SlideShare a Scribd company logo
1 of 16
Download to read offline
GSEducationalVersion 246 Wakefield St WellingtonSARC321 Assignment 2 Guyshaw 20/08/14 Sheet IndexLiam Baines #300263108 1:1, 1:200
Sheet Index
Layout ID
101
102
103
104
105
106
107
108
109
110
201
202
301
401
402
403
404
405
406
407
Layout Name
SITE PLAN
GROUND FLOOR PLAN
CORE PLAN LABELLED
CORE PLAN MEASUREMENTS
CEILING PLAN
CARPARK PLAN
CARPARK CORE DESIGN
ROOFTOP FLOOR
ROOF PLAN
ROOFTOP BAR PART 1
Section 1
Section 2
Elevations
Fift to Floor
HVAC Details
REVOLVING DOOR DETAIL PL…
Carpark Elevator Lift Pit
Elevator Lift Pit Callouts
Rooftop Bar
Rooftop Bar Callouts
Remark
Highrise 1.3.bpn; 01 Sheet Index; 100%; 20/08/14 4:44 pm
GSEducationalVersion 246 Wakefield St WellingtonSARC321 Assignment 2 Guyshaw 20/08/14 101SITE PLANLiam Baines #300263108 1:500
6
6
2
2
3
3
4
4
5
5
1
1
A
A
B
B
C
C
D
D
E
E
9,500
9,500
9,500
9,500
10,500
10,500
10,500
10,500
10,500
52,500
38,000
N
Highrise 1.3.bpn; 101 SITE PLAN; 100%; 20/08/14 4:44 pm
GSEducationalVersion 246 Wakefield St WellingtonSARC321 Assignment 2 Guyshaw 20/08/14 102GROUND FLOOR PLANLiam Baines #300263108 1:200
6
6
F
2
2
3
3
4
4
5
5
1
1
AA
BB
CC
DD
EE
9
Rotating Door
9,5009,5009,5009,500
10,500 10,500 10,500 10,500 10,500
52,500
38,000
A1 A1
A2 A2
A3A3
A4A4
N
Highrise 1.3.bpn; 102 GROUND FLOOR PLAN; 100%; 20/08/14 4:44 pm
GSEducationalVersion 246 Wakefield St WellingtonSARC321 Assignment 2 Guyshaw 20/08/14 103CORE PLAN LABELLEDLiam Baines #300263108 1:50
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
F
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
A1 A1
A3A3
A4A4
Electrical Riser
Data Riser
HVAC Riser
Kitchenette Ventilation
Riser
Plumbing Riser
Wet Services Riser
Ground Floor Retail Riser
Toilet Exhaust Riser
Wet Services Riser
Ground Floor Retail Riser
Toilet Exhaust Riser
Electrical Riser
HVAC Riser
Fire Riser
Stair Pressure Riser
Fire Riser
Cleaners Cupboard
Stair Pressure Riser
Kitchenette
Comms Room
Carpark Riser
Accessible Toilet
Womens Toilet
Elevator 4
Staircase 2
Elevator 2
Staircase 1
Elevator 3
Elevator 1
Staircase 3
(to Carpark)
Stair Pressure Riser
Bay C
Bay B
Bay C
Bay B
Bay 3 Bay 4
Bay 3 Bay 4
N
Highrise 1.3.bpn; 103 CORE PLAN LABELLED; 100%; 20/08/14 4:44 pm
GSEducationalVersion 246 Wakefield St WellingtonSARC321 Assignment 2 Guyshaw 20/08/14 104CORE PLAN MEASUREMENTSLiam Baines #300263108 1:50
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
F
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
500
500
9001,8401,2002,6008852,200 600 600 667 600 600 851848
2,000
2,920
1,500
1,508
700
600
1,730
1,200
5001,000
500
3,133
2,873
3,010
N
Bay C
Bay B
Bay C
Bay B
Bay 3 Bay 4
Bay 3 Bay 4
Highrise 1.3.bpn; 104 CORE PLAN MEASUREMENTS; 100%; 20/08/14 4:44 pm
GSEducationalVersion 246 Wakefield St WellingtonSARC321 Assignment 2 Guyshaw 20/08/14 105CEILING PLANLiam Baines #300263108 1:50
N
600x600 Suspended
Ceiling on Potter System
No Ceiling (Riser Spaces)
Toilet Partitions
stop short
below Ceiling
FLAT ROUND
CEILING LIGHT
SPRINKLER
SYSTEM
