PERSONAL INFORMATION
Name: Sompol Kaewsanun
Gender: Male
Date of Birth: Feb 05, 1979
Age: 37
Address: 171/8 Mungkornthong Village, Moo 10, T.Kaojeak, A. Mung, Phatthalung
Nationality: Thai / Race: Thai
Height: 170 Cm.
Weight: 73 Kg.
Marital Status: Single
Tel: +66 (0)85 074 6262, +95 (0) 92 5426 3982
E-mail: Sompol5671@gmail.com,
Expect Salary: Negotiable
EDUCATION
2000 – 2002 King Mongkut's Institute Of Technology Ladkrabang,
Electronic &Computer
1997 – 2000 High Vocational Diploma, Phatthalung Technical College,
Telecommunication
TRAINING EXPERIENCE
29 Oct-4 Nov 08 Wood Group ESP Inc Course# Cable Splicing Certificate
8 July 09 RMSPump Tools Course# RMSPumptools Product Orientation Course
24-26 April 13 GE Oil&Gas Inc. Course# HRO Training Course
27 May 13 GE Oil&Gas Inc. Course# Influencing Skills Course
28 May 13 GE Oil&Gas Inc. Course# Hiring the right people Course
24 Sept 13 Basic Offshore Safety Induction & Emergency Training Course (BOSIET)
25 Mar 14 Solar alert Course# Hydrogen Sulfide Safety Awareness
WORK EXPERIENCE
SPIE Oil & Gas Services (Thailand) Ltd. (Yangon Branch) 232 Orchid Condo, Unit 147 Ahlon
Rd, Ahlon Township, Yangon 11121, Myanmar. (+95) 92 5426 3982
Project: Zawtika Maintenance, Shutdowns & Modification
Client: PTTEP INTERNATIONAL LIMITED Nov 14 – Present
Location: Yangon (Myanmar)
Position: Maintenance & Inspection Planner
Responsibility:
 Planning preventive/predictive maintenance schedules (routine maintenance tasks)
and inspection schedules (routine inspection tasks) in conjunction with offshore
supervisor and plant personnel,
 Input and maintain the accuracy and integrity of equipment, maintenance and
inspection records into COMPANY’s MAXIMO and SAP. Ensure that all data are
updated and provide a suitable information base,
 Control and follow up on the routine administrative paperwork involved with
COMPANY’s MAXIMO and SAP, such as time sheets, work orders, and etc.,
 Generate management report in text and graphic mode that reflect maintenance of
machinery segregated into disciplines, work types including major equipment
reliability, availability and use factor statistic to CMMS and planner,
 Compile and generate offshore/onshore maintenance campaigns’ look ahead plan /
inspection campaigns’ look ahead plan and distribute to all concerned parties for
their revision,
 Follow and encourage strict adherence to the COMPANY’s SSHE policy and
regulations in all work under the responsibility and directly report to COMPANY’s
CMMS and planner.
 Optimize the planning / scheduling of preventive maintenance routine of equipment
and machinery as well as ensure that all works are carried out in accordance with
COMPANY’s SSHE operating procedures.
 Maximizing equipment reliability through using planned maintenance most
effectively
 Ensure that all data contained in COMPANY’s CMMS are accurate and reliable and
timely up-to-date.
 Coordinate with Maintenance Material officer to plan in acquiring stock & materials,
ensuring good
 Planning and implementation to timely serve offshore maintenance campaign’s
requirements as well as that of onshore Maintenance activities,
 Preservation according to COMPANY’s procedures. Also responsible for real time
management of stock and parts in the Workshops as well as updating of all stock-
related report in the COMPANY’s Computerized Maintenance Management System
(CMMS),
 Plan, organize, & maintain storage facilities & handling equipment to ensure that
they are always in a good & safe working condition,
 Ensure of all material, equipment, spare parts and accessories are according to
required specifications and timely available to user at all time,
 Reserve stock by raise SIR on SAP system and raise WO (Work order) for
preventive maintenance on SAP system.
