SOFTWARE TESTING
Mentor: Vinodh Sivaraman
Mail id: iotvino18@gmail.com
AGENDA
Intro to Testing
Verification vs Validation
Types of Application
Probabilities of Getting errors in the Application
SDLC
Advantages & Disadvantages of each SDLC
Principles of Testing
STLC
Difference between Test Case, Use Case & Scenario
How to Prepare Test plan and Strategy
How to Prepare Test Case Template
Error, Defect, Bug & Failure
AGENDA
Test Case Design Technique
Bug Life Cycle
How to Prepare the Bug Template?
Bug Tracking Tool
Types of Testing
Difference between Static and Dynamic testing
Difference between Functional and Non-functional
testing
Black box testing and its types
White box testing and its types
System Integration Testing vs User Acceptance Testing
Entry Criteria and Exit Criteria
AGENDA
• Test Environment and Test data preparation
• Flow graph notations
• Statement coverage
• Branch Coverage
• Path coverage
• Cyclometric Complexity
• Integration testing
• Big Bang Integration
• I n c r e m e n t a l A p p r o a c h T o p - D o w n , B o t t o m - u p , a n d H y b r
i d
• Requirement traceability matrix
INTRO TO TESTING
• DEBUGGING
• JOSEPH JURAN – QUALITY CONTROL HANDBOOK
• Glen ford J. Myers – Software Testing
• Intended to identify any defect in software
• Attributes of Software
• Reliability
• Scalability - Measure
• Portability - Os
• Re-usability
• Usability
• 7 Principles of Testing
Verification vs Validation
Verification Validation
The verifying process includes checking
documents, design, code, and program
It is a dynamic mechanism of testing
and validating the actual product
It does not involve executing the code It always involves executing the code
Verification uses methods like reviews,
walkthroughs, inspections, and desk-
checking etc.
It uses methods like Black Box Testing, White
Box Testing, and non-functional testing
Whether the software conforms to
specification is checked
It checks whether the software meets the
requirements and expectations of a customer
It finds bugs early in the development cycle
It can find bugs that the verification process
can not catch
Target is application and software
architecture, specification, complete
design, high level, and database design etc.
Target is an actual product
QA team does verification and make sure
that the software is as per the requirement
in the SRS document.
With the involvement of testing team
validation is executed on software code.
TYPES OF APPLICATION
•A collection of Microsoft software including MS Office, PowerPoint, Word, Excel, and
Outlook.
•Common Internet browsers like Google Chrome, Safari, Firefox, etc.
•Graphics and designing software such as Canva, Adobe Photoshop, CorelDraw, and
AutoCAD.
•Mobile Apps – Mobile application Testing - IDE
•E-commerce Application
•Education Software
•Resource Management Application Software
•Project Management Application Software
•Customized Project Relevant Software used in Embedded, Banking & Insurance
Industries
What is Software Testing?
• Software testing is the process of evaluating and verifying that a
software product or application does what it is supposed to do.
• The benefits of testing include preventing bugs, reducing
development costs and improving performance.
• Checking the functionality of an application is called software testing.
ERROR IN APPLICATION
• Errors which cause an application to fail and terminate
abnormally
Why should we do Software Testing?
• Every software is developed to support the business.
• If there is a defect in the software, it will affect the business and
to ensure the quality of software application.
• So, before we launch the software to the customer, every defect
should be identified, and it should be resolved.
SDLC
Software Development Life Cycle
> Software Development Life Cycle is a systematic approach to develop software. It is a
Process followed by Software Developers and Software Testing is an integral part of
Software Development, so it is also important for Software Testers...
> Software Development Life Cycle (SDLC) is a process used by the software industry to
design, develop and test software. The SDLC aims to produce a high-quality software
that meets or exceeds customer expectations, reaches completion within times and cost
estimates.
> ISO/IEC 12207 is an international standard for software life-cycle processes. It defines
all the tasks required for developing and maintaining software.
SDLC
Phases of Software Development Life Cycle,
These phases may vary form one organization to another, but purpose is almost all same,
that is "Develop and Maintain Quality Software",
i) Requirement Gathering
ii) Analysis
iii) Design
iv) Coding / Development
v) Testing
vi) Deployment & Maintenance
Note: It is General Software Development Life Cycle, we have various SDLC
Models in the IT Industry, Waterfall Model, V Model, Spiral Model and Agile
Development Models etc...,
Software Development process varies from one SDLC Model to another.
i) Requirement Gathering
> Requirement Gathering is the most important phase in software development life cycle,
Business Analyst collects the requirements from the Customer/Client as per the clients
business needs and documents the requirements in the Business Requirement
Specification and provides the same to Development Team.
SDLC
> Suppose Our Planned Software is not intended for a single customer and the software
product for multiple customers then Business Analyst or Business Team collects
Requirements from the Market and also evaluate Other similar products in the Market
> Key Role in this phase is Business Analyst and Outcome of the phase is "Business
Requirement Specification".
ii) Analysis
> Once the Requirement Gathering is done the next step is to define and document the
product requirements and get them approved by the customer. This is done through SRS
(Software Requirement Specification) document. SRS consists of all the product
requirements to be designed and developed during the project life cycle.
> Key people involved in this phase are Project Manager, Business Analyst and Senior
members of the Team. The outcome of this phase is Software Requirement Specification.
SDLC
> iii) Design
> In Design phase Senior Developers and Architects, they give the architecture of the
software product to be developed. It has two steps one is HLD (High Level Design) or
Global Design and another is LLD (Low Level Design) or Detailed Design,
> High Level Design (HLD) is the overall system design, covers the system architecture
and database design. It describes the relation between various modules and functions of
the system.
> Low Level Design (LLD) is the detailed system design, covers how each and every
feature in the product should work and how every component should work.
> The outcome of this phase is High Level Document and Low Level Document which
works as an input to the next phase Coding...
iv) Coding / Development
> Developers (seniors, juniors and fresher) involved in this phase, this is the phase where
we start building the software and start writing the code for the product.
> The outcome of this phase is Source Code Document (SCD) and the developed product.
SDLC
v) Testing
> Once the software is complete then it is deployed in the testing environment. The testing
team starts testing (either test the software manually or using automated test tools depends
on process defined in STLC)
> Testing is done to verify that the entire application works according to the customer
requirement.
> During this phase, Testing team may find defects which they communicate to
developers, the development team fixes the defect and send back to Testing for a re-test.
This process continues until the software is Stable, and working according to the business
needs of that system.
vi) Deployment & Maintenance
> After successful testing, the product is delivered (deployed to the customer for their
use), Deployment is done by the Deployment/Implementation engineers and Once when
the customers start using the developed system then the actual problems will come up and
needs to be solved from time to time.
> Fixing the issues found by the customer comes in the maintenance phase. 100% testing
is not possible – because, the way testers test the product is different from the way
customers use the product. Maintenance should be done as per SLA (Service Level
Agreement) .
SDLC
Software Development Life Cycle Models
> There are various software development life cycle models defined and designed which
are followed during the software development process. These models are also referred as
Software Development Process Models".
i) Waterfall Model
> Waterfall approach was first SDLC Model to be used widely in Software Engineering to
ensure success of the project. In "The Waterfall" approach, the whole process of software
development is divided into separate phases. In this Waterfall model, typically, the
outcome of one phase acts as the input for the next phase sequentially.
Phases of Waterfall Model:
a) Requirements Gathering:
 This first step is also the most important, because it involves gathering information
about what the customer needs and defining, in the clearest possible terms, the
problem that the product is expected to solve.
b) Software Requirements:
> In this phase Business Requirements are converted as Software Requirements.
SDLC
c) Design:
> In this phase Global and Detailed design can be produced based on Software
Requirements.
d) Coding:
> This step consists of actually constructing the product as per the design specification(s)
developed in the previous step. Typically, this step is performed by a development team
consisting of programmers, interface designers and other specialists, using tools such as
compilers, debuggers, interpreters and media editors. The output of this step is one or
more product components, built according to a pre-defined coding standard and
debugged, tested and integrated to satisfy the system architecture requirements.
e) Testing:
> In this stage, System will be tested by testers, if the find any mismatch they report
defects. Developers /Programmers fix the defects and then testers close defects by
performing confirmation testing (Regression Testing).
SDLC
c) Design:
> In this phase Global and Detailed design can be produced based on Software
Requirements.
d) Coding:
> This step consists of actually constructing the product as per the design specification(s)
developed in the previous step. Typically, this step is performed by a development team
consisting of programmers, interface designers and other specialists, using tools such as
compilers, debuggers, interpreters and media editors. The output of this step is one or
more product components, built according to a pre-defined coding standard and
debugged, tested and integrated to satisfy the system architecture requirements.
e) Testing:
> In this stage, System will be tested by testers, if the find any mismatch they report
defects. Developers /Programmers fix the defects and then testers close defects by
performing confirmation testing (Regression Testing).
Software Development Life Cycle
SDLC
f) Release & Maintenance:
> Release team (consists of a few developers, testers, and tech-support people etc…)
install software in Customer environment and they consider below factors;
Correct & Complete installation, User Management, Services Management, Coexistence
with other software, Handling of Input & Output devices, and Handling of secondary
storage devices Etc…
Maintenance team process Customer issues based on service agreements.
Advantages of Waterfall Model:
a) Simple and easy to use
b) Easy to manage due to the rigidity of the model- each phase has specific deliverables
and a review process.
c) Phases are processed and completed one at a time.
d) Works well for smaller projects where requirements are very well understood.
Disadvantages of Waterfall Model:
a) No working software is produced until late during the life cycle
b) High amount of risk and uncertainty
c) Poor model for complex and object-oriented projects.
d) Poor model for Long and ongoing projects
e) Poor Model where requirements are at a moderate to high risk of changing.
SDLC
ii) V Model
> It is Verification & Validation model, known as V Model, in this model all development
phases can be integrated with Testing phases.
> The V-model illustrates how testing activities can be integrated into each phase of the
software development life cycle.
> V Model was inaugurated in order to avoid drawbacks in Waterfall model and its main
focus on multiple stages of testing.
> Multiple stages of Testing avoids defects multiplication.
b) Software Requirements Vs System Testing
> Development Manager/Tech Manager converts User Requirements as Software
Requirements and Reviews, Meetings like verification methods will be performed on
Software Requirements, after Verification Project manager provides Approval.
> Independent testers generate test cases from Software Requirements in order to perform
System Testing
c) Global Design Vs Integration Testing
> System Architect / senior developer creates Global design, Informal Review/ Walk
through / Technical Review / Inspection like Verification methods will be applied on
Design documents.
> Developers perform Integration Testing based on Software Global Design.
SDLC
d) Detailed Design Vs Unit / Component Testing
> Developers perform Unit /Component Testing based on Software Detailed Design.
Advantages of V Model:
a) Tester role will take place in the requirement phase itself
b) Multiple stages of Testing available so that Defects multiplication can be reduced.
c) Can be used for any type of requirements
d) Due to Multiple stages of Testing and Multiple teams' involvement Quality can be
improved.
e) The V Model Supports wide range of development methodologies such as Structured
and Object-oriented systems development.
f) The V Model supports tailoring.
Disadvantages of V Model:
a) It an expensive model than Waterfall model, needs lot of resources, budget and time.
b) Co-ordination and Maintenance are difficult.
c) Adoption of changes in Requirements and Adding New Requirements at middle of the
process are difficult.
d) It needs an established process for proper implementation.
DIAGRAM
SPIRAL MODEL
STLC
MODEL
STLC
Requirement Analysis
QA interacts with various stakeholders like Client, Business Analyst,
System Analyst, Technical Lead/ Development Manager to understand the
requirements in detail to develop the project.
During this phase the QA takes an important decisions like what are the
testing types & techniques to be performed, feasibility for automation
testing implementation, etc.
Test Planning:
• It is a document which contains the plan related to all testing activities which needs
to be done to deliver a quality product.
• Senior QA Manager determines test plan strategy along with efforts and cost
estimates for the project.
Testduration
Resources
Whatto test
Whatcannotbe
tested
Toolsusedfor
testing
Risksand
contingencies
planning
STLC
What is Entry and Exit Criteria in STLC?
•Entry Criteria: Entry Criteria gives the prerequisite items that must be completed
before testing can begin.
•Exit Criteria: Exit Criteria defines the items that must be completed before testing can
be concluded
You have Entry and Exit Criteria for all levels in the Software Testing Life Cycle
(STLC)
Test Case Development Phase
The Test Case Development Phase involves the creation, verification and rework of
test cases & test scripts after the test plan is ready. Initially, the Test data is identified
then created and reviewed and then reworked based on the preconditions. Then the QA
team starts the development process of test cases for individual units.
Test Case Development Activities
•Create test cases, automation scripts (if applicable)
•Review and baseline test cases and scripts
•Create test data (If Test Environment is available)
Deliverables of Test Case Development
•Test cases/scripts
•Test data
STLC
Test Environment Setup
Test Environment Setup decides the software and hardware conditions under which a
work product is tested. It is one of the critical aspects of the testing process and can be
done in parallel with the Test Case Development Phase. Test team may not be involved
in this activity if the development team provides the test environment. The test team is
required to do a readiness check (smoke testing) of the given environment.
Test Environment Setup Activities
•Understand the required architecture, environment set-up and prepare hardware and
software requirement list for the Test Environment.
•Setup test Environment and test data
•Perform smoke test on the build
Deliverables of Test Environment Setup
•Environment ready with test data set up
•Smoke Test Results.
STLC
Test Execution Phase
Test Execution Phase is carried out by the testers in which testing of the software build
is done based on test plans and test cases prepared. The process consists of test script
execution, test script maintenance and bug reporting. If bugs are reported then it is
reverted back to development team for correction and retesting will be performed.
Test Execution Activities
•Execute tests as per plan
•Document test results, and log defects for failed cases
•Map defects to test cases in RTM
•Retest the Defect fixes
•Track the defects to closure
Deliverables of Test Execution
•Completed RTM with the execution status
•Test cases updated with results
•Defect reports
STLC
Test Cycle Closure
Test Cycle Closure phase is completion of test execution which involves several
activities like test completion reporting, collection of test completion matrices and test
results. Testing team members meet, discuss and analyze testing artifacts to identify
strategies that have to be implemented in future, taking lessons from current test cycle.
The idea is to remove process bottlenecks for future test cycles.
