SlideShare a Scribd company logo
1 of 12
Student Name 3
182020
Under the guidance of
Mr.
Assistant Professor
Department of Civil Engineering
Ramireddy Subbarami Reddy Engineering College
FIRST REVIEW
29th APRIL 2022
Student Name 2
182020
Student Name 4
182020
Student Name 1
193R1A0
Student Name 5
182020
TITLE OF THE PROJECT
A project work submitted in partial fulfilment of the requirements for the degree of
BACHELOR OF TECHNOLOGY in CIVIL ENGINEERING
by
DEPARTMENT OF CIVIL ENGINEERING RAMIREDDY SUBBARAMI REDDY ENGINEERING COLLEGE 2
Go to View - Slide Master and ADD Project Title
Overview
Introduction
Scope
Objectives
Literature review
Methodology
Conclusion & Future Work
References
DEPARTMENT OF CIVIL ENGINEERING RAMIREDDY SUBBARAMI REDDY ENGINEERING COLLEGE 3
Go to View - Slide Master and ADD Project Title
TENTATIVE SCHEDULE OF WORK
March 2022 Title finalisation
21.12.10 – 15.01.11 Review of literature
16.01.11 – 25.01.11 Collection of Toposheet
26.01.11 – 5.02.11 Sample Collection
06.02.11 – 15.02.11
16.02.11 – 10.03.11 Analysis
11.03.11 – 20.03.11 Study Of
21.03.11 – 31.03.11 Final Draft
DEPARTMENT OF CIVIL ENGINEERING RAMIREDDY SUBBARAMI REDDY ENGINEERING COLLEGE 4
Go to View - Slide Master and ADD Project Title
Introduction
DEPARTMENT OF CIVIL ENGINEERING RAMIREDDY SUBBARAMI REDDY ENGINEERING COLLEGE 5
Go to View - Slide Master and ADD Project Title
Scope
DEPARTMENT OF CIVIL ENGINEERING RAMIREDDY SUBBARAMI REDDY ENGINEERING COLLEGE 6
Go to View - Slide Master and ADD Project Title
Objective
DEPARTMENT OF CIVIL ENGINEERING RAMIREDDY SUBBARAMI REDDY ENGINEERING COLLEGE 7
Go to View - Slide Master and ADD Project Title
DEPARTMENT OF CIVIL ENGINEERING RAMIREDDY SUBBARAMI REDDY ENGINEERING COLLEGE 8
Go to View - Slide Master and ADD Project Title
DEPARTMENT OF CIVIL ENGINEERING RAMIREDDY SUBBARAMI REDDY ENGINEERING COLLEGE 9
Go to View - Slide Master and ADD Project Title
DEPARTMENT OF CIVIL ENGINEERING RAMIREDDY SUBBARAMI REDDY ENGINEERING COLLEGE 10
Go to View - Slide Master and ADD Project Title
Conclusion & Future Work
DEPARTMENT OF CIVIL ENGINEERING RAMIREDDY SUBBARAMI REDDY ENGINEERING COLLEGE 11
Go to View - Slide Master and ADD Project Title
References
1. Author 1, Author 2 and Author 3, “Title of the Paper”,” Journal name where
the paper published, vol. 11, pp. 11-15, Jan. 2020.
DEPARTMENT OF CIVIL ENGINEERING RAMIREDDY SUBBARAMI REDDY ENGINEERING COLLEGE 12
Go to View - Slide Master and ADD Project Title
Thank You!!!

More Related Content

Similar to RSREC_CIVIL_Project Work Presentation Template.pptx

2012 ISCN Symposium Sustainable Initiatives in Universiti Teknologi Malaysia
2012 ISCN Symposium Sustainable Initiatives in Universiti Teknologi Malaysia2012 ISCN Symposium Sustainable Initiatives in Universiti Teknologi Malaysia
2012 ISCN Symposium Sustainable Initiatives in Universiti Teknologi Malaysia
ISCN_Secretariat
 