SMOKE DETECTOR
VENTILATION
EXTRACT / INTAKE
KEY
SECURITY CAMERASecurity Camera
HVAC Vent
Light Fitting
Sprinkler Outlet
Smoke Detector
Highrise 1.3.bpn; 105 CEILING PLAN; 100%; 20/08/14 4:44 pm
GSEducationalVersion 246 Wakefield St WellingtonSARC321 Assignment 2 Guyshaw 20/08/14 106CARPARK PLANLiam Baines #300263108 1:200
D037
2,100
3,500
D037
2,100
3,500
6
6
2
2
3
3
4
4
5
5
1
1
AA
BB
CC
DD
EE
10
Carpark Elevator 2 Lift Pit
13,470
2,0001,8404,3901,200
A1 A1
A2 A2
A3A3
A4A4
N
Entrance
Exit
81 carpark spaces
1 bicycle shed
GSEducationalVersion 246 Wakefield St WellingtonSARC321 Assignment 2 Guyshaw 20/08/14 107CARPARK CORE DESIGNLiam Baines #300263108 1:50
BB
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
10
Carpark Elevator 2 Lift Pit
13,470
2,0001,8404,3901,200
A1 A1
A3
A4
Stairwell to Ground
Floor
Raised Pedestrian
Platform
Elevator 1
Electrical Riser
Data Riser
Plumbing Riser
Wet Services RiserWet Services Riser
Electrical Riser
Carpark Riser
Bicycle Shed
Elevator Lift Pit (Head
Height 2400mm)
Elevator Lift Pit (Head
Height 2400mm)
Elevator Lift Pit (Head
Height 2400mm)
3 4
3 4
GSEducationalVersion 246 Wakefield St WellingtonSARC321 Assignment 2 Guyshaw 20/08/14 108ROOFTOP FLOORLiam Baines #300263108 1:200
6
6
2
2
3
3
4
4
5
5
1
1
AA
BB
CC
DD
EE
A1 A1
A2 A2
A3A3
A4A4
N
Exterior Space
Stairwell 2 accesses rooftop
level
Elevator 1 accesses rooftop
bar
Elevators 2, 3 and 4
extend through roof
for mechanics
GSEducationalVersion 246 Wakefield St WellingtonSARC321 Assignment 2 Guyshaw 20/08/14 109ROOF PLANLiam Baines #300263108 1:200
6
6
2
2
3
3
4
4
5
5
1
1
AA
BB
CC
DD
EE
GSEducationalVersion 246 Wakefield St WellingtonSARC321 Assignment 2 Guyshaw 20/08/14 110ROOFTOP BAR PART 1Liam Baines #300263108 1:100
2 3 4 5
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
A1 A1
A2 A2
A3A3
A4A4
GSEducationalVersion 246 Wakefield St WellingtonSARC321 Assignment 2 Guyshaw 20/08/14 403REVOLVING DOOR DETAIL
PLAN
Liam Baines #300263108 1:10
Weatherproofing Jamb
Weatherproofing Sheet
Weatherproofing Jamb
Aluminium Exterior
Flashing
Weatherproofing Sheet
Aluminium Exterior
Flashing
90x200 Treated Timber
Stud
Revolving Door (see
manufacturer details)
Plywood Interior Cladding
Weatherproofing Sheet Weatherproofing Sheet
90x200 Treated Timber
Stud
Storefront Window
Plywood Interior Cladding
Plywood Interior Cladding
with 10mm overlap past
timber filler
500x500mm
Reinforced Concrete
Column (Bay 3)
Drainage Gap Drainage Gap
GSEducationalVersion 246 Wakefield St WellingtonSARC321 Assignment 2 Guyshaw 20/08/14 404Carpark Elevator Lift PitLiam Baines #300263108 1:50, 1:100
2,200
2,600
500
500
500
500
4 3
11
Elevator 2 Lift Pit Callout
12
Elevator 1 Lift Pit Callout
1,150
3,550
2,400
-3,700
1 Carpark
-3,700
1 Carpark
±0
2 Ground Floor
±0
2 Ground Floor
+3,700
3 First Floor
+3,700
3 First Floor
1 Carpark Elevator 2 Lift Pit 1:50
2 A1 Section AA 1:100
Elevator 1 Lift Pit (In Earth)
Reinforced Concrete Piles
150mm Traydeck
Reinforced Floor slab
Staircase 3 (to Ground
Floor / Carpark)
