Presentation outline-
➢ Introduction
➢ Classification of Solar Power Plant in BD
➢ Status of large scale Power plant
➢ Limitations
➢ Conclusions
➢ Searching for alternative energy sources is essential due to global warming occurred by
conventional fossil fuel based energy.
➢ Renewable energy can play a vital role in this regard.
➢ Bangladesh Government’s target for producing power from renewable energy is 2.4 GW
within 2021 [1].
➢ Among 2.4 GW, 2.11 GW will be produced from solar energy [1].
➢ Among this 2.11 GW, almost all of power will be planned to produce from solar power
plant [1].
➢ The main contributors in terms of capacity is 1500 MW including all on grid large scale
solar power plants[1].
➢ These 1500 MW are planned to produce from 13 PV power plant which will be located 13
different places of Bangladesh [1].
Introduction
➢We can classify our solar power plant into three for explanation. They are:
small scale power plant, medium scale power plant and large scale power
plant.
➢The capacity of small scale power plant will be less than 50 MW.
➢The capacity of a medium scale power plant will be greater than 50 MW
less than 100 MW.
➢The capacity of a large scale power plant will be greater than 100 MW.
Classification of Solar Power Plant in BD
➢ Among the proposed solar power plant, 71% power will be supplied from large scale power plant.
➢ This large scale power plant can further be categorized in 3 classes.
They are: Deal signed, Under planning and Rejected [2].
➢ Only 2 large scale power plant were undersigned with third party to establish. This will supply 27% of
total power.
Status of large scale Power plant
Serial Location Agency Capacity
1 Teknaf
Upazila,
Cox's Bazar
BPDB 200 MW
2 Sundarganj,
Gaibandha
BPDB 200 MW
Total 400 MW
Table-1: Large Scale Solar Power Plant signed to implement.
Source: www.sreda.gov.bd
Status of large scale Power plant
Status of large scale Power plant
Present condition of “200 MW Teknaf Power Plant”:
➢ Southern Solar Power Limited a subsidiary of US based SunEdison had
signed with BPDB to develop it [3].
➢ Estimated investment will be 300 million$[3].
➢ BPDB will pay 0.17$ for per unit power [3].
➢ BPDB will purchase power for 20 years on the basis of no electricity no
payment [3].
➢ This project will require 1000 acres of land [3].
➢ This project will be completed in 18 months [3].
➢ This project is cancelled by the government due to failure of
implementation [5].
Status of large scale Power plant
Present condition of “200 MW Shundargonj Power Plant”:
➢ Teesta Solar Limited (TSL), joint venture of a Bangladeshi & Chinese
power company has signed with BPDB to develop it [4].
➢ Beximco Power of Bangladesh will hold 80% share of this venture [4].
➢ BPDB will purchase power from venture for 20 years [4].
➢ BPDB will pay 15 US Cents for per unit power [4].
➢ Government terminated the project due to failure of implementation [6].
Serial Location Agency Capacity
1 Sonagazi, Feni EGCB 100 MW
2 Sonagazi, Feni EGCB 100 MW
3 Sonagazi, Feni BPDB 100 MW