An Investigation on Processing and Properties of Recycle Aggregate Concrete
An Investigation on Processing and Properties of Recycle Aggregate ConcreteAn Investigation on Processing and Properties of Recycle Aggregate Concrete
An Investigation on Processing and Properties of Recycle Aggregate Concrete
Mohammed Alauddin
 
Dissertation report on underwater structures with proposal
Dissertation report on underwater structures with proposalDissertation report on underwater structures with proposal
Dissertation report on underwater structures with proposal
Adiba Nisar
 
101804898 project-report-of-pre-engineered-steel-building
101804898 project-report-of-pre-engineered-steel-building101804898 project-report-of-pre-engineered-steel-building
101804898 project-report-of-pre-engineered-steel-building
hlksd
 
Seminar ppt format college [Autosaved].ppt
Seminar ppt format college [Autosaved].pptSeminar ppt format college [Autosaved].ppt
Seminar ppt format college [Autosaved].ppt
karttik487
 
PPT format for first defending of B.Tech. final year project (All Branches)
PPT format for first defending of B.Tech. final year project (All Branches)PPT format for first defending of B.Tech. final year project (All Branches)
PPT format for first defending of B.Tech. final year project (All Branches)
Varun Pratap Singh
 

Similar to RSREC_CIVIL_Project Work Presentation Template.pptx (20)

solar_Still_improvement-_insulation.pptx
solar_Still_improvement-_insulation.pptxsolar_Still_improvement-_insulation.pptx
solar_Still_improvement-_insulation.pptx
 
2012 ISCN Symposium Sustainable Initiatives in Universiti Teknologi Malaysia
2012 ISCN Symposium Sustainable Initiatives in Universiti Teknologi Malaysia2012 ISCN Symposium Sustainable Initiatives in Universiti Teknologi Malaysia
2012 ISCN Symposium Sustainable Initiatives in Universiti Teknologi Malaysia
 
project-i-green-building.pdf
project-i-green-building.pdfproject-i-green-building.pdf
project-i-green-building.pdf
 
Modelling Analysis and Design of Self Anchored Suspension Bridge
Modelling Analysis and Design of Self Anchored Suspension BridgeModelling Analysis and Design of Self Anchored Suspension Bridge
Modelling Analysis and Design of Self Anchored Suspension Bridge
 
Design engineering 2A report
Design engineering 2A reportDesign engineering 2A report
Design engineering 2A report
 
OPTIMAL LEARNING SPACES IN HOT AND DRY CLIMATE
OPTIMAL LEARNING SPACES IN HOT AND DRY CLIMATEOPTIMAL LEARNING SPACES IN HOT AND DRY CLIMATE
OPTIMAL LEARNING SPACES IN HOT AND DRY CLIMATE
 
EST-Report[1] grp dhansahri.docx
EST-Report[1] grp dhansahri.docxEST-Report[1] grp dhansahri.docx
EST-Report[1] grp dhansahri.docx
 
CV-Acdm - 1
CV-Acdm - 1CV-Acdm - 1
CV-Acdm - 1
 
Graduation presentation
Graduation presentationGraduation presentation
Graduation presentation
 
An Investigation on Processing and Properties of Recycle Aggregate Concrete
An Investigation on Processing and Properties of Recycle Aggregate ConcreteAn Investigation on Processing and Properties of Recycle Aggregate Concrete
An Investigation on Processing and Properties of Recycle Aggregate Concrete
 
AMI .pdf
AMI .pdfAMI .pdf
AMI .pdf
 
Siddharth Srivastava
Siddharth SrivastavaSiddharth Srivastava
Siddharth Srivastava
 
BLENDER TUTORIAL. REALISTIC WOOD CUP. MARK SEAM & UNWRAP Tihomir Dovramadjiev...
BLENDER TUTORIAL. REALISTIC WOOD CUP. MARK SEAM & UNWRAP Tihomir Dovramadjiev...BLENDER TUTORIAL. REALISTIC WOOD CUP. MARK SEAM & UNWRAP Tihomir Dovramadjiev...
BLENDER TUTORIAL. REALISTIC WOOD CUP. MARK SEAM & UNWRAP Tihomir Dovramadjiev...
 