Reinforced Concrete Piles
Waterproofing Membrane
Elevator 2
Shaft
Elevator 2
Lift Pit
(Protrudes
into Carpark)
Raised
Pedestrian
Walkway
Elevator 1 Shaft
Sump Pit
Membrane
Lift Pit
GSEducationalVersion 246 Wakefield St WellingtonSARC321 Assignment 2 Guyshaw 20/08/14 405Elevator Lift Pit CalloutsLiam Baines #300263108 1:20
Construction Joint,
roughened, cleaned and
moistened before
concreting
900 800 900
500
400
400
3
400
150
2 Elevator 2 Lift Pit Callout 1:20
1 Elevator 1 Lift Pit Callout 1:20
150mm Reinforced Concrete
Traydeck Slab
Lift Shaft
Reinforcing Bracket
Construction Joint,
roughened, cleaned
and moistened
before concreting
Steel Reinforcing
∅10mm
Lift Sump
Lift Sump Pump
Permeable Membrane
Lift Sump
Lift Sump Pump
Permeable Membrane
Waterproofing
Membrane (sealed by
Piles)
150mm Reinforced Concrete
Traydeck Slab
Earth
Distribution reinforcement
(bottom) ∅10 every
150mm
Distribution reinforcement
(bottom) ∅10 every
150mm
Distribution reinforcement
(top and bottom) ∅10
every 150mm
Highrise 1.3.bpn; 405 Elevator Lift Pit Callouts; 100%; 20/08/14 4:44 pm
GSEducationalVersion 246 Wakefield St WellingtonSARC321 Assignment 2 Guyshaw 20/08/14 406Rooftop BarLiam Baines #300263108 1:100
13
Exterior Column Sheath Callout
15
Wall to Balcony Junction
14
Wall-Roof Junction
+33,300
11 Ninth Floor
+33,300
11 Ninth Floor
+37,000
12 Roof Bar
+37,000
12 Roof Bar
+40,700
13 Roof
+40,700
13 Roof
1 A2 Section AA 1:100
610x305mm UB
610x305mm UB
610x305mm UB
150mm traydec concrete
slab
Drinking area
Bar / Kitchen area Interior section
Exterior, roofed section
Roof construction
Balustrade
The Callout "Exterior Column Sheath" details
the junction between the exterior column and
roof, which partially encloses an outdoor roof
courtyard area. The Columns have a
weatherproofing system which wraps around,
and is detailed in the section.
Callouts defined on 407
GSEducationalVersion 246 Wakefield St WellingtonSARC321 Assignment 2 Guyshaw 20/08/14 407Rooftop Bar CalloutsLiam Baines #300263108 1:20, 1:100
500
150
150
1 Exterior Column Sheath Callout 1:20
3 Wall to Balcony Junction 1:20
2 Wall-Roof Junction 1:20
1b Exterior column space explained1:100
500x500mm exterior
reinforced concrete
column
Weatherproof flashing
Sealant
Waterproofing membrane
610x305mm
UB
610x305mm UB
Plywood beam enclosure
Weatherproof
flashing
Profiled Aluminium Roof
Cladding
Roof structure
Treated Plywood ceiling
Timber filler
jamb
Weatherproof flashing
Sealant
610x305mm UB
Treated plywood exterior
cladding
Plywood beam enclosure
Weatherproof membrane
Timber filler
jamb
Suspended
ceiling
610x305mm
UB
Plywood interior cladding
30mm Insulation
150mm thick concrete
wall
150mm thick traydec
floor slab
Distribution reinforcement
(bottom and top) ∅10
every 150mm
Treated plywood
exterior flooring
Flashing
Weatherproof
membrane
610x305mm UB
30mm Insulation
Balustrades
3D Visualisation of "Exterior Column
Sheath Callout" showing roof extending
over exterior space, supported by
columns in the grid.
Exterior SpaceInterior Space
Exterior Space