4 Madarganj Upazila,
Jamalpur
B-R Power Gen 100 MW
5 Katiadi Upazila,
Kishoreganj
APSCL 100 MW
6 Madarganj Upazila,
Jamalpur
RPCL 100 MW
7 Pabna Sadar Upazila,
Pabna
BPDB 100 MW
8 Mongla Upazila,
Bagerhat
BPDB 100 MW
9 Aditmari, Lalmonirhat BPDB 100 MW
Total 900 MW
Table-2: Under Planning Large Scale Solar Power Plant
Source: www.sreda.gov.bd
Status of large scale Power plant
Serial Location Agency Capacity
1 Charbhadrasan
Upazila,
Faridpur
NWPGCL 100 MW
2 Mollahat
Upazila,
Bagerhat
RPCL 100 MW
Total 200 MW
Table-3: Rejected Large Scale Solar Power Plant
Source: www.sreda.gov.bd
Status of large scale Power plant
Although Bangladesh government is targeted to produce 1.5 GW solar power
from 13 large scale solar plant [1], but most of them are either in planning
stage or rejected. There are lot of limitation in large solar power plant
development. They can be written as following [2]:
➢ Land limitation
➢ Limitation Due to Weather Conditions
➢ Limitations due to blanks in Supply Chain
➢ Limitations of Existing Power Infrastructure and Technical Standards
➢ Other limitations
Limitations
Here, we will discuss the limitation due to land. The main reason
behind land limitation are [2] -
➢ Un-sufficiency of appropriate land
➢ Proprietorship of land
➢ Land preparation
➢ Protection from erosion
Limitations
Limitation Due to Weather Conditions are [2]:
➢ Harsh weather conditions
➢ Low irradiance
➢ Dirt
➢ Long implementation period
Limitations
Limitations due to gaps in Supply Chain [2]:
➢ Scarcity of human resources
➢ Economies of scale
➢ Insufficient information on existing services
➢ Long difficulties
Limitations
Limitations due to Existing Power Infrastructure can denoted as follows [2]:
➢ Unreliable grid
➢ Proper transmission network
➢ Scarcity of transmission infrastructure
➢ Lack of technical standards
Limitations
Other limitations can be outlined as follows [2]:
➢ Cost and research losses
➢ Facility in research
➢ Scarcity of transmission infrastructure
➢ Lack of technical standards
➢ Workshop
➢ Privatization
Limitations
➢ It is mentionable that till now establishment of any large scale (greater than
100 MW) solar power plant in Bangladesh not yet started.
➢ Maximum capacity of a largest solar power plant of Bangladesh is just 20 MW
which is situated in Teknaf Upazila of Cox's Bazar financed by BPDB.
➢ Although large scale solar power plant are not yet in operation as expected
but with the proper guidance and step by the government, this project can
become the huge source of renewable solar energy to replace conventional
fossil fuel based energy.
Conclusions
References
1. www.sreda.gov.bd
2. Solar Park: The Next Generation Energy Source in Bangladesh by Zafrin Ahmed
Liza and Mohammad Rakibul Islam, Journal of Energy Research and Reviews 4(2):
9-19, 2020; Article no.JENRR.54460ISSN: 2581-8368
3.www.thedailystar-net.cdn/january10,2017
4.www.dhakatribune.com/october27th/2017
5.www.thedailystar-net.cdn/january01,2019
6.www.energybangla.com/june2/2019
Questions / Comments
Thank you

