Basic Photocomposition
Mass Communication Department
School of Arts and Sciences
Ateneo de Davao University
Selection of Visual Elements

© Rexor Amancio
Proper Arrangement of Elements

© Shaulia Almeria
Smooth Combination of Elements

© Yuell Lisondra
Photocomposition
Foundation upon which we build our photo
images by the
§  correct selection
§  arrangement and
§  combination of the visual elements

within the picture area to produce a harmonious
and pleasing photograph
Limitation of Photography
§  Photographer can use of objects within a frame of
the camera viewfinder.
§  Not to point the camera head on and shoot like a
tourist who does look around for the best angle
and lighting condition.
§  Little harder than the artist, he must find a scene
that has the best composition by finding the right
angle, choosing the right lenses, at the right time
of the day for the best lighting condition and using
creative exposures.
Decide what’s your Subject
§  What’s your subject?
§  Remove clutter you see in the viewfinder.
§  Keep your backgrounds clean. If possible
use DOF that will show clearly your
subject.
§  May allow distractions in the foreground or
background to remain out of focus.
Distraction Elimination
§  Eliminate distractions. Identify your subject and
emphasize only the subject.
§  It is best to communicate only one idea per
photograph. A written sentence that does too much
is called a run-on sentence and is considered poor
English.
§  A run-on photograph is bad photography. Keep
each photograph simple. Remove unnecessary
elements. Move in closer if required.
What’s
subject in
this photo?
What’s wrong with this photo?
How do I remove the clutter?
Basic Elements of
Photocomposition
§  Mass
§  Line
§  Form
§  Value
§  Color
MASS
§  Objects, such as trees, houses, mountains,
lakes or any other large or small object
within the picture area (viewfinder).
§  These are the objects the photographer is
“stuck” with and has to do the best with
what is in front of the camera.
Mass
Vancouver, BC Canada July 7, 2004 (Bong Eliab)
Mass
§  Mass comes in two sections
§  Formal Balance: equal balance or classical
balance; it elicits feelings of dignity, repose, but
makes static, unimaginative photo images as
the objects in the picture are of equal size, one
balancing the other equally. It makes the
photograph uninteresting and boring after the
first look
Toronto City Hall, July 9, 2004 (Bong Eliab)
Mass

§  Informal Balance: un-even or un-equal balance in the picture area
Toronto Yonge St., Canada July 9, 2004 (Bong Eliab)
Avoid the Center or the Bull’s
Eye Composition
Use the entire photograph. Placing your
subject in the geometric center of your
view finder is not pleasing to the eye and
does not efficiently use your picture space.
Avoid the center. Before you snap the
shutter, check all four corners of the finder
to see that you are properly using the space.
Avoid the Center or the Bull’s
Eye Composition
With the main subject at the center, the eye
will go in to picture and stay in the center
and will not move around to see and enjoy
other objects in the frame. The eye will get
tired very fast and lose interest in the
photograph.
Bull’s Eye Composition
Golden Mean
Golden Mean
Golden Mean
§  Divide the picture area
into “thirds” horizontally
and vertically, the lines
that cross in the picture
area are the golden mean
or the best spot in which
to place your main subject
as it is the focal point of
the picture.
Golden Mean
§  The best spot is the upper
right or the lower right
because the eye enters the
picture frame at the lower
left hand corner, travels to
the center of the picture
area, then reaches the right
hand position where it
stops to look at the center
of interest (main subject)
Rule of Thirds
Golden Mean
Golden Mean
Golden Mean
Golden Mean
Decentering

The branches in the foreground add depth and focus
attention.
Decentering

This photograph just does not work in B&W. It is all
about subtle color.
Rule of Thirds
Decentering

