This document provides details on software quality assurance including:
1. It lists the 8 steps for launching an SQA program including initiating the program, identifying issues, writing an SQA plan, establishing standards and structure, and implementing and evaluating the plan.
2. It discusses reasons SQA programs sometimes fail such as lack of experienced staff and development groups not producing quality plans.
3. It provides responsibilities of SQA like reviewing development and quality plans and auditing source code management performance.
Quality management tin software engineering with respect to S.Q.C., S.Q.P., S.Q.A. ISO QUALITY Factors, McCall's Quality Factors, Garvin's Quality Factors and all aspects about quality in software engineering.
Software Quality Analyst and Software Quality Managementنور شزننا
This presentation slide is purposely for our Software Quality course. You will notice less words, as we had been given only 10 minutes to present. All information is taken through our research on internet. Thanks to all worldwide SE Experts for your valuable knowledge.
Quality management tin software engineering with respect to S.Q.C., S.Q.P., S.Q.A. ISO QUALITY Factors, McCall's Quality Factors, Garvin's Quality Factors and all aspects about quality in software engineering.
Software Quality Analyst and Software Quality Managementنور شزننا
This presentation slide is purposely for our Software Quality course. You will notice less words, as we had been given only 10 minutes to present. All information is taken through our research on internet. Thanks to all worldwide SE Experts for your valuable knowledge.
A Guide to the Forthcoming 2012 Revision of the IEEE Software Quality Assuran...dheimann5
The IEEE is in the process of updating and adding significant content to its IEEE-730-2002 standard on Software Quality Assurance (SQA). The new version will coordinate with the four process areas and sixteen SQA tasks in the IEEE-12207-2008 standard “Systems and Software Engineering: Software Life Cycle Processes”, providing detailed elaborations for these areas and tasks.
The presentation provides a brief overview of these areas and tasks, discuss the difference between SQA and testing, and cover the annexes in IEEE 730 that provide industry-specific information as well as the relationships with software process approaches such as CMMI, Agile, SPICE, CSQE, PMBOK, and VSEs.
Top 10 metrology interview questions with answersjasminewhite302
In this file, you can ref interview materials for metrology such as, metrology situational interview, metrology behavioral interview, metrology phone interview, metrology interview thank you letter, metrology interview tips …
Top 10 metrology interview questions with answersharrisaimee4
In this file, you can ref interview materials for metrology such as, metrology situational interview, metrology behavioral interview, metrology phone interview, metrology interview thank you letter, metrology interview tips …
A Guide to the Forthcoming 2012 Revision of the IEEE Software Quality Assuran...dheimann5
The IEEE is in the process of updating and adding significant content to its IEEE-730-2002 standard on Software Quality Assurance (SQA). The new version will coordinate with the four process areas and sixteen SQA tasks in the IEEE-12207-2008 standard “Systems and Software Engineering: Software Life Cycle Processes”, providing detailed elaborations for these areas and tasks.
The presentation provides a brief overview of these areas and tasks, discuss the difference between SQA and testing, and cover the annexes in IEEE 730 that provide industry-specific information as well as the relationships with software process approaches such as CMMI, Agile, SPICE, CSQE, PMBOK, and VSEs.
Top 10 metrology interview questions with answersjasminewhite302
In this file, you can ref interview materials for metrology such as, metrology situational interview, metrology behavioral interview, metrology phone interview, metrology interview thank you letter, metrology interview tips …
Top 10 metrology interview questions with answersharrisaimee4
In this file, you can ref interview materials for metrology such as, metrology situational interview, metrology behavioral interview, metrology phone interview, metrology interview thank you letter, metrology interview tips …
Introduction to software quality assurance by QuontraSolutionsQUONTRASOLUTIONS
Quontra Solutions provides QA training by Real time Industry experts. QA is having good demand in the market. Our QA online training Instructors are very much experienced and highly qualified and dedicated.
Our QA online training program is job oriented. After completion of QA training with us you should be able to work on any kind of project. After completion of QA online training our dedicated team will be supporting you.
How to Build Software from Scratch in 5 Simple Steps.pdfBaek Yongsun
Learn how to build software from scratch in 5 simple steps. From defining requirements to deployment and maintenance, follow this guide for successful software development.
