SAFE Notice
SYDNEY, 17 AUGUST 2017 DIRECTOR SAFETY & STANDARDS SYDNEY TRAINS
Returned to Controlling Manager: Date: .................................... Signed: ................................................................
(Cut along this line and forward the detached receipt to your Controlling Manager)
To Controlling Manager: ...................................................................................................................................................
Received SAFE Notice No. 190 – 2017 Date: ................................ Signed: .............................................................
Name (print): .................................................................. Location: .............................................................................
(Controlling Manager to retain this Acknowledgment of Receipt of the SAFE Notice for record purposes for 90 days.)
¡
SAFE Notice No. 190 – 2017 Page 1
WESTMEAD – SEVEN HILLS – PENRITH – EMU PLAINS – NEWNES JUNCTION –
EDGECOMBE – ZIG ZAG – LITHGOW
From Monday, 28 August until Friday, 8 September 2017
In conjunction with Special Train Notice No. 1258 – 2017, the following Safeworking arrangements will apply:
190
TRACK POSSESSION NO. 1
WORK ON TRACK
The Engineering Disciplines will be carrying out signal maintenance and testing at various locations within the
possession area.
In exception to the procedures shown in NWT 302, page 5 (Local Possession Authority), the half-staffs must not be
removed and protection must be afforded by placing Railway Track Signals and red flags/red lights at the limits of the
LPA when signal testing is being undertaken.