Test Cycle Closure Activities
•Evaluate cycle completion criteria based on Time, Test coverage, Cost,Software,
Critical Business Objectives, Quality
•Prepare test metrics based on the above parameters.
•Document the learning out of the project
•Prepare Test closure report
•Qualitative and quantitative reporting of quality of the work product to the customer.
•Test result analysis to find out the defect distribution by type and severity.
Deliverables of Test Cycle Closure
•Test Closure report
•Test metrics
STLC
Comparison
parameter
Use Case Test case
Definition
A sequential actions which is use to
describe the interaction among the role and
system to maintain a specified objective,
A Group of test inputs,
conditions and variables by
which the charcaterstics of the
software is defined.
Goal
To reach the last operation follow all
sequential operation
validating the software as it is
working fine or not.
Iteration it follows different paths
it follows single test case is
tested at a time
Dependency it is dependent on the requirements it is dependent over the use case
Requirement Documents and research is required
Test inputs scripts and each test
scripts complete one step
Working
it is working as following the step by step
function ability of the software.
it is working with the help of
testers to validate the software
Users End-users execute the use cases. Testers execute the test cases.
Iteration Can support various paths. Can support a single path only.
STLC
Test Scenario Test Case
A test scenario is a high-level document that
defines the functionality to be tested from
beginning to end.
For evaluating all of an application's functionality,
test cases contain specified test procedures, data,
and expected results.
It emphasizes "what to test" rather than "how to
test."
The emphasis is entirely on "what to test" and
"how to test."
A one-liner is a test case. As a result, there is
always the risk of ambiguity during testing
A step, pre-requisites, intended outcome, and so
on are all described in test cases. As a result, there
is no room for misunderstanding in this procedure
BRS, SRS, and other test artifacts are used to
create test scenarios.
The majority of test cases are derived from test
scenarios. A single Test Scenario might provide
several test cases.
It aids in the rapid testing of end-to-end
functionality.
It aids in the thorough testing of an application.
High-level actions are used in test scenarios. Low-level actions are what test cases are.
Creating and testing scenarios requires
significantly less time and money.
More resources are required for test case
documentation and execution.
Test Strategy
• A Test Strategy is a plan for defining an approach to the Software Testing Life Cycle
(STLC).
• It guides QA teams to define test coverage and testing scope.
• It helps testers get a clear picture of the project at any instance.
• The possibility of missing any test activity is very low when there is a proper test
strategy in place
Test Strategy Document
• Test Strategy Document is a well-described document in software testing which
clearly defines the exact software testing approach and testing objectives of the
software application.
• Test document is an important document for QA teams which is derived from actual
business requirements that guides the whole team about software testing approach
and objectives for each activity in the software testing process.
• A Test strategy document answers all the questions like what you want to get done
and how you are going to accomplish it, etc. Writing an effective Strategy document
is a skill that a tester develops with experience. Testing strategy plan should be
communicated with the entire team so that the team will be consistent on approach
and responsibilities.
Test Plan Test Strategy
 Test focus and project scope are defined. It
deals with test coverage, scheduling,
features to be tested, features not to be
tested, estimation and resource
management.
 Guideline to be followed to achieve the test
objective and execution of test types
mentioned in the testing plan. It deals with
test objective, test environment, test
approach, automation tools and strategy,
contingency plan, and risk analysis
Test Plan Vs Test Strategy
Test Strategy in STLC:
 Scope
It defines parameters like
 Who will review the document?
 Who will approve this document?
 Software Testing activities carried
out with timelines
 Test Approach
 Process of testing
 Testing levels
 Roles and responsibilities of each team member
 Types of Testing ( Load testing, Security testing, Performace testing etc.)
 Testing approach & automation tool if applicable
 Adding new defects, re-testing, Defect triage, Regression Testing and test
sign off
 Test Environment
 Define the number of requirement and setup required for each environment.
 Define backup of test data and restore strategy
 Testing Tools
 Automation and Test management tools needed for test execution
 Figure out a number of open-source as well as commercial tools required,
and determine how many users are supported on it and plan accordingly
 Release Control
 Release management plan with appropriate version history that will make
sure test execution for all modification in that release
 Risk Analysis
 List all risks that you can estimate
 Give a clear plan to mitigate the risks also a contingency plan
 Review and Approvals
 All these activities are reviewed and signed off by the business team, project
management, development team, etc.
 Summary of review changes should be traced at the beginning of the
document along with an approved date, name, and comment
ERROR BUG DEFECT & FAILURE
Difference between Defect, Error, Bug, Failure and Fault!
Testing is the process of identifying defects, where a defect is any variance between
actual and expected results. “A mistake in coding is called Error, error found by tester is
called Defect, defect accepted by development team then it is called Bug, build does not
meet the requirements then it Is Failure.”
DEFECT:
It can be simply defined as a variance between expected and actual. The defect is an
error found AFTER the application goes into production. It commonly refers to several
troubles with the software products, with their external behavior or with its internal
features. In other words, a Defect is a difference between expected and actual results in
the context of testing. It is the deviation of the customer requirement.
Defect can be categorized into the following:
Wrong:
When requirements are implemented not in the right way. This defect is a variance from
the given specification. It is Wrong!
Missing:
A requirement of the customer that was not fulfilled. This is a variance from the
specifications, an indication that a specification was not implemented, or a requirement
of the customer was not noted correctly.
ERROR, DEFECT, BUG & FAILURE
Extra:
A requirement incorporated into the product that was not given by the end customer. This
is always a variance from the specification, but maybe an attribute desired by the user of
the product. However, it is considered a defect because it’s a variance from the existing
requirements.
ERROR:
An error is a mistake, misconception, or misunderstanding on the part of a software
developer. In the category of the developer, we include software engineers,
programmers, analysts, and testers. For example, a developer may misunderstand a de-
sign notation, or a programmer might type a variable name incorrectly – leads to an
Error. It is the one that is generated because of the wrong login, loop or syntax. The error
normally arises in software; it leads to a change in the functionality of the program.
BUG:
A bug is the result of a coding error. An Error found in the development environment
before the product is shipped to the customer. A programming error that causes a
program to work poorly, produce incorrect results or crash. An error in software or
hardware that causes a program to malfunction. A bug is the terminology of Tester.
ERROR, BUG, DEFECT & FAILURE
FAILURE:
A failure is the inability of a software system or component to perform its required
functions within specified performance requirements. When a defect reaches the end
customer it is called a Failure. During development, Failures are usually observed by
testers.
FAULT:
An incorrect step, process or data definition in a computer program that causes the
program to perform in an unintended or unanticipated manner. A fault is introduced into
the software as the result of an error. It is an anomaly in the software that may cause it to
behave incorrectly, and not according to its specification. It is the result of the error.
The software industry can still not agree on the definitions for all the above. In essence,
if you use the term to mean one specific thing, it may not be understood to be that thing
by your audience.
Test Case Design Technique
Boundary Value Analysis (BVA)
Boundary value analysis is based on testing at the boundaries between partitions. It
includes maximum, minimum, inside or outside boundaries, typical values and error
values.
It is generally seen that a large number of errors occur at the boundaries of the defined
input values rather than the center. It is also known as BVA and gives a selection of test
cases which exercise bounding values.
This black box testing technique complements equivalence partitioning. This software
testing technique base on the principle that, if a system works well for these particular
values then it will work perfectly well for all values which comes between the two
boundary values.
Guidelines for Boundary Value analysis
•If an input condition is restricted between values x and y, then the test cases should be
designed with values x and y as well as values which are above and below x and y.
•If an input condition is a large number of values, the test case should be developed
which need to exercise the minimum and maximum numbers. Here, values above and
below the minimum and maximum values are also tested.
•Apply guidelines 1 and 2 to output conditions. It gives an output which reflects the
minimum and the maximum values expected. It also tests the below or above values.
Test Case Design Techniques
Examples:
Input condition is valid between 1 to 10
Boundary values 0,1,2 and 9,10,11
Equivalence Class Partitioning
Equivalent Class Partitioning allows you to divide set of test condition into a partition
which should be considered the same. This software testing method divides the input
domain of a program into classes of data from which test cases should be designed.
The concept behind this Test Case Design Technique is that test case of a representative
value of each class is equal to a test of any other value of the same class. It allows you to
Identify valid as well as invalid equivalence classes.
Example:
Input conditions are valid between
1 to 10 and 20 to 30
Hence there are Five Equivalence Class:
----- to 0 - Invalid
1 to 10 – Valid
11 to 19 – Invalid
20 to 30 – Valid
31 to ---- - Invalid
TEST CASE DESIGN
Decision Table Based Testing
A decision table is also known as to Cause-Effect table. This software testing technique
is used for functions which respond to a combination of inputs or events. For example, a
submit button should be enabled if the user has entered all required fields.
The first task is to identify functionalities where the output depends on a combination of
inputs. If there are large input set of combinations, then divide it into smaller subsets
which are helpful for managing a decision table.
For every function, you need to create a table and list down all types of combinations of
inputs and its respective outputs. This helps to identify a condition that is overlooked by
the tester.
Following are steps to create a decision table:
•Enlist the inputs in rows
•Enter all the rules in the column
•Fill the table with the different combination of inputs
•In the last row, note down the output against the input combination.
TEST CASE DESIGN
Example: A submit button in a contact form is enabled only when all the inputs are
entered by the end user.
TEST CASE DESIGN
Example: A submit button in a contact form is enabled only when all the inputs are
entered by the end user.
State Transition
 In State Transition technique changes in input conditions change the state of the
Application Under Test (AUT).
 This testing technique allows the tester to test the behavior of an AUT.
 The tester can perform this action by entering various input conditions in a sequence
 In State transition technique, the testing team provides positive as well as negative
input test values for evaluating the system behavior.
Guideline for State Transition:
•State transition should be used when a testing team is testing the application for a
limited set of input values.
•The Test Case Design Technique should be used when the testing team wants to
test sequence of events which happen in the application under test.
Example: In the following example, if the user enters a valid password in any of the first
three attempts the user will be able to log in successfully. If the user enters the invalid
password in the first or second try, the user will be prompted to re-enter the password.
When the user enters password incorrectly 3rd time, the action has taken, and the
account will be blocked.
State Transition Table
Correct PIN Incorrect PIN
S1) Start S5 S2
S2) 1st attempt S5 S3
S3) 2nd attempt S5 S4
S4) 3rd attempt S5 S6
S5) Access Granted – –
S6) Account blocked – –
In the above-given table when the user enters the correct PIN, the state is transitioned to
Access granted. And if the user enters an incorrect password, he or she is moved to next
state. If he does the same 3rd time, he will reach the account blocked state.
Error Guessing
 Error Guessing is a software testing technique based on guessing the error which can
prevail in the code.
 The technique is heavily based on the experience where the test analysts use their
experience to guess the problematic part of the testing application. Hence, the test
analysts must be skilled and experienced for better error guessing.
 The technique counts a list of possible errors or error-prone situations. Then tester
writes a test case to expose those errors.
 To design test cases based on this software testing technique, the analyst can use the
past experiences to identify the conditions.
Guidelines for Error Guessing:
 The test should use the previous experience of testing similar applications
 Understanding of the system under test
 Knowledge of typical implementation errors
 Remember previously troubled areas
 Evaluate Historical data & Test results
Defect /Bug Life Cycle
 Defect Life Cycle or Bug Life Cycle in software testing is the specific set of states that
defect or bug goes through in its entire life.
 The purpose of Defect life cycle is to easily coordinate and communicate current status of
defect which changes to various assignees and make the defect fixing process systematic
and efficient.
 Defect Status or Bug Status in defect life cycle is the present state from which the defect
or a bug is currently undergoing.
 The goal of defect status is to precisely convey the current state or progress of a defect or
bug in order to better track and understand the actual progress of the defect life cycle.
 The number of states that a defect goes through varies from project to project.
Defect Status Lifecycle Diagram
Defect Status Lifecycle Diagram
1. New: When a new defect is logged and posted for the first time. It is assigned a
status as NEW.
2. Assigned: Once the bug is posted by the tester, the lead of the tester approves the
bug and assigns the bug to the developer team
3. Open: The developer starts analyzing and works on the defect fix
4. Fixed: When a developer makes a necessary code change and verifies the change, he
or she can make bug status as “Fixed.”
5. Pending retest: Once the defect is fixed the developer gives a particular code for
retesting the code to the tester. Since the software testing remains pending from the
testers end, the status assigned is “pending retest”.
6. Retest: Tester does the retesting of the code at this stage to check whether the defect
is fixed by the developer or not and changes the status to “Re-test.”
Defect Status Lifecycle Diagram
7. Verified: The tester re-tests the bug after it got fixed by the developer. If there is no
bug detected in the software, then the bug is fixed and the status assigned is “verified.”
8. Reopen: If the bug persists even after the developer has fixed the bug, the tester
changes the status to “reopened”. Once again the bug goes through the life cycle.
9. Closed: If the bug is no longer exists then tester assigns the status “Closed.”
10. Duplicate: If the defect is repeated twice or the defect corresponds to the same
concept of the bug, the status is changed to “duplicate.”
11. Rejected: If the developer feels the defect is not a genuine defect then it changes the
defect to “rejected.”
12. Deferred: If the present bug is not of a prime priority and if it is expected to get
fixed in the next release, then status “Deferred” is assigned to such bugs
13. Not a bug: If it does not affect the functionality of the application then the status
assigned to a bug is “Not a bug”.
Defect Life Cycle Explained
BUG REPORT
•Important Features in Your Bug Report
•#1) Bug Number/id
•#2) Bug Title
•#3) Priority
•#4) Platform/Environment
•#5) Description
•#6) Steps to Reproduce
•#7) Expected and Actual Result
•#8) Screenshot
#1) Bug Number/id
A Bug number or an identification number (like swb001) makes bug reporting and the
process of referring to bugs much easier. The developer can easily check if a particular
bug has been fixed or not. It makes the whole testing and retesting process smoother and
easier.
#2) Bug Title
Bug titles are read more often than any other part of the bug report. This should explain
all about what comes in the bug. The Bug title should be suggestive enough that the
reader can understand it. A clear bug title makes it easy to understand and the reader can
know if the bug has been reported earlier or has been fixed.
BUG REPORT
#3) Priority
Based on the severity of the bug, a priority can be set for it. A bug can be a Blocker,
Critical, Major, Minor, Trivial, or a suggestion. Bug priorities can be given from P1 to
P5 so that the important ones are viewed first.