Asset finance system project initiation 101. “Selecting and implementing a new asset finance system? In the second of three articles, we go back to basics to take a look at what you need to consider at the start of your project to give yourself the best chance of success.” This has necessarily been a brief look at Project Initiation. We welcome comments and would be happy to help you get your project off to a good start.
Critical steps in Determining Your Value Stream Management SolutionDevOps.com
In order to increase your delivery velocity, you must find, identify and solve the bottlenecks of delivery. Value Stream management solutions capture metrics and processes helping guide your digital transformation journey.
Join Marc Hornbeek, Principal Consultant and Jeff Keyes from Plutora where they will discuss a methodology determining a value stream management solution for your organization. It will consist of critical steps including a Review of VSM Assessments, Future-State Value Stream Mapping, Road-Mapping VSM Transformation, and more. Following these steps provide a logical and comprehensive approach to determine a value stream management solution that fits for your organization’s requirements.
What will be learned:
WHY – is following steps for determining a VSM solution important?
HOW – are VSM solutions determined?
WHAT – is the expected outcome of a Value Stream Management solution recommendation?
Continuous Integration and Testing_ A DevOps Approach.pdfRuhiParveen6
In the ever-evolving landscape of software development, the adoption of DevOps practices has become paramount for organizations striving to deliver high-quality software at an accelerated pace.
“Selecting and implementing a new asset finance system? In the second of three articles, we go back to basics to take a look at what you need to consider at the start of your project to give yourself the best chance of success.”
This has necessarily been a brief look at Project Initiation. We welcome comments and would be happy to help you get your project off to a good start.
About
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
• Remote control: Parallel or serial interface.
• Compatible with MAFI CCR system.
• Compatible with IDM8000 CCR.
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
• Easy in configuration using DIP switches.
Technical Specifications
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
Key Features
Indigenized remote control interface card suitable for MAFI system CCR equipment. Compatible for IDM8000 CCR. Backplane mounted serial and TCP/Ethernet communication module for CCR remote access. IDM 8000 CCR remote control on serial and TCP protocol.
• Remote control: Parallel or serial interface
• Compatible with MAFI CCR system
• Copatiable with IDM8000 CCR
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
Application
• Remote control: Parallel or serial interface.
• Compatible with MAFI CCR system.
• Compatible with IDM8000 CCR.
• Compatible with Backplane mount serial communication.
• Compatible with commercial and Defence aviation CCR system.
• Remote control system for accessing CCR and allied system over serial or TCP.
• Indigenized local Support/presence in India.
• Easy in configuration using DIP switches.
Final project report on grocery store management system..pdfKamal Acharya
In today’s fast-changing business environment, it’s extremely important to be able to respond to client needs in the most effective and timely manner. If your customers wish to see your business online and have instant access to your products or services.
Online Grocery Store is an e-commerce website, which retails various grocery products. This project allows viewing various products available enables registered users to purchase desired products instantly using Paytm, UPI payment processor (Instant Pay) and also can place order by using Cash on Delivery (Pay Later) option. This project provides an easy access to Administrators and Managers to view orders placed using Pay Later and Instant Pay options.
In order to develop an e-commerce website, a number of Technologies must be studied and understood. These include multi-tiered architecture, server and client-side scripting techniques, implementation technologies, programming language (such as PHP, HTML, CSS, JavaScript) and MySQL relational databases. This is a project with the objective to develop a basic website where a consumer is provided with a shopping cart website and also to know about the technologies used to develop such a website.
This document will discuss each of the underlying technologies to create and implement an e- commerce website.
Water scarcity is the lack of fresh water resources to meet the standard water demand. There are two type of water scarcity. One is physical. The other is economic water scarcity.
Industrial Training at Shahjalal Fertilizer Company Limited (SFCL)MdTanvirMahtab2
This presentation is about the working procedure of Shahjalal Fertilizer Company Limited (SFCL). A Govt. owned Company of Bangladesh Chemical Industries Corporation under Ministry of Industries.
Event Management System Vb Net Project Report.pdfKamal Acharya
In present era, the scopes of information technology growing with a very fast .We do not see any are untouched from this industry. The scope of information technology has become wider includes: Business and industry. Household Business, Communication, Education, Entertainment, Science, Medicine, Engineering, Distance Learning, Weather Forecasting. Carrier Searching and so on.
