 Total Area:21000SF
 Type : Office
 Structure :8 floors
 Total TR :350TR
 Occupancy:3100 persons
 Peak Dry Bulb Temp:104⁰F
 Peak Wet Bulb Temp:84⁰F
 Create Spaces And Zones.
 Calculate Sensible And Latent Heat Load.
 Calculate ADP.
 Generate The Report.
 Taking Rectangular, Round And Flexible Duct.
 Size Is Selected As Per The Air Flow.
 Air Terminal Neck Size Is Selected As Per Throw Of Air Flow.
3D VIEW:
AIR DISTRIBUTION PLAN VIEW:
SECTIONALVIEW:
 Critical path of the air flow is due to the bends and head.
 It is measured by system inspector.
PRESSURE LOSS REPORT:
PRESSURE LOSS IN PLAN VIEW:
 For 350TR,
 200TR×1-Water cooled screw chiller.
 100TR×2-Water cooled screw chiller(1-Stand by).
 50TR×1-Air cooled scroll chiller(24×7 operations).
 Poly Vinyl Chloride(PVC) Pipe is used for Domestic cold water and Sanitary.
 Slope of the sanitary pipes are 1%.
3D VIEW:
PLUMBING SYSTEM PLAN VIEW :
SECTIONAL VIEW:
 Steel Carbon Material is used For Fire Fighting Pipes.
 Pendent Type Sprinklers is connected to Fire Fighting Pipes.


 Ceiling Square box and Suspended Pendent lights are placed.
 Ladder type cable trays are used for carrying the Wires.
3D VIEWS:
ELECTRICAL SYSTEM PLAN VIEW:
SECTIONAL VIEW:
 Coordinating Mechanical, Electrical and Fire Fighting system in same Project.
 Ensure that there is no interference or Clash between the coordinated model.
 Checking Clashes within the project and between the linked projects.
 Rendering the Project is Clash free.
 Calculation the Bill Of Quantities for the project based on the schedules.
 As per the Project Requirement , new Families are created like AHU,Air
Terminal and its Loaded into Project.
AHU: AIR TERMINAL:
PORTFOLIO

More Related Content

What's hot

Data Center Cooling System Design: Reducing Cooling Costs and Power Consumpti...
Data Center Cooling System Design: Reducing Cooling Costs and Power Consumpti...Data Center Cooling System Design: Reducing Cooling Costs and Power Consumpti...
Data Center Cooling System Design: Reducing Cooling Costs and Power Consumpti...SimScale
 
SimScale to IES for Building Simulation
SimScale to IES for Building SimulationSimScale to IES for Building Simulation
SimScale to IES for Building SimulationSimScale
 
Pressure relief valve_data_sheet_rev01
Pressure relief valve_data_sheet_rev01Pressure relief valve_data_sheet_rev01
Pressure relief valve_data_sheet_rev01soetrisno
 
CO Removal and Smoke Extraction: Garage Ventilation System Design with CFD
CO Removal and Smoke Extraction: Garage Ventilation System Design with CFDCO Removal and Smoke Extraction: Garage Ventilation System Design with CFD
CO Removal and Smoke Extraction: Garage Ventilation System Design with CFDSimScale
 
Pressure Coefficients on Building Facades for Building Simulation
Pressure Coefficients on Building Facades for Building SimulationPressure Coefficients on Building Facades for Building Simulation
Pressure Coefficients on Building Facades for Building SimulationSimScale
 
Design of recuperative gas combustion chamber
Design of recuperative gas combustion chamberDesign of recuperative gas combustion chamber
Design of recuperative gas combustion chamberApurva Anand
 
Simulating the Performance of the Unique MicroLouvre™ for Low Energy Building...
Simulating the Performance of the Unique MicroLouvre™ for Low Energy Building...Simulating the Performance of the Unique MicroLouvre™ for Low Energy Building...
Simulating the Performance of the Unique MicroLouvre™ for Low Energy Building...SimScale
 