#4) Platform/Environment
OS and browser configuration is necessary for a clear bug report. It is the best way to
communicate how the bug can be reproduced.
Without the exact platform or environment, the application may behave differently and
the bug at the tester’s end may not replicate on the developer’s end. So it is best to
clearly mention the environment in which the bug was detected.
#5) Description
Bug description helps the developer to understand the bug. It describes the problem
encountered. A poor description will create confusion and waste the time of the
developers as well as testers.
It is necessary to communicate clearly about the effect of the description. It’s always
helpful to use complete sentences. It is a good practice to describe each problem
separately instead of crumbling them altogether. Don’t use terms like “I think” or “I
believe”.
BUG REPORT
#6) Steps to Reproduce
A good Bug report should clearly mention the steps to reproduce. These steps should
include actions that may cause the bug. Don’t make generic statements. Be specific on
the steps to follow.
A good example of a well-written procedure is given below
Steps:
•Select product Abc01.
•Click on Add to cart.
•Click Remove to remove the product from the cart.
#7) Expected and Actual Result
A Bug description is incomplete without the Expected and Actual results. It is necessary
to outline what the outcome of the test is and what the user should expect. The reader
should know what the correct outcome of the test is. Clearly, mention what happened
during the test and what the outcome was.
#8) Screenshot
A picture is worth a thousand words. Take a Screenshot of the instance of failure with
proper captioning to highlight the defect. Highlight unexpected error messages with light
red color. This draws attention to the required area.
TYPES OF
TESTING
Types
of Testing
STATIC TESTING
Static Testing is a type of software testing in which software application is tested without
code execution. Manual or automated reviews of code, requirement documents and
document design are done in order to find the errors. The main objective of static testing is
to improve the quality of software applications by finding errors in early stages of software
development process.
Static testing involves manual or automated reviews of the documents. This review is done
during an initial phase of testing to catch Defect early in STLC. It examines work
documents and provides review comments. It is also called Non-execution testing or
verification testing.
Examples of Work documents:
•Requirement specifications
•Design document
•Source Code
•Test Plans
•Test Cases
•Test Scripts
•Help or User document
•Web Page content
DYNAMIC TESTING
Under Dynamic Testing, a code is executed. It checks for functional behavior of software
system, memory/CPU usage and overall performance of the system. Hence the name
“Dynamic”.
The main objective of this testing is to confirm that the software product works in
conformance with the business requirements. This testing is also called an Execution
technique or validation testing.
Dynamic testing executes the software and validates the output with the expected outcome.
Dynamic testing is performed at all levels of testing, and it can be either black or white box
testing.
STATIC TESTING TECHNIQUES
Static Testing Techniques:
•Informal Reviews: This is one of the type of review which doesn’t follow any process to
find errors in the document. Under this technique, you just review the document and give
informal comments on it.
•Technical Reviews: A team consisting of your peers, review the technical specification
of the software product and checks whether it is suitable for the project. They try to find
any discrepancies in the specifications and standards followed. This review concentrates
mainly on the technical documentation related to the software such as Test Strategy, Test
Plan and requirement specification documents.
•Walkthrough: The author of the work product explains the product to his team.
Participants can ask questions if any. A meeting is led by the author. Scribe makes note of
review comments
•Inspection: The main purpose is to find defects and meeting is led by a trained moderator.
This review is a formal type of review where it follows a strict process to find the defects.
Reviewers have a checklist to review the work products. They record the defect and inform
the participants to rectify those errors.
•Static code Review: This is a systematic review of the software source code without
executing the code. It checks the syntax of the code, coding standards, code optimization,
etc. This is also termed as white box testing. This review can be done at any point during
development.
DYNAMIC TESTING TECHNIQUES
•Unit Testing: Under Unit Testing, individual units or modules are tested by the
developers. It involves testing of source code by developers.
•Integration Testing: Individual modules are grouped together and tested by the
developers. The purpose is to determine what modules are working as expected
once they are integrated.
•System Testing: System Testing is performed on the whole system by checking
whether the system or application meets the requirement specification document.
STATIC VS DYNAMIC
Static Testing Dynamic Testing
Testing was done without executing the program Testing is done by executing the program
This testing does the verification process Dynamic testing does the validation process
Static testing is about prevention of defects Dynamic testing is about finding and fixing the defects
Static testing gives an assessment of code and
documentation
Dynamic testing gives bugs/bottlenecks in the software
system.
Static testing involves a checklist and process to be
followed
Dynamic testing involves test cases for execution
This testing can be performed before compilation Dynamic testing is performed after compilation
Static testing covers the structural and statement
coverage testing
Dynamic testing techniques are Boundary Value Analysis
& Equivalence Partitioning.
Cost of finding defects and fixing is less Cost of finding and fixing defects is high
Return on investment will be high as this process
involved at an early stage
Return on investment will be low as this process involves
after the development phase
More reviews comments are highly recommended for
good quality
More defects are highly recommended for good quality.
Requires loads of meetings Comparatively requires lesser meetings
FUNCTIONAL & NON-FUNCTIONAL TESTING
What is Functional Testing?
Functional testing is a type of testing which verifies that each function of the
software application operates in conformance with the requirement specification.
This testing mainly involves black box testing, and it is not concerned about the
source code of the application.
Every functionality of the system is tested by providing appropriate input,
verifying the output and comparing the actual results with the expected results.
This testing involves checking of User Interface, APIs, Database, security, client/
server applications and functionality of the Application Under Test. The testing
can be done either manually or using automation
What is Non-Functional Testing?
Non-functional testing is a type of testing to check non-functional aspects
(performance, usability, reliability, etc.) of a software application. It is explicitly
designed to test the readiness of a system as per nonfunctional parameters which
are never addressed by functional testing.
A good example of non-functional test would be to check how many people can
simultaneously login into a software.
Non-functional testing is equally important as functional testing and affects client
satisfaction.
Functional & Non-functional Testing
Parameters Functional Non-functional testing
Execution
It is performed before non-functional
testing.
It is performed after the functional testing.
Focus area It is based on customer’s requirements. It focusses on customer’s expectation.
Requirement It is easy to define functional requirements.
It is difficult to define the requirements for
non-functional testing.
Usage
Helps to validate the behavior of the
application.
Helps to validate the performance of the
application.
Objective Carried out to validate software actions.
It is done to validate the performance of
the software.
Requirements
Functional testing is carried out using the
functional specification.
This kind of testing is carried out by
performance specifications
Manual testing
Functional testing is easy to execute by
manual testing.
It’s very hard to perform non-functional
testing manually.
Functionality It describes what the product does. It describes how the product works.
Example Test Case Check login functionality. The dashboard should load in 2 seconds.
Functional & Non-functional Testing
Parameters Functional Non-functional testing
Testing Types
Examples of Functional Testing Types
•Unit testing
•Smoke testing
•User Acceptance
•Integration Testing
•Regression testing
•Localization
•Globalization
•Interoperability
Examples of Non-functional Testing Types
•Performance Testing
•Volume Testing
•Scalability
•Usability Testing
•Load Testing
•Stress Testing
•Compliance Testing
•Portability Testing
•Disaster Recover Testing
Functionality It describes what the product does. It describes how the product works.
Example Test Case Check login functionality. The dashboard should load in 2 seconds.
Testing Types
Examples of Functional Testing Types
•Unit testing
•Smoke testing
•User Acceptance
•Integration Testing
•Regression testing
•Localization
•Globalization
•Interoperability
Examples of Non-functional Testing Types
•Performance Testing
•Volume Testing
•Scalability
•Usability Testing
•Load Testing
•Stress Testing
•Compliance Testing
•Portability Testing
•Disaster Recover Testing
Functionality It describes what the product does. It describes how the product works.
BLACK BOX TESTING & ITS TYPES
WHITE BOX TESTING
The software testing in which the internal structure of the software is tested including the
design and codes is known as white box testing. It enhances the design and security while
also verifying the input-output flow. The other name of white box testing is clear box
testing because unlike black box testing the code is available and visible.
A few of the other names given to white box testing are open box testing, transparent box
testing, glass testing, and code-based testing. With the help of white box testing the tester
can find whether or not there are any security loopholes, if the codes are perfectly
structured, the input flow in the code, checking conditional loops and testing every element
individually.
How to do White Box Testing?
The steps of white box testing are:
Identifying what has to be tested
If the identified elements are smaller in number, it is better as white box testing endorses
testing every component of the selected case. When these are tested all the loopholes
present are visible clearly. The testing on the features and components is repeatedly done to
ensure that they work in the way they are expected. Small components are taken and tested
and when the goal is achieved the next component is taken. It is also important that the
testing are energy efficient, that is there is a balance between the amount of energy put to
the amount of output obtained.
WHITE BOX TESTING
Plotting on the flowgraph
All possible and thinkable paths are plotted in the flowgraph. These paths can be for any
feature, component, or module. It is done to determine the scope of the testing.
Creating test cases for every path
After plotting the possible paths, create test cases for each path. After the test cases are made,
they are executed.
Execute
It is the execution phase of testing where the test cases are executed. The execution phases
can be repeated for confirmation of the test results.
WHITE BOX TESTING
What are the types of White Box Testing?
The different types of white box testing are:
1. Unit Testing
Unit testing is done to confirm whether a particular code is running or not, to check its
functionality. It is usually done in the early steps of the process. Unit testing helps in
eliminating simple errors and hence forms one of the basic steps of performance.
2. Static Analysis
Static Analysis is used for evaluating the static parts of the code. If there are any defects or
errors, static analysis helps in figuring it out. Therefore, the errors are removed in the first
steps of the process.
3. Dynamic Analysis
Following static analysis comes dynamic analysis. According to a lot of testers static and
dynamic analysis should be performed together. With the help of dynamic analysis, the
source code is analyzed and thereafter executed. The output is analyzed, but that does not
affect the process.
4. Statement Coverage
One of the most important steps of the testing process is known as statement coverage. The
advantages are obtained in the steps of execution. Statement coverage helps in analyzing
whether the functionalities are in working order or not. Every function is executed, even if
it is for once.
WHITE BOX TESTING
5. Branch Testing Coverage
The software and web applications are not programmed in a continuous pattern. They are
branched into different ways so that the process of segregation can be done effectively.
Branch coverage helps in finding results fast. The branches are verified like codes. If there
are any unnatural elements in the application, it is easily found with the help of this code.
6. Security Testing
Security is one element that has to be perfect at all times. Therefore, security testing are
done by most of the testers. The application has to be protected automatically hence there
has to be a formulated process. Security testing has a lot of subsets. If there is any
unauthorized access, the testing helps in rectifying them. If there is any risk of breach the
process prevents it.
7. Mutation Testing
Mutation testing is usually the last segment of the process. It is basically a rechecking
technique to find bugs and defects that helps in obtaining more information about the
strategy to make the system stronger at regular intervals of time.
WHITE BOX TESTING
White Box Testing Tools
The different white box testing tools are:
 EclEmma
 PyUnit
 HTMLUnit
 CppdUnit
Advantages of White Box Testing
 The test cases can be automated with ease.
 The tests can be done without GUI.
 Testing is more efficient.
 Optimization of code can be done as the hidden errors are visible
Disadvantages of White Box Testing
 It is comparatively a more complex process.
 It can be expensive.
 The tests are usually not detailed; hence they can have errors.
 An experienced resource person is required for testing as it requires technical
knowledge.
SIT Vs UAT Testing
In general, testing is done by both testers and developers. Each of them follows its own
pattern to test an application.
SIT UAT
System Integration Testing or SIT is
done by testers
User Acceptance Testing, commonly
known as UAT is done lastly by the
end-users.
Level of Testing Hierarchy
 Unit testing
 Component testing
 System testing
 System integration testing
 User acceptance testing
 Production
System Integration Testing (SIT)
Two different subsystems/systems will combine at a point in any project. We have to
then test this system as a whole. Hence this is called System Integration Testing.
Working Steps Of SIT
1. The individual units have to be integrated first in separate builds.
2. The entire system has to be tested as a whole.
3. Test cases have to be written using proper software based on software requirements.
4. The errors such as UI errors, data flow errors, and interface errors can be found in
this testing.
System Integration Testing (SIT)
Example:
Let us consider that a healthcare site has 3 tabs initially i.e. Patient Information,
Education, and Previous medical records. The healthcare site has now added a new tab
called Injection information.
Now the new tab’s details or database has to be merged with the existing tabs and the
system has to be tested as a whole with 4 tabs.
System Integration Testing (SIT)
We have to test the integrated site that has four tabs.
System Integration Testing (SIT)
Techniques Used In SIT
 Top-down Approach
 Bottom-up Approach
 Big bang approach
1) Top-Down Approach
System Integration Testing (SIT)
As the name itself suggests it means that it follows the top to bottom execution. It is a
method in which the main functionality or module is tested followed by the sub-
modules in order. Here, arises a question as to what will we do if the consecutive actual
sub-modules are not present immediately for integration.
The answer to this gives rise to STUBS.
Stubs are known as called programs. They act as dummy modules and perform the
required module function in a limited manner.
Stubs perform the functionality of a unit/module/sub-module in a partial manner until
the actual module gets ready for integration as the integration of sub-modules is
difficult.
The low-level components may be replaced by stubs in order to integrate. Hence top-
down approach may follow a structured or procedure language. After one stub is
replaced with the actual component, the next stub can be replaced with the actual
components.
The execution of the above diagram will be module A, module B, module C, module D,
module E, module F, and module G.
System Integration Testing (SIT)
Example For Stubs:
System Integration Testing (SIT)
2) Bottom-Up Approach
This approach follows the bottom-to-top hierarchy. Here, the lower modules are
integrated first and then the higher modules are integrated and tested.
The bottom-most modules or units are merged and tested. The set of lower units is
called Clusters. While integrating the sub-modules with the main module, in case the
main module is not available then the DRIVERS are used to code the main program.
DRIVERS are called calling programs.
System Integration Testing (SIT)
Defect leakage is less in this approach
To integrate the sub-modules to a higher level or main module a driver module is
created as shown in the above figure.
System Integration Testing (SIT)
3) Big Bang Approach
In simple words, in the Big Bang Approach, you need to connect all the units at once
and test all the components. No partition is done here. Defect leakage must not occur.
This approach is useful for freshly developed projects that are developed from scratch
or those which have undergone major enhancements.
User Acceptance Testing (UAT)
Whenever a tester is handing over the completed tested project to the client/end-user
then the client/end-user will again test the project to see if it is designed correctly. This
is called User Acceptance Testing.