Dissertation report on underwater structures with proposal
Dissertation report on underwater structures with proposalDissertation report on underwater structures with proposal
Dissertation report on underwater structures with proposal
 
ARCHITECTURE AND SHELTER The Roles And Responsibilities Of Architects In Meet...
ARCHITECTURE AND SHELTER The Roles And Responsibilities Of Architects In Meet...ARCHITECTURE AND SHELTER The Roles And Responsibilities Of Architects In Meet...
ARCHITECTURE AND SHELTER The Roles And Responsibilities Of Architects In Meet...
 
101804898 project-report-of-pre-engineered-steel-building
101804898 project-report-of-pre-engineered-steel-building101804898 project-report-of-pre-engineered-steel-building
101804898 project-report-of-pre-engineered-steel-building
 
A project report on Foot Step Power Generation By Indrakumar R Padwani
A project report on Foot Step Power Generation By Indrakumar R PadwaniA project report on Foot Step Power Generation By Indrakumar R Padwani
A project report on Foot Step Power Generation By Indrakumar R Padwani
 
Seminar ppt format college [Autosaved].ppt
Seminar ppt format college [Autosaved].pptSeminar ppt format college [Autosaved].ppt
Seminar ppt format college [Autosaved].ppt
 
Training Report on "ELEVATED ROAD"
Training Report on "ELEVATED ROAD"Training Report on "ELEVATED ROAD"
Training Report on "ELEVATED ROAD"
 
PPT format for first defending of B.Tech. final year project (All Branches)
PPT format for first defending of B.Tech. final year project (All Branches)PPT format for first defending of B.Tech. final year project (All Branches)
PPT format for first defending of B.Tech. final year project (All Branches)
 

Recently uploaded

Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
Kamal Acharya
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
ssuser89054b
 

Recently uploaded (20)

Thermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.pptThermal Engineering -unit - III & IV.ppt
Thermal Engineering -unit - III & IV.ppt
 
Signal Processing and Linear System Analysis
Signal Processing and Linear System AnalysisSignal Processing and Linear System Analysis
Signal Processing and Linear System Analysis
 
Online electricity billing project report..pdf
Online electricity billing project report..pdfOnline electricity billing project report..pdf
Online electricity billing project report..pdf
 
💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...
💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...
💚Trustworthy Call Girls Pune Call Girls Service Just Call 🍑👄6378878445 🍑👄 Top...
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
DC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equationDC MACHINE-Motoring and generation, Armature circuit equation
DC MACHINE-Motoring and generation, Armature circuit equation
 
Thermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - VThermal Engineering-R & A / C - unit - V
Thermal Engineering-R & A / C - unit - V
 
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced LoadsFEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
FEA Based Level 3 Assessment of Deformed Tanks with Fluid Induced Loads
 
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...
Jaipur ❤CALL GIRL 0000000000❤CALL GIRLS IN Jaipur ESCORT SERVICE❤CALL GIRL IN...
 
Max. shear stress theory-Maximum Shear Stress Theory ​ Maximum Distortional ...
Max. shear stress theory-Maximum Shear Stress Theory ​  Maximum Distortional ...Max. shear stress theory-Maximum Shear Stress Theory ​  Maximum Distortional ...
Max. shear stress theory-Maximum Shear Stress Theory ​ Maximum Distortional ...
 
Introduction to Data Visualization,Matplotlib.pdf
Introduction to Data Visualization,Matplotlib.pdfIntroduction to Data Visualization,Matplotlib.pdf
Introduction to Data Visualization,Matplotlib.pdf
 
Employee leave management system project.
Employee leave management system project.Employee leave management system project.
Employee leave management system project.
 
Hospital management system project report.pdf
Hospital management system project report.pdfHospital management system project report.pdf
Hospital management system project report.pdf
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best ServiceTamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
Tamil Call Girls Bhayandar WhatsApp +91-9930687706, Best Service
 
Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)Theory of Time 2024 (Universal Theory for Everything)
Theory of Time 2024 (Universal Theory for Everything)
 
Hostel management system project report..pdf
Hostel management system project report..pdfHostel management system project report..pdf
Hostel management system project report..pdf
 
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
NO1 Top No1 Amil Baba In Azad Kashmir, Kashmir Black Magic Specialist Expert ...
 