Color would add nothing here.
Framing
§  Try to frame your
subject in such a
way as to direct
attention toward the
subject.
Lines
§  Vertical Line: it denotes dignity, height,
strength, and grandeur. We find verticals in
trees, tall buildings, fences, people standing up,
mountains, etc. A tall building shows height,
grandeur and dignity. Trees show height and
strength.
CN Tower, Toronto, Canada Jul 10. 2004 (Bong Eliab)
Lines
§  Horizontal Line: it denotes repose, calm,
tranquility, peacefulness, such as a person
lying in the grass sleeping, flowers in the
field, the flatness of a desert scene or lake.
Toronto Harbour, Canada - Jul 10, 2004 (Bong Eliab)
Lines
§  Diagonal line: it gives the sensation of
force, energy and motion as seen in
trees bent by the wind, a runner at the
starting line or a slope of a mountain as
it climbs into the sky.
San Francisco, CA July 15, 2004 (Bong Eliab)
Diagonals
create depth and texture
to the photo
Diagonal Accents
§  When possible, accent any diagonal lines in your
scene. Diagonals are great for directing attention
and for adding tension to your photograph.
§  Diagonals are visually exciting because they play
against the rectilinear edges of the photograph.
§  Nothing can rivet attention as powerfully as a set
of converging lines.
Diagonals

	

The diagonal horizon simply adds visual tension.	

Bong S. Eliab © Babusanta May 20, 2007
Diagonals

Strong diagonal elements and an interesting angle	

Bong S. Eliab © Babusanta May 20, 2007
Meandering
§  If your subject possesses curvature, try to
compose in what is called an S-curve. This
is visually interesting and works like a
meandering diagonal.
§  The curve is a line of great beauty and
charm, it creates the sensation of elasticity,
charm and strength, perfect grace and
balance
Eye Direction
S-Curve Body
S-Curve Body
S-Curve Body
Human Curvature
BHS
Leading Line
§  The line that leads your eye in to the picture area
easily like a road, a shoreline or a river, a row of
trees or a pathway.
§  The un-successful leading line will take the eye in
to the picture but will zoom the eye right out of
the picture if there is no “stopper” to hold the eye
in the picture frame. The main subject should act
as the stopper.
Leading Line

San Francisco, California Jul 15, 2004 (Bong Eliab)
Leading Lines

	


Bong S. Eliab © Babusanta May 20, 2007
Good Leading Lines
Circles

§  Circle: a continuous curve and its circular
movement keeps the eye in the picture frame
Forms
§  Radii: a connection of lines meeting in the
center, it is also an expansion of lines
leaving the center. The eye has two ways to
go when meeting the radii, it can be drawn
toward to center or be led out of it. Caution
must be done with the radii.
Toronto, July 10, 2004 (Bong Eliab)
Form
§  Cross: it shows “opposing forces in cohesion”, it
creates a sensation of unity and relationship. The
horizontal bar acts as the stopper while the vertical
acts as the leading line.
Cornell University 2001
Value
§  Color also helps in photocomposition by
drawing attention to the subjects. The eye
will always go to the “brightest and lightest”
colors in the photograph. Watch for the
play of colors at all times.
Value of Colors
§  The value of colors depends on intensity,
brightness and luminance factors. Thus colors
have strong and weak values. They can be warm
or cold, advancing or receding. The longer
wavelength colors from red to yellow are usually
described as strong, warm, advancing colors while
the shorter wavelength colors, the greens and the
blues may be described as weak, cold and
receding colors.
Value of Colors
§  Pastel colors are quiet and moody while bright
colors are strong and active. However, certain
colors “react” very strongly if juxtaposed with
others, giving contrasts. To many people, these
will become “discords” rather than “harmonies.”
§  Hue is the scientific counterpart for the more
popular word color. Red, yellow, green and blue
are primary hues, while orange, blue-green, and
violets ate secondary hues.
Value of Colors
§  Complimentary Colors: desirable in any
photograph as it highlights and compliments each
other. If you place primary and secondary colors
in the color wheel, you will find that red will be
opposite of green, orange of blue, yellow of violet,
etc.
Accent Lighting
Avoid Horizon Bisection
§  In landscape photography it is usually best
not to bisect your photograph with the
horizon line. If you are photographing sky,
put the horizon in the bottom third of the
frame. If you are photographing land, why
include one-half picture of empty sky? This
issue of horizon placement is really just a
special case of the first rule: use the entire
frame.
Landscapes and Horizon
“Cutting” People
§  A photograph should be complete unto itself.
§  Do not allow picture components to trail off
the edge of the photograph. This is especially
true of portraits.
§  Try not to cut off people's legs, arms, and
hands.
Framing Problem
What’s wrong with this?
Portraiture: Close Up
Portraiture: Close Up
Portraiture: Close Up
Portraiture: Close Up
Session 6 Photocomposition (Basic Photography Class)

Session 6 Photocomposition (Basic Photography Class)