 Proper notifications of special material instructions/inspection requirements,
provided to concerned parties,
 Maintain and strengthen good relationship with users and COMPANY’s
Warehouse/Yard personnel,
Gulf Agency Company (Thailand) Ltd.
Project: Salamander Energy Bualuang Oil Project, Gulf of Thailand. Oct 13 – Oct 14
Jack up rig: •Atwood Mako
Position: Material Man
Responsibility:
 Assist Drilling Sup. (Company Man) for any basic plan and urgent requirement
covering drilling schedule at individual rig. Material prioritizations
completely bring to discuss & plan.
 Recheck the equipment onboard and raise Material Order to requesting the
equipment, tool and accessories for drilling operation.
 Notify Drilling Sup. (Company Man) and Planner for shortage items to be
ordering onward.
 Monitors accurate stock inventories, and prepares Material Issue for any equipment
& Tool issued for drilling per well
 Monitors accurate stock inventories, and prepares Material Return for any equipment
& Tool that pooh from the well and recheck condition of the equipment and tool as
well
 Monitors accurate stock inventories, and update Drilling equipment & Tools any
movement income / outcome on Summary and submitting to DST and Warehouse
Managerl
 Monitor & Maintain ‘Material On Board – MOB’ inventory/non-
inventory/Bulk/Chemical of company materials, Contractor materials
 Notify to Drilling Sup (Company Man) for any damage tool or equipment and raise
report to send back for repair.
 Coordinate with Warehouse Team to check and prepare any equipment or tool send
to Rig.
 Coordinate with Jetty team & Warehouse team to manage vessel schedule and
supervise loading and departure time without delay and also advise speed &
Sailing time per Drilling plan.
 Coordinate with rig Radio Man, Barge Master when boat arrival or departure
base on Manifest or else.
 Closely monitor Loading and Offloading operation.
 To guarantee that all items received are in good condition and correct Qty,
conforming with required specifications and in accordance with Material order or the
manifest.
 Organize Crane Operator for offload and Back load the equipment.
 Advise priority of service tool to Crane operator for offload and Back load.
 Organize and ensure all lifting equipment, tool, basket and service tool that
are certified for Drilling operation.
 Monitors and booking any crews change by Chopper or via Boat
 Monitors and raise ROB report for any Fuel oil, OBM, Water from Boat and Rig
after that send to Drilling Sup.
 Notify shortage ROB to Drilling Sup for ordering in the future
 Support and Coordinate related function such as Drilling Dept
,Receiving/Dispatching & Safety to ensure job accomplishment
 Acknowledged the contractual and legal obligations of the Drilling
Contractor, third party service contractors and suppliers
GE Oil & Gas ESP PTE Ltd (Oil & Gas Services Company) July .08 – Sept 13
Position: Inventory Team Leader Mar 12- Sept 13
Position: Procurement & Inventory Sup and Expeditor Oct 10 –
Mar 12
Project: - Mubadala Petroleum Thailand.
- PTT Exploration and Production Public Company.
- Chevron Thailand.
- CEC International Thailand
- Pan Orient Energy & Siam Thailand Company.
- Brunei Petroleum Ltd at Brunei
- Salamander Energy Thailand.
Responsibility:
 Get any order from any Projects and sourcing the equipment from any Vendor in
local or International
 Negotiate with the Vendors about the material, price, due-date, term and condition
 Requesting Quotation from Vendors (International & Local) after that analysis
before submitting to Manager for finalize
 Make sure about purchase process must be match with company policy
 Checking PN, Description and Unit price before ordering and advise Project
Manager for quoting quotation to the customer
 Created Material Order Request (MOR) and send to Manager for approval
 Created Purchase Order & Shipping Instruction and send to Vendors (International
& Local) including T/C
 Chase up and Expediting all orders to Vendors (International & Local) and FF
 Advise Shipping instruction to agent about Consignee name, Notify party, PN,
Description, Unit price, PO refer and Shipping mode
 Analysis the equipments, tools and consumables how many need to order more for
reserve when I have low Inventory stock
 Receiving the equipment into System (Syteline Program)
 Analysis and write-off tools or consumables from System (Syteline Program) that we
had supplied to customer
 Created Sale Order monthly from System when we have sale the equipments to
customer
 Requesting OKC to creating New PN, Description into System when I have order
new equipments from Third Vendors.