Conjugate Heat Transfer Best Practices in SimScale
Conjugate Heat Transfer Best Practices in SimScaleConjugate Heat Transfer Best Practices in SimScale
Conjugate Heat Transfer Best Practices in SimScaleSimScale
 
Suresh BIM HVAC Portfolio.
Suresh BIM HVAC Portfolio.Suresh BIM HVAC Portfolio.
Suresh BIM HVAC Portfolio.Suresh Babu G
 
SimScale Pedestrian Wind Comfort Capabilities
SimScale Pedestrian Wind Comfort CapabilitiesSimScale Pedestrian Wind Comfort Capabilities
SimScale Pedestrian Wind Comfort CapabilitiesSimScale
 
Using SimScale for Demonstrating Compliance With LEED, BREEAM & the WELL Buil...
Using SimScale for Demonstrating Compliance With LEED, BREEAM & the WELL Buil...Using SimScale for Demonstrating Compliance With LEED, BREEAM & the WELL Buil...
Using SimScale for Demonstrating Compliance With LEED, BREEAM & the WELL Buil...SimScale
 
Assessment of the natural air ventilation of buildings in urban area with the...
Assessment of the natural air ventilation of buildings in urban area with the...Assessment of the natural air ventilation of buildings in urban area with the...
Assessment of the natural air ventilation of buildings in urban area with the...Stephane Meteodyn
 
CCM Mega Presentation
CCM Mega PresentationCCM Mega Presentation
CCM Mega Presentationstevesabo
 
Evaluating the Thermal Performance of Lighting Solutions With Cloud-Based CFD
Evaluating the Thermal Performance of Lighting Solutions With Cloud-Based CFDEvaluating the Thermal Performance of Lighting Solutions With Cloud-Based CFD
Evaluating the Thermal Performance of Lighting Solutions With Cloud-Based CFDSimScale
 
Smoke Control in a Car Park with Cloud Based CFD
Smoke Control in a Car Park with Cloud Based CFDSmoke Control in a Car Park with Cloud Based CFD
Smoke Control in a Car Park with Cloud Based CFDSimScale
 
in-situ g-value for monitoring of existing building facades Daniel Plorer (Un...
in-situ g-value for monitoring of existing building facades Daniel Plorer (Un...in-situ g-value for monitoring of existing building facades Daniel Plorer (Un...
in-situ g-value for monitoring of existing building facades Daniel Plorer (Un...IDM Südtirol - Alto Adige
 
Testo Measurement Instruments for Mechanical Dept of Engineering cColleges &...
Testo Measurement Instruments  for Mechanical Dept of Engineering cColleges &...Testo Measurement Instruments  for Mechanical Dept of Engineering cColleges &...
Testo Measurement Instruments for Mechanical Dept of Engineering cColleges &...Testo-India-Pvt-Ltd
 

What's hot (20)

Data Center Cooling System Design: Reducing Cooling Costs and Power Consumpti...
Data Center Cooling System Design: Reducing Cooling Costs and Power Consumpti...Data Center Cooling System Design: Reducing Cooling Costs and Power Consumpti...
Data Center Cooling System Design: Reducing Cooling Costs and Power Consumpti...
 
SimScale to IES for Building Simulation
SimScale to IES for Building SimulationSimScale to IES for Building Simulation
SimScale to IES for Building Simulation
 
Pressure relief valve_data_sheet_rev01
Pressure relief valve_data_sheet_rev01Pressure relief valve_data_sheet_rev01
Pressure relief valve_data_sheet_rev01
 
CO Removal and Smoke Extraction: Garage Ventilation System Design with CFD
CO Removal and Smoke Extraction: Garage Ventilation System Design with CFDCO Removal and Smoke Extraction: Garage Ventilation System Design with CFD
CO Removal and Smoke Extraction: Garage Ventilation System Design with CFD
 
Pressure Coefficients on Building Facades for Building Simulation
Pressure Coefficients on Building Facades for Building SimulationPressure Coefficients on Building Facades for Building Simulation
Pressure Coefficients on Building Facades for Building Simulation
 
Design of recuperative gas combustion chamber
Design of recuperative gas combustion chamberDesign of recuperative gas combustion chamber
Design of recuperative gas combustion chamber
 
RUDRA 7 portfolio
RUDRA 7 portfolioRUDRA 7 portfolio
RUDRA 7 portfolio
 
Simulating the Performance of the Unique MicroLouvre™ for Low Energy Building...
Simulating the Performance of the Unique MicroLouvre™ for Low Energy Building...Simulating the Performance of the Unique MicroLouvre™ for Low Energy Building...
Simulating the Performance of the Unique MicroLouvre™ for Low Energy Building...
 
