This document summarizes a proposed 10 MWp solar PV farm project in Romania. Key details include:
- The project will be developed on 64 hectares of leased land and include PV panels, infrastructure like access roads and a substation.
- Construction is planned to start in late 2014 and be completed in late 2016, with the PV farm operational by mid-2017.
- Once built, the PV farm will require some administrative staff but operate automatically, generating an estimated 11.13 GWh annually.