 Management Inventory for All projects
 Recheck Inventory Summary for all projects before submit to customer every month
 Training Inventory System when we got New Inventory person
 Creating Inventory Summary when we have got New Project
 Updating Inventory for all projects and send to Manager & Finance Controller
(OKC) every month
 Advise and clarify the customer PO for all invoices from Freight forwarder , Third
Vendor
 Supporting any requirement from Auditor from customer and owner.
 Planning for Inventory for monthly circle count and physical check
 Working data entry for Syteline system to control All Inventory
Position: Inventory & Field Service July 08 – Oct 10
Responsibility:
 Preparation ESP equipments before install to well.
 Shimming Pump and Gas sep before install to well.
 Tandem Gas Sep and Seal before install to well.
 Tandem Motor and Sensor and check condition P-P, P-G.
 Checking condition temp and intake pressure of Sensor before installation.
 Checking condition P-P, P-G and Test Cable before installation.
 Installation ESP equipments and Cable to well.
 Pulling out ESP equipment from well.
 Installation Surface Cable (BIW cable) from Christmas 3 to VSD system.
 Wiring Surface cable and LV cable in VSD system.
 Designed Database program for inventory.
 Supporting users for hardware and software.
 Development database program.
 Designed physical circle count equipment every week.
 Physical inventory stock for every week.
 Issue shipping document purpose to be purchase order and reparation.
 Issue E-quotation document to vendor (local and international)
 Coordinating with vendor and shipper (local and international)
 Coordinating with customer.
 Updating summary report to customer.
 Management the inventory system
 Keep good relationship with our customer.
 Knowledge about cable splicing and basic ESP system.
 Co- operation with Supervisor, Base Manager.
 Commissioning the VSD control.
 Testing ESP equipment and Cable.
NAI LERT PARK HOTEL Jan 06 - Aug 08
Position: Technician 2
Responsibility:
 Management and reparation electrical system.
 Management and reparation chiller system.
 Management and maintenance cooling tower
 Management and reparation mechanic system.
 Management and reparation telephone system.
 Set and repair computer and wire line.
SUMMARY OF QUALIFICATIONS
Computer Skills:
 Operating Systems:
- Microsoft Windows 98
- Microsoft Windows ME
- Microsoft Windows 2000
- Microsoft Windows XP
- Microsoft Windows Vista
- Microsoft Windows 2000 Server.
- Microsoft Windows 2003 Server.
- Microsoft Windows 2008 Server.
• Programming Language:
- Java
- C
- C++
- ASP
- PHP
- HTML
• Database:
- SQL Server 2000
- MySQL
• Application:
- MS Office (Word, Excel, PowerPoint, Access)
- Adobe Photoshop
- Adobe Premiere
- Macromedia Flash
• Network Engineering
- Basic network knowledge.
- Network analysis and design.
- Switch and router configuration.
- Network setup and maintenance.
- Network technology and equipments selection.
• Software Engineering.
- Basic software engineering knowledge.
- Gather user requirements.
- System analysis and design.
- Database design.
• Administrator.
 Basic hardware knowledge.
 Microsoft Windows installation and configuration.
 Computer troubleshooting and repair.
 Computer modification and maintenance.
 Hardware selection.
English Skill:
 Good written and oral English communication
REFERENCES
Mr. Hanafiah Mohammed (At GE Oil & Gas ESP Pte)
Facility Central Asia Manager Mobile: +668-13015851, +668-65476787
Mr. Varawut Kongpanlert (At Gulf Agency Company)
Mobile: 084-450-7438, 081-1719295
Mr. Surin Kosolpisit (At SPIE Oil & Gas Services Ltd.)