More Related Content

Similar to LiamBaines_Construction_OFFICECORE

Selleck, Matthew NEDF Built Environment Project
Selleck, Matthew NEDF Built Environment Project Selleck, Matthew NEDF Built Environment Project
Selleck, Matthew NEDF Built Environment Project MatthewSelleck1
 
Airtightness and insulation with solar study
Airtightness and insulation with solar studyAirtightness and insulation with solar study
Airtightness and insulation with solar studyJonathan Flanagan
 
Concept Design- Gavin Orton, MADE City Builder Academy 2013
Concept Design- Gavin Orton, MADE City Builder Academy 2013Concept Design- Gavin Orton, MADE City Builder Academy 2013
Concept Design- Gavin Orton, MADE City Builder Academy 2013Design South East
 
Final year Revit project
Final year Revit projectFinal year Revit project
Final year Revit projectMark Thornton
 
General Arrangement Drawings
General Arrangement DrawingsGeneral Arrangement Drawings
General Arrangement DrawingsMark Flynn
 
67 GARRICK STREET COOLANGATTA s
67 GARRICK STREET COOLANGATTA s67 GARRICK STREET COOLANGATTA s
67 GARRICK STREET COOLANGATTA sMike Darwich
 
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - E0C
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - E0CSAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - E0C
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - E0CSunit Dhingra
 
John Curry 26.05.2015 Final BIM Submission merged pdfs
John Curry 26.05.2015 Final BIM Submission merged pdfsJohn Curry 26.05.2015 Final BIM Submission merged pdfs
John Curry 26.05.2015 Final BIM Submission merged pdfsJohn Curry
 
3d home exterior rendering
3d home exterior rendering 3d home exterior rendering
3d home exterior rendering Mohamed Mostafa
 
New Bong Escape PH gantt
New Bong Escape PH ganttNew Bong Escape PH gantt
New Bong Escape PH ganttBob Clarke
 
Drawings of Revit project for D type qtr.
Drawings of Revit project for  D type qtr.Drawings of Revit project for  D type qtr.
Drawings of Revit project for D type qtr.mahfooz alam khan
 
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - EASTWOODS
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - EASTWOODSSAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - EASTWOODS
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - EASTWOODSSunit Dhingra
 
Adrian Matejko Portfolio 2016
Adrian Matejko Portfolio 2016Adrian Matejko Portfolio 2016
Adrian Matejko Portfolio 2016Adrian Matejko
 
Ananth.K.Samy_PRo_Sample
Ananth.K.Samy_PRo_SampleAnanth.K.Samy_PRo_Sample
Ananth.K.Samy_PRo_SampleAnanth K.Samy
 
Electric Wire Rope Hoist Manufacturers in Ahmedabad
Electric Wire Rope Hoist Manufacturers in AhmedabadElectric Wire Rope Hoist Manufacturers in Ahmedabad
Electric Wire Rope Hoist Manufacturers in AhmedabadTechno Industries
 
BU813618 Two Notch- Amin091-006_Verizon Wireless 91580_SA85770_004_01_11.11.15
BU813618 Two Notch- Amin091-006_Verizon Wireless 91580_SA85770_004_01_11.11.15BU813618 Two Notch- Amin091-006_Verizon Wireless 91580_SA85770_004_01_11.11.15
BU813618 Two Notch- Amin091-006_Verizon Wireless 91580_SA85770_004_01_11.11.15Maher (Mack) Eltarhoni
 