My project named “Event Management System” is software that store and maintained all events coordinated in college. It also helpful to print related reports. My project will help to record the events coordinated by faculties with their Name, Event subject, date & details in an efficient & effective ways.
In my system we have to make a system by which a user can record all events coordinated by a particular faculty. In our proposed system some more featured are added which differs it from the existing system such as security.
Explore the innovative world of trenchless pipe repair with our comprehensive guide, "The Benefits and Techniques of Trenchless Pipe Repair." This document delves into the modern methods of repairing underground pipes without the need for extensive excavation, highlighting the numerous advantages and the latest techniques used in the industry.
Learn about the cost savings, reduced environmental impact, and minimal disruption associated with trenchless technology. Discover detailed explanations of popular techniques such as pipe bursting, cured-in-place pipe (CIPP) lining, and directional drilling. Understand how these methods can be applied to various types of infrastructure, from residential plumbing to large-scale municipal systems.
Ideal for homeowners, contractors, engineers, and anyone interested in modern plumbing solutions, this guide provides valuable insights into why trenchless pipe repair is becoming the preferred choice for pipe rehabilitation. Stay informed about the latest advancements and best practices in the field.
Sachpazis:Terzaghi Bearing Capacity Estimation in simple terms with Calculati...Dr.Costas Sachpazis
Terzaghi's soil bearing capacity theory, developed by Karl Terzaghi, is a fundamental principle in geotechnical engineering used to determine the bearing capacity of shallow foundations. This theory provides a method to calculate the ultimate bearing capacity of soil, which is the maximum load per unit area that the soil can support without undergoing shear failure. The Calculation HTML Code included.
Overview of the fundamental roles in Hydropower generation and the components involved in wider Electrical Engineering.
This paper presents the design and construction of hydroelectric dams from the hydrologist’s survey of the valley before construction, all aspects and involved disciplines, fluid dynamics, structural engineering, generation and mains frequency regulation to the very transmission of power through the network in the United Kingdom.
Author: Robbie Edward Sayers
Collaborators and co editors: Charlie Sims and Connor Healey.
(C) 2024 Robbie E. Sayers
1. WWW.VIDYARTHIPLUS.COM
WWW.VIDYARTHIPLUS.COM V+ TEAM
SOFTWARE QUALITY ASSURANCE
Two Marks with Answers
UNIT I- FUNDAMENTALS OF SOFTWARE QUALITY ASSURANCE
1) Write the statement of key management axiom.
A key management of axiom says that “what is not tracked is not done”
2) What is the prime benefit of an SQA program?
The prime benefit of an SQA program is ASSURANCE it provides management that the
officially established process is actually being implemented.
3) What are the goals of SQA?
a) To improve software quality by appropriately monitoring both the s/w and the
development process that produces it.
b) To ensure full compliance with the established standards and procedures for the software
process
c) To ensure that any inadequacies in the product, the process or the standards are brought
to management attention so that inadequacies can be fixed.
4) Write the responsibilities of SQA?
a) Review all development and quality plans for completeness
b) Participate as inspection moderators in design and code inspections
c) Review all test plans for adherence to standards
d) Periodically audit SCM performance to determine adherence to standards
5) Write the 8 steps for launching an SQA PROGRAM?
a) Initiate the SQA program
b) Identify SQA issues
c) write the SQA plan
d) Establish the standards
e) Establish the SQA function
f) Conduct training and promote the SQA program
g) Implement the SQA plan
h) Evaluate the SQA program.
6) Write the reason for software quality assurance organization fail to have much impact
on software quality.
a) SQA organizations are rarely staffed with sufficiently experienced or knowledgeable
people
2. WWW.VIDYARTHIPLUS.COM
WWW.VIDYARTHIPLUS.COM V+ TEAM
b) The SQA management team is often not capable of negotiating with development
c) Senior management often backs development over SQA on a large percentage of issues
d) Software development groups rarely produce verifiable quality plans.
7) Write short notes on SQAP.
“Software Quality Assurance Plan” that specifies its goal, the SQA tasks to be
performed, the standards against which development work is to be measured and the procedure
are organizational structure.