Appropriate test cases have to be written for both in order to perform testing.
User Acceptance Testing (UAT)
The developers develop a code based on the Functional Requirement Specification
document. The testers test it and report bugs. But the client or end-user only knows
how the system exactly works. Hence they test the system from their end.
Working Steps Of UAT
 The UAT plan has to be created based on the requirements.
 The scenarios have to be built from the requirements.
 The test cases and test data have to be prepared.
 The test cases have to be run and checked for any bugs present.
 If there is no bug and the test cases have passed then the project can be put to sign
off and sent for production.
 If any defects or bugs are found then it has to be fixed immediately to prepare for
release.
User Acceptance Testing (UAT)
Types Of UAT Testing
1. Alpha And Beta Testing: Alpha testing is done at the development site
whereas beta testing is done in the external environment i.e. an outside
company etc.
2. Contract Acceptance Testing: In a contract the accepted specifications that
are predefined need to be met.
3. Regulation Acceptance Testing: As the name says the testing is done against
the regulations
4. Operational Acceptance Testing: The operation or the workflow designed
must be as expected.
5. Black Box Testing: Without going deeply the software needs to be tested for
its vital purpose.
User Acceptance Testing (UAT)
SIT UAT
This is performed by testers and developers. This is performed by end users and clients.
Integration of the subunits/units is checked
here. The interfaces are to be tested.
The whole design is checked here.
The individual units are integrated and tested
such that the system works as per the
requirements.
The system is tested as a whole for the main
functionality of the product as desired by the user.
It is done based on the requirements by the
testers.
It is done based on the user perspective as to how
the product has to be used by end user.
SIT is performed as soon as the system is
assembled.
UAT is performed finally just prior to the product
release.
Key Differences Between SIT Vs UAT
Short notes about SIT and UAT
• System integration testing is done mainly to test the interface requirements of a
system.
• User acceptance testing is done to verify the system functionality as a whole by an
end-user. Appropriate test cases have to be written for both the testing.
1. SIT can be done by 3 techniques (Top-down, Bottom-up, and Big bang approaches).
2. UAT can be done using 5 methodologies (Alpha and Beta testing, Contract
Acceptance testing, Regulation Acceptance testing, Operational Acceptance testing,
and Black box testing).
 Defects found in system testing can be corrected easily. Different builds can be made
based on defects.
 Defects found in UAT are considered as a black mark to the testers and are not
accepted.
I. In UAT the business officials or clients must be satisfied that the developed product
meets their needs in the business environment.
II. SIT should satisfy the functional requirements of the system.
Statement, Branch and Path coverage
Statement Coverage:
In this the test case is executed in such a way that every statement of the code is
executed at least once.
Branch/Decision Coverage:
Test coverage criteria requires enough test cases such that each condition in a
decision takes on all possible outcomes at least once, and each point of entry to a
program or subroutine is invoked at least once. That is, every branch (decision) taken
each way, true and false. It helps in validating all the branches in the code making sure
that no branch leads to abnormal behavior of the application.
Path Coverage:
In this the test case is executed in such a way that every path is executed at least
once. All possible control paths taken, including all loop paths taken zero, once, and
multiple (ideally, maximum) items in path coverage technique, the test cases are
prepared based on the logical complexity measure of a procedural design. In this type of
testing every statement in the program is guaranteed to be executed at least one time.
Flow Graph, Cyclomatic Complexity and Graph Metrics are used to arrive at basis path
Statement, Branch and Path coverage
Cyclomatic Complexity
1. Cyclomatic Complexity for a flow graph is computed in one of three ways:
The numbers of regions of the flow graph correspond to the Cyclomatic complexity.
2. Cyclomatic complexity, V(G), for a flow graph G is defined as
V(G) = E – N + 2
where E is the number of flow graph edges and N is the number of flow graph nodes.
3. Cyclomatic complexity, V(G), for a graph flow G is also defined as
V(G) = P + 1
Where P is the number of predicate nodes contained in the flow graph G.
Statement, Branch and Path coverage
Example: Consider the following flow graph
Region, R= 6
Number of Nodes = 13
Number of edges = 17
Number of Predicate Nodes = 5
Cyclomatic Complexity, V( C) :
V( C ) = R = 6;
Or
V(C) = Predicate Nodes + 1
=5+1 =6
Or
V( C)= E-N+2
= 17-13+2
Nodes represent entries, exits,
decisions and each statement of code.
Edges represent non-branching and
branching links between nodes.
Statement, Branch and Path coverage
The flow chart is
Example:
Read P
Read Q
IF P+Q > 100 THEN
Print “Large”
ENDIF
If P > 50 THEN
Print “P Large”
ENDIF
Statement, Branch and Path coverage
Statement Coverage (SC) Branch Coverage (BC) Path Coverage (PC)
To calculate Statement
Coverage, find out the shortest
number of paths following
which all the nodes will be
covered. Here by traversing
through path 1A-2C-3D-E-4G-
5H all
the nodes are covered. So by
traveling through only one path
all the nodes 12345 are covered,
so the Statement coverage in this
case is 1.
To calculate Branch Coverage,
find out the minimum number of
paths which will
ensure covering of all the edges.
In this case there is no single
path which will ensure coverage
of all the edges at one go. By
following paths 1A-2C-3D-E-
4G-5H, maximum numbers of
edges (A, C, D, E, G and H) are
covered but edges B and F are
left. To covers these edges we 3
www.ajoysinigha.info
can follow 1A-2B-E-4F. By the
combining the above two paths
we can ensure of traveling
through all the paths. Hence
Branch Coverage is 2. The aim is
to cover all possible true/false
decisions.
Path Coverage ensures covering
of all the paths from start to end.
All possible paths are-
1A-2B-E-4F
1A-2B-E-4G-5H
1A-2C-3D-E-4G-5H
1A-2C-3D-E-4F
So path coverage is 4.
Thus for the above example
SC=1, BC=2 and PC=4.
REQUIREMENT TRACIBILITY MATRIX - RTM
What is Traceability Matrix (TM)?
A Traceability Matrix is a document that co-relates any two-baseline documents that require a many-to-many
relationship to check the completeness of the relationship.
It is used to track the requirements and to check the current project requirements are met.
What is Requirement Traceability Matrix?
Requirement Traceability Matrix (RTM) is a document that maps and traces user requirement with test
cases. It captures all requirements proposed by the client and requirement traceability in a single document,
delivered at the conclusion of the Software development life cycle. The main purpose of Requirement
Traceability Matrix is to validate that all requirements are checked via test cases such that no functionality is
unchecked during Software testing.
Why RTM is Important?
The main agenda of every tester should be to understand the client’s requirement and make sure that the output
product should be defect-free. To achieve this goal, every QA should understand the requirement thoroughly
and create positive and negative test cases.
This would mean that the software requirements provided by the client must be further split into different
scenarios and further to test cases. Each of this case must be executed individually.
A question arises here on how to make sure that the requirement is tested considering all possible
scenarios/cases? How to ensure that any requirement is not left out of the testing cycle?
A simple way is to trace the requirement with its corresponding test scenarios and test cases. This merely is
termed as ‘Requirement Traceability Matrix.’
The traceability matrix is typically a worksheet that contains the requirements with its all-possible test
scenarios and cases and their current state, i.e., if they have been passed or failed. This would help the testing
team to understand the level of testing activities done for the specific product.
REQUIREMENT TRACIBILITY MATRIX - RTM
Which Parameters to include in Requirement Traceability
Matrix?
•Requirement ID
•Requirement Type and Description
•Test Cases with Status
Above is a sample requirement traceability matrix.
REQUIREMENT TRACIBILITY MATRIX - RTM
But in a typical software testing project, the traceability matrix would have more than these parameters.
As illustrated above, a requirement traceability matrix can:
REQUIREMENT TRACIBILITY MATRIX - RTM
 Show the requirement coverage in the number of test cases
 Design status as well as execution status for the specific test case
 If there is any User Acceptance test to be done by the users, then UAT status can also be captured
in the same matrix.
 The related defects and the current state can also be mentioned in the same matrix.
This kind of matrix would be providing One Stop Shop for all the testing activities.
Apart from maintaining an excel separately. A testing team can also opt for requirements tracing
available Test Management Tools.
Types of Traceability Test Matrix
In Software Engineering, traceability matrix can be divided into three major components as
mentioned below:
 Forward traceability: This matrix is used to check whether the project progresses in the desired
direction and for the right product. It makes sure that each requirement is applied to the product
and that each requirement is tested thoroughly. It maps requirements to test cases.
 Backward or reverse traceability: It is used to ensure whether the current product remains on
the right track. The purpose behind this type of traceability is to verify that we are not expanding
the scope of the project by adding code, design elements, test or other work that is not specified
in the requirements. It maps test cases to requirements.
 Bi-directional traceability (Forward Backward): This traceability matrix ensures that all
requirements are covered by test cases. It analyzes the impact of a change in requirements
affected by the Defect in a work product and vice versa.
REQUIREMENT TRACIBILITY MATRIX - RTM
How to create Requirement Traceability Matrix
Let’s understand the concept of Requirement Traceability Matrix through a Guru99 banking project.
Based on the Business Requirement Document (BRD) and Technical Requirement Document
(TRD), testers start writing test cases.
Let suppose, the following table is our Business Requirement Document or BRD for Guru99
banking project.
Here the scenario is that the customer should be able to login to Guru99 banking website with the
correct password and user#id while manager should be able to login to the website through customer
login page.
REQUIREMENT TRACIBILITY MATRIX - RTM
While the below table is our Technical Requirement Document (TRD).
Let’s Go Ahead and create RTM in Testing
Step 1: Our sample Test Case is
“Verify Login, when correct ID and Password is entered, it should log in
successfully”
REQUIREMENT TRACIBILITY MATRIX - RTM
Step 2: Identify the Technical Requirement that this test case is verifying. For our test case, the technical requirement is
T94 is being verified.
Step 3: Note this Technical Requirement (T94) in the Test Case.
Step 4: Identify the Business Requirement for which this TR (Technical Requirement-T94) is defined
REQUIREMENT TRACIBILITY MATRIX - RTM
Step 5: Note the BR (Business Requirement) in Test Case
Step 6: Do above for all Test Cases. Later Extract the First 3 Columns from your Test Suite. RTM in testing is Ready!
REQUIREMENT TRACIBILITY MATRIX - RTM
Advantage of Requirement Traceability Matrix
 It confirms 100% test coverage
 It highlights any requirements missing or document inconsistencies
 It shows the overall defects or execution status with a focus on business requirements
 It helps in analyzing or estimating the impact on the QA team’s work with respect to
revisiting or re-working on the test cases
Difference Between White Box and Black Box Testing
White Box Testing
Manual Testing:
• Write Source Code for an
application.
• Test each and every LOC(lines of
code) manually.
Automation Testing:
• Write Source Code for an
application.
• Write the program to test the
development program using a tool.
• For Example:
JUNIT Tool - Java,
NUNIT Tool – Dot Net.
Black Box Testing
Manual Testing:
• Testing the UI and Functionality of an
application manually.
Automation Testing:
• Write a program to test the UI and
Functionality of an application using
tool.
• Run the test program in the tool.(Ex:
selenium tool)
Types of Testing
Manual Testing
• Checking the functionality of an
application is called software
testing.
• Drawbacks: Manual Regression
Testing
Automation Testing
• It is the process of testing the
application automatically using
the automation tool.
• Advantages: Saves time and
money.
• We can easily do compatibility
testing by running the test
scripts in multiple platforms
simultaneously, this is called
parallel execution.
• We can generate the reports
automatically.
Black Box Testing
Development Environment
Login page: whenever
we enter the valid
details, navigate to
home page.
Requirement
Testing Environment
Login page: we
enter the valid
details
Home page
Software
Compress
Compile
Source code
written by
developers
Types in Black Box Testing
Functional Non Functional
Smoke testing
Functional testing
 Integration testing
 System testing
 Retesting
 Regression
 Exploratory
Acceptance testing
Alpha
Beta
Compatibility
 Performance
 Usability
 Adhoc
 Accessibility
 Globalization
Recovery
Aesthetic
Security
Testing Life Cycle
System study
Write Test Plan
Write Test Cases
Prepare RTM
Execute Test Cases
Defect Tracking
Test Execution Report
Retrospective / Post Mortem Meeting
Error, Defect, Bug & Failure
• “A mistake in coding is called Error, error found by
tester is called Defect, defect accepted by development team then
it is called Bug, build does not meet the requirements then it Is
Failure.”
What is Scenario?
• Testing an application in all possible ways.
• To find the defects, we must identify scenarios first.
Positive scenarios:
• Testing an application with valid inputs.
Negative scenarios:
• Testing an application with invalid inputs.
Examples for Scenario
Scenarios for Pen:
Positive:
• Check if the all parts of the pen is fitting properly and no loose fitting.
[Installation Testing]
• Check if the pen ball is fitted properly and ball is moving with ease. [Installation Testing]
• Check if pen is writing on the page properly. [Functional Testing]
• Check if the ink on the paper is belongs with the similar color as what we see in the refill.
[Functional Testing]
• Check if pressure needs to be applied on the pen to write down on page with least efforts.
[Usability Testing]
• Size and shape should be confirmable for writing. [UI Testing]
• Logo on the pen should be properly printed. [UI Testing]
Negative:
• Check pen stress testing by dropping pen down from practical height and check if nothing is
breaking, no any damage to pen and pen is working without any issues.
• Hold the pen upwards direction for some time and try to write on paper.
• Keep the pen in water and try to write on paper.
• Check how pen is working at different climate environmental conditions like at room
temperature, different climate conditions.
Requirement for Registration
• User Name: should accept 6 – 32 characters(only alphabets).
• Email Id: should accept valid Email Id.
• Mobile Number: should accept valid and only 10 digit number.
• Password: should accept 5 – 10 characters (any characters).
• Registration button: to register the new customer.
Scenarios for Registration Button
Positive:
1. Enter all the fields with valid data & click on Registration Button.
2. Enter only mandatory fields & click on Registration Button.
3. Enter only optional fields & click on Registration Button.
Negative:
1. Enter all the fields with Invalid data & click on Registration
Button.
2. Leave all the fields & click on Registration Button.
Test Case for Registration Button
• Open Browser(chrome, Firefox etc)
• Enter website URL
• Click on Login/Registration from header
• The popup will be displayed
• Click on Register from popup
• Enter all valid the fields with valid data
• Click on registration button
• Close the browser
Differences between Scenario and Test
Case
Scenario
• Scenario will tell what to do.