MASUNGA KGOTLA CONFERENCE CENTRE
MASUNGA KGOTLA CONFERENCE CENTREMASUNGA KGOTLA CONFERENCE CENTRE
MASUNGA KGOTLA CONFERENCE CENTREAntony Omoro
 

Similar to LiamBaines_Construction_OFFICECORE (20)

Selleck, Matthew NEDF Built Environment Project
Selleck, Matthew NEDF Built Environment Project Selleck, Matthew NEDF Built Environment Project
Selleck, Matthew NEDF Built Environment Project
 
Airtightness and insulation with solar study
Airtightness and insulation with solar studyAirtightness and insulation with solar study
Airtightness and insulation with solar study
 
Concept Design- Gavin Orton, MADE City Builder Academy 2013
Concept Design- Gavin Orton, MADE City Builder Academy 2013Concept Design- Gavin Orton, MADE City Builder Academy 2013
Concept Design- Gavin Orton, MADE City Builder Academy 2013
 
Final year Revit project
Final year Revit projectFinal year Revit project
Final year Revit project
 
BC_Three-StoreyHouse
BC_Three-StoreyHouseBC_Three-StoreyHouse
BC_Three-StoreyHouse
 
General Arrangement Drawings
General Arrangement DrawingsGeneral Arrangement Drawings
General Arrangement Drawings
 
67 GARRICK STREET COOLANGATTA s
67 GARRICK STREET COOLANGATTA s67 GARRICK STREET COOLANGATTA s
67 GARRICK STREET COOLANGATTA s
 
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - E0C
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - E0CSAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - E0C
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - E0C
 
John Curry 26.05.2015 Final BIM Submission merged pdfs
John Curry 26.05.2015 Final BIM Submission merged pdfsJohn Curry 26.05.2015 Final BIM Submission merged pdfs
John Curry 26.05.2015 Final BIM Submission merged pdfs
 
3d home exterior rendering
3d home exterior rendering 3d home exterior rendering
3d home exterior rendering
 
New Bong Escape PH gantt
New Bong Escape PH ganttNew Bong Escape PH gantt
New Bong Escape PH gantt
 
Drawings of Revit project for D type qtr.
Drawings of Revit project for  D type qtr.Drawings of Revit project for  D type qtr.
Drawings of Revit project for D type qtr.
 
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - EASTWOODS
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - EASTWOODSSAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - EASTWOODS
SAMPLE REVIT DRAWINGS-SUNIT K DHINGRA-COMPLETE - EASTWOODS
 
Adrian Matejko Portfolio 2016
Adrian Matejko Portfolio 2016Adrian Matejko Portfolio 2016
Adrian Matejko Portfolio 2016
 
3. Hansons lodge.pdf
3. Hansons lodge.pdf3. Hansons lodge.pdf
3. Hansons lodge.pdf
 
Ananth.K.Samy_PRo_Sample
Ananth.K.Samy_PRo_SampleAnanth.K.Samy_PRo_Sample
Ananth.K.Samy_PRo_Sample
 
Electric Wire Rope Hoist Manufacturers in Ahmedabad
Electric Wire Rope Hoist Manufacturers in AhmedabadElectric Wire Rope Hoist Manufacturers in Ahmedabad
Electric Wire Rope Hoist Manufacturers in Ahmedabad
 
BU813618 Two Notch- Amin091-006_Verizon Wireless 91580_SA85770_004_01_11.11.15
BU813618 Two Notch- Amin091-006_Verizon Wireless 91580_SA85770_004_01_11.11.15BU813618 Two Notch- Amin091-006_Verizon Wireless 91580_SA85770_004_01_11.11.15
BU813618 Two Notch- Amin091-006_Verizon Wireless 91580_SA85770_004_01_11.11.15
 
Final Plans
Final PlansFinal Plans
Final Plans
 
MASUNGA KGOTLA CONFERENCE CENTRE
MASUNGA KGOTLA CONFERENCE CENTREMASUNGA KGOTLA CONFERENCE CENTRE
MASUNGA KGOTLA CONFERENCE CENTRE
 

