1. Sandeep.B
E-Mail: sandeepbsps@gmail.com Mobile: +91-9535039152
Seeking Assignments in the domain of Telecommunication with a growth oriented organization.
Preferred Location: Bangalore.
PROFESSIONAL ABRIDGEMENT
A competent professional with more than 4 year experience in Transmission Planning.
Worked 3.4 Years for Tata Tele Services Private Ltd, Bangalore as Transmission planning Engineer.
Presently working in Ericsson India Global ServicePrivate Ltd, Bangalore as Transmission Circuit planning
Engineer.
Sucecssfully completed transmission level project based work(2G Catapult proj , CS proj, 3G proj & project based on
activities in alkatal lucent & Rehoming acitvities)
A team player with strongcommunication, interpersonal, analytical and problem-solving skills; demonstrated ability to
work under pressure situations and meet deadlines.
KNOWLEDGE PURVIEW
Wireless & wireline Communication Technologies (GSM & CDMA)
Path loss (v4.0)
Fiber, MicroWave, PDH & SDHconectivities
3G and 2G E1 Planning (Rollout)
LBR and UBR Connectivities with planning Capex and Opex.
Loop and Break Teasting for 2G and 3G E1’s.
3G E1 Testing End to End.(ECI,ALU, RNC and Tellabs media)
Back Bone upgradation on Fiber
Configuration in NMS (ECI & ALU vendor)
Fiber-Optic Communication
Types of equipments involved in SDH
Google and Map info and Global mapper applications at Tx media.
EMPLOYMENT CHRONICLE
Tata Teleservices,Bangalore (from Oct’12 to Dec’2015)
As Transmission Planning Engineer
Key Deliverables:
Handalling Karnataka.(GSM & CDMA)
Internal(Backbone) & External(Customer) Network Design palnning.
Basic knowledge of configuration of Internal & customer circuit, Mux installation, Testing & Topology Creation.
Coordination with NOC & telecom vendors NSN, ALU , Tejus Networks etc to synchronise the activities in NMS
(Network Management System) & on the field.
Troubleshooting Technical & Equipment(MUX) issues in NMS level.
Providing feasibility for customer E1 delivery & for Higher level for Ethernet & MPLS network.
Preparing & Maintaining survey Report’s done by implementation team.
Alaram monitoring.
2. PDH ,SDH & Ceragon Planning
NEC,Ceragon,NSN (PDH /SDH/Hybrid) Microwave Links working on 7 GHz to 18 GHz Frequencies for
Microwave & SDH Sites for Karnataka Circle.
Planning for changes orUpgrades of existing Transmission network
Up gradation of Back bone network.
Ring spitting according activity.
Mux Planning & co ordination for Installation.
Ericsson India Global Service Pvt Ltd (from Jan’16 to Present)
As Transmission Circuit Planning Engineer
Project: Mobile Broadband Network Ltd (United Kingdom)
MBNL is a joint venture company owned by 3UK and Everything Everywhere (previously T-Mobile (UK)).The network
consolidation project has resulted in customers of Three UK and T-Mobile enjoying the best 3G coverage in the UK, by
combining their 3G access networks (the mobile masts and infrastructure that connects to each operator's separate core
network) Everything Everywhere and Three UK has created Europe's most extensive high-speed packet access (HSPA)
network.
Responsibility as Service Request Fulfillment Engineer (SRF):
Planning and Provisioning of DE, Layer 3, 3G Data Circuit & Legacy Circuits for 3G Network.
Network Up gradation and Expansion as per the Planning Data.
Producing Cutover Packs through Circuit Manager which is further useful field Operations.
Generation of various network report and comparison with live network and reduce the discrepancy.
Adept to work on Tools like APOLLO, NEMESIS,SAP, ISIS.
Single point of contact between Circuit planning team and LSO UK.
Delivering training sessions on upcoming project and technology related to MBNL UK.
Identifying the scope of process improvement on circuit provisioning techniques in Circuit manager and cramer.
Involved on the strategic plans for upcoming projects of their implementation and circuit plans from LSO UK for
MBNL.
Played a major role for the implementation plan of Circuit design in Circuit manager for MBNL UK 2G IPABIS,
Layer 3 and LTE Circuits..
Circuit Manager:-
Planning and creating circuit pack of 2M, DATA and Ethernet circuits for BTS BSC Connectivity of 2G and
NodeB RNC Connectivity of 3G Network.
Provisioning of 2G IPABIS, Direct Ethernet, Layer 3, and LTE Circuit.
64K Time Slot grooming in DAACs, Microwave Radio Planning, Provisioning of 2M,DATA and Ethernet circuits
on DWDM, Passport and Switches.
Configuring Nortel, Ericsson and Huawei BTS for 2G and Nokia Flexi Node B for 3G.
3. ACADEMIC PROJECTS
Title: Audio Compression Using Munich and Cambridge Morlet Wavelet
Duration: 2months
Project Description:
The project work titled "AUDIO COPRESSION USING MUNICH AND CAMBRIDGE MORLET WAVELET"
is carried out in E-TECH Institute- BANGALORE.
Wavelets,however, give both localization in time and frequency. Therefore, using filter banks that utilize wavelets might
allow for better audio compression
An attempt has been made in this project work to give best compression ratio and sound quality in comparison to the FFT
and Cambridge coders. A high selectivity was noticed and can lead to some interesting perspectives on audio coding using
this type of psycho-acoustic model. The facility thus developed has been tested and found to be working satisfactorily.
ACADEMIA
M.TECH;(Electonis & Communications)
-persuing
-KSO University Bangalore.
B.E :(Electronics & Communication)
- DON BOSCO Institue of Technology, Bangalore.
- Secured 69%
Pre-University College-(PCMC)
- SJRRC , Bangalore
- Secured 54%
School
- SMHS, Bangalore.
- Secured 78%
PERSONAL VITAE
Date of Birth : 05th Feb 1989
Address : 107th 4th Cross 2nd Main Jantha Colony Mariyappana Palya Gnana bharathi Post Bl-56
Linguistic Ability :Kannada, English, Hindi.