Mobile: 098-016-7122
SOMPOL'S CV updated 16-Aug-2016
SOMPOL'S CV updated 16-Aug-2016
SOMPOL'S CV updated 16-Aug-2016
SOMPOL'S CV updated 16-Aug-2016

SOMPOL'S CV updated 16-Aug-2016

  • 1.
    PERSONAL INFORMATION Name: SompolKaewsanun Gender: Male Date of Birth: Feb 05, 1979 Age: 37 Address: 171/8 Mungkornthong Village, Moo 10, T.Kaojeak, A. Mung, Phatthalung Nationality: Thai / Race: Thai Height: 170 Cm. Weight: 73 Kg. Marital Status: Single Tel: +66 (0)85 074 6262, +95 (0) 92 5426 3982 E-mail: Sompol5671@gmail.com, Expect Salary: Negotiable EDUCATION 2000 – 2002 King Mongkut's Institute Of Technology Ladkrabang, Electronic &Computer 1997 – 2000 High Vocational Diploma, Phatthalung Technical College, Telecommunication TRAINING EXPERIENCE 29 Oct-4 Nov 08 Wood Group ESP Inc Course# Cable Splicing Certificate 8 July 09 RMSPump Tools Course# RMSPumptools Product Orientation Course 24-26 April 13 GE Oil&Gas Inc. Course# HRO Training Course 27 May 13 GE Oil&Gas Inc. Course# Influencing Skills Course 28 May 13 GE Oil&Gas Inc. Course# Hiring the right people Course 24 Sept 13 Basic Offshore Safety Induction & Emergency Training Course (BOSIET) 25 Mar 14 Solar alert Course# Hydrogen Sulfide Safety Awareness
  • 2.
    WORK EXPERIENCE SPIE Oil& Gas Services (Thailand) Ltd. (Yangon Branch) 232 Orchid Condo, Unit 147 Ahlon Rd, Ahlon Township, Yangon 11121, Myanmar. (+95) 92 5426 3982 Project: Zawtika Maintenance, Shutdowns & Modification Client: PTTEP INTERNATIONAL LIMITED Nov 14 – Present Location: Yangon (Myanmar) Position: Maintenance & Inspection Planner Responsibility:  Planning preventive/predictive maintenance schedules (routine maintenance tasks) and inspection schedules (routine inspection tasks) in conjunction with offshore supervisor and plant personnel,  Input and maintain the accuracy and integrity of equipment, maintenance and inspection records into COMPANY’s MAXIMO and SAP. Ensure that all data are updated and provide a suitable information base,  Control and follow up on the routine administrative paperwork involved with COMPANY’s MAXIMO and SAP, such as time sheets, work orders, and etc.,  Generate management report in text and graphic mode that reflect maintenance of machinery segregated into disciplines, work types including major equipment reliability, availability and use factor statistic to CMMS and planner,  Compile and generate offshore/onshore maintenance campaigns’ look ahead plan / inspection campaigns’ look ahead plan and distribute to all concerned parties for their revision,  Follow and encourage strict adherence to the COMPANY’s SSHE policy and regulations in all work under the responsibility and directly report to COMPANY’s CMMS and planner.  Optimize the planning / scheduling of preventive maintenance routine of equipment and machinery as well as ensure that all works are carried out in accordance with COMPANY’s SSHE operating procedures.  Maximizing equipment reliability through using planned maintenance most effectively  Ensure that all data contained in COMPANY’s CMMS are accurate and reliable and timely up-to-date.  Coordinate with Maintenance Material officer to plan in acquiring stock & materials, ensuring good  Planning and implementation to timely serve offshore maintenance campaign’s requirements as well as that of onshore Maintenance activities,  Preservation according to COMPANY’s procedures. Also responsible for real time management of stock and parts in the Workshops as well as updating of all stock- related report in the COMPANY’s Computerized Maintenance Management System (CMMS),  Plan, organize, & maintain storage facilities & handling equipment to ensure that they are always in a good & safe working condition,  Ensure of all material, equipment, spare parts and accessories are according to required specifications and timely available to user at all time,  Reserve stock by raise SIR on SAP system and raise WO (Work order) for preventive maintenance on SAP system.  Proper notifications of special material instructions/inspection requirements, provided to concerned parties,
  • 3.