More Related Content

Similar to Situations of solar power plant over 100 MW in Bangladesh.

Solar India - Sun Power is Solution to India's Energy Crisis
Solar India - Sun Power is Solution to India's Energy CrisisSolar India - Sun Power is Solution to India's Energy Crisis
Solar India - Sun Power is Solution to India's Energy Crisis
solarindia
 
Executive Summary Solar Energy Without Borders, Inc. is inviting Stakeholders...
Executive Summary Solar Energy Without Borders, Inc. is inviting Stakeholders...Executive Summary Solar Energy Without Borders, Inc. is inviting Stakeholders...
Executive Summary Solar Energy Without Borders, Inc. is inviting Stakeholders...
Syed Hashimi
 
SEO-PPT-5 for educational purchase work
SEO-PPT-5 for educational  purchase workSEO-PPT-5 for educational  purchase work
SEO-PPT-5 for educational purchase work
arvindchopra9
 
Energy policy of PUNJAB
Energy policy of PUNJABEnergy policy of PUNJAB
Energy policy of PUNJAB
RahulBhatiya1
 
Deepening Regional Power Collaboration to Enable a Successful Energy Transiti...
Deepening Regional Power Collaboration to Enable a Successful Energy Transiti...Deepening Regional Power Collaboration to Enable a Successful Energy Transiti...
Deepening Regional Power Collaboration to Enable a Successful Energy Transiti...
Celestial Light
 
A road to mitigate energy demand until 2030 & acquisition of Bangladesh in po...
A road to mitigate energy demand until 2030 & acquisition of Bangladesh in po...A road to mitigate energy demand until 2030 & acquisition of Bangladesh in po...
A road to mitigate energy demand until 2030 & acquisition of Bangladesh in po...
Kazi Tanvir
 
Solar power - A developer prespective
Solar power - A developer prespectiveSolar power - A developer prespective
Solar power - A developer prespective
Ponmanikandan Sritharan
 
Solar Presentation
Solar PresentationSolar Presentation
Solar Presentation
Manit S Parikh
 
Rooppur Atomic Power Plant
Rooppur Atomic Power PlantRooppur Atomic Power Plant
Rooppur Atomic Power Plant
Sudipto Krishna Dutta
 
Solar Regulations & Market Policies- YP Chawla
Solar Regulations & Market Policies- YP ChawlaSolar Regulations & Market Policies- YP Chawla
Solar Regulations & Market Policies- YP Chawla
Y P Chawla
 
Ap solar policy 2012.
Ap solar policy 2012.Ap solar policy 2012.
Ap solar policy 2012.
antastoya
 
Green Corner l2010
Green Corner l2010Green Corner l2010
Green Corner l2010
Amit Bharti
 
J&K Solar policy 2010
J&K Solar policy 2010J&K Solar policy 2010
J&K Solar policy 2010
Headway Solar
 
assignment on power plant engineering
assignment on power plant engineering assignment on power plant engineering
assignment on power plant engineering
Khaled Mosharraf Mukut
 
Odisha solar policy 2013 draft
Odisha solar policy 2013 draftOdisha solar policy 2013 draft
Odisha solar policy 2013 draft
Headway Solar
 
Power System Protection -Plant visiting report
Power System Protection -Plant visiting report Power System Protection -Plant visiting report
Power System Protection -Plant visiting report
AB Amit
 
Draft explanatory-memorandum solar-power-projects
Draft explanatory-memorandum solar-power-projectsDraft explanatory-memorandum solar-power-projects
Draft explanatory-memorandum solar-power-projects
Sanman Rajput
 
Rice husk power plant project design document for finance, subsidy & projec...
Rice husk power plant project design document   for finance, subsidy & projec...Rice husk power plant project design document   for finance, subsidy & projec...
Rice husk power plant project design document for finance, subsidy & projec...
Radha Krishna Sahoo
 
Renewable energy
Renewable energyRenewable energy
Renewable energy
ratnajiundavalli
 
Empowering Sustainability: A Comprehensive Analysis of Sarishabari Engreen So...
Empowering Sustainability: A Comprehensive Analysis of Sarishabari Engreen So...Empowering Sustainability: A Comprehensive Analysis of Sarishabari Engreen So...
Empowering Sustainability: A Comprehensive Analysis of Sarishabari Engreen So...
IRJET Journal
 

Similar to Situations of solar power plant over 100 MW in Bangladesh. (20)

Solar India - Sun Power is Solution to India's Energy Crisis
Solar India - Sun Power is Solution to India's Energy CrisisSolar India - Sun Power is Solution to India's Energy Crisis
Solar India - Sun Power is Solution to India's Energy Crisis
 
Executive Summary Solar Energy Without Borders, Inc. is inviting Stakeholders...
Executive Summary Solar Energy Without Borders, Inc. is inviting Stakeholders...Executive Summary Solar Energy Without Borders, Inc. is inviting Stakeholders...
Executive Summary Solar Energy Without Borders, Inc. is inviting Stakeholders...
 
