Structural Engineering
Structural Engineering
vs.
vs.
Civil Engineering
Civil Engineering
What is Structural
Engineering?
Structural engineering is a
branch of civil engineering
that focuses on designing and
analyzing structures like
buildings and bridges to
ensure they are safe and
stable.
Buildings
Bridges and Tunnels
Towers and Masts
Offshore Structures
Civil engineering is a broad
field that involves the design,
construction, and
maintenance of infrastructure
such as roads, bridges, and
dams.
What is Civil
Engineering?
Transportation Systems
Water Resources
Environmental
Engineering
Geotechnical
Engineering
Building Information
Modeling (BIM)
Structural Analysis
Software
Finite Element Analysis
Drones
Geographic Information
Systems (GIS)
Computer-Aided Design
(CAD) Software
Surveying Equipment
Project Management
Software
Key Responsibilities of
Structural Engineers
Key Responsibilities of
Civil Engineers
Design and Analysis
Material Selection
Collaboration
Inspections
Project Planning
Site Surveys
Compliance
Project Management
Civil Engineering Focus
Areas
Structural Engineering
Focus Areas
Tools and Technologies Tools and Technologies
https://www.buildinginformationmodelling.net/structural-4d-modeling/structural-4d-
bim-services.html
https://www.buildinginformationmodelling.net

Structural Engineering vs. Civil Engineering.pdf

  • 1.
    Structural Engineering Structural Engineering vs. vs. CivilEngineering Civil Engineering What is Structural Engineering? Structural engineering is a branch of civil engineering that focuses on designing and analyzing structures like buildings and bridges to ensure they are safe and stable. Buildings Bridges and Tunnels Towers and Masts Offshore Structures Civil engineering is a broad field that involves the design, construction, and maintenance of infrastructure such as roads, bridges, and dams. What is Civil Engineering? Transportation Systems Water Resources Environmental Engineering Geotechnical Engineering Building Information Modeling (BIM) Structural Analysis Software Finite Element Analysis Drones Geographic Information Systems (GIS) Computer-Aided Design (CAD) Software Surveying Equipment Project Management Software Key Responsibilities of Structural Engineers Key Responsibilities of Civil Engineers Design and Analysis Material Selection Collaboration Inspections Project Planning Site Surveys Compliance Project Management Civil Engineering Focus Areas Structural Engineering Focus Areas Tools and Technologies Tools and Technologies https://www.buildinginformationmodelling.net/structural-4d-modeling/structural-4d- bim-services.html https://www.buildinginformationmodelling.net