• Scenario does not have
navigation steps.
• Scenario will not tell where
exactly the defect is.
Test Case
• Test Case will tell how to do.
• Test Case has navigation steps.
• Test Case will tell where exactly
the defect is.
Differences between Priority & Severity
Priority
• How fast the Defect has been
fixed by developer that will be
convey through priority.
Types:
1. High
2. Medium
3. Low
Severity
• How much the Defect will be
impact in the customer’s
business that will be convey
through severity.
Types:
1. Blocker/Show Stopper
2. Critical
3. Major
4. Minor

Software_Testing.pptx

  • 1.
    SOFTWARE TESTING Mentor: VinodhSivaraman Mail id: iotvino18@gmail.com
  • 2.
    AGENDA Intro to Testing Verificationvs Validation Types of Application Probabilities of Getting errors in the Application SDLC Advantages & Disadvantages of each SDLC Principles of Testing STLC Difference between Test Case, Use Case & Scenario How to Prepare Test plan and Strategy How to Prepare Test Case Template Error, Defect, Bug & Failure
  • 3.
    AGENDA Test Case DesignTechnique Bug Life Cycle How to Prepare the Bug Template? Bug Tracking Tool Types of Testing Difference between Static and Dynamic testing Difference between Functional and Non-functional testing Black box testing and its types White box testing and its types System Integration Testing vs User Acceptance Testing Entry Criteria and Exit Criteria
  • 4.
    AGENDA • Test Environmentand Test data preparation • Flow graph notations • Statement coverage • Branch Coverage • Path coverage • Cyclometric Complexity • Integration testing • Big Bang Integration • I n c r e m e n t a l A p p r o a c h T o p - D o w n , B o t t o m - u p , a n d H y b r i d • Requirement traceability matrix
  • 5.
    INTRO TO TESTING •DEBUGGING • JOSEPH JURAN – QUALITY CONTROL HANDBOOK • Glen ford J. Myers – Software Testing • Intended to identify any defect in software • Attributes of Software • Reliability • Scalability - Measure • Portability - Os • Re-usability • Usability • 7 Principles of Testing
  • 6.
    Verification vs Validation VerificationValidation The verifying process includes checking documents, design, code, and program It is a dynamic mechanism of testing and validating the actual product It does not involve executing the code It always involves executing the code Verification uses methods like reviews, walkthroughs, inspections, and desk- checking etc. It uses methods like Black Box Testing, White Box Testing, and non-functional testing Whether the software conforms to specification is checked It checks whether the software meets the requirements and expectations of a customer It finds bugs early in the development cycle It can find bugs that the verification process can not catch Target is application and software architecture, specification, complete design, high level, and database design etc. Target is an actual product QA team does verification and make sure that the software is as per the requirement in the SRS document. With the involvement of testing team validation is executed on software code.
  • 7.
    TYPES OF APPLICATION •Acollection of Microsoft software including MS Office, PowerPoint, Word, Excel, and Outlook. •Common Internet browsers like Google Chrome, Safari, Firefox, etc. •Graphics and designing software such as Canva, Adobe Photoshop, CorelDraw, and AutoCAD. •Mobile Apps – Mobile application Testing - IDE •E-commerce Application •Education Software •Resource Management Application Software •Project Management Application Software •Customized Project Relevant Software used in Embedded, Banking & Insurance Industries
  • 8.
    What is SoftwareTesting? • Software testing is the process of evaluating and verifying that a software product or application does what it is supposed to do. • The benefits of testing include preventing bugs, reducing development costs and improving performance. • Checking the functionality of an application is called software testing.
  • 9.
    ERROR IN APPLICATION •Errors which cause an application to fail and terminate abnormally
  • 10.
    Why should wedo Software Testing? • Every software is developed to support the business. • If there is a defect in the software, it will affect the business and to ensure the quality of software application. • So, before we launch the software to the customer, every defect should be identified, and it should be resolved.
  • 11.
    SDLC Software Development LifeCycle > Software Development Life Cycle is a systematic approach to develop software. It is a Process followed by Software Developers and Software Testing is an integral part of Software Development, so it is also important for Software Testers... > Software Development Life Cycle (SDLC) is a process used by the software industry to design, develop and test software. The SDLC aims to produce a high-quality software that meets or exceeds customer expectations, reaches completion within times and cost estimates. > ISO/IEC 12207 is an international standard for software life-cycle processes. It defines all the tasks required for developing and maintaining software.
  • 12.
    SDLC Phases of SoftwareDevelopment Life Cycle, These phases may vary form one organization to another, but purpose is almost all same, that is "Develop and Maintain Quality Software", i) Requirement Gathering ii) Analysis iii) Design iv) Coding / Development v) Testing vi) Deployment & Maintenance Note: It is General Software Development Life Cycle, we have various SDLC Models in the IT Industry, Waterfall Model, V Model, Spiral Model and Agile Development Models etc..., Software Development process varies from one SDLC Model to another. i) Requirement Gathering > Requirement Gathering is the most important phase in software development life cycle, Business Analyst collects the requirements from the Customer/Client as per the clients business needs and documents the requirements in the Business Requirement Specification and provides the same to Development Team.
  • 13.
    SDLC > Suppose OurPlanned Software is not intended for a single customer and the software product for multiple customers then Business Analyst or Business Team collects Requirements from the Market and also evaluate Other similar products in the Market > Key Role in this phase is Business Analyst and Outcome of the phase is "Business Requirement Specification". ii) Analysis > Once the Requirement Gathering is done the next step is to define and document the product requirements and get them approved by the customer. This is done through SRS (Software Requirement Specification) document. SRS consists of all the product requirements to be designed and developed during the project life cycle. > Key people involved in this phase are Project Manager, Business Analyst and Senior members of the Team. The outcome of this phase is Software Requirement Specification.
  • 14.
    SDLC > iii) Design >In Design phase Senior Developers and Architects, they give the architecture of the software product to be developed. It has two steps one is HLD (High Level Design) or Global Design and another is LLD (Low Level Design) or Detailed Design, > High Level Design (HLD) is the overall system design, covers the system architecture and database design. It describes the relation between various modules and functions of the system. > Low Level Design (LLD) is the detailed system design, covers how each and every feature in the product should work and how every component should work. > The outcome of this phase is High Level Document and Low Level Document which works as an input to the next phase Coding... iv) Coding / Development > Developers (seniors, juniors and fresher) involved in this phase, this is the phase where we start building the software and start writing the code for the product. > The outcome of this phase is Source Code Document (SCD) and the developed product.
  • 15.
    SDLC v) Testing > Oncethe software is complete then it is deployed in the testing environment. The testing team starts testing (either test the software manually or using automated test tools depends on process defined in STLC) > Testing is done to verify that the entire application works according to the customer requirement. > During this phase, Testing team may find defects which they communicate to developers, the development team fixes the defect and send back to Testing for a re-test. This process continues until the software is Stable, and working according to the business needs of that system. vi) Deployment & Maintenance > After successful testing, the product is delivered (deployed to the customer for their use), Deployment is done by the Deployment/Implementation engineers and Once when the customers start using the developed system then the actual problems will come up and needs to be solved from time to time. > Fixing the issues found by the customer comes in the maintenance phase. 100% testing is not possible – because, the way testers test the product is different from the way customers use the product. Maintenance should be done as per SLA (Service Level Agreement) .
  • 16.
    SDLC Software Development LifeCycle Models > There are various software development life cycle models defined and designed which are followed during the software development process. These models are also referred as Software Development Process Models". i) Waterfall Model > Waterfall approach was first SDLC Model to be used widely in Software Engineering to ensure success of the project. In "The Waterfall" approach, the whole process of software development is divided into separate phases. In this Waterfall model, typically, the outcome of one phase acts as the input for the next phase sequentially. Phases of Waterfall Model: a) Requirements Gathering:  This first step is also the most important, because it involves gathering information about what the customer needs and defining, in the clearest possible terms, the problem that the product is expected to solve. b) Software Requirements: > In this phase Business Requirements are converted as Software Requirements.
  • 17.
    SDLC c) Design: > Inthis phase Global and Detailed design can be produced based on Software Requirements. d) Coding: > This step consists of actually constructing the product as per the design specification(s) developed in the previous step. Typically, this step is performed by a development team consisting of programmers, interface designers and other specialists, using tools such as compilers, debuggers, interpreters and media editors. The output of this step is one or more product components, built according to a pre-defined coding standard and debugged, tested and integrated to satisfy the system architecture requirements. e) Testing: > In this stage, System will be tested by testers, if the find any mismatch they report defects. Developers /Programmers fix the defects and then testers close defects by performing confirmation testing (Regression Testing).
  • 18.
    SDLC c) Design: > Inthis phase Global and Detailed design can be produced based on Software Requirements. d) Coding: > This step consists of actually constructing the product as per the design specification(s) developed in the previous step. Typically, this step is performed by a development team consisting of programmers, interface designers and other specialists, using tools such as compilers, debuggers, interpreters and media editors. The output of this step is one or more product components, built according to a pre-defined coding standard and debugged, tested and integrated to satisfy the system architecture requirements. e) Testing: > In this stage, System will be tested by testers, if the find any mismatch they report defects. Developers /Programmers fix the defects and then testers close defects by performing confirmation testing (Regression Testing).
  • 19.
  • 20.
    SDLC f) Release &Maintenance: > Release team (consists of a few developers, testers, and tech-support people etc…) install software in Customer environment and they consider below factors; Correct & Complete installation, User Management, Services Management, Coexistence with other software, Handling of Input & Output devices, and Handling of secondary storage devices Etc… Maintenance team process Customer issues based on service agreements. Advantages of Waterfall Model: a) Simple and easy to use b) Easy to manage due to the rigidity of the model- each phase has specific deliverables and a review process. c) Phases are processed and completed one at a time. d) Works well for smaller projects where requirements are very well understood. Disadvantages of Waterfall Model: a) No working software is produced until late during the life cycle b) High amount of risk and uncertainty c) Poor model for complex and object-oriented projects. d) Poor model for Long and ongoing projects e) Poor Model where requirements are at a moderate to high risk of changing.
  • 21.
    SDLC ii) V Model >It is Verification & Validation model, known as V Model, in this model all development phases can be integrated with Testing phases. > The V-model illustrates how testing activities can be integrated into each phase of the software development life cycle. > V Model was inaugurated in order to avoid drawbacks in Waterfall model and its main focus on multiple stages of testing. > Multiple stages of Testing avoids defects multiplication. b) Software Requirements Vs System Testing > Development Manager/Tech Manager converts User Requirements as Software Requirements and Reviews, Meetings like verification methods will be performed on Software Requirements, after Verification Project manager provides Approval. > Independent testers generate test cases from Software Requirements in order to perform System Testing c) Global Design Vs Integration Testing > System Architect / senior developer creates Global design, Informal Review/ Walk through / Technical Review / Inspection like Verification methods will be applied on Design documents. > Developers perform Integration Testing based on Software Global Design.
  • 22.
    SDLC d) Detailed DesignVs Unit / Component Testing > Developers perform Unit /Component Testing based on Software Detailed Design. Advantages of V Model: a) Tester role will take place in the requirement phase itself b) Multiple stages of Testing available so that Defects multiplication can be reduced. c) Can be used for any type of requirements d) Due to Multiple stages of Testing and Multiple teams' involvement Quality can be improved. e) The V Model Supports wide range of development methodologies such as Structured and Object-oriented systems development. f) The V Model supports tailoring. Disadvantages of V Model: a) It an expensive model than Waterfall model, needs lot of resources, budget and time. b) Co-ordination and Maintenance are difficult. c) Adoption of changes in Requirements and Adding New Requirements at middle of the process are difficult. d) It needs an established process for proper implementation.
  • 23.
  • 24.
  • 25.
  • 26.
    STLC Requirement Analysis QA interactswith various stakeholders like Client, Business Analyst, System Analyst, Technical Lead/ Development Manager to understand the requirements in detail to develop the project. During this phase the QA takes an important decisions like what are the testing types & techniques to be performed, feasibility for automation testing implementation, etc. Test Planning: • It is a document which contains the plan related to all testing activities which needs to be done to deliver a quality product. • Senior QA Manager determines test plan strategy along with efforts and cost estimates for the project. Testduration Resources Whatto test Whatcannotbe tested Toolsusedfor testing Risksand contingencies planning
  • 27.
    STLC What is Entryand Exit Criteria in STLC? •Entry Criteria: Entry Criteria gives the prerequisite items that must be completed before testing can begin. •Exit Criteria: Exit Criteria defines the items that must be completed before testing can be concluded You have Entry and Exit Criteria for all levels in the Software Testing Life Cycle (STLC) Test Case Development Phase The Test Case Development Phase involves the creation, verification and rework of test cases & test scripts after the test plan is ready. Initially, the Test data is identified then created and reviewed and then reworked based on the preconditions. Then the QA team starts the development process of test cases for individual units. Test Case Development Activities •Create test cases, automation scripts (if applicable) •Review and baseline test cases and scripts •Create test data (If Test Environment is available) Deliverables of Test Case Development •Test cases/scripts •Test data
  • 28.
    STLC Test Environment Setup TestEnvironment Setup decides the software and hardware conditions under which a work product is tested. It is one of the critical aspects of the testing process and can be done in parallel with the Test Case Development Phase. Test team may not be involved in this activity if the development team provides the test environment. The test team is required to do a readiness check (smoke testing) of the given environment. Test Environment Setup Activities •Understand the required architecture, environment set-up and prepare hardware and software requirement list for the Test Environment. •Setup test Environment and test data •Perform smoke test on the build Deliverables of Test Environment Setup •Environment ready with test data set up •Smoke Test Results.
  • 29.
    STLC Test Execution Phase TestExecution Phase is carried out by the testers in which testing of the software build is done based on test plans and test cases prepared. The process consists of test script execution, test script maintenance and bug reporting. If bugs are reported then it is reverted back to development team for correction and retesting will be performed. Test Execution Activities •Execute tests as per plan •Document test results, and log defects for failed cases •Map defects to test cases in RTM •Retest the Defect fixes •Track the defects to closure Deliverables of Test Execution •Completed RTM with the execution status •Test cases updated with results •Defect reports
  • 30.