LiamBaines_Construction_OFFICECORE

  • 1. GSEducationalVersion 246 Wakefield St WellingtonSARC321 Assignment 2 Guyshaw 20/08/14 Sheet IndexLiam Baines #300263108 1:1, 1:200 Sheet Index Layout ID 101 102 103 104 105 106 107 108 109 110 201 202 301 401 402 403 404 405 406 407 Layout Name SITE PLAN GROUND FLOOR PLAN CORE PLAN LABELLED CORE PLAN MEASUREMENTS CEILING PLAN CARPARK PLAN CARPARK CORE DESIGN ROOFTOP FLOOR ROOF PLAN ROOFTOP BAR PART 1 Section 1 Section 2 Elevations Fift to Floor HVAC Details REVOLVING DOOR DETAIL PL… Carpark Elevator Lift Pit Elevator Lift Pit Callouts Rooftop Bar Rooftop Bar Callouts Remark Highrise 1.3.bpn; 01 Sheet Index; 100%; 20/08/14 4:44 pm
  • 2. GSEducationalVersion 246 Wakefield St WellingtonSARC321 Assignment 2 Guyshaw 20/08/14 101SITE PLANLiam Baines #300263108 1:500 6 6 2 2 3 3 4 4 5 5 1 1 A A B B C C D D E E 9,500 9,500 9,500 9,500 10,500 10,500 10,500 10,500 10,500 52,500 38,000 N Highrise 1.3.bpn; 101 SITE PLAN; 100%; 20/08/14 4:44 pm
  • 3. GSEducationalVersion 246 Wakefield St WellingtonSARC321 Assignment 2 Guyshaw 20/08/14 102GROUND FLOOR PLANLiam Baines #300263108 1:200 6 6 F 2 2 3 3 4 4 5 5 1 1 AA BB CC DD EE 9 Rotating Door 9,5009,5009,5009,500 10,500 10,500 10,500 10,500 10,500 52,500 38,000 A1 A1 A2 A2 A3A3 A4A4 N Highrise 1.3.bpn; 102 GROUND FLOOR PLAN; 100%; 20/08/14 4:44 pm
  • 4. GSEducationalVersion 246 Wakefield St WellingtonSARC321 Assignment 2 Guyshaw 20/08/14 103CORE PLAN LABELLEDLiam Baines #300263108 1:50 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 F 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 A1 A1 A3A3 A4A4 Electrical Riser Data Riser HVAC Riser Kitchenette Ventilation Riser Plumbing Riser Wet Services Riser Ground Floor Retail Riser Toilet Exhaust Riser Wet Services Riser Ground Floor Retail Riser Toilet Exhaust Riser Electrical Riser HVAC Riser Fire Riser Stair Pressure Riser Fire Riser Cleaners Cupboard Stair Pressure Riser Kitchenette Comms Room Carpark Riser Accessible Toilet Womens Toilet Elevator 4 Staircase 2 Elevator 2 Staircase 1 Elevator 3 Elevator 1 Staircase 3 (to Carpark) Stair Pressure Riser Bay C Bay B Bay C Bay B Bay 3 Bay 4 Bay 3 Bay 4 N Highrise 1.3.bpn; 103 CORE PLAN LABELLED; 100%; 20/08/14 4:44 pm
  • 5. GSEducationalVersion 246 Wakefield St WellingtonSARC321 Assignment 2 Guyshaw 20/08/14 104CORE PLAN MEASUREMENTSLiam Baines #300263108 1:50 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 F 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 500 500 9001,8401,2002,6008852,200 600 600 667 600 600 851848 2,000 2,920 1,500 1,508 700 600 1,730 1,200 5001,000 500 3,133 2,873 3,010 N Bay C Bay B Bay C Bay B Bay 3 Bay 4 Bay 3 Bay 4 Highrise 1.3.bpn; 104 CORE PLAN MEASUREMENTS; 100%; 20/08/14 4:44 pm
  • 6. GSEducationalVersion 246 Wakefield St WellingtonSARC321 Assignment 2 Guyshaw 20/08/14 105CEILING PLANLiam Baines #300263108 1:50 N 600x600 Suspended Ceiling on Potter System No Ceiling (Riser Spaces) Toilet Partitions stop short below Ceiling FLAT ROUND CEILING LIGHT SPRINKLER SYSTEM SMOKE DETECTOR VENTILATION EXTRACT / INTAKE KEY SECURITY CAMERASecurity Camera HVAC Vent Light Fitting Sprinkler Outlet Smoke Detector Highrise 1.3.bpn; 105 CEILING PLAN; 100%; 20/08/14 4:44 pm