SEO-PPT-5 for educational purchase work
SEO-PPT-5 for educational  purchase workSEO-PPT-5 for educational  purchase work
SEO-PPT-5 for educational purchase work
 
Energy policy of PUNJAB
Energy policy of PUNJABEnergy policy of PUNJAB
Energy policy of PUNJAB
 
Deepening Regional Power Collaboration to Enable a Successful Energy Transiti...
Deepening Regional Power Collaboration to Enable a Successful Energy Transiti...Deepening Regional Power Collaboration to Enable a Successful Energy Transiti...
Deepening Regional Power Collaboration to Enable a Successful Energy Transiti...
 
A road to mitigate energy demand until 2030 & acquisition of Bangladesh in po...
A road to mitigate energy demand until 2030 & acquisition of Bangladesh in po...A road to mitigate energy demand until 2030 & acquisition of Bangladesh in po...
A road to mitigate energy demand until 2030 & acquisition of Bangladesh in po...
 
Solar power - A developer prespective
Solar power - A developer prespectiveSolar power - A developer prespective
Solar power - A developer prespective
 
Solar Presentation
Solar PresentationSolar Presentation
Solar Presentation
 
Rooppur Atomic Power Plant
Rooppur Atomic Power PlantRooppur Atomic Power Plant
Rooppur Atomic Power Plant
 
Solar Regulations & Market Policies- YP Chawla
Solar Regulations & Market Policies- YP ChawlaSolar Regulations & Market Policies- YP Chawla
Solar Regulations & Market Policies- YP Chawla
 
Ap solar policy 2012.
Ap solar policy 2012.Ap solar policy 2012.
Ap solar policy 2012.
 
Green Corner l2010
Green Corner l2010Green Corner l2010
Green Corner l2010
 
J&K Solar policy 2010
J&K Solar policy 2010J&K Solar policy 2010
J&K Solar policy 2010
 
assignment on power plant engineering
assignment on power plant engineering assignment on power plant engineering
assignment on power plant engineering
 
Odisha solar policy 2013 draft
Odisha solar policy 2013 draftOdisha solar policy 2013 draft
Odisha solar policy 2013 draft
 
Power System Protection -Plant visiting report
Power System Protection -Plant visiting report Power System Protection -Plant visiting report
Power System Protection -Plant visiting report
 
Draft explanatory-memorandum solar-power-projects
Draft explanatory-memorandum solar-power-projectsDraft explanatory-memorandum solar-power-projects
Draft explanatory-memorandum solar-power-projects
 
Rice husk power plant project design document for finance, subsidy & projec...
Rice husk power plant project design document   for finance, subsidy & projec...Rice husk power plant project design document   for finance, subsidy & projec...
Rice husk power plant project design document for finance, subsidy & projec...
 
Renewable energy
Renewable energyRenewable energy
Renewable energy
 
Empowering Sustainability: A Comprehensive Analysis of Sarishabari Engreen So...
Empowering Sustainability: A Comprehensive Analysis of Sarishabari Engreen So...Empowering Sustainability: A Comprehensive Analysis of Sarishabari Engreen So...
Empowering Sustainability: A Comprehensive Analysis of Sarishabari Engreen So...
 

Recently uploaded

Life upper-Intermediate B2 Workbook for student
Life upper-Intermediate B2 Workbook for studentLife upper-Intermediate B2 Workbook for student
Life upper-Intermediate B2 Workbook for student
NgcHiNguyn25
 
Film vocab for eal 3 students: Australia the movie
Film vocab for eal 3 students: Australia the movieFilm vocab for eal 3 students: Australia the movie
Film vocab for eal 3 students: Australia the movie
Nicholas Montgomery
 
How to deliver Powerpoint Presentations.pptx
How to deliver Powerpoint  Presentations.pptxHow to deliver Powerpoint  Presentations.pptx
How to deliver Powerpoint Presentations.pptx
HajraNaeem15
 
The History of Stoke Newington Street Names
The History of Stoke Newington Street NamesThe History of Stoke Newington Street Names
The History of Stoke Newington Street Names
History of Stoke Newington
 
NEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptx
NEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptxNEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptx
NEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptx
iammrhaywood
 
Leveraging Generative AI to Drive Nonprofit Innovation
Leveraging Generative AI to Drive Nonprofit InnovationLeveraging Generative AI to Drive Nonprofit Innovation
Leveraging Generative AI to Drive Nonprofit Innovation
TechSoup
 
Pollock and Snow "DEIA in the Scholarly Landscape, Session One: Setting Expec...
Pollock and Snow "DEIA in the Scholarly Landscape, Session One: Setting Expec...Pollock and Snow "DEIA in the Scholarly Landscape, Session One: Setting Expec...
Pollock and Snow "DEIA in the Scholarly Landscape, Session One: Setting Expec...
National Information Standards Organization (NISO)
 
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdfবাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
eBook.com.bd (প্রয়োজনীয় বাংলা বই)
 
Advanced Java[Extra Concepts, Not Difficult].docx
Advanced Java[Extra Concepts, Not Difficult].docxAdvanced Java[Extra Concepts, Not Difficult].docx
Advanced Java[Extra Concepts, Not Difficult].docx
adhitya5119
 
How to Make a Field Mandatory in Odoo 17
How to Make a Field Mandatory in Odoo 17How to Make a Field Mandatory in Odoo 17
How to Make a Field Mandatory in Odoo 17
Celine George
 
Pengantar Penggunaan Flutter - Dart programming language1.pptx
Pengantar Penggunaan Flutter - Dart programming language1.pptxPengantar Penggunaan Flutter - Dart programming language1.pptx
Pengantar Penggunaan Flutter - Dart programming language1.pptx
Fajar Baskoro
 
PCOS corelations and management through Ayurveda.
PCOS corelations and management through Ayurveda.PCOS corelations and management through Ayurveda.
PCOS corelations and management through Ayurveda.
Dr. Shivangi Singh Parihar
 
Wound healing PPT
Wound healing PPTWound healing PPT
Wound healing PPT
Jyoti Chand
 
Your Skill Boost Masterclass: Strategies for Effective Upskilling
Your Skill Boost Masterclass: Strategies for Effective UpskillingYour Skill Boost Masterclass: Strategies for Effective Upskilling
Your Skill Boost Masterclass: Strategies for Effective Upskilling
Excellence Foundation for South Sudan
 
RHEOLOGY Physical pharmaceutics-II notes for B.pharm 4th sem students
RHEOLOGY Physical pharmaceutics-II notes for B.pharm 4th sem studentsRHEOLOGY Physical pharmaceutics-II notes for B.pharm 4th sem students
RHEOLOGY Physical pharmaceutics-II notes for B.pharm 4th sem students
Himanshu Rai
 
BÀI TẬP BỔ TRỢ TIẾNG ANH LỚP 9 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2024-2025 - ...
BÀI TẬP BỔ TRỢ TIẾNG ANH LỚP 9 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2024-2025 - ...BÀI TẬP BỔ TRỢ TIẾNG ANH LỚP 9 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2024-2025 - ...
BÀI TẬP BỔ TRỢ TIẾNG ANH LỚP 9 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2024-2025 - ...
Nguyen Thanh Tu Collection
 
The basics of sentences session 6pptx.pptx
The basics of sentences session 6pptx.pptxThe basics of sentences session 6pptx.pptx
The basics of sentences session 6pptx.pptx
heathfieldcps1
 
clinical examination of hip joint (1).pdf
clinical examination of hip joint (1).pdfclinical examination of hip joint (1).pdf
clinical examination of hip joint (1).pdf
Priyankaranawat4
 
Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...
Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...
Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...
Dr. Vinod Kumar Kanvaria
 