    STLC Test Cycle Closure TestCycle Closure phase is completion of test execution which involves several activities like test completion reporting, collection of test completion matrices and test results. Testing team members meet, discuss and analyze testing artifacts to identify strategies that have to be implemented in future, taking lessons from current test cycle. The idea is to remove process bottlenecks for future test cycles. Test Cycle Closure Activities •Evaluate cycle completion criteria based on Time, Test coverage, Cost,Software, Critical Business Objectives, Quality •Prepare test metrics based on the above parameters. •Document the learning out of the project •Prepare Test closure report •Qualitative and quantitative reporting of quality of the work product to the customer. •Test result analysis to find out the defect distribution by type and severity. Deliverables of Test Cycle Closure •Test Closure report •Test metrics
  • 31.
    STLC Comparison parameter Use Case Testcase Definition A sequential actions which is use to describe the interaction among the role and system to maintain a specified objective, A Group of test inputs, conditions and variables by which the charcaterstics of the software is defined. Goal To reach the last operation follow all sequential operation validating the software as it is working fine or not. Iteration it follows different paths it follows single test case is tested at a time Dependency it is dependent on the requirements it is dependent over the use case Requirement Documents and research is required Test inputs scripts and each test scripts complete one step Working it is working as following the step by step function ability of the software. it is working with the help of testers to validate the software Users End-users execute the use cases. Testers execute the test cases. Iteration Can support various paths. Can support a single path only.
  • 32.
    STLC Test Scenario TestCase A test scenario is a high-level document that defines the functionality to be tested from beginning to end. For evaluating all of an application's functionality, test cases contain specified test procedures, data, and expected results. It emphasizes "what to test" rather than "how to test." The emphasis is entirely on "what to test" and "how to test." A one-liner is a test case. As a result, there is always the risk of ambiguity during testing A step, pre-requisites, intended outcome, and so on are all described in test cases. As a result, there is no room for misunderstanding in this procedure BRS, SRS, and other test artifacts are used to create test scenarios. The majority of test cases are derived from test scenarios. A single Test Scenario might provide several test cases. It aids in the rapid testing of end-to-end functionality. It aids in the thorough testing of an application. High-level actions are used in test scenarios. Low-level actions are what test cases are. Creating and testing scenarios requires significantly less time and money. More resources are required for test case documentation and execution.
  • 33.
    Test Strategy • ATest Strategy is a plan for defining an approach to the Software Testing Life Cycle (STLC). • It guides QA teams to define test coverage and testing scope. • It helps testers get a clear picture of the project at any instance. • The possibility of missing any test activity is very low when there is a proper test strategy in place
  • 34.
    Test Strategy Document •Test Strategy Document is a well-described document in software testing which clearly defines the exact software testing approach and testing objectives of the software application. • Test document is an important document for QA teams which is derived from actual business requirements that guides the whole team about software testing approach and objectives for each activity in the software testing process. • A Test strategy document answers all the questions like what you want to get done and how you are going to accomplish it, etc. Writing an effective Strategy document is a skill that a tester develops with experience. Testing strategy plan should be communicated with the entire team so that the team will be consistent on approach and responsibilities.
  • 35.
    Test Plan TestStrategy  Test focus and project scope are defined. It deals with test coverage, scheduling, features to be tested, features not to be tested, estimation and resource management.  Guideline to be followed to achieve the test objective and execution of test types mentioned in the testing plan. It deals with test objective, test environment, test approach, automation tools and strategy, contingency plan, and risk analysis Test Plan Vs Test Strategy
  • 36.
  • 37.
     Scope It definesparameters like  Who will review the document?  Who will approve this document?  Software Testing activities carried out with timelines  Test Approach  Process of testing  Testing levels  Roles and responsibilities of each team member  Types of Testing ( Load testing, Security testing, Performace testing etc.)  Testing approach & automation tool if applicable  Adding new defects, re-testing, Defect triage, Regression Testing and test sign off
  • 38.
     Test Environment Define the number of requirement and setup required for each environment.  Define backup of test data and restore strategy  Testing Tools  Automation and Test management tools needed for test execution  Figure out a number of open-source as well as commercial tools required, and determine how many users are supported on it and plan accordingly  Release Control  Release management plan with appropriate version history that will make sure test execution for all modification in that release
  • 39.
     Risk Analysis List all risks that you can estimate  Give a clear plan to mitigate the risks also a contingency plan  Review and Approvals  All these activities are reviewed and signed off by the business team, project management, development team, etc.  Summary of review changes should be traced at the beginning of the document along with an approved date, name, and comment
  • 40.
    ERROR BUG DEFECT& FAILURE Difference between Defect, Error, Bug, Failure and Fault! Testing is the process of identifying defects, where a defect is any variance between actual and expected results. “A mistake in coding is called Error, error found by tester is called Defect, defect accepted by development team then it is called Bug, build does not meet the requirements then it Is Failure.” DEFECT: It can be simply defined as a variance between expected and actual. The defect is an error found AFTER the application goes into production. It commonly refers to several troubles with the software products, with their external behavior or with its internal features. In other words, a Defect is a difference between expected and actual results in the context of testing. It is the deviation of the customer requirement. Defect can be categorized into the following: Wrong: When requirements are implemented not in the right way. This defect is a variance from the given specification. It is Wrong! Missing: A requirement of the customer that was not fulfilled. This is a variance from the specifications, an indication that a specification was not implemented, or a requirement of the customer was not noted correctly.
  • 41.
    ERROR, DEFECT, BUG& FAILURE Extra: A requirement incorporated into the product that was not given by the end customer. This is always a variance from the specification, but maybe an attribute desired by the user of the product. However, it is considered a defect because it’s a variance from the existing requirements. ERROR: An error is a mistake, misconception, or misunderstanding on the part of a software developer. In the category of the developer, we include software engineers, programmers, analysts, and testers. For example, a developer may misunderstand a de- sign notation, or a programmer might type a variable name incorrectly – leads to an Error. It is the one that is generated because of the wrong login, loop or syntax. The error normally arises in software; it leads to a change in the functionality of the program. BUG: A bug is the result of a coding error. An Error found in the development environment before the product is shipped to the customer. A programming error that causes a program to work poorly, produce incorrect results or crash. An error in software or hardware that causes a program to malfunction. A bug is the terminology of Tester.
  • 42.
    ERROR, BUG, DEFECT& FAILURE FAILURE: A failure is the inability of a software system or component to perform its required functions within specified performance requirements. When a defect reaches the end customer it is called a Failure. During development, Failures are usually observed by testers. FAULT: An incorrect step, process or data definition in a computer program that causes the program to perform in an unintended or unanticipated manner. A fault is introduced into the software as the result of an error. It is an anomaly in the software that may cause it to behave incorrectly, and not according to its specification. It is the result of the error. The software industry can still not agree on the definitions for all the above. In essence, if you use the term to mean one specific thing, it may not be understood to be that thing by your audience.
  • 43.
    Test Case DesignTechnique Boundary Value Analysis (BVA) Boundary value analysis is based on testing at the boundaries between partitions. It includes maximum, minimum, inside or outside boundaries, typical values and error values. It is generally seen that a large number of errors occur at the boundaries of the defined input values rather than the center. It is also known as BVA and gives a selection of test cases which exercise bounding values. This black box testing technique complements equivalence partitioning. This software testing technique base on the principle that, if a system works well for these particular values then it will work perfectly well for all values which comes between the two boundary values. Guidelines for Boundary Value analysis •If an input condition is restricted between values x and y, then the test cases should be designed with values x and y as well as values which are above and below x and y. •If an input condition is a large number of values, the test case should be developed which need to exercise the minimum and maximum numbers. Here, values above and below the minimum and maximum values are also tested. •Apply guidelines 1 and 2 to output conditions. It gives an output which reflects the minimum and the maximum values expected. It also tests the below or above values.
  • 44.
    Test Case DesignTechniques Examples: Input condition is valid between 1 to 10 Boundary values 0,1,2 and 9,10,11 Equivalence Class Partitioning Equivalent Class Partitioning allows you to divide set of test condition into a partition which should be considered the same. This software testing method divides the input domain of a program into classes of data from which test cases should be designed. The concept behind this Test Case Design Technique is that test case of a representative value of each class is equal to a test of any other value of the same class. It allows you to Identify valid as well as invalid equivalence classes. Example: Input conditions are valid between 1 to 10 and 20 to 30 Hence there are Five Equivalence Class: ----- to 0 - Invalid 1 to 10 – Valid 11 to 19 – Invalid 20 to 30 – Valid 31 to ---- - Invalid
  • 45.
    TEST CASE DESIGN DecisionTable Based Testing A decision table is also known as to Cause-Effect table. This software testing technique is used for functions which respond to a combination of inputs or events. For example, a submit button should be enabled if the user has entered all required fields. The first task is to identify functionalities where the output depends on a combination of inputs. If there are large input set of combinations, then divide it into smaller subsets which are helpful for managing a decision table. For every function, you need to create a table and list down all types of combinations of inputs and its respective outputs. This helps to identify a condition that is overlooked by the tester. Following are steps to create a decision table: •Enlist the inputs in rows •Enter all the rules in the column •Fill the table with the different combination of inputs •In the last row, note down the output against the input combination.
  • 46.
    TEST CASE DESIGN Example:A submit button in a contact form is enabled only when all the inputs are entered by the end user.
  • 47.
    TEST CASE DESIGN Example:A submit button in a contact form is enabled only when all the inputs are entered by the end user.
  • 48.
    State Transition  InState Transition technique changes in input conditions change the state of the Application Under Test (AUT).  This testing technique allows the tester to test the behavior of an AUT.  The tester can perform this action by entering various input conditions in a sequence  In State transition technique, the testing team provides positive as well as negative input test values for evaluating the system behavior. Guideline for State Transition: •State transition should be used when a testing team is testing the application for a limited set of input values. •The Test Case Design Technique should be used when the testing team wants to test sequence of events which happen in the application under test.
  • 49.
    Example: In thefollowing example, if the user enters a valid password in any of the first three attempts the user will be able to log in successfully. If the user enters the invalid password in the first or second try, the user will be prompted to re-enter the password. When the user enters password incorrectly 3rd time, the action has taken, and the account will be blocked.
  • 50.
    State Transition Table CorrectPIN Incorrect PIN S1) Start S5 S2 S2) 1st attempt S5 S3 S3) 2nd attempt S5 S4 S4) 3rd attempt S5 S6 S5) Access Granted – – S6) Account blocked – – In the above-given table when the user enters the correct PIN, the state is transitioned to Access granted. And if the user enters an incorrect password, he or she is moved to next state. If he does the same 3rd time, he will reach the account blocked state.
  • 51.
    Error Guessing  ErrorGuessing is a software testing technique based on guessing the error which can prevail in the code.  The technique is heavily based on the experience where the test analysts use their experience to guess the problematic part of the testing application. Hence, the test analysts must be skilled and experienced for better error guessing.  The technique counts a list of possible errors or error-prone situations. Then tester writes a test case to expose those errors.  To design test cases based on this software testing technique, the analyst can use the past experiences to identify the conditions.
  • 52.
    Guidelines for ErrorGuessing:  The test should use the previous experience of testing similar applications  Understanding of the system under test  Knowledge of typical implementation errors  Remember previously troubled areas  Evaluate Historical data & Test results
  • 53.
    Defect /Bug LifeCycle  Defect Life Cycle or Bug Life Cycle in software testing is the specific set of states that defect or bug goes through in its entire life.  The purpose of Defect life cycle is to easily coordinate and communicate current status of defect which changes to various assignees and make the defect fixing process systematic and efficient.  Defect Status or Bug Status in defect life cycle is the present state from which the defect or a bug is currently undergoing.  The goal of defect status is to precisely convey the current state or progress of a defect or bug in order to better track and understand the actual progress of the defect life cycle.  The number of states that a defect goes through varies from project to project.
  • 54.
  • 55.
    Defect Status LifecycleDiagram 1. New: When a new defect is logged and posted for the first time. It is assigned a status as NEW. 2. Assigned: Once the bug is posted by the tester, the lead of the tester approves the bug and assigns the bug to the developer team 3. Open: The developer starts analyzing and works on the defect fix 4. Fixed: When a developer makes a necessary code change and verifies the change, he or she can make bug status as “Fixed.” 5. Pending retest: Once the defect is fixed the developer gives a particular code for retesting the code to the tester. Since the software testing remains pending from the testers end, the status assigned is “pending retest”. 6. Retest: Tester does the retesting of the code at this stage to check whether the defect is fixed by the developer or not and changes the status to “Re-test.”
  • 56.
    Defect Status LifecycleDiagram 7. Verified: The tester re-tests the bug after it got fixed by the developer. If there is no bug detected in the software, then the bug is fixed and the status assigned is “verified.” 8. Reopen: If the bug persists even after the developer has fixed the bug, the tester changes the status to “reopened”. Once again the bug goes through the life cycle. 9. Closed: If the bug is no longer exists then tester assigns the status “Closed.” 10. Duplicate: If the defect is repeated twice or the defect corresponds to the same concept of the bug, the status is changed to “duplicate.” 11. Rejected: If the developer feels the defect is not a genuine defect then it changes the defect to “rejected.” 12. Deferred: If the present bug is not of a prime priority and if it is expected to get fixed in the next release, then status “Deferred” is assigned to such bugs 13. Not a bug: If it does not affect the functionality of the application then the status assigned to a bug is “Not a bug”.
  • 57.
  • 58.
    BUG REPORT •Important Featuresin Your Bug Report •#1) Bug Number/id •#2) Bug Title •#3) Priority •#4) Platform/Environment •#5) Description •#6) Steps to Reproduce •#7) Expected and Actual Result •#8) Screenshot #1) Bug Number/id A Bug number or an identification number (like swb001) makes bug reporting and the process of referring to bugs much easier. The developer can easily check if a particular bug has been fixed or not. It makes the whole testing and retesting process smoother and easier. #2) Bug Title Bug titles are read more often than any other part of the bug report. This should explain all about what comes in the bug. The Bug title should be suggestive enough that the reader can understand it. A clear bug title makes it easy to understand and the reader can know if the bug has been reported earlier or has been fixed.
  • 59.
