connectedsuite-
telematics.html
Case Studies – UTI World Wide
Pain Areas:
• Delays in delivery schedule
• No real time location and deviations
• Fuel pilferage
• No real time alerts and reports
• Vehicle and driver records were manually maintained
Solution Benefits:
• Our solution provided ETA of vehicles. Hence, the delays in delivery schedules were proactively monitored and
corrective action were taken
• Our telematic intelligence provided them with real time location/reports/alerts
• Our fuel monitoring solution provided them with alerts for any pilferage
• Our temperature monitoring system provides real time temperature reports to manage cold chain logistics
• Our vehicle maintenance module helps in keeping good record of drivers and vehicle and also alerts the customer for
any deviations on statutory compliance
Study Finding:
• UTI was able to provide their customers with ETA of vehicle accurately which HELPED THEM IN
GAINING CUSTOMER GOODWILL
• Prior to using this system their LOSS IN FUEL PILFERAGE HAS BEEN REDUCED BY 50%
Case Studies – City Link
Pain Areas:
• Dry runs
• Real-time authentication of delivery
• Real-time ETA for customers
• Billing Transparency
• Measuring real-time efficiency
Solution Benefits:
• Our solution provided ETA of vehicles. Hence, the delays in delivery schedules were proactively
monitored and corrective action were taken
• Our telematic intelligence provided them with real time location/reports/alerts
• The job is assigned to nearest vehicle REDUCING THE DRY RUNS
• Our solution gave them REAL-TIME POD with digital signature
Study Finding:
• It was found that the DRY RUNS OF VEHICLES WERE REDUCED BY 30%
WITHIN FIRST 6 MONTHS of implementation ; Satisfaction index > 50%
National Permit
National Permit
Enterprise
version for
large fleet
Driver &
Owner App
Geo Fencing
and Route
Calibration
Doc share &
Security
Features
E-wallet &
Cashless
Transactions
Crowd
Sourcing
from Drivers
Owner App
Driver App
The product caters to logistics/Transportation sector
(Mobile Technology)
Sample Screen Shots
Sample Screen Shots
Case Studies – Flipkart
Case Studies – Cement Company
Thank You!

Sun telematics 3 pl

  • 1.
  • 2.
    Team B. Anthony Sheen,Co-Founder, Managing Director & CEO 20 years experience across companies as Motorola, BPL Mobile, Zenrin/Infotrack in Sales and Marketing covering Telecom & Telematics Domain Instrumental in Launching India’s First Motorola Digital Trunk Technology (Procall) with inbuilt GPS Sasikumar Arumugham, Co-Founder, CTO 15 years experience catering to Logistics sector as Car Rentals in Telematics Technology; First to Design & Develop a Taxi Dispatch System in India for Meru Cabs Implemented Taxi Dispatch System in more than 25 Taxi Companies Globally – TFS, Meru, Dubai Taxi, Nano Taxi, Mega Cabs to name a few Worked for HP and Zenrin/Infotrack Kamalesh Sekhar, Strategy & Business Development Corporate Finance in Asian Paints; Marketing & Business Strategy for ArcelorMittal in Mexico – USD 6 Bn revenues Last 7 years: Advising Indian Companies in Customer acquisition/Market entry into Latin America, Capital raising for Growth, M&A; Business Diligence & Portfolio management for PE funds/Family Offices
  • 3.
    Team • 50 yearsof Cumulative experience across Commercial Freight, Taxi and Cab Rental Business across Sales, Technology and Operations. • First to develop the Technology in India.
  • 4.
    2019 • A Teamof 60 • Strong unit economics/PAT positive for last three years with 24000 fleet in platform Fleet Management Product • Locational Intelligence • Fleet and Driver Analytics • Management Information System An innovative product to help the unorganised logistics sector to improve efficiency 2013 A team of 6 – SunFleet – 100% YoY growth recorded for SaaS Tracing our Journey
  • 5.
    Our Products Conventional BlackBox based Fleet Management solutions. Specialised for various logistics verticals. Integration with OBD and fleet analytics. NextGen Mobile based product for unorganised truck industry Enable paperless transaction. Integration with various Marketplaces
  • 6.