8) What are the points to be considered when SQA can be effective, while considering SQA
people?
a) The practice of starting new hires in SQA is a partial solution that can be effective only if
there are enough experienced people there already
b) Rotation schemes can also be effective from SQA.
c) New development managers be performed SQA
d) SQA to be effective, they must have good people and full management backing.
9) What are the roles of IV&V?
“Independent Verification and Validation”
a) IV&V role is to ensure that the customer’s needs are adequately reflected in the work.
b) To ensure that the right skills and attitudes are in place
c) To provide an independent development or maintenance organizations performance.
10) Write the minimum content for the section on standards, practices and conventions of
IEEE.
a) Documentation Standards
b) Logic structure standards
c) Coding standards
d) Commentary standards
11) Mention some potential pitfalls while SQA monitoring the responsibilities?
a) It is a mistake to ensure that the SQA people themselves can do anything about quality
b) The existence of an SQA function does not ensure that the standards and procedures are
followed
c) Unless management periodically demonstrates its support for SQA by following their
recommendation SQA will be ineffective.
12) What is the simple rule on SQA Reporting?
The one simple rule on SQA reporting is that it not be under the software development
manager. Project schedules are always tight, so these line managers are not likely to listen
3. WWW.VIDYARTHIPLUS.COM
WWW.VIDYARTHIPLUS.COM V+ TEAM
sympathetically to reports of inadequate test plans, human factors problem or documentation
errors.
13) List out the key SCM tasks?
a. Change management
b. configuration control
c. Revisions
d. versions
e. deltas
f. conditional code
14) What are the roles of CCB?
“Change Control Board” or Configuration Control Board
On moderate to very large projects, a central control mechanism is needed to ensure that
every change is properly considered and coordinated
It is to ensure that every baseline change is properly considered by all concerned parties
and that every change is authorized before implementation
15) Mention any 4 general ground rules for SCM audits?
a) They are periodically needed to ensure the integrity of the software boundaries
b) A successful audit is performed before every major baseline change
c) The audit verifies that changes to the baseline are implemented as intended.
d) The auditing function is an integral part of the SCM system.
16) Define Software Quality.
Conformance to explicitly stated functional and performance requirements, explicitly
documented development standards, and implicit characteristics that are expected of all
professionally developed software.
17) Define SCM.
“Software Configuration Management”
SCM are the practices and procedures for administering source code, producing software
development builds, controlling change, and managing software configurations.
18) What is SCI?
“Software Configuration Identification”
Uniquely identifies every project development item. SCI definitions are kept under configuration
control and expanded as more is learned about the product and its structure
4. WWW.VIDYARTHIPLUS.COM
WWW.VIDYARTHIPLUS.COM V+ TEAM
19) What are the special SCM function needs in during implementation?
a) Source code change out and change in facilities
b) Read only access to specifications and object code
c) A procedure for making approved changes to module specifications.
d) An SCM procedure to ensure that any new source code is consistent with the module
specifications
20) What is SCMP?
“Software Configuration Management Plan”
A first step in establishing an SCM system. It includes objectives, responsibilities and the
approach and methods to be used
UNIT II - MANAGING SOFTWARE QUALITY
1) What are the basic principles of Project Management?
Each project has a plan that is based on a hierarchy of commitments.
A management system resolves the natural conflicts between the projects and between
the line of staff organization.
An oversight and review system audits & tracks progress against the plans.
2) List at least four elements of an effective commitment?
a) The person making the commitment does so willingly.
b) There is agreement between the parties on what is to be done, by whom & when.
c) The commitment is openly & publicly started.
d) The person responsible tries to meet the commitment; even if help is needed.
3) What is the Contention Process?
Contention system is that the best decisions are based on a full understanding of the relevant
issues.
To encourage the open expression of differences and their rational resolution.
4) What is the need for Quarterly reviews?
It provides a forum for residing conflicts & monitoring progress against period and
product objectives. The topics should typically include an assessment of project performance
against plan & the organization performance against its goal.
5. WWW.VIDYARTHIPLUS.COM
WWW.VIDYARTHIPLUS.COM V+ TEAM
5) Mention any four principles of phase reviews.
a) Before initiation & at predetermined points during the project. Detailed technical &
management reviews are conducted.
b) The reviews are conducted by the project manager.
c) All involved line and staff organization participate.
d) The meeting is not resolving issues but to identify them & assign resolution
responsibility.