    BUG REPORT #3) Priority Basedon the severity of the bug, a priority can be set for it. A bug can be a Blocker, Critical, Major, Minor, Trivial, or a suggestion. Bug priorities can be given from P1 to P5 so that the important ones are viewed first. #4) Platform/Environment OS and browser configuration is necessary for a clear bug report. It is the best way to communicate how the bug can be reproduced. Without the exact platform or environment, the application may behave differently and the bug at the tester’s end may not replicate on the developer’s end. So it is best to clearly mention the environment in which the bug was detected. #5) Description Bug description helps the developer to understand the bug. It describes the problem encountered. A poor description will create confusion and waste the time of the developers as well as testers. It is necessary to communicate clearly about the effect of the description. It’s always helpful to use complete sentences. It is a good practice to describe each problem separately instead of crumbling them altogether. Don’t use terms like “I think” or “I believe”.
  • 60.
    BUG REPORT #6) Stepsto Reproduce A good Bug report should clearly mention the steps to reproduce. These steps should include actions that may cause the bug. Don’t make generic statements. Be specific on the steps to follow. A good example of a well-written procedure is given below Steps: •Select product Abc01. •Click on Add to cart. •Click Remove to remove the product from the cart. #7) Expected and Actual Result A Bug description is incomplete without the Expected and Actual results. It is necessary to outline what the outcome of the test is and what the user should expect. The reader should know what the correct outcome of the test is. Clearly, mention what happened during the test and what the outcome was. #8) Screenshot A picture is worth a thousand words. Take a Screenshot of the instance of failure with proper captioning to highlight the defect. Highlight unexpected error messages with light red color. This draws attention to the required area.
  • 61.
  • 62.
  • 63.
    STATIC TESTING Static Testingis a type of software testing in which software application is tested without code execution. Manual or automated reviews of code, requirement documents and document design are done in order to find the errors. The main objective of static testing is to improve the quality of software applications by finding errors in early stages of software development process. Static testing involves manual or automated reviews of the documents. This review is done during an initial phase of testing to catch Defect early in STLC. It examines work documents and provides review comments. It is also called Non-execution testing or verification testing. Examples of Work documents: •Requirement specifications •Design document •Source Code •Test Plans •Test Cases •Test Scripts •Help or User document •Web Page content
  • 64.
    DYNAMIC TESTING Under DynamicTesting, a code is executed. It checks for functional behavior of software system, memory/CPU usage and overall performance of the system. Hence the name “Dynamic”. The main objective of this testing is to confirm that the software product works in conformance with the business requirements. This testing is also called an Execution technique or validation testing. Dynamic testing executes the software and validates the output with the expected outcome. Dynamic testing is performed at all levels of testing, and it can be either black or white box testing.
  • 65.
    STATIC TESTING TECHNIQUES StaticTesting Techniques: •Informal Reviews: This is one of the type of review which doesn’t follow any process to find errors in the document. Under this technique, you just review the document and give informal comments on it. •Technical Reviews: A team consisting of your peers, review the technical specification of the software product and checks whether it is suitable for the project. They try to find any discrepancies in the specifications and standards followed. This review concentrates mainly on the technical documentation related to the software such as Test Strategy, Test Plan and requirement specification documents. •Walkthrough: The author of the work product explains the product to his team. Participants can ask questions if any. A meeting is led by the author. Scribe makes note of review comments •Inspection: The main purpose is to find defects and meeting is led by a trained moderator. This review is a formal type of review where it follows a strict process to find the defects. Reviewers have a checklist to review the work products. They record the defect and inform the participants to rectify those errors. •Static code Review: This is a systematic review of the software source code without executing the code. It checks the syntax of the code, coding standards, code optimization, etc. This is also termed as white box testing. This review can be done at any point during development.
  • 66.
    DYNAMIC TESTING TECHNIQUES •UnitTesting: Under Unit Testing, individual units or modules are tested by the developers. It involves testing of source code by developers. •Integration Testing: Individual modules are grouped together and tested by the developers. The purpose is to determine what modules are working as expected once they are integrated. •System Testing: System Testing is performed on the whole system by checking whether the system or application meets the requirement specification document.
  • 67.
    STATIC VS DYNAMIC StaticTesting Dynamic Testing Testing was done without executing the program Testing is done by executing the program This testing does the verification process Dynamic testing does the validation process Static testing is about prevention of defects Dynamic testing is about finding and fixing the defects Static testing gives an assessment of code and documentation Dynamic testing gives bugs/bottlenecks in the software system. Static testing involves a checklist and process to be followed Dynamic testing involves test cases for execution This testing can be performed before compilation Dynamic testing is performed after compilation Static testing covers the structural and statement coverage testing Dynamic testing techniques are Boundary Value Analysis & Equivalence Partitioning. Cost of finding defects and fixing is less Cost of finding and fixing defects is high Return on investment will be high as this process involved at an early stage Return on investment will be low as this process involves after the development phase More reviews comments are highly recommended for good quality More defects are highly recommended for good quality. Requires loads of meetings Comparatively requires lesser meetings
  • 68.
    FUNCTIONAL & NON-FUNCTIONALTESTING What is Functional Testing? Functional testing is a type of testing which verifies that each function of the software application operates in conformance with the requirement specification. This testing mainly involves black box testing, and it is not concerned about the source code of the application. Every functionality of the system is tested by providing appropriate input, verifying the output and comparing the actual results with the expected results. This testing involves checking of User Interface, APIs, Database, security, client/ server applications and functionality of the Application Under Test. The testing can be done either manually or using automation What is Non-Functional Testing? Non-functional testing is a type of testing to check non-functional aspects (performance, usability, reliability, etc.) of a software application. It is explicitly designed to test the readiness of a system as per nonfunctional parameters which are never addressed by functional testing. A good example of non-functional test would be to check how many people can simultaneously login into a software. Non-functional testing is equally important as functional testing and affects client satisfaction.
  • 69.
    Functional & Non-functionalTesting Parameters Functional Non-functional testing Execution It is performed before non-functional testing. It is performed after the functional testing. Focus area It is based on customer’s requirements. It focusses on customer’s expectation. Requirement It is easy to define functional requirements. It is difficult to define the requirements for non-functional testing. Usage Helps to validate the behavior of the application. Helps to validate the performance of the application. Objective Carried out to validate software actions. It is done to validate the performance of the software. Requirements Functional testing is carried out using the functional specification. This kind of testing is carried out by performance specifications Manual testing Functional testing is easy to execute by manual testing. It’s very hard to perform non-functional testing manually. Functionality It describes what the product does. It describes how the product works. Example Test Case Check login functionality. The dashboard should load in 2 seconds.
  • 70.
    Functional & Non-functionalTesting Parameters Functional Non-functional testing Testing Types Examples of Functional Testing Types •Unit testing •Smoke testing •User Acceptance •Integration Testing •Regression testing •Localization •Globalization •Interoperability Examples of Non-functional Testing Types •Performance Testing •Volume Testing •Scalability •Usability Testing •Load Testing •Stress Testing •Compliance Testing •Portability Testing •Disaster Recover Testing Functionality It describes what the product does. It describes how the product works. Example Test Case Check login functionality. The dashboard should load in 2 seconds. Testing Types Examples of Functional Testing Types •Unit testing •Smoke testing •User Acceptance •Integration Testing •Regression testing •Localization •Globalization •Interoperability Examples of Non-functional Testing Types •Performance Testing •Volume Testing •Scalability •Usability Testing •Load Testing •Stress Testing •Compliance Testing •Portability Testing •Disaster Recover Testing Functionality It describes what the product does. It describes how the product works.
  • 71.
    BLACK BOX TESTING& ITS TYPES
  • 72.
    WHITE BOX TESTING Thesoftware testing in which the internal structure of the software is tested including the design and codes is known as white box testing. It enhances the design and security while also verifying the input-output flow. The other name of white box testing is clear box testing because unlike black box testing the code is available and visible. A few of the other names given to white box testing are open box testing, transparent box testing, glass testing, and code-based testing. With the help of white box testing the tester can find whether or not there are any security loopholes, if the codes are perfectly structured, the input flow in the code, checking conditional loops and testing every element individually. How to do White Box Testing? The steps of white box testing are: Identifying what has to be tested If the identified elements are smaller in number, it is better as white box testing endorses testing every component of the selected case. When these are tested all the loopholes present are visible clearly. The testing on the features and components is repeatedly done to ensure that they work in the way they are expected. Small components are taken and tested and when the goal is achieved the next component is taken. It is also important that the testing are energy efficient, that is there is a balance between the amount of energy put to the amount of output obtained.
  • 73.
    WHITE BOX TESTING Plottingon the flowgraph All possible and thinkable paths are plotted in the flowgraph. These paths can be for any feature, component, or module. It is done to determine the scope of the testing. Creating test cases for every path After plotting the possible paths, create test cases for each path. After the test cases are made, they are executed. Execute It is the execution phase of testing where the test cases are executed. The execution phases can be repeated for confirmation of the test results.
  • 74.
    WHITE BOX TESTING Whatare the types of White Box Testing? The different types of white box testing are: 1. Unit Testing Unit testing is done to confirm whether a particular code is running or not, to check its functionality. It is usually done in the early steps of the process. Unit testing helps in eliminating simple errors and hence forms one of the basic steps of performance. 2. Static Analysis Static Analysis is used for evaluating the static parts of the code. If there are any defects or errors, static analysis helps in figuring it out. Therefore, the errors are removed in the first steps of the process. 3. Dynamic Analysis Following static analysis comes dynamic analysis. According to a lot of testers static and dynamic analysis should be performed together. With the help of dynamic analysis, the source code is analyzed and thereafter executed. The output is analyzed, but that does not affect the process. 4. Statement Coverage One of the most important steps of the testing process is known as statement coverage. The advantages are obtained in the steps of execution. Statement coverage helps in analyzing whether the functionalities are in working order or not. Every function is executed, even if it is for once.
  • 75.
    WHITE BOX TESTING 5.Branch Testing Coverage The software and web applications are not programmed in a continuous pattern. They are branched into different ways so that the process of segregation can be done effectively. Branch coverage helps in finding results fast. The branches are verified like codes. If there are any unnatural elements in the application, it is easily found with the help of this code. 6. Security Testing Security is one element that has to be perfect at all times. Therefore, security testing are done by most of the testers. The application has to be protected automatically hence there has to be a formulated process. Security testing has a lot of subsets. If there is any unauthorized access, the testing helps in rectifying them. If there is any risk of breach the process prevents it. 7. Mutation Testing Mutation testing is usually the last segment of the process. It is basically a rechecking technique to find bugs and defects that helps in obtaining more information about the strategy to make the system stronger at regular intervals of time.
  • 76.
    WHITE BOX TESTING WhiteBox Testing Tools The different white box testing tools are:  EclEmma  PyUnit  HTMLUnit  CppdUnit Advantages of White Box Testing  The test cases can be automated with ease.  The tests can be done without GUI.  Testing is more efficient.  Optimization of code can be done as the hidden errors are visible Disadvantages of White Box Testing  It is comparatively a more complex process.  It can be expensive.  The tests are usually not detailed; hence they can have errors.  An experienced resource person is required for testing as it requires technical knowledge.
  • 77.
    SIT Vs UATTesting In general, testing is done by both testers and developers. Each of them follows its own pattern to test an application. SIT UAT System Integration Testing or SIT is done by testers User Acceptance Testing, commonly known as UAT is done lastly by the end-users.
  • 78.
    Level of TestingHierarchy  Unit testing  Component testing  System testing  System integration testing  User acceptance testing  Production
  • 79.
    System Integration Testing(SIT) Two different subsystems/systems will combine at a point in any project. We have to then test this system as a whole. Hence this is called System Integration Testing. Working Steps Of SIT 1. The individual units have to be integrated first in separate builds. 2. The entire system has to be tested as a whole. 3. Test cases have to be written using proper software based on software requirements. 4. The errors such as UI errors, data flow errors, and interface errors can be found in this testing.
  • 80.
    System Integration Testing(SIT) Example: Let us consider that a healthcare site has 3 tabs initially i.e. Patient Information, Education, and Previous medical records. The healthcare site has now added a new tab called Injection information. Now the new tab’s details or database has to be merged with the existing tabs and the system has to be tested as a whole with 4 tabs.
  • 81.
    System Integration Testing(SIT) We have to test the integrated site that has four tabs.
  • 82.
    System Integration Testing(SIT) Techniques Used In SIT  Top-down Approach  Bottom-up Approach  Big bang approach 1) Top-Down Approach
  • 83.
    System Integration Testing(SIT) As the name itself suggests it means that it follows the top to bottom execution. It is a method in which the main functionality or module is tested followed by the sub- modules in order. Here, arises a question as to what will we do if the consecutive actual sub-modules are not present immediately for integration. The answer to this gives rise to STUBS. Stubs are known as called programs. They act as dummy modules and perform the required module function in a limited manner. Stubs perform the functionality of a unit/module/sub-module in a partial manner until the actual module gets ready for integration as the integration of sub-modules is difficult. The low-level components may be replaced by stubs in order to integrate. Hence top- down approach may follow a structured or procedure language. After one stub is replaced with the actual component, the next stub can be replaced with the actual components. The execution of the above diagram will be module A, module B, module C, module D, module E, module F, and module G.
  • 84.
    System Integration Testing(SIT) Example For Stubs:
  • 85.
    System Integration Testing(SIT) 2) Bottom-Up Approach This approach follows the bottom-to-top hierarchy. Here, the lower modules are integrated first and then the higher modules are integrated and tested. The bottom-most modules or units are merged and tested. The set of lower units is called Clusters. While integrating the sub-modules with the main module, in case the main module is not available then the DRIVERS are used to code the main program. DRIVERS are called calling programs.
  • 86.
    System Integration Testing(SIT) Defect leakage is less in this approach To integrate the sub-modules to a higher level or main module a driver module is created as shown in the above figure.
  • 87.
    System Integration Testing(SIT) 3) Big Bang Approach In simple words, in the Big Bang Approach, you need to connect all the units at once and test all the components. No partition is done here. Defect leakage must not occur. This approach is useful for freshly developed projects that are developed from scratch or those which have undergone major enhancements.
  • 88.
    User Acceptance Testing(UAT) Whenever a tester is handing over the completed tested project to the client/end-user then the client/end-user will again test the project to see if it is designed correctly. This is called User Acceptance Testing. Appropriate test cases have to be written for both in order to perform testing.
  • 89.
    User Acceptance Testing(UAT) The developers develop a code based on the Functional Requirement Specification document. The testers test it and report bugs. But the client or end-user only knows how the system exactly works. Hence they test the system from their end. Working Steps Of UAT  The UAT plan has to be created based on the requirements.  The scenarios have to be built from the requirements.  The test cases and test data have to be prepared.  The test cases have to be run and checked for any bugs present.  If there is no bug and the test cases have passed then the project can be put to sign off and sent for production.  If any defects or bugs are found then it has to be fixed immediately to prepare for release.