A Independência da América Espanhola LAPBOOK.pdf
A Independência da América Espanhola LAPBOOK.pdfA Independência da América Espanhola LAPBOOK.pdf
A Independência da América Espanhola LAPBOOK.pdf
Jean Carlos Nunes Paixão
 

Recently uploaded (20)

Life upper-Intermediate B2 Workbook for student
Life upper-Intermediate B2 Workbook for studentLife upper-Intermediate B2 Workbook for student
Life upper-Intermediate B2 Workbook for student
 
Film vocab for eal 3 students: Australia the movie
Film vocab for eal 3 students: Australia the movieFilm vocab for eal 3 students: Australia the movie
Film vocab for eal 3 students: Australia the movie
 
How to deliver Powerpoint Presentations.pptx
How to deliver Powerpoint  Presentations.pptxHow to deliver Powerpoint  Presentations.pptx
How to deliver Powerpoint Presentations.pptx
 
The History of Stoke Newington Street Names
The History of Stoke Newington Street NamesThe History of Stoke Newington Street Names
The History of Stoke Newington Street Names
 
NEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptx
NEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptxNEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptx
NEWSPAPERS - QUESTION 1 - REVISION POWERPOINT.pptx
 
Leveraging Generative AI to Drive Nonprofit Innovation
Leveraging Generative AI to Drive Nonprofit InnovationLeveraging Generative AI to Drive Nonprofit Innovation
Leveraging Generative AI to Drive Nonprofit Innovation
 
Pollock and Snow "DEIA in the Scholarly Landscape, Session One: Setting Expec...
Pollock and Snow "DEIA in the Scholarly Landscape, Session One: Setting Expec...Pollock and Snow "DEIA in the Scholarly Landscape, Session One: Setting Expec...
Pollock and Snow "DEIA in the Scholarly Landscape, Session One: Setting Expec...
 
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdfবাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
বাংলাদেশ অর্থনৈতিক সমীক্ষা (Economic Review) ২০২৪ UJS App.pdf
 
Advanced Java[Extra Concepts, Not Difficult].docx
Advanced Java[Extra Concepts, Not Difficult].docxAdvanced Java[Extra Concepts, Not Difficult].docx
Advanced Java[Extra Concepts, Not Difficult].docx
 
How to Make a Field Mandatory in Odoo 17
How to Make a Field Mandatory in Odoo 17How to Make a Field Mandatory in Odoo 17
How to Make a Field Mandatory in Odoo 17
 
Pengantar Penggunaan Flutter - Dart programming language1.pptx
Pengantar Penggunaan Flutter - Dart programming language1.pptxPengantar Penggunaan Flutter - Dart programming language1.pptx
Pengantar Penggunaan Flutter - Dart programming language1.pptx
 
PCOS corelations and management through Ayurveda.
PCOS corelations and management through Ayurveda.PCOS corelations and management through Ayurveda.
PCOS corelations and management through Ayurveda.
 
Wound healing PPT
Wound healing PPTWound healing PPT
Wound healing PPT
 
Your Skill Boost Masterclass: Strategies for Effective Upskilling
Your Skill Boost Masterclass: Strategies for Effective UpskillingYour Skill Boost Masterclass: Strategies for Effective Upskilling
Your Skill Boost Masterclass: Strategies for Effective Upskilling
 
RHEOLOGY Physical pharmaceutics-II notes for B.pharm 4th sem students
RHEOLOGY Physical pharmaceutics-II notes for B.pharm 4th sem studentsRHEOLOGY Physical pharmaceutics-II notes for B.pharm 4th sem students
RHEOLOGY Physical pharmaceutics-II notes for B.pharm 4th sem students
 
BÀI TẬP BỔ TRỢ TIẾNG ANH LỚP 9 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2024-2025 - ...
BÀI TẬP BỔ TRỢ TIẾNG ANH LỚP 9 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2024-2025 - ...BÀI TẬP BỔ TRỢ TIẾNG ANH LỚP 9 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2024-2025 - ...
BÀI TẬP BỔ TRỢ TIẾNG ANH LỚP 9 CẢ NĂM - GLOBAL SUCCESS - NĂM HỌC 2024-2025 - ...
 