6) What are the four basic quality principles?
a) Unless you establish aggressive quality goals, nothing will change.
b) If these goals are not numerical, the 6.5 quality program will remain just task.
c) Without quality plans, only you are committed to quality.
d) Quality plans are just paper unless you track & reviews them.
7) Write short notes on Error Seeding.
Error seeding is a potentially intersecting way to evaluate program quality. The idea is
to inject a known number of “dummy” defects into the program & then to track how many of
them are found by the various tests or inspections.
8) Define availability.
The system ability to perform the intended function whenever needed, this is called
availability.
Availability= (1-MTTR/MTTR+MTBF) X100
MTBF: Mean time between failures
MTTR: Mean time required to response
Availability is the perfect of total time that the system is available for use.
9) Write short notes on Removal Efficiency.
It indicates the cumulative percent of the previously injected errors that have been
removed by the end of each project phase since defect removal costs can be expected to roughly
double with each project phase, attention should be focused on early removal.
10) List at least two critical elements of Software Quality Management system?
a) A responsible authority is named to own the quality data and the tracking and reporting
system.
b) Quality performance is tracked and reported to this authority, during both development
and maintenance.
c) Resources are established for validating the reported data and retaining it in the process
database.
6. WWW.VIDYARTHIPLUS.COM
WWW.VIDYARTHIPLUS.COM V+ TEAM
11) What are the principles of the Contention System?
a) All major decisions are reviewed with the involved parties in advance, and the parties are
requested to agree. Where possible, any issues are resolved before proceeding.
b) When the time comes for the decision, all dementing parties are present and asked to state
their views.
c) When there is no disagreement, the senior manager determines if there is knowledgeable
agreement.
If any disagreeing parties are absent or if more preparation is needed. In later two cases, the
decision is defined until the necessary homework has been done.
12) What are the principles of Software Defect Prevention?
a) The programmers must evaluate their own process
b) Feedback is an essential part of defect prevention
c) There is no single cure-all that will solve all the problems
d) Process improvement must be an integral part of the process
e) Process improvement takes time to learn.
13) What are the 6 categories of error suggested by Enders?
a) Technological
b) Organizational
c) Historic
d) Group dynamic
e) Individual
f) Other cases & inexplicable Causes
14) write at least 4 key action team responsibilities.
a) Prioritize all action items
b) Establish an implementation plan for the highest priority items.
c) Assign responsibilities
d) Track implementation
e) Report to management as progress
f) Continue with the next priority items.
15) Write at least 4 process changes for defect prevention.
a) Kick off meeting
b) Task data from the process task is entered in the process DB.
c) All improvement suggestions are retained in the action tracking system.
d) A feedback system is established to ensure that the results are communicated to the
professionals and that their contributions are recognized.
7. WWW.VIDYARTHIPLUS.COM
WWW.VIDYARTHIPLUS.COM V+ TEAM
UNIT III -SOFTWARE QUALITY ASSURANCE METRICS
1. What is software Quality?
Software quality is the degree to which a system, component, or process meets Specified
requirements, and customer or user needs or expectations
2. List out some of the Characteristics of software quality?
Characteristics
Software Quality is not absolute
Software Quality is multidimensional
Software Quality is subject to Constraints
Software Quality is about acceptable Compromises
Software Quality Criteria are not independent, but interact with each other Causing
Conflicts
3. What are five different views of quality suggested by Garvin?
Transcendental View
User view
Manufacturing View
Product View
Value-based View
4. What is Value-based view?
The value-based view sees quality as dependent on the amount a customer is willing to pay
for it
5. What is Transcendental View?
The Transcendental view sees quality as something that can be recognized but not defined in
some tractable form. A good quality object stands out, and it is easily recognized
6. What is user view?
The User view sees quality as fitness for purpose. Quality Concerns the extent to which a
product meets user needs and exceptions.