     Maintain andstrengthen good relationship with users and COMPANY’s Warehouse/Yard personnel, Gulf Agency Company (Thailand) Ltd. Project: Salamander Energy Bualuang Oil Project, Gulf of Thailand. Oct 13 – Oct 14 Jack up rig: •Atwood Mako Position: Material Man Responsibility:  Assist Drilling Sup. (Company Man) for any basic plan and urgent requirement covering drilling schedule at individual rig. Material prioritizations completely bring to discuss & plan.  Recheck the equipment onboard and raise Material Order to requesting the equipment, tool and accessories for drilling operation.  Notify Drilling Sup. (Company Man) and Planner for shortage items to be ordering onward.  Monitors accurate stock inventories, and prepares Material Issue for any equipment & Tool issued for drilling per well  Monitors accurate stock inventories, and prepares Material Return for any equipment & Tool that pooh from the well and recheck condition of the equipment and tool as well  Monitors accurate stock inventories, and update Drilling equipment & Tools any movement income / outcome on Summary and submitting to DST and Warehouse Managerl  Monitor & Maintain ‘Material On Board – MOB’ inventory/non- inventory/Bulk/Chemical of company materials, Contractor materials  Notify to Drilling Sup (Company Man) for any damage tool or equipment and raise report to send back for repair.  Coordinate with Warehouse Team to check and prepare any equipment or tool send to Rig.  Coordinate with Jetty team & Warehouse team to manage vessel schedule and supervise loading and departure time without delay and also advise speed & Sailing time per Drilling plan.  Coordinate with rig Radio Man, Barge Master when boat arrival or departure base on Manifest or else.  Closely monitor Loading and Offloading operation.  To guarantee that all items received are in good condition and correct Qty, conforming with required specifications and in accordance with Material order or the manifest.  Organize Crane Operator for offload and Back load the equipment.  Advise priority of service tool to Crane operator for offload and Back load.  Organize and ensure all lifting equipment, tool, basket and service tool that are certified for Drilling operation.  Monitors and booking any crews change by Chopper or via Boat  Monitors and raise ROB report for any Fuel oil, OBM, Water from Boat and Rig after that send to Drilling Sup.  Notify shortage ROB to Drilling Sup for ordering in the future  Support and Coordinate related function such as Drilling Dept ,Receiving/Dispatching & Safety to ensure job accomplishment
  • 4.
     Acknowledged thecontractual and legal obligations of the Drilling Contractor, third party service contractors and suppliers GE Oil & Gas ESP PTE Ltd (Oil & Gas Services Company) July .08 – Sept 13 Position: Inventory Team Leader Mar 12- Sept 13 Position: Procurement & Inventory Sup and Expeditor Oct 10 – Mar 12 Project: - Mubadala Petroleum Thailand. - PTT Exploration and Production Public Company. - Chevron Thailand. - CEC International Thailand - Pan Orient Energy & Siam Thailand Company. - Brunei Petroleum Ltd at Brunei - Salamander Energy Thailand. Responsibility:  Get any order from any Projects and sourcing the equipment from any Vendor in local or International  Negotiate with the Vendors about the material, price, due-date, term and condition  Requesting Quotation from Vendors (International & Local) after that analysis before submitting to Manager for finalize  Make sure about purchase process must be match with company policy  Checking PN, Description and Unit price before ordering and advise Project Manager for quoting quotation to the customer  Created Material Order Request (MOR) and send to Manager for approval  Created Purchase Order & Shipping Instruction and send to Vendors (International & Local) including T/C  Chase up and Expediting all orders to Vendors (International & Local) and FF  Advise Shipping instruction to agent about Consignee name, Notify party, PN, Description, Unit price, PO refer and Shipping mode  Analysis the equipments, tools and consumables how many need to order more for reserve when I have low Inventory stock  Receiving the equipment into System (Syteline Program)  Analysis and write-off tools or consumables from System (Syteline Program) that we had supplied to customer  Created Sale Order monthly from System when we have sale the equipments to customer  Requesting OKC to creating New PN, Description into System when I have order new equipments from Third Vendors.  Management Inventory for All projects  Recheck Inventory Summary for all projects before submit to customer every month  Training Inventory System when we got New Inventory person  Creating Inventory Summary when we have got New Project  Updating Inventory for all projects and send to Manager & Finance Controller (OKC) every month  Advise and clarify the customer PO for all invoices from Freight forwarder , Third Vendor
  • 5.