The basics of sentences session 6pptx.pptx
The basics of sentences session 6pptx.pptxThe basics of sentences session 6pptx.pptx
The basics of sentences session 6pptx.pptx
 
clinical examination of hip joint (1).pdf
clinical examination of hip joint (1).pdfclinical examination of hip joint (1).pdf
clinical examination of hip joint (1).pdf
 
Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...
Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...
Exploiting Artificial Intelligence for Empowering Researchers and Faculty, In...
 
A Independência da América Espanhola LAPBOOK.pdf
A Independência da América Espanhola LAPBOOK.pdfA Independência da América Espanhola LAPBOOK.pdf
A Independência da América Espanhola LAPBOOK.pdf
 

Situations of solar power plant over 100 MW in Bangladesh.

  • 1. CUET BANGLADESH Situations of Solar Power Plant over 100 MW in Bangladesh Nur Mohammad Mohiuddin Chowdhury Roll: 18MEE006F Dept. of EEE, CUET Chittagong-4349, Bangladesh.
  • 2. Presentation outline- ➢ Introduction ➢ Classification of Solar Power Plant in BD ➢ Status of large scale Power plant ➢ Limitations ➢ Conclusions
  • 3. ➢ Searching for alternative energy sources is essential due to global warming occurred by conventional fossil fuel based energy. ➢ Renewable energy can play a vital role in this regard. ➢ Bangladesh Government’s target for producing power from renewable energy is 2.4 GW within 2021 [1]. ➢ Among 2.4 GW, 2.11 GW will be produced from solar energy [1]. ➢ Among this 2.11 GW, almost all of power will be planned to produce from solar power plant [1]. ➢ The main contributors in terms of capacity is 1500 MW including all on grid large scale solar power plants[1]. ➢ These 1500 MW are planned to produce from 13 PV power plant which will be located 13 different places of Bangladesh [1]. Introduction
  • 4. ➢We can classify our solar power plant into three for explanation. They are: small scale power plant, medium scale power plant and large scale power plant. ➢The capacity of small scale power plant will be less than 50 MW. ➢The capacity of a medium scale power plant will be greater than 50 MW less than 100 MW. ➢The capacity of a large scale power plant will be greater than 100 MW. Classification of Solar Power Plant in BD
  • 5. ➢ Among the proposed solar power plant, 71% power will be supplied from large scale power plant. ➢ This large scale power plant can further be categorized in 3 classes. They are: Deal signed, Under planning and Rejected [2]. ➢ Only 2 large scale power plant were undersigned with third party to establish. This will supply 27% of total power. Status of large scale Power plant
  • 6. Serial Location Agency Capacity 1 Teknaf Upazila, Cox's Bazar BPDB 200 MW 2 Sundarganj, Gaibandha BPDB 200 MW Total 400 MW Table-1: Large Scale Solar Power Plant signed to implement. Source: www.sreda.gov.bd Status of large scale Power plant
  • 7. Status of large scale Power plant Present condition of “200 MW Teknaf Power Plant”: ➢ Southern Solar Power Limited a subsidiary of US based SunEdison had signed with BPDB to develop it [3]. ➢ Estimated investment will be 300 million$[3]. ➢ BPDB will pay 0.17$ for per unit power [3]. ➢ BPDB will purchase power for 20 years on the basis of no electricity no payment [3]. ➢ This project will require 1000 acres of land [3]. ➢ This project will be completed in 18 months [3]. ➢ This project is cancelled by the government due to failure of implementation [5].