7. What is manufacturing view?
8. WWW.VIDYARTHIPLUS.COM
WWW.VIDYARTHIPLUS.COM V+ TEAM
The manufacturing view sees quality as conformance to specification.it focuses on product
quality during production after delivery
8. What is defect count?
Defect count is the total number of known defects recorded against a product during
development and use
9. what are the three areas addressed by McCall’ Model?
Performance
Design
Adaptation
10. What are all McCall’s criteria of quality?
Efficiency
Integrity
Reliablity
Usability
Correctness
Maintainability
Verifiability
Expandability
Flexibility
Interoperability
Portability
Reusability
11. What is Correctness?
Correctness is the degree to which Software performs its desired function
12. Define Usability?
Reliability is a set of attributes that bear on the effort needed for use and on the individual
assessment of such use by a stated or implied set of users
13. Define Reliability?
Reliability is a set of attributes that bear on the capability of software to maintain its level of
performance under stated condition for a stated period of time.it is also defined as the probability
of failure-free Operation.
9. WWW.VIDYARTHIPLUS.COM
WWW.VIDYARTHIPLUS.COM V+ TEAM
14. What is Maintainability?
Maintainability is a set of attributes that bear on the effort needed to make specified
modifications
15. Define MTTC
MTTC is the time it takes to analyze, design and implement the change. Maintainable
programs have a lower MTTC
16. What are the Criteria included in Maintainability?
Consistency
Simplicity
Conciseness
Self-descriptiveness
Modularity
17. What is verifiability?
Verifiability deals with the capacity to verify that the software design and
implementation is in accordance with program specifications
18. List out the criteria of Verifiability
Criteria include
Consistency
Simplicity
Conciseness
Self-descriptiveness
Modularity
19. What is Expandability?
Expandability deals with the relative effort involved in increasing the capability of the software
20. What is Interoperability?
Interoperability is the ability of the software to work with other software system or to coexist
without causing difficulties.
21. What is portability?
10. WWW.VIDYARTHIPLUS.COM
WWW.VIDYARTHIPLUS.COM V+ TEAM
Portability is a setoff attributes that bera on the capability of software to be transferred from
one environment to another
22. Define Reusability
Reusability is the ability of components of the software to be used in other applications
23. What are the Criteria available for reusability?
Generality
Self-descriptiveness
Modularity
Simplicity
Document Accessibility
System Clarity
Machine Independence
Application Independence
24. Define TQM
Total Quality Management is a Management system for a customer focused organization
that involves all employees in continual improvement of all aspects of the organization
25. What are the principles of TQM?
Be customer focused
Insure Total Employee involvement
Process Centered
Integrated system
Strategic and Systematic approach
Continual Improvement
Fact Based Decision Making
Communication
26. What are the types of Failure Cost
Failure costs can be split in to those resulting from
Internal failure
External failure
27. When does an internal failure cost occur?
11. WWW.VIDYARTHIPLUS.COM
WWW.VIDYARTHIPLUS.COM V+ TEAM
Internal failure costs occur when results fail to reach quality standards and are detected before
they are shipped to the customer
28. When does an external failure cost occur?
External failure costs occur when the products or services fail to reach quality standard,
but are not detected until after the customer receives the item
29. What is PDCA cycle?
PDCA(Plan-do-Check-act)is an iterative four-step management method used in business
for the control and continuous improvement of processes and products.it is also called:PDCA
cycle, Deming Cycle,Shewhart Cycle
30.What is the purpose of Software Quality Metrics?
The purpose of software metrics is to make assessments throughout the software life cycle as
to whether the software quality requirements are being met.