  • 90.
    User Acceptance Testing(UAT) Types Of UAT Testing 1. Alpha And Beta Testing: Alpha testing is done at the development site whereas beta testing is done in the external environment i.e. an outside company etc. 2. Contract Acceptance Testing: In a contract the accepted specifications that are predefined need to be met. 3. Regulation Acceptance Testing: As the name says the testing is done against the regulations 4. Operational Acceptance Testing: The operation or the workflow designed must be as expected. 5. Black Box Testing: Without going deeply the software needs to be tested for its vital purpose.
  • 91.
    User Acceptance Testing(UAT) SIT UAT This is performed by testers and developers. This is performed by end users and clients. Integration of the subunits/units is checked here. The interfaces are to be tested. The whole design is checked here. The individual units are integrated and tested such that the system works as per the requirements. The system is tested as a whole for the main functionality of the product as desired by the user. It is done based on the requirements by the testers. It is done based on the user perspective as to how the product has to be used by end user. SIT is performed as soon as the system is assembled. UAT is performed finally just prior to the product release. Key Differences Between SIT Vs UAT
  • 92.
    Short notes aboutSIT and UAT • System integration testing is done mainly to test the interface requirements of a system. • User acceptance testing is done to verify the system functionality as a whole by an end-user. Appropriate test cases have to be written for both the testing. 1. SIT can be done by 3 techniques (Top-down, Bottom-up, and Big bang approaches). 2. UAT can be done using 5 methodologies (Alpha and Beta testing, Contract Acceptance testing, Regulation Acceptance testing, Operational Acceptance testing, and Black box testing).  Defects found in system testing can be corrected easily. Different builds can be made based on defects.  Defects found in UAT are considered as a black mark to the testers and are not accepted. I. In UAT the business officials or clients must be satisfied that the developed product meets their needs in the business environment. II. SIT should satisfy the functional requirements of the system.
  • 93.
    Statement, Branch andPath coverage Statement Coverage: In this the test case is executed in such a way that every statement of the code is executed at least once. Branch/Decision Coverage: Test coverage criteria requires enough test cases such that each condition in a decision takes on all possible outcomes at least once, and each point of entry to a program or subroutine is invoked at least once. That is, every branch (decision) taken each way, true and false. It helps in validating all the branches in the code making sure that no branch leads to abnormal behavior of the application. Path Coverage: In this the test case is executed in such a way that every path is executed at least once. All possible control paths taken, including all loop paths taken zero, once, and multiple (ideally, maximum) items in path coverage technique, the test cases are prepared based on the logical complexity measure of a procedural design. In this type of testing every statement in the program is guaranteed to be executed at least one time. Flow Graph, Cyclomatic Complexity and Graph Metrics are used to arrive at basis path
  • 94.
    Statement, Branch andPath coverage Cyclomatic Complexity 1. Cyclomatic Complexity for a flow graph is computed in one of three ways: The numbers of regions of the flow graph correspond to the Cyclomatic complexity. 2. Cyclomatic complexity, V(G), for a flow graph G is defined as V(G) = E – N + 2 where E is the number of flow graph edges and N is the number of flow graph nodes. 3. Cyclomatic complexity, V(G), for a graph flow G is also defined as V(G) = P + 1 Where P is the number of predicate nodes contained in the flow graph G.
  • 95.
    Statement, Branch andPath coverage Example: Consider the following flow graph Region, R= 6 Number of Nodes = 13 Number of edges = 17 Number of Predicate Nodes = 5 Cyclomatic Complexity, V( C) : V( C ) = R = 6; Or V(C) = Predicate Nodes + 1 =5+1 =6 Or V( C)= E-N+2 = 17-13+2 Nodes represent entries, exits, decisions and each statement of code. Edges represent non-branching and branching links between nodes.
  • 96.
    Statement, Branch andPath coverage The flow chart is Example: Read P Read Q IF P+Q > 100 THEN Print “Large” ENDIF If P > 50 THEN Print “P Large” ENDIF
  • 97.
    Statement, Branch andPath coverage Statement Coverage (SC) Branch Coverage (BC) Path Coverage (PC) To calculate Statement Coverage, find out the shortest number of paths following which all the nodes will be covered. Here by traversing through path 1A-2C-3D-E-4G- 5H all the nodes are covered. So by traveling through only one path all the nodes 12345 are covered, so the Statement coverage in this case is 1. To calculate Branch Coverage, find out the minimum number of paths which will ensure covering of all the edges. In this case there is no single path which will ensure coverage of all the edges at one go. By following paths 1A-2C-3D-E- 4G-5H, maximum numbers of edges (A, C, D, E, G and H) are covered but edges B and F are left. To covers these edges we 3 www.ajoysinigha.info can follow 1A-2B-E-4F. By the combining the above two paths we can ensure of traveling through all the paths. Hence Branch Coverage is 2. The aim is to cover all possible true/false decisions. Path Coverage ensures covering of all the paths from start to end. All possible paths are- 1A-2B-E-4F 1A-2B-E-4G-5H 1A-2C-3D-E-4G-5H 1A-2C-3D-E-4F So path coverage is 4. Thus for the above example SC=1, BC=2 and PC=4.
  • 98.
    REQUIREMENT TRACIBILITY MATRIX- RTM What is Traceability Matrix (TM)? A Traceability Matrix is a document that co-relates any two-baseline documents that require a many-to-many relationship to check the completeness of the relationship. It is used to track the requirements and to check the current project requirements are met. What is Requirement Traceability Matrix? Requirement Traceability Matrix (RTM) is a document that maps and traces user requirement with test cases. It captures all requirements proposed by the client and requirement traceability in a single document, delivered at the conclusion of the Software development life cycle. The main purpose of Requirement Traceability Matrix is to validate that all requirements are checked via test cases such that no functionality is unchecked during Software testing. Why RTM is Important? The main agenda of every tester should be to understand the client’s requirement and make sure that the output product should be defect-free. To achieve this goal, every QA should understand the requirement thoroughly and create positive and negative test cases. This would mean that the software requirements provided by the client must be further split into different scenarios and further to test cases. Each of this case must be executed individually. A question arises here on how to make sure that the requirement is tested considering all possible scenarios/cases? How to ensure that any requirement is not left out of the testing cycle? A simple way is to trace the requirement with its corresponding test scenarios and test cases. This merely is termed as ‘Requirement Traceability Matrix.’ The traceability matrix is typically a worksheet that contains the requirements with its all-possible test scenarios and cases and their current state, i.e., if they have been passed or failed. This would help the testing team to understand the level of testing activities done for the specific product.
  • 99.
    REQUIREMENT TRACIBILITY MATRIX- RTM Which Parameters to include in Requirement Traceability Matrix? •Requirement ID •Requirement Type and Description •Test Cases with Status Above is a sample requirement traceability matrix.
  • 100.
    REQUIREMENT TRACIBILITY MATRIX- RTM But in a typical software testing project, the traceability matrix would have more than these parameters. As illustrated above, a requirement traceability matrix can:
  • 101.
    REQUIREMENT TRACIBILITY MATRIX- RTM  Show the requirement coverage in the number of test cases  Design status as well as execution status for the specific test case  If there is any User Acceptance test to be done by the users, then UAT status can also be captured in the same matrix.  The related defects and the current state can also be mentioned in the same matrix. This kind of matrix would be providing One Stop Shop for all the testing activities. Apart from maintaining an excel separately. A testing team can also opt for requirements tracing available Test Management Tools. Types of Traceability Test Matrix In Software Engineering, traceability matrix can be divided into three major components as mentioned below:  Forward traceability: This matrix is used to check whether the project progresses in the desired direction and for the right product. It makes sure that each requirement is applied to the product and that each requirement is tested thoroughly. It maps requirements to test cases.  Backward or reverse traceability: It is used to ensure whether the current product remains on the right track. The purpose behind this type of traceability is to verify that we are not expanding the scope of the project by adding code, design elements, test or other work that is not specified in the requirements. It maps test cases to requirements.  Bi-directional traceability (Forward Backward): This traceability matrix ensures that all requirements are covered by test cases. It analyzes the impact of a change in requirements affected by the Defect in a work product and vice versa.
  • 102.
    REQUIREMENT TRACIBILITY MATRIX- RTM How to create Requirement Traceability Matrix Let’s understand the concept of Requirement Traceability Matrix through a Guru99 banking project. Based on the Business Requirement Document (BRD) and Technical Requirement Document (TRD), testers start writing test cases. Let suppose, the following table is our Business Requirement Document or BRD for Guru99 banking project. Here the scenario is that the customer should be able to login to Guru99 banking website with the correct password and user#id while manager should be able to login to the website through customer login page.
  • 103.
    REQUIREMENT TRACIBILITY MATRIX- RTM While the below table is our Technical Requirement Document (TRD). Let’s Go Ahead and create RTM in Testing Step 1: Our sample Test Case is “Verify Login, when correct ID and Password is entered, it should log in successfully”
  • 104.
    REQUIREMENT TRACIBILITY MATRIX- RTM Step 2: Identify the Technical Requirement that this test case is verifying. For our test case, the technical requirement is T94 is being verified. Step 3: Note this Technical Requirement (T94) in the Test Case. Step 4: Identify the Business Requirement for which this TR (Technical Requirement-T94) is defined
  • 105.
    REQUIREMENT TRACIBILITY MATRIX- RTM Step 5: Note the BR (Business Requirement) in Test Case Step 6: Do above for all Test Cases. Later Extract the First 3 Columns from your Test Suite. RTM in testing is Ready!
  • 106.
    REQUIREMENT TRACIBILITY MATRIX- RTM Advantage of Requirement Traceability Matrix  It confirms 100% test coverage  It highlights any requirements missing or document inconsistencies  It shows the overall defects or execution status with a focus on business requirements  It helps in analyzing or estimating the impact on the QA team’s work with respect to revisiting or re-working on the test cases
  • 107.
    Difference Between WhiteBox and Black Box Testing White Box Testing Manual Testing: • Write Source Code for an application. • Test each and every LOC(lines of code) manually. Automation Testing: • Write Source Code for an application. • Write the program to test the development program using a tool. • For Example: JUNIT Tool - Java, NUNIT Tool – Dot Net. Black Box Testing Manual Testing: • Testing the UI and Functionality of an application manually. Automation Testing: • Write a program to test the UI and Functionality of an application using tool. • Run the test program in the tool.(Ex: selenium tool)
  • 108.
    Types of Testing ManualTesting • Checking the functionality of an application is called software testing. • Drawbacks: Manual Regression Testing Automation Testing • It is the process of testing the application automatically using the automation tool. • Advantages: Saves time and money. • We can easily do compatibility testing by running the test scripts in multiple platforms simultaneously, this is called parallel execution. • We can generate the reports automatically.
  • 109.
    Black Box Testing DevelopmentEnvironment Login page: whenever we enter the valid details, navigate to home page. Requirement Testing Environment Login page: we enter the valid details Home page Software Compress Compile Source code written by developers
  • 110.
    Types in BlackBox Testing Functional Non Functional Smoke testing Functional testing  Integration testing  System testing  Retesting  Regression  Exploratory Acceptance testing Alpha Beta Compatibility  Performance  Usability  Adhoc  Accessibility  Globalization Recovery Aesthetic Security
  • 111.
    Testing Life Cycle Systemstudy Write Test Plan Write Test Cases Prepare RTM Execute Test Cases Defect Tracking Test Execution Report Retrospective / Post Mortem Meeting
  • 112.
    Error, Defect, Bug& Failure • “A mistake in coding is called Error, error found by tester is called Defect, defect accepted by development team then it is called Bug, build does not meet the requirements then it Is Failure.”
  • 113.
    What is Scenario? •Testing an application in all possible ways. • To find the defects, we must identify scenarios first. Positive scenarios: • Testing an application with valid inputs. Negative scenarios: • Testing an application with invalid inputs.
  • 114.
    Examples for Scenario Scenariosfor Pen: Positive: • Check if the all parts of the pen is fitting properly and no loose fitting. [Installation Testing] • Check if the pen ball is fitted properly and ball is moving with ease. [Installation Testing] • Check if pen is writing on the page properly. [Functional Testing] • Check if the ink on the paper is belongs with the similar color as what we see in the refill. [Functional Testing] • Check if pressure needs to be applied on the pen to write down on page with least efforts. [Usability Testing] • Size and shape should be confirmable for writing. [UI Testing] • Logo on the pen should be properly printed. [UI Testing] Negative: • Check pen stress testing by dropping pen down from practical height and check if nothing is breaking, no any damage to pen and pen is working without any issues. • Hold the pen upwards direction for some time and try to write on paper. • Keep the pen in water and try to write on paper. • Check how pen is working at different climate environmental conditions like at room temperature, different climate conditions.
  • 115.
    Requirement for Registration •User Name: should accept 6 – 32 characters(only alphabets). • Email Id: should accept valid Email Id. • Mobile Number: should accept valid and only 10 digit number. • Password: should accept 5 – 10 characters (any characters). • Registration button: to register the new customer.
  • 116.
    Scenarios for RegistrationButton Positive: 1. Enter all the fields with valid data & click on Registration Button. 2. Enter only mandatory fields & click on Registration Button. 3. Enter only optional fields & click on Registration Button. Negative: 1. Enter all the fields with Invalid data & click on Registration Button. 2. Leave all the fields & click on Registration Button.
  • 117.
    Test Case forRegistration Button • Open Browser(chrome, Firefox etc) • Enter website URL • Click on Login/Registration from header • The popup will be displayed • Click on Register from popup • Enter all valid the fields with valid data • Click on registration button • Close the browser
  • 118.
    Differences between Scenarioand Test Case Scenario • Scenario will tell what to do. • Scenario does not have navigation steps. • Scenario will not tell where exactly the defect is. Test Case • Test Case will tell how to do. • Test Case has navigation steps. • Test Case will tell where exactly the defect is.
  • 119.
    Differences between Priority& Severity Priority • How fast the Defect has been fixed by developer that will be convey through priority. Types: 1. High 2. Medium 3. Low Severity • How much the Defect will be impact in the customer’s business that will be convey through severity. Types: 1. Blocker/Show Stopper 2. Critical 3. Major 4. Minor