  • 7. GSEducationalVersion 246 Wakefield St WellingtonSARC321 Assignment 2 Guyshaw 20/08/14 106CARPARK PLANLiam Baines #300263108 1:200 D037 2,100 3,500 D037 2,100 3,500 6 6 2 2 3 3 4 4 5 5 1 1 AA BB CC DD EE 10 Carpark Elevator 2 Lift Pit 13,470 2,0001,8404,3901,200 A1 A1 A2 A2 A3A3 A4A4 N Entrance Exit 81 carpark spaces 1 bicycle shed
  • 8. GSEducationalVersion 246 Wakefield St WellingtonSARC321 Assignment 2 Guyshaw 20/08/14 107CARPARK CORE DESIGNLiam Baines #300263108 1:50 BB 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 10 Carpark Elevator 2 Lift Pit 13,470 2,0001,8404,3901,200 A1 A1 A3 A4 Stairwell to Ground Floor Raised Pedestrian Platform Elevator 1 Electrical Riser Data Riser Plumbing Riser Wet Services RiserWet Services Riser Electrical Riser Carpark Riser Bicycle Shed Elevator Lift Pit (Head Height 2400mm) Elevator Lift Pit (Head Height 2400mm) Elevator Lift Pit (Head Height 2400mm) 3 4 3 4
  • 9. GSEducationalVersion 246 Wakefield St WellingtonSARC321 Assignment 2 Guyshaw 20/08/14 108ROOFTOP FLOORLiam Baines #300263108 1:200 6 6 2 2 3 3 4 4 5 5 1 1 AA BB CC DD EE A1 A1 A2 A2 A3A3 A4A4 N Exterior Space Stairwell 2 accesses rooftop level Elevator 1 accesses rooftop bar Elevators 2, 3 and 4 extend through roof for mechanics
  • 10. GSEducationalVersion 246 Wakefield St WellingtonSARC321 Assignment 2 Guyshaw 20/08/14 109ROOF PLANLiam Baines #300263108 1:200 6 6 2 2 3 3 4 4 5 5 1 1 AA BB CC DD EE
  • 11. GSEducationalVersion 246 Wakefield St WellingtonSARC321 Assignment 2 Guyshaw 20/08/14 110ROOFTOP BAR PART 1Liam Baines #300263108 1:100 2 3 4 5 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 A1 A1 A2 A2 A3A3 A4A4
  • 12. GSEducationalVersion 246 Wakefield St WellingtonSARC321 Assignment 2 Guyshaw 20/08/14 403REVOLVING DOOR DETAIL PLAN Liam Baines #300263108 1:10 Weatherproofing Jamb Weatherproofing Sheet Weatherproofing Jamb Aluminium Exterior Flashing Weatherproofing Sheet Aluminium Exterior Flashing 90x200 Treated Timber Stud Revolving Door (see manufacturer details) Plywood Interior Cladding Weatherproofing Sheet Weatherproofing Sheet 90x200 Treated Timber Stud Storefront Window Plywood Interior Cladding Plywood Interior Cladding with 10mm overlap past timber filler 500x500mm Reinforced Concrete Column (Bay 3) Drainage Gap Drainage Gap
  • 13. GSEducationalVersion 246 Wakefield St WellingtonSARC321 Assignment 2 Guyshaw 20/08/14 404Carpark Elevator Lift PitLiam Baines #300263108 1:50, 1:100 2,200 2,600 500 500 500 500 4 3 11 Elevator 2 Lift Pit Callout 12 Elevator 1 Lift Pit Callout 1,150 3,550 2,400 -3,700 1 Carpark -3,700 1 Carpark ±0 2 Ground Floor ±0 2 Ground Floor +3,700 3 First Floor +3,700 3 First Floor 1 Carpark Elevator 2 Lift Pit 1:50 2 A1 Section AA 1:100 Elevator 1 Lift Pit (In Earth) Reinforced Concrete Piles 150mm Traydeck Reinforced Floor slab Staircase 3 (to Ground Floor / Carpark) Reinforced Concrete Piles Waterproofing Membrane Elevator 2 Shaft Elevator 2 Lift Pit (Protrudes into Carpark) Raised Pedestrian Walkway Elevator 1 Shaft Sump Pit Membrane Lift Pit
