The St. Joe Drive bridge in Park Hills, MO was originally built in 1920 but became obsolete. In 2017, the St. Francois County Special Road District 2 demolished the old bridge and replaced it with a new bridge spanning the UPRR line. Excavation for the new bridge's footings revealed weakened rock from the original railroad cut, requiring contractors to dig six feet deeper than planned to install a sub-footing on solid rock. The new bridge was designed by BFA Engineers and constructed by Kozeny Wagner and United Ironworkers.