Electromagnetic relays used for power system .pptx
Electromagnetic relays used for power system .pptxElectromagnetic relays used for power system .pptx
Electromagnetic relays used for power system .pptx
 
fitting shop and tools used in fitting shop .ppt
fitting shop and tools used in fitting shop .pptfitting shop and tools used in fitting shop .ppt
fitting shop and tools used in fitting shop .ppt
 

RSREC_CIVIL_Project Work Presentation Template.pptx

  • 1. Student Name 3 182020 Under the guidance of Mr. Assistant Professor Department of Civil Engineering Ramireddy Subbarami Reddy Engineering College FIRST REVIEW 29th APRIL 2022 Student Name 2 182020 Student Name 4 182020 Student Name 1 193R1A0 Student Name 5 182020 TITLE OF THE PROJECT A project work submitted in partial fulfilment of the requirements for the degree of BACHELOR OF TECHNOLOGY in CIVIL ENGINEERING by
  • 2. DEPARTMENT OF CIVIL ENGINEERING RAMIREDDY SUBBARAMI REDDY ENGINEERING COLLEGE 2 Go to View - Slide Master and ADD Project Title Overview Introduction Scope Objectives Literature review Methodology Conclusion & Future Work References
  • 3. DEPARTMENT OF CIVIL ENGINEERING RAMIREDDY SUBBARAMI REDDY ENGINEERING COLLEGE 3 Go to View - Slide Master and ADD Project Title TENTATIVE SCHEDULE OF WORK March 2022 Title finalisation 21.12.10 – 15.01.11 Review of literature 16.01.11 – 25.01.11 Collection of Toposheet 26.01.11 – 5.02.11 Sample Collection 06.02.11 – 15.02.11 16.02.11 – 10.03.11 Analysis 11.03.11 – 20.03.11 Study Of 21.03.11 – 31.03.11 Final Draft
  • 4. DEPARTMENT OF CIVIL ENGINEERING RAMIREDDY SUBBARAMI REDDY ENGINEERING COLLEGE 4 Go to View - Slide Master and ADD Project Title Introduction
  • 5. DEPARTMENT OF CIVIL ENGINEERING RAMIREDDY SUBBARAMI REDDY ENGINEERING COLLEGE 5 Go to View - Slide Master and ADD Project Title Scope
  • 6. DEPARTMENT OF CIVIL ENGINEERING RAMIREDDY SUBBARAMI REDDY ENGINEERING COLLEGE 6 Go to View - Slide Master and ADD Project Title Objective
  • 7. DEPARTMENT OF CIVIL ENGINEERING RAMIREDDY SUBBARAMI REDDY ENGINEERING COLLEGE 7 Go to View - Slide Master and ADD Project Title
  • 8. DEPARTMENT OF CIVIL ENGINEERING RAMIREDDY SUBBARAMI REDDY ENGINEERING COLLEGE 8 Go to View - Slide Master and ADD Project Title
  • 9. DEPARTMENT OF CIVIL ENGINEERING RAMIREDDY SUBBARAMI REDDY ENGINEERING COLLEGE 9 Go to View - Slide Master and ADD Project Title
  • 10. DEPARTMENT OF CIVIL ENGINEERING RAMIREDDY SUBBARAMI REDDY ENGINEERING COLLEGE 10 Go to View - Slide Master and ADD Project Title Conclusion & Future Work
  • 11. DEPARTMENT OF CIVIL ENGINEERING RAMIREDDY SUBBARAMI REDDY ENGINEERING COLLEGE 11 Go to View - Slide Master and ADD Project Title References 1. Author 1, Author 2 and Author 3, “Title of the Paper”,” Journal name where the paper published, vol. 11, pp. 11-15, Jan. 2020.
  • 12. DEPARTMENT OF CIVIL ENGINEERING RAMIREDDY SUBBARAMI REDDY ENGINEERING COLLEGE 12 Go to View - Slide Master and ADD Project Title Thank You!!!