  • 7.
    Problem Definition –Freight Industry Real Time Live Stream of Shipment High Cost of Delivery Driver Management Real Time Analytics Optimal Routing Safety & Compliance Manpower Intrinsic Delayed deliveries
  • 8.
    Benefits of oursolution Driver Behavior analytics provide reduced accidents & fuel costs Increased customer satisfaction index Real Time tracking helps prevent delay in deliveries Fuel Savings; Adhering to safety & compliance standards Substantial reduction in manhours Optimization of routes resulting in reduced cost of deliveries
  • 9.
    Benefits for FleetOwners Tracking Track all vehicles on a single screen Jobs Assign Job to drivers and Keep track of job status Analytics Real time information on speed, ETA etc. Load Market Improve capacity utilization of trucks by improving order management and delivery schedules Consignee Tracking The Consignee gets to track his shipment as well With our Compliance & Safety management tool – we can pre-empt renewal of Insurance and we have the ability to get the best insurance rates given our platform aggregation capabilities Insurance
  • 10.
    Benefits for CompanyFerrying Goods Tracking Real time monitoring of goods movement – Helps in JIT in factory and ensuring customers are kept updated on ETA Utilization Better utilization of trucks resulting in better negotiations with fleet owners for cost reduction Time Spent Faster in and out of trucks – enabling cost saving Routing & scheduling Optimal routing & scheduling of trips helps in reduced kms thereby reducing freight costs Goods Insurance Company has the ability to provide Insurance for the goods being transported at competitive prices
  • 11.
    Sun Fleet Freight Operators Integration with various Sensors WebPortal & Mobile App for Feet Management Driving Behaviour OBD Integration Fuel Management Real Time Analytics
  • 12.
    Sun Fleet -Features Integrated end to end logistics platform Vital tracking functionalities Powerful reporting suite for analysis Route planning and trip monitoring Real time sensor monitoring system Delivery management system Driver behavior analysis Billing & cost management Compliance management for your fleet. Safety management for Fleet & Driver
  • 13.
    Tracking Management Real TimeTracking of fleet /individual vehicle on Google Map Live traffic data and nearby vehicles History tracking of individual vehicles Live summary of individual vehicle Live information relating to speed, driving direction, ignition status, driving violations, past trips and more. Live information on driver & his driving efficiency 1 2 3 4 5 6
  • 14.
    Reports & Alerts CustomReports Reports include movement, location, trip and utilization reports, as well as driver scoring, fuel, event violations and cost analysis reports. Analytics The solution’s robust reporting capability enables data to be reviewed and analyzed in detail as well as in dynamic and customizable formats.
  • 15.
    Routing and TripManagement Optimization of routes based on time, distance, traffic data, etc. for lesser delivery schedules Geofencing Routes and providing deviations alert E-trip sheet & e-trip authentication of delivery & pickup ETA to planned trip stops can be monitored live Our Routing & scheduling tool helps companies to optimize routes and inventory-based scheduling
  • 16.
    Sensor Management Temperature Sensor • Front/Rear Sideof Truck temperature monitoring • Cabin Temperature Monitoring Sleep Sensor • Anti Sleep Alarm for Drivers Fuel Sensor • Location based fuel consumption analytics • Fuel Pilferage alert & report • Fuel refill report & alert OBD Sensor • All available on-board diagnostics
  • 17.
    Delivery Management System ETAof planned delivery stops can be monitored E-Delivery authentication Deviations of ETA can be monitored live for corrective actions Share live feed with customers/buyers.
  • 18.
    Driver Behavior Management POORGOOD Poor Good Great Excellent Fair Driving Pattern Analysis in terms of Speed, Acceleration, braking etc Driver Ranking system based on analysis Duration of driving and providing alert based on accepted hours of driving/day Pre & Post accident analysis
  • 19.