UNIT IV- SOFTWARE QUALITY PROGRAM
1. What is SQP?
SQP stands for software Quality Program. Software Quality program is a framework
for and performance have been achieved
2. Give the objective of the software quality program
The objective of the software quality program is to assure the quality of
.Deliverable software and documentation
.The process used to produce deliverable software
.non deliverable software
3. What are the tasks establish Software Quality program?
.Swift and accurate collection of data
.Develop a plan for Quality
4. What is the use of Quality plan?
A quality plan helps you schedule all of the tasks needed to make sure that your
project meet the needs of your customer
5. What are the parts of Quality plan?
Quality plan comprises two parts
.The Quality Assurance Plan lists the independent reviews needed and
12. WWW.VIDYARTHIPLUS.COM
WWW.VIDYARTHIPLUS.COM V+ TEAM
.The Quality Control Plan lists the internal reviews needed to meet your Quality Targets
6. Give the purpose of Software quality plan
The purpose of this Software Quality Plan is to define the techniques, procedure,
and methodologies that will used to assure timely delivery of the software and that the
development system meets the specified requirements within project resources
7. What are the technical definitions of Quality Plan contain?
The technical definitions Consists of the following three parts
1. Requirements:
The organization must develop, manufacture and distribute consistently
Low cost product and service
The products must be what Customers believe they want
2. Confidence:
The products must be supplied at the level of reliability which matches the
client’s needs
3. Constant improvement: Constant improvement of all products and all processes
must be made as integral part of the corporate culture for the Client to continue to
perceive a supplier as a Quality producer.
8. List out the basic system considerations for quality goals establishment.
System Characteristics
Trade-offs
Caveats
Quality Functions
Training
9. What are the systems characteristics on which the quality goals for a system depend?
The quality goals for a system depend upon system characteristics which include
the following
Functionality
Performance
Constraints
Technological Innovativeness
Technological and managerial risk
10. What is the scope of SQA plan (SQAP)?
13. WWW.VIDYARTHIPLUS.COM
WWW.VIDYARTHIPLUS.COM V+ TEAM
The scope of SQA plan (SQAP) is tailored to fit the current software development
effort and is related to the project planning and lifecycle description documents for this project. It
traces the all phases of this software development process and how the qualities of the product
are ensured.
11. What is the task of SQA group?
The SQA group ensures the quality of the software process and thereby ensures the
quality of the product. SQA group’s tasks cover the entire software lifecycle from conception to
delivery.
12. What is the objective of reviewing the software?
The objectives of reviewing software are:
To reveal all kinds of code errors and bugs in project implementation
To verify that the software meets its requirements
To ensure that the software has been represented according to predefined
conventions and standards
To achieve software to be developed in a uniform manner
13. List out the types of Errors.
1. Documentation errors
2. Program code errors
14. What are the factors that affect the SQA effort?
System Size
System Criticality
Cost of correcting errors
Type of release
Relationship with the user
15. List out the effective leadership guidelines.
Trust your subordinates
Develop your vision
Keep u cool
Encourage risk
Be an expert
Invite dissent
Simplify
14. WWW.VIDYARTHIPLUS.COM
WWW.VIDYARTHIPLUS.COM V+ TEAM
16. Define system size.
System Size refers to the amount of effort needed to produce the system.
UNIT V SOFTWARE QUALITY ASSURANCE STANDARDIZATION
1. What is a Software standard?
Software standard is a standard, protocol, or other common format of a document, file,
or data transfer accepted and used by one or more software developers while working on one or
more than one software programs
2. Define ISO
ISO stands for International Organization for Standardization .It is a worldwide
federation of national standards bodies, at present comprising 140 members, one in each country
3. List out the purpose of ISO
The purpose of ISO are
Promote the development of standardization and related world activities to facilitate the
international exchange of goods and services
Develop Cooperation in intellectual, scientific and Economic activity
Ensure a quality standard and specific requirement to use
Show that a company is consistent in its input of product as well as the output of product
based on a customer’s requirements
Facilitate global consensus agreements on international quality standards.
4. What is ISO 9000?
The ISO 9000 is a generic name given to a family of standards represents an
international Consensus on good management practices with the aim of ensuring that the
organization can time and time again deliver the product or services that meet the client’s
Quality requirements
5. Give the objective of ISO 9000?
The ISO 9000 is a generic name given to a family of standards represent an
international Consensus on good management practices with the aim of ensuring that the
15. WWW.VIDYARTHIPLUS.COM
WWW.VIDYARTHIPLUS.COM V+ TEAM
organization can time and time again deliver the product or services that meet the clients quality
requirements
6. What are the Older Standards of ISO 9000?
ISO 9001 – Model for quality assurance: design, development, production, installation
and servicing.
ISO 9002 – Model for quality assurance : production, installation and servicing
ISO 9003 – Model for quality assurance : final inspection and test.
7. What are the Current Standards of ISO 9000?
The family of ISO 9000 Standards has been developed by Iso and it is made up of four
core standards:
ISO 9000:2005 – Fundamentals and Vocabulary
ISO 9001: 2008 – Quality Management Systems – Requirements
ISO 9004:2009 – Quality Management Systems – Guidelines for performance
improvements
ISO 19011:2002 – Guidelines for quality and / or environmental management systems
auditing
8. Why is the Quality System needed?
To satisfy customers through a quality product
To gain self-confidence - we get what we planned
To achieve competitiveness in both the local and overseas markets
As a blueprint for efforts to improve the quality system of the organization
9. Mention the eight quality management principles?
Focus on your customers
Provide leadership
Involve your people
Use a process approach
Take a systems approach
16. WWW.VIDYARTHIPLUS.COM
WWW.VIDYARTHIPLUS.COM V+ TEAM
Encourage continual improvement
Get the facts before you decide
Work with your suppliers
10. Mention the elements of ISO 9000.
The standards of ISO 9000 detail 20 requirements for an organization’s quality
management system in the following areas:
Management Responsibility
Quality System
Order Entry
Design Control
Document and Data Control
Purchasing
Control of Customer Supplied Products
Product Identification and Tractability
Process Control
Inspection and Testing Control of Inspection, Measuring and Test Equipment
Inspection and Test Status
Control of Nonconforming Products
Corrective and Preventive Action
Handling, Storage, Packaging and Delivery
Control of Quality Records
Internal Quality Audits
Training
Servicing
Statistical Techniques
11. List out the advantage of ISO 9000.
Increased customer satisfaction
Improved internal communication and raises morale
Improved customer service
Reduction of product – liability risks
12. Give the structure of CMM.
The CMM is structured as follows:
Maturity Levels (Staged Representation)
17. WWW.VIDYARTHIPLUS.COM
WWW.VIDYARTHIPLUS.COM V+ TEAM
Key Process Area (KPA)
Goals: Generic and Specific
Common Features
Key Practices: Generic and Specific
13. What is Maturity Level?
A maturity level is a well-defined evolutionary plateau toward achieving a mature
software process.
14. What is CMMI?
CMMI or CMM Integration is developed to integrate current and upcoming models. It is
sort of an upgrade from the CMM Model and describes process improvement for organizations
especially in software development.
15. What are the benefits of CMMI?
Expand the scope of and visibility into the product life cycle and engineering activities ot
ensure that the product or service meets customer expectations.
Incorporate lessons learned from additional areas of best practice. Example -
Measurement, Risk Management and Supplier Management
Implement more robust high – maturity practices
16. How is CMM Maturity Level organized?
The CMM is organized into five maturity levels:
Level 6: Initial
Level 7: Repeatable
Level 8: Defined
Level 9: Managed
Level 10: Optimizing
17. Difference between CMM and CMMI
CMM CMMI
CMM stands for capability maturity model CMMI stands for capability maturity model
integration
CMM designed only for Software Industry CMMI designed for all other industries like
call centre etc..,along with software
It is initial model provide baseline toCMMI It is upgraded model of CMM
CMM focus attention on processes, but the
new
CMMI focus attention on result-Oriented
Process
18. WWW.VIDYARTHIPLUS.COM
WWW.VIDYARTHIPLUS.COM V+ TEAM
CMM describes about the software engineering
alone
CMM Integrated describes both software and
system Engineering
18. List out the common feature of ISO 9000 and SEI’S CMM
Capability to deliver with consistency
Aim at Quality Improvement of the products or services
Stress that Quality assurance should be a planned activity
Require management commitment to quality expressed through appropriate explicit
policy statement(s)
19. Give the relationship of the SQA group role to SEI’S CMM
SEI Maturity level Role of SQA
Initial Testing
Repeatable Quality Hurdle
Defined Oversight, Metrics
Managed Process and Management
Optimizing Reference, Oversight
20. Compare the process elements of ISO9000 and CMM
Process elements unique to ISO 9000 Process elements unique to CMM
1.Contract Management
2.Purchase and Customer Supplied
Components
3.Personnel issues
4.Package,Delivery and Installation
1.Project tracking and oversight
2.Process and Technology Change
Management
3.Intergroup coordination to meet customer
requirements
4.Organization-Wide Process Focus, Process
Development and Integrated Management