     Supporting anyrequirement from Auditor from customer and owner.  Planning for Inventory for monthly circle count and physical check  Working data entry for Syteline system to control All Inventory Position: Inventory & Field Service July 08 – Oct 10 Responsibility:  Preparation ESP equipments before install to well.  Shimming Pump and Gas sep before install to well.  Tandem Gas Sep and Seal before install to well.  Tandem Motor and Sensor and check condition P-P, P-G.  Checking condition temp and intake pressure of Sensor before installation.  Checking condition P-P, P-G and Test Cable before installation.  Installation ESP equipments and Cable to well.  Pulling out ESP equipment from well.  Installation Surface Cable (BIW cable) from Christmas 3 to VSD system.  Wiring Surface cable and LV cable in VSD system.  Designed Database program for inventory.  Supporting users for hardware and software.  Development database program.  Designed physical circle count equipment every week.  Physical inventory stock for every week.  Issue shipping document purpose to be purchase order and reparation.  Issue E-quotation document to vendor (local and international)  Coordinating with vendor and shipper (local and international)  Coordinating with customer.  Updating summary report to customer.  Management the inventory system  Keep good relationship with our customer.  Knowledge about cable splicing and basic ESP system.  Co- operation with Supervisor, Base Manager.  Commissioning the VSD control.  Testing ESP equipment and Cable. NAI LERT PARK HOTEL Jan 06 - Aug 08 Position: Technician 2 Responsibility:  Management and reparation electrical system.  Management and reparation chiller system.  Management and maintenance cooling tower  Management and reparation mechanic system.  Management and reparation telephone system.  Set and repair computer and wire line.
  • 6.
    SUMMARY OF QUALIFICATIONS ComputerSkills:  Operating Systems: - Microsoft Windows 98 - Microsoft Windows ME - Microsoft Windows 2000 - Microsoft Windows XP - Microsoft Windows Vista - Microsoft Windows 2000 Server. - Microsoft Windows 2003 Server. - Microsoft Windows 2008 Server. • Programming Language: - Java - C - C++ - ASP - PHP - HTML • Database: - SQL Server 2000 - MySQL • Application: - MS Office (Word, Excel, PowerPoint, Access) - Adobe Photoshop - Adobe Premiere - Macromedia Flash • Network Engineering - Basic network knowledge. - Network analysis and design. - Switch and router configuration. - Network setup and maintenance. - Network technology and equipments selection. • Software Engineering. - Basic software engineering knowledge. - Gather user requirements. - System analysis and design. - Database design. • Administrator.  Basic hardware knowledge.  Microsoft Windows installation and configuration.
  • 7.
     Computer troubleshootingand repair.  Computer modification and maintenance.  Hardware selection. English Skill:  Good written and oral English communication REFERENCES Mr. Hanafiah Mohammed (At GE Oil & Gas ESP Pte) Facility Central Asia Manager Mobile: +668-13015851, +668-65476787 Mr. Varawut Kongpanlert (At Gulf Agency Company) Mobile: 084-450-7438, 081-1719295 Mr. Surin Kosolpisit (At SPIE Oil & Gas Services Ltd.) Mobile: 098-016-7122