  • 14. GSEducationalVersion 246 Wakefield St WellingtonSARC321 Assignment 2 Guyshaw 20/08/14 405Elevator Lift Pit CalloutsLiam Baines #300263108 1:20 Construction Joint, roughened, cleaned and moistened before concreting 900 800 900 500 400 400 3 400 150 2 Elevator 2 Lift Pit Callout 1:20 1 Elevator 1 Lift Pit Callout 1:20 150mm Reinforced Concrete Traydeck Slab Lift Shaft Reinforcing Bracket Construction Joint, roughened, cleaned and moistened before concreting Steel Reinforcing ∅10mm Lift Sump Lift Sump Pump Permeable Membrane Lift Sump Lift Sump Pump Permeable Membrane Waterproofing Membrane (sealed by Piles) 150mm Reinforced Concrete Traydeck Slab Earth Distribution reinforcement (bottom) ∅10 every 150mm Distribution reinforcement (bottom) ∅10 every 150mm Distribution reinforcement (top and bottom) ∅10 every 150mm Highrise 1.3.bpn; 405 Elevator Lift Pit Callouts; 100%; 20/08/14 4:44 pm
  • 15. GSEducationalVersion 246 Wakefield St WellingtonSARC321 Assignment 2 Guyshaw 20/08/14 406Rooftop BarLiam Baines #300263108 1:100 13 Exterior Column Sheath Callout 15 Wall to Balcony Junction 14 Wall-Roof Junction +33,300 11 Ninth Floor +33,300 11 Ninth Floor +37,000 12 Roof Bar +37,000 12 Roof Bar +40,700 13 Roof +40,700 13 Roof 1 A2 Section AA 1:100 610x305mm UB 610x305mm UB 610x305mm UB 150mm traydec concrete slab Drinking area Bar / Kitchen area Interior section Exterior, roofed section Roof construction Balustrade The Callout "Exterior Column Sheath" details the junction between the exterior column and roof, which partially encloses an outdoor roof courtyard area. The Columns have a weatherproofing system which wraps around, and is detailed in the section. Callouts defined on 407
  • 16. GSEducationalVersion 246 Wakefield St WellingtonSARC321 Assignment 2 Guyshaw 20/08/14 407Rooftop Bar CalloutsLiam Baines #300263108 1:20, 1:100 500 150 150 1 Exterior Column Sheath Callout 1:20 3 Wall to Balcony Junction 1:20 2 Wall-Roof Junction 1:20 1b Exterior column space explained1:100 500x500mm exterior reinforced concrete column Weatherproof flashing Sealant Waterproofing membrane 610x305mm UB 610x305mm UB Plywood beam enclosure Weatherproof flashing Profiled Aluminium Roof Cladding Roof structure Treated Plywood ceiling Timber filler jamb Weatherproof flashing Sealant 610x305mm UB Treated plywood exterior cladding Plywood beam enclosure Weatherproof membrane Timber filler jamb Suspended ceiling 610x305mm UB Plywood interior cladding 30mm Insulation 150mm thick concrete wall 150mm thick traydec floor slab Distribution reinforcement (bottom and top) ∅10 every 150mm Treated plywood exterior flooring Flashing Weatherproof membrane 610x305mm UB 30mm Insulation Balustrades 3D Visualisation of "Exterior Column Sheath Callout" showing roof extending over exterior space, supported by columns in the grid. Exterior SpaceInterior Space Exterior Space