Conjugate Heat Transfer Best Practices in SimScale
Conjugate Heat Transfer Best Practices in SimScaleConjugate Heat Transfer Best Practices in SimScale
Conjugate Heat Transfer Best Practices in SimScale
 
Suresh BIM HVAC Portfolio.
Suresh BIM HVAC Portfolio.Suresh BIM HVAC Portfolio.
Suresh BIM HVAC Portfolio.
 
Slot_Diffuser
Slot_DiffuserSlot_Diffuser
Slot_Diffuser
 
SimScale Pedestrian Wind Comfort Capabilities
SimScale Pedestrian Wind Comfort CapabilitiesSimScale Pedestrian Wind Comfort Capabilities
SimScale Pedestrian Wind Comfort Capabilities
 
Using SimScale for Demonstrating Compliance With LEED, BREEAM & the WELL Buil...
Using SimScale for Demonstrating Compliance With LEED, BREEAM & the WELL Buil...Using SimScale for Demonstrating Compliance With LEED, BREEAM & the WELL Buil...
Using SimScale for Demonstrating Compliance With LEED, BREEAM & the WELL Buil...
 
Assessment of the natural air ventilation of buildings in urban area with the...
Assessment of the natural air ventilation of buildings in urban area with the...Assessment of the natural air ventilation of buildings in urban area with the...
Assessment of the natural air ventilation of buildings in urban area with the...
 
CCM Mega Presentation
CCM Mega PresentationCCM Mega Presentation
CCM Mega Presentation
 
Evaluating the Thermal Performance of Lighting Solutions With Cloud-Based CFD
Evaluating the Thermal Performance of Lighting Solutions With Cloud-Based CFDEvaluating the Thermal Performance of Lighting Solutions With Cloud-Based CFD
Evaluating the Thermal Performance of Lighting Solutions With Cloud-Based CFD
 
Presentation Cooling Eng
Presentation Cooling EngPresentation Cooling Eng
Presentation Cooling Eng
 
Smoke Control in a Car Park with Cloud Based CFD
Smoke Control in a Car Park with Cloud Based CFDSmoke Control in a Car Park with Cloud Based CFD
Smoke Control in a Car Park with Cloud Based CFD
 
in-situ g-value for monitoring of existing building facades Daniel Plorer (Un...
in-situ g-value for monitoring of existing building facades Daniel Plorer (Un...in-situ g-value for monitoring of existing building facades Daniel Plorer (Un...
in-situ g-value for monitoring of existing building facades Daniel Plorer (Un...
 
Testo Measurement Instruments for Mechanical Dept of Engineering cColleges &...
Testo Measurement Instruments  for Mechanical Dept of Engineering cColleges &...Testo Measurement Instruments  for Mechanical Dept of Engineering cColleges &...
Testo Measurement Instruments for Mechanical Dept of Engineering cColleges &...
 

Similar to PORTFOLIO

An Investigation in Performance Enhancement of Induced Draft Counter Flow Wet...
An Investigation in Performance Enhancement of Induced Draft Counter Flow Wet...An Investigation in Performance Enhancement of Induced Draft Counter Flow Wet...
An Investigation in Performance Enhancement of Induced Draft Counter Flow Wet...IRJET Journal
 
CASE STUDY Hybrid Cooling IIT Delhi 13.2.2019.pdf
CASE STUDY Hybrid Cooling IIT Delhi 13.2.2019.pdfCASE STUDY Hybrid Cooling IIT Delhi 13.2.2019.pdf
CASE STUDY Hybrid Cooling IIT Delhi 13.2.2019.pdfUtkarshSingh554039
 
Basics on Cooling Tower & Water.pdf sana parveen
Basics on Cooling Tower & Water.pdf sana parveenBasics on Cooling Tower & Water.pdf sana parveen
Basics on Cooling Tower & Water.pdf sana parveenSana Khan
 
4 cooling system dynamics
4 cooling system dynamics4 cooling system dynamics
4 cooling system dynamicsFuad Kareem.
 