    Billing & CostManagement 0 5 10 Category 1 Category 2 Category 3 Category 4 Chart Title Series 1 Series 2 Series 3 On Completion of Trip automated Invoice can be generated based on customer-wise contractual data. Trip-wise/Vehicle-wise Profitability can be generated . Trip Expenses or cost of delivery monitoring Integration with legacy system
  • 20.
    Compliance Management All Vehicle/Driverstatutory compliances can be monitored Proactive alerts are given before expiry of any compliances Vehicles/Driver not adhering to compliances will not be scheduled
  • 21.
    Safety Management Various alertmechanisms like Overspeed/idle/Aircondition/Seat Belt/ Unplanned Deviations etc SOS distress button is available for driver Email & SMS based alerts can be made available. Closure of any deviations on portal is made available
  • 22.
    Sun Fleet –Last Mile Logistics Solution • Solution Provided: – Web Application – Hassle-free booking – Type of Booking - Contractual and Regular/On-demand • Solution Benefits: – Optimal solution for Last mile logistics – Estimate total cost of goods movement – Validation of vendors and customers based on scores – Track your truck – Smart Navigation – Monthly invoice generation for both vendors and customers – Multi-model Payment options – GCN (Goods Consignment Note) – POD (Proof of delivery) – Digital Signature
  • 23.
    Case Studies –Thermo king for Ingersoll Rand Our white labelled product to Thermo King developed fully by Sun Telematics has the following features: • Milkrun and long-haul integration with Customer ERP • Integration with Thermo king reefer which is achieved by an iBox designed and developed by Sun Team and Ingersoll Team. • Using this integration, remotely monitor and control: • Temperature monitoring and control in front side, centre and rear side of the reefer given different temperature requirements; • Identify remotely which side of the door is open or closed • Alert the supervisor and the client on the Temperature increase/door open and close • Ability to set remotely different temperatures for different type of goods either through our Web app or Mobile app. • A Real time MIS on the Temperature readings • External fuel sensors and pilferage alerts • Speed alerts • Harsh driving alerts and sensitive tracking • Video: https://www.thermoking.com/na/en/road/connectedsuite- telematics.html
  • 24.
    Case Studies –UTI World Wide Pain Areas: • Delays in delivery schedule • No real time location and deviations • Fuel pilferage • No real time alerts and reports • Vehicle and driver records were manually maintained Solution Benefits: • Our solution provided ETA of vehicles. Hence, the delays in delivery schedules were proactively monitored and corrective action were taken • Our telematic intelligence provided them with real time location/reports/alerts • Our fuel monitoring solution provided them with alerts for any pilferage • Our temperature monitoring system provides real time temperature reports to manage cold chain logistics • Our vehicle maintenance module helps in keeping good record of drivers and vehicle and also alerts the customer for any deviations on statutory compliance Study Finding: • UTI was able to provide their customers with ETA of vehicle accurately which HELPED THEM IN GAINING CUSTOMER GOODWILL • Prior to using this system their LOSS IN FUEL PILFERAGE HAS BEEN REDUCED BY 50%
  • 25.
    Case Studies –City Link Pain Areas: • Dry runs • Real-time authentication of delivery • Real-time ETA for customers • Billing Transparency • Measuring real-time efficiency Solution Benefits: • Our solution provided ETA of vehicles. Hence, the delays in delivery schedules were proactively monitored and corrective action were taken • Our telematic intelligence provided them with real time location/reports/alerts • The job is assigned to nearest vehicle REDUCING THE DRY RUNS • Our solution gave them REAL-TIME POD with digital signature Study Finding: • It was found that the DRY RUNS OF VEHICLES WERE REDUCED BY 30% WITHIN FIRST 6 MONTHS of implementation ; Satisfaction index > 50%
  • 26.
    National Permit National Permit Enterprise versionfor large fleet Driver & Owner App Geo Fencing and Route Calibration Doc share & Security Features E-wallet & Cashless Transactions Crowd Sourcing from Drivers Owner App Driver App The product caters to logistics/Transportation sector (Mobile Technology)
  • 27.
  • 28.
  • 29.
  • 30.
    Case Studies –Cement Company
  • 31.