  • 8. Status of large scale Power plant Present condition of “200 MW Shundargonj Power Plant”: ➢ Teesta Solar Limited (TSL), joint venture of a Bangladeshi & Chinese power company has signed with BPDB to develop it [4]. ➢ Beximco Power of Bangladesh will hold 80% share of this venture [4]. ➢ BPDB will purchase power from venture for 20 years [4]. ➢ BPDB will pay 15 US Cents for per unit power [4]. ➢ Government terminated the project due to failure of implementation [6].
  • 9. Serial Location Agency Capacity 1 Sonagazi, Feni EGCB 100 MW 2 Sonagazi, Feni EGCB 100 MW 3 Sonagazi, Feni BPDB 100 MW 4 Madarganj Upazila, Jamalpur B-R Power Gen 100 MW 5 Katiadi Upazila, Kishoreganj APSCL 100 MW 6 Madarganj Upazila, Jamalpur RPCL 100 MW 7 Pabna Sadar Upazila, Pabna BPDB 100 MW 8 Mongla Upazila, Bagerhat BPDB 100 MW 9 Aditmari, Lalmonirhat BPDB 100 MW Total 900 MW Table-2: Under Planning Large Scale Solar Power Plant Source: www.sreda.gov.bd Status of large scale Power plant
  • 10. Serial Location Agency Capacity 1 Charbhadrasan Upazila, Faridpur NWPGCL 100 MW 2 Mollahat Upazila, Bagerhat RPCL 100 MW Total 200 MW Table-3: Rejected Large Scale Solar Power Plant Source: www.sreda.gov.bd Status of large scale Power plant
  • 11. Although Bangladesh government is targeted to produce 1.5 GW solar power from 13 large scale solar plant [1], but most of them are either in planning stage or rejected. There are lot of limitation in large solar power plant development. They can be written as following [2]: ➢ Land limitation ➢ Limitation Due to Weather Conditions ➢ Limitations due to blanks in Supply Chain ➢ Limitations of Existing Power Infrastructure and Technical Standards ➢ Other limitations Limitations
  • 12. Here, we will discuss the limitation due to land. The main reason behind land limitation are [2] - ➢ Un-sufficiency of appropriate land ➢ Proprietorship of land ➢ Land preparation ➢ Protection from erosion Limitations
  • 13. Limitation Due to Weather Conditions are [2]: ➢ Harsh weather conditions ➢ Low irradiance ➢ Dirt ➢ Long implementation period Limitations
  • 14. Limitations due to gaps in Supply Chain [2]: ➢ Scarcity of human resources ➢ Economies of scale ➢ Insufficient information on existing services ➢ Long difficulties Limitations
  • 15. Limitations due to Existing Power Infrastructure can denoted as follows [2]: ➢ Unreliable grid ➢ Proper transmission network ➢ Scarcity of transmission infrastructure ➢ Lack of technical standards Limitations
  • 16. Other limitations can be outlined as follows [2]: ➢ Cost and research losses ➢ Facility in research ➢ Scarcity of transmission infrastructure ➢ Lack of technical standards ➢ Workshop ➢ Privatization Limitations
  • 17. ➢ It is mentionable that till now establishment of any large scale (greater than 100 MW) solar power plant in Bangladesh not yet started. ➢ Maximum capacity of a largest solar power plant of Bangladesh is just 20 MW which is situated in Teknaf Upazila of Cox's Bazar financed by BPDB. ➢ Although large scale solar power plant are not yet in operation as expected but with the proper guidance and step by the government, this project can become the huge source of renewable solar energy to replace conventional fossil fuel based energy. Conclusions
  • 18. References 1. www.sreda.gov.bd 2. Solar Park: The Next Generation Energy Source in Bangladesh by Zafrin Ahmed Liza and Mohammad Rakibul Islam, Journal of Energy Research and Reviews 4(2): 9-19, 2020; Article no.JENRR.54460ISSN: 2581-8368 3.www.thedailystar-net.cdn/january10,2017 4.www.dhakatribune.com/october27th/2017 5.www.thedailystar-net.cdn/january01,2019 6.www.energybangla.com/june2/2019