Energy transfer and heat load analysis
Energy transfer and heat load analysisEnergy transfer and heat load analysis
Energy transfer and heat load analysisSatwinder Singh
 
Final report on spent solution in hydro
Final report on spent solution in hydroFinal report on spent solution in hydro
Final report on spent solution in hydroprateekj765
 
Mechanical Engineering Seminar 2017_3
Mechanical Engineering Seminar 2017_3Mechanical Engineering Seminar 2017_3
Mechanical Engineering Seminar 2017_3Nicholas Naing
 
EFFECT OF PERFORATION ON ANNULAR FIN
EFFECT OF PERFORATION ON ANNULAR FINEFFECT OF PERFORATION ON ANNULAR FIN
EFFECT OF PERFORATION ON ANNULAR FINpkstanwar911
 
HVAC Mini project review.pptx
HVAC Mini project review.pptxHVAC Mini project review.pptx
HVAC Mini project review.pptxCollege
 
Cryogenic air separation plant design
Cryogenic air separation plant designCryogenic air separation plant design
Cryogenic air separation plant designRahul Ghalme
 
Energy Conservation Opportunities in Cooling Tower.pdf
Energy Conservation Opportunities in Cooling Tower.pdfEnergy Conservation Opportunities in Cooling Tower.pdf
Energy Conservation Opportunities in Cooling Tower.pdfNITIN ASNANI
 
IRJET- Enhancement of COP of Vapor Compression Refrigeration Cycle using CFD
IRJET- Enhancement of COP of Vapor Compression Refrigeration Cycle using CFDIRJET- Enhancement of COP of Vapor Compression Refrigeration Cycle using CFD
IRJET- Enhancement of COP of Vapor Compression Refrigeration Cycle using CFDIRJET Journal
 

Similar to PORTFOLIO (20)

Design HVAC System for Hospital
Design HVAC System for Hospital Design HVAC System for Hospital
Design HVAC System for Hospital
 
Project portfolio
Project portfolioProject portfolio
Project portfolio
 
An Investigation in Performance Enhancement of Induced Draft Counter Flow Wet...
An Investigation in Performance Enhancement of Induced Draft Counter Flow Wet...An Investigation in Performance Enhancement of Induced Draft Counter Flow Wet...
An Investigation in Performance Enhancement of Induced Draft Counter Flow Wet...
 
Praveen portfolio
Praveen portfolioPraveen portfolio
Praveen portfolio
 
Project ppt
Project pptProject ppt
Project ppt
 
CASE STUDY Hybrid Cooling IIT Delhi 13.2.2019.pdf
CASE STUDY Hybrid Cooling IIT Delhi 13.2.2019.pdfCASE STUDY Hybrid Cooling IIT Delhi 13.2.2019.pdf
CASE STUDY Hybrid Cooling IIT Delhi 13.2.2019.pdf
 
Cooling tower
Cooling tower Cooling tower
Cooling tower
 
Basics on Cooling Tower & Water.pdf sana parveen
Basics on Cooling Tower & Water.pdf sana parveenBasics on Cooling Tower & Water.pdf sana parveen
Basics on Cooling Tower & Water.pdf sana parveen
 
4 cooling system dynamics
4 cooling system dynamics4 cooling system dynamics
4 cooling system dynamics
 
mel709-41.ppt
mel709-41.pptmel709-41.ppt
mel709-41.ppt
 
project
projectproject
project
 
FYPP
FYPPFYPP
FYPP
 
Energy transfer and heat load analysis
Energy transfer and heat load analysisEnergy transfer and heat load analysis
Energy transfer and heat load analysis
 
