1. SAFETY FIRST
Different kind of mobile plant..
Static or fixed plant / equipment machinery..
Plant that lifts people..
Planning before start up the activities..
Realized and recognized the Equipment Hazards..
Controls for the safe operation of plant.
Prepared by; Jayson Tobias Eliseo
2. Different Kind of Mobile Plant
Excavator
Forklift
Bulldozer
Crawler crane
All Terrain
Truck mount (telescopic crane)
Luffing tower
Tower crane (hammer head)
4. Plants That Lift People..
Mobile elevating work platform (MWEP)
Mast climber
5. Planning b’4 Start Up
Activities
Level the crane and ensure support surface is
firm and able to support the load
Contact power line owners and determine
precautions. Know the location and voltage of
power lines unstable soil or high winds
Make other personnel aware of hoisting
activities.
Barricade areas within swing radius.
Ensure proper maintenance and inspections.
Determine safe areas to store materials and
place machinery.
6. Equipment Hazard
improper load rating
Excessive speed
No hand signal
Inadequate inspection and maintenance
Unguarded parts
Unguarded swing radius
Working too close to power lines
Improper exhaust system
No steps/guardrails walkways
No boom angle indicator
Not using outriggers
7. Using Controls for Safe
Operations
Isolating vehicles and plants from persons on the site
Using fencing, barriers, barricades temporary warning or control
signs.
Planning the direction that plant moves, so visibility is not
restricted
Implementing safe working distances
Using clear communication system
Minimizing amount of plant working at one time
Using demarcation lines or zones
Using audible reversing alarm
Using reversing/rear view cameras(see right)
Using reversing sensors
Using flashing lights
Using high visibility garments
Using spotters or observers
8. the use of the specific measures to eliminate and
minimized identified risks should involve the
selection of the most effective controls measures
based on a risk assessment
The controls identified in this alert are not
exhaustive and it is the expected that a number
measures would need be selected and integrated
into the system of work to ensure the highest
possible level of safety