  • 1.
    Basic Photocomposition Mass CommunicationDepartment School of Arts and Sciences Ateneo de Davao University
  • 2.
    Selection of VisualElements © Rexor Amancio
  • 3.
    Proper Arrangement ofElements © Shaulia Almeria
  • 4.
    Smooth Combination ofElements © Yuell Lisondra
  • 5.
    Photocomposition Foundation upon whichwe build our photo images by the §  correct selection §  arrangement and §  combination of the visual elements within the picture area to produce a harmonious and pleasing photograph
  • 6.
    Limitation of Photography § Photographer can use of objects within a frame of the camera viewfinder. §  Not to point the camera head on and shoot like a tourist who does look around for the best angle and lighting condition. §  Little harder than the artist, he must find a scene that has the best composition by finding the right angle, choosing the right lenses, at the right time of the day for the best lighting condition and using creative exposures.
  • 7.
    Decide what’s yourSubject §  What’s your subject? §  Remove clutter you see in the viewfinder. §  Keep your backgrounds clean. If possible use DOF that will show clearly your subject. §  May allow distractions in the foreground or background to remain out of focus.
  • 8.
    Distraction Elimination §  Eliminatedistractions. Identify your subject and emphasize only the subject. §  It is best to communicate only one idea per photograph. A written sentence that does too much is called a run-on sentence and is considered poor English. §  A run-on photograph is bad photography. Keep each photograph simple. Remove unnecessary elements. Move in closer if required.
  • 9.
  • 10.
  • 11.
    How do Iremove the clutter?
  • 17.
    Basic Elements of Photocomposition § Mass §  Line §  Form §  Value §  Color
  • 18.
    MASS §  Objects, suchas trees, houses, mountains, lakes or any other large or small object within the picture area (viewfinder). §  These are the objects the photographer is “stuck” with and has to do the best with what is in front of the camera.
  • 19.
  • 20.
    Vancouver, BC CanadaJuly 7, 2004 (Bong Eliab)
  • 21.
    Mass §  Mass comesin two sections §  Formal Balance: equal balance or classical balance; it elicits feelings of dignity, repose, but makes static, unimaginative photo images as the objects in the picture are of equal size, one balancing the other equally. It makes the photograph uninteresting and boring after the first look
  • 22.
    Toronto City Hall,July 9, 2004 (Bong Eliab)
  • 23.
    Mass §  Informal Balance:un-even or un-equal balance in the picture area
  • 24.
    Toronto Yonge St.,Canada July 9, 2004 (Bong Eliab)
  • 25.
    Avoid the Centeror the Bull’s Eye Composition Use the entire photograph. Placing your subject in the geometric center of your view finder is not pleasing to the eye and does not efficiently use your picture space. Avoid the center. Before you snap the shutter, check all four corners of the finder to see that you are properly using the space.
  • 26.
    Avoid the Centeror the Bull’s Eye Composition With the main subject at the center, the eye will go in to picture and stay in the center and will not move around to see and enjoy other objects in the frame. The eye will get tired very fast and lose interest in the photograph.
  • 27.
  • 28.
  • 29.
  • 30.
    Golden Mean §  Dividethe picture area into “thirds” horizontally and vertically, the lines that cross in the picture area are the golden mean or the best spot in which to place your main subject as it is the focal point of the picture.
  • 31.
    Golden Mean §  Thebest spot is the upper right or the lower right because the eye enters the picture frame at the lower left hand corner, travels to the center of the picture area, then reaches the right hand position where it stops to look at the center of interest (main subject)
  • 32.
  • 33.
  • 34.
  • 35.
  • 36.
  • 37.
    Decentering The branches inthe foreground add depth and focus attention.
  • 38.
    Decentering This photograph justdoes not work in B&W. It is all about subtle color.
  • 39.
  • 40.
  • 41.
    Framing §  Try toframe your subject in such a way as to direct attention toward the subject.
  • 42.
    Lines §  Vertical Line:it denotes dignity, height, strength, and grandeur. We find verticals in trees, tall buildings, fences, people standing up, mountains, etc. A tall building shows height, grandeur and dignity. Trees show height and strength.
  • 43.
    CN Tower, Toronto,Canada Jul 10. 2004 (Bong Eliab)
  • 45.
    Lines §  Horizontal Line:it denotes repose, calm, tranquility, peacefulness, such as a person lying in the grass sleeping, flowers in the field, the flatness of a desert scene or lake.
  • 46.
    Toronto Harbour, Canada- Jul 10, 2004 (Bong Eliab)
  • 47.
    Lines §  Diagonal line:it gives the sensation of force, energy and motion as seen in trees bent by the wind, a runner at the starting line or a slope of a mountain as it climbs into the sky.
  • 48.
    San Francisco, CAJuly 15, 2004 (Bong Eliab)
  • 49.
    Diagonals create depth andtexture to the photo
  • 50.
    Diagonal Accents §  Whenpossible, accent any diagonal lines in your scene. Diagonals are great for directing attention and for adding tension to your photograph. §  Diagonals are visually exciting because they play against the rectilinear edges of the photograph. §  Nothing can rivet attention as powerfully as a set of converging lines.
  • 51.
    Diagonals The diagonal horizonsimply adds visual tension. Bong S. Eliab © Babusanta May 20, 2007
  • 52.
    Diagonals Strong diagonal elementsand an interesting angle Bong S. Eliab © Babusanta May 20, 2007
  • 53.
    Meandering §  If yoursubject possesses curvature, try to compose in what is called an S-curve. This is visually interesting and works like a meandering diagonal. §  The curve is a line of great beauty and charm, it creates the sensation of elasticity, charm and strength, perfect grace and balance
  • 54.
  • 55.
  • 56.
  • 57.
  • 58.
  • 59.
  • 60.
    Leading Line §  Theline that leads your eye in to the picture area easily like a road, a shoreline or a river, a row of trees or a pathway. §  The un-successful leading line will take the eye in to the picture but will zoom the eye right out of the picture if there is no “stopper” to hold the eye in the picture frame. The main subject should act as the stopper.
  • 61.
    Leading Line San Francisco,California Jul 15, 2004 (Bong Eliab)
  • 62.
    Leading Lines Bong S.Eliab © Babusanta May 20, 2007
  • 63.
  • 64.
    Circles §  Circle: acontinuous curve and its circular movement keeps the eye in the picture frame
  • 65.
    Forms §  Radii: aconnection of lines meeting in the center, it is also an expansion of lines leaving the center. The eye has two ways to go when meeting the radii, it can be drawn toward to center or be led out of it. Caution must be done with the radii.
  • 66.
    Toronto, July 10,2004 (Bong Eliab)
  • 67.
    Form §  Cross: itshows “opposing forces in cohesion”, it creates a sensation of unity and relationship. The horizontal bar acts as the stopper while the vertical acts as the leading line.
  • 68.
  • 69.
    Value §  Color alsohelps in photocomposition by drawing attention to the subjects. The eye will always go to the “brightest and lightest” colors in the photograph. Watch for the play of colors at all times.
  • 70.
    Value of Colors § The value of colors depends on intensity, brightness and luminance factors. Thus colors have strong and weak values. They can be warm or cold, advancing or receding. The longer wavelength colors from red to yellow are usually described as strong, warm, advancing colors while the shorter wavelength colors, the greens and the blues may be described as weak, cold and receding colors.
  • 71.
    Value of Colors § Pastel colors are quiet and moody while bright colors are strong and active. However, certain colors “react” very strongly if juxtaposed with others, giving contrasts. To many people, these will become “discords” rather than “harmonies.” §  Hue is the scientific counterpart for the more popular word color. Red, yellow, green and blue are primary hues, while orange, blue-green, and violets ate secondary hues.
  • 72.
    Value of Colors § Complimentary Colors: desirable in any photograph as it highlights and compliments each other. If you place primary and secondary colors in the color wheel, you will find that red will be opposite of green, orange of blue, yellow of violet, etc.
  • 74.
  • 75.
    Avoid Horizon Bisection § In landscape photography it is usually best not to bisect your photograph with the horizon line. If you are photographing sky, put the horizon in the bottom third of the frame. If you are photographing land, why include one-half picture of empty sky? This issue of horizon placement is really just a special case of the first rule: use the entire frame.
  • 76.
  • 77.
    “Cutting” People §  Aphotograph should be complete unto itself. §  Do not allow picture components to trail off the edge of the photograph. This is especially true of portraits. §  Try not to cut off people's legs, arms, and hands.
  • 78.
  • 79.
  • 81.
  • 82.
  • 83.
  • 84.