Final report on spent solution in hydro
Final report on spent solution in hydroFinal report on spent solution in hydro
Final report on spent solution in hydro
 
Mechanical Engineering Seminar 2017_3
Mechanical Engineering Seminar 2017_3Mechanical Engineering Seminar 2017_3
Mechanical Engineering Seminar 2017_3
 
EFFECT OF PERFORATION ON ANNULAR FIN
EFFECT OF PERFORATION ON ANNULAR FINEFFECT OF PERFORATION ON ANNULAR FIN
EFFECT OF PERFORATION ON ANNULAR FIN
 
HVAC Mini project review.pptx
HVAC Mini project review.pptxHVAC Mini project review.pptx
HVAC Mini project review.pptx
 
Cryogenic air separation plant design
Cryogenic air separation plant designCryogenic air separation plant design
Cryogenic air separation plant design
 
Energy Conservation Opportunities in Cooling Tower.pdf
Energy Conservation Opportunities in Cooling Tower.pdfEnergy Conservation Opportunities in Cooling Tower.pdf
Energy Conservation Opportunities in Cooling Tower.pdf
 
IRJET- Enhancement of COP of Vapor Compression Refrigeration Cycle using CFD
IRJET- Enhancement of COP of Vapor Compression Refrigeration Cycle using CFDIRJET- Enhancement of COP of Vapor Compression Refrigeration Cycle using CFD
IRJET- Enhancement of COP of Vapor Compression Refrigeration Cycle using CFD
 

PORTFOLIO

  • 1. KAVIN.P MECHANICAL ENGINEER(B.E) with HVAC Design & Revit Skills. Mobile No:+91-8012147922 E-mail:kavinmech922@gmail.com
  • 2.  Location : Chennai  Total Area:21000SF  Type : Office  Structure :8 floors  Total TR :350TR  Occupancy:3100 persons  Peak Dry Bulb Temp:104⁰F  Peak Wet Bulb Temp:84⁰F
  • 3.  Create Spaces And Zones.  Calculate Sensible And Latent Heat Load.  Calculate ADP.  Generate The Report.
  • 4.  Taking Rectangular, Round And Flexible Duct.  Size Is Selected As Per The Air Flow.  Air Terminal Neck Size Is Selected As Per Throw Of Air Flow. 3D VIEW:
  • 5. AIR DISTRIBUTION PLAN VIEW: SECTIONALVIEW:
  • 6.  Critical path of the air flow is due to the bends and head.  It is measured by system inspector. PRESSURE LOSS REPORT:
  • 7. PRESSURE LOSS IN PLAN VIEW:
  • 8.  For 350TR,  200TR×1-Water cooled screw chiller.  100TR×2-Water cooled screw chiller(1-Stand by).  50TR×1-Air cooled scroll chiller(24×7 operations).
  • 9.  Poly Vinyl Chloride(PVC) Pipe is used for Domestic cold water and Sanitary.  Slope of the sanitary pipes are 1%. 3D VIEW:
  • 10. PLUMBING SYSTEM PLAN VIEW : SECTIONAL VIEW:
  • 11.  Steel Carbon Material is used For Fire Fighting Pipes.  Pendent Type Sprinklers is connected to Fire Fighting Pipes.  
  • 12.  Ceiling Square box and Suspended Pendent lights are placed.  Ladder type cable trays are used for carrying the Wires. 3D VIEWS:
  • 13. ELECTRICAL SYSTEM PLAN VIEW: SECTIONAL VIEW:
  • 14.  Coordinating Mechanical, Electrical and Fire Fighting system in same Project.  Ensure that there is no interference or Clash between the coordinated model.
  • 15.  Checking Clashes within the project and between the linked projects.  Rendering the Project is Clash free.
  • 16.  Calculation the Bill Of Quantities for the project based on the schedules.
  • 17.  As per the Project Requirement , new Families are created like AHU,Air Terminal and its Loaded into Project. AHU: AIR TERMINAL: