5. Air Distribution
• Ceiling suspended AHU is
selected to distribute air
• Comfort condition 77°F with
50% RH
• ADP is 54°F & CFM is 5550
• Chilled water inlet 7°C & outlet
is 15°C
• VCD are placed at beginning of
each duct
• Backward curved aero-foil
blade centrifugal fan for AHU
• Inline centrifugal fan is
selected for exhaust air
7. Chiller Plant
• Total building load
40TR
• Diversity factor is 100%
• Water cooled scroll
chillers 2 quantities
20TR+ 20TR
• Counter flow cooling
tower for 50 TR ( Total
building load * 1.25 )
• Approach is 3°C and
Range is 5°C
8. PLUMBING
• All the plumbing
fixtures are placed as
per the architectural
plan and both hot and
cold water piping is
done as well.
• Slope of 1% is provided
for the piping.
10. Fire Fighting
• Pipes are sized based
on number of
sprinklers
• Sprinklers are placed
by considering the
throw of the sprinklers
and are placed
effectively to cover
entire area of the
building
11. Interference report
Interference report between only mechanical plan and architectural plan is shown